Professional Documents
Culture Documents
Sign:
Sign:
Date:23/12/2014
Date: 23/12/2014
ICT PROCEDURE
MANUAL
REF: KIBU/ICT/WP/2.6
TABLE OF CONTENTS
PROCEDURE NUMBER 1: ICT USER SUPPORT .............................................................. 3
PROCEDURE NUMBER 2: SCHEDULED MAINTENANCE........................................ 5
PROCEDURE NUMBER 3: DATA BACKUP AND RESTORATION ............................ 8
PROCEDURE NUMBER 4: WEBSITE MANAGEMENT ............................................... 11
Version A
Page 2 of 12
Revision 0
ICT PROCEDURE
MANUAL
REF: KIBU/ICT/WP/2.6
GENERAL
1.1
PURPOSE
The purpose of this procedure is to ensure effectiveness, consistency and
efficiency in providing ICT User Support Services in the University College.
1.2
SCOPE
This procedure shall apply to ICT User Support Services in the University
College.
1.3
REFERENCES
a) Quality Manual KUC/MR/QM/002.
b) ICT Policy, 2014.
c) Current ICT Maintenance Policy, and
d) Current ICT Client Service Charter.
1.4
1.5
PRINCIPAL RESPONSIBILITY
The Director ICT shall ensure this procedure is adheredto.
2.0
METHOD
2.1
This procedure shall start with the Helpdesk Officer as per communication
procedure number 1 in the Administration Procedure Manual receiving a
requestfor User Support from an End User.
2.2
Upon receipt, the Helpdesk Officer shall record the request in the Job Card
and assign it a particular code/reference based on the Client service Charter.
2.3
The
Helpdesk
officer
shall
communicate
to
theEnd
User
his/her
Version A
Page 3 of 12
Revision 0
2.4
ICT PROCEDURE
MANUAL
REF: KIBU/ICT/WP/2.6
The Helpdesk shall forward the coded request to the Director ICTfor
scheduling to respective section for action.
2.5
Upon receipt of coded request from the Helpdesk, the Director ICT shall
forward it to the relevant ICT support staff for action.
2.6
Upon receiptof the coded request from the Director ICT, the ICT Officer shall:
a) Provide the support to the End user in a step by step method in case the
requested support can be offered over the phone and update the Job Card,
or
b) Visit the user location, carry out the troubleshooting exercise and solve the
problemin
case
thesupport
requires
physical
evaluation
and
In the event that arepair is required, the ICT officer shall consider the
following:
a) The nature of repair required, and
b) The components required.
2.8
The ICT Officer shall repair the faulty equipment in case the components for
repair are available.
2.9
In the event that the required components or skills are not available, the
procurement of goods and services shall be done as per procedure number 3
in the Procurement Procedures Manual.
2.10
Upon resolution of the problem, the ICT Officer shall record on the Job Card
the service performed and the procedure shall be deemed complete.
3.0
3.1
Evidence of communication.
3.2
Job Card.
Version A
Page 4 of 12
Revision 0
PROCEDURE
NUMBER
ICT PROCEDURE
MANUAL
2:
SCHEDULED
REF: KIBU/ICT/WP/2.6
MAINTENANCE
KIBU/ICT/WP/2.6.11
1.0
GENERAL
1.1
PURPOSE
The purpose of this procedure is to ensure efficiency, effectiveness and
consistencyin the maintenance of ICT equipment in the University College.
1.2
SCOPE
This procedure shall apply to maintenance of ICT equipment in the
University College.
1.3
REFERENCES
a) Quality Manual KUC/MR/QM/002.
b) ICT Policy, 2014.
c) Current ICT Maintenance Policy.
d) Manufacturers Maintenance Manuals.
1.4
1.5
PRINCIPAL RESPONSIBILITY
The Director ICT shall ensure this procedure is adhered to.
2.0
METHOD
2.1
2.2
Version A
Page 5 of 12
Revision 0
ICT PROCEDURE
MANUAL
REF: KIBU/ICT/WP/2.6
d) University Almanac.
2.3
2.4
Upon receipt, the Director ICT shall consider the following in verifying the
schedule:
a) Criteria in 2.2 above,
b) Directorate Budget,
c) Human Capacity.
2.5
2.6
Upon verification of the schedule, the Director ICT shall forward it to the
Principal for approval.
2.7
In the event that there are concerns, the Principal shall make comments to the
Director ICT for review
2.8
Upon approval by the Principal, the Director ICT shall as per communication
procedure number 1 in the Administration Procedure Manual communicate
the schedule to all members of staff for information.
2.9
2.10
3.0
3.1
Evidence of Communication.
3.2
Evidence of Meeting.
3.3
3.4
3.5
3.6
Version A
Page 6 of 12
Revision 0
Version A
ICT PROCEDURE
MANUAL
Page 7 of 12
REF: KIBU/ICT/WP/2.6
Revision 0
PROCEDURE NUMBER 3:
ICT PROCEDURE
MANUAL
DATA BACKUP
REF: KIBU/ICT/WP/2.6
AND RESTORATION
KIBU/ICT/WP/2.6.12
1.0
GENERAL
1.1
PURPOSE
The purpose of this procedure is to ensure consistency, effectiveness and
timeliness in data back up and restoration in the University College.
1.2
SCOPE
Thisprocedure shall apply to data back up and restoration of data stored in
networked computers and servers in the University College.
1.3
REFERENCES
a) Quality Manual - KUC/MR/QM/002.
b) ICT Policy, 2014.
c) Current ICT Data Back-Up Policy.
1.4
1.5
PRINCIPAL RESPONSIBILITY
The Director ICT shall ensure that this procedure is adhered to.
2.0
METHOD
2.1
2.2
The System Administrator shall ensure all backups performed must be noted
in the server backup log upon completion. The log shall include:
a) Server/ computer name.
b) Date and time of back-up.
c) Name of administrator performing the back-up.
d) Files backed up and/or skipped.
e) Software used to perform the back-up.
f) Backup medium used and its label/name, and
Version A
Page 8 of 12
Revision 0
ICT PROCEDURE
MANUAL
REF: KIBU/ICT/WP/2.6
Version A
Page 9 of 12
Revision 0
2.3
ICT PROCEDURE
MANUAL
REF: KIBU/ICT/WP/2.6
2.4
In the event that a User has a restore request, he/she shall fill a Data Recovery
Request Form and submit it to the Director ICT.
2.5
Upon receipt, the Director ICT shall forward the Data Recovery Request Form
to the System Administrator for recovery upon verifying authenticity of the
request.
2.6
The System Administrator shall restore the data for the end user and ensure
he/she shall record the recovery activity in theBack-Up and Restoration
Logbook and the procedure shall be deemed complete.
3.0
3.1
Evidence of communication.
3.2
Back up Schedule.
3.3
Back up log.
3.4
3.5
Version A
Page 10 of 12
Revision 0
ICT PROCEDURE
MANUAL
REF: KIBU/ICT/WP/2.6
GENERAL
1.1
PURPOSE
The purpose of this procedure is to ensure effectiveness, consistency and
timeliness in Website Management.
1.2
SCOPE
This procedureshall apply to uploading, archiving and management of the
content in the University Colleges Website.
1.3
REFERENCES
a) Quality Manual - KUC/MR/QM/002.
b) ICT Policy, 2014.
c) Current ICT College Website Policy.
1.4
1.5
PRINCIPAL RESPONSIBILITY
The Director ICT shall ensure this procedure is adhered to.
2.0
METHOD
2.1
2.2
2.3
The webmaster shall within a day where applicablefrom the time of receipt
act on the recommendations from the Director ICT.
Version A
Page 11 of 12
Revision 0
2.4
ICT PROCEDURE
MANUAL
REF: KIBU/ICT/WP/2.6
The webmaster shall also archive information from the website and make any
other changes that he/she may deem necessary
subject to approval by
When the website is down, the webmaster shall determine the cause of the
problem and if it is internal he/she shall carry out necessary action.
2.6
In the event the problem is external, the webmaster shall contactthe respective
service provider.
2.7
The Webmaster shall record actions that were taken to restore the website in
the Website Logbook
3.0
3.1
3.2
Website Logbook.
3.3
Evidence of Communication.
Version A
Page 12 of 12
Revision 0