You are on page 1of 1

Two Week Progress Details

Description

S.No.

Unit

Plan for
Previous
Total Scope
Two
Week

Progress between 6.1.16 to 19.01.16

Difference
(Plan v/s
Achieved)

As on 5th
January-16

As on 19th
January-16

Progress in
Two Week

5624
5624

5624
5624

0
0

0
0

14

379

386

-7

130
129

130
129

0
0

0
-1

124

126

-5

Foul Sewerage Network

% Overall
Progress

Balance

Plan for
Next Two
Week

Pipeline Network
Trench Excavation, Compaction & Beddings
Laying, Testing & Backfilling of Pipes
Testing & Commissioning
Inspection Chamber Pipe Laying
Manhole (Chamber) Construction

Mtr
Mtr
Mtr
Nos

5624
5624
5624
393

Excavation/Blinding/Raft/Benching
Wall With Liner
Cover Slab
Backfilling
Testing

Nos
Nos
Nos
Nos
Nos

130
130
130
131
131

100.00%
100.00%
0.00%
98.22%

0
0
7

100.00%
99.23%
0.00%
96.18%
0.00%

0
1

100.00%
99.04%
99.04%
99.04%
99.04%
0.00%
82.21%
78.94%

0
34
34
34
34

Storm Water Drainage Network

2
Pipeline Network
Trench Excavation
Compaction & Beddings
Laying of Pipes
Testing of Pipes
Backfilling of Pipes
Testing & Commissioning
Gullies Pot (Concreting)
Gullies (Fixing)
Manhole (Chamber) Construction

Mtr
Mtr
Mtr
Mtr
Mtr
Mtr
Nos
Nos

3552
3552
3552
3552
3552
3552
489
489

Excavation/Blinding/Raft
Benching
Wall With Liner
Cover Slab
Backfilling
Testing

Nos
Nos
Nos
Nos
Nos
Nos

67
67
67
67
67
67

Excavation/Blinding
Raft
Wall
Pipe Fixing-Tee
Roof Slab
Backfilling

Nos
Nos
Nos
Nos
Nos
Nos

2
2
2
2
2
2

Construction of Temporary Bund


Excavation
Blinding
Base Slab Concreting
Pipe Fixing-Tee
Primary Armour Laying
Backfilling

Nos
Nos
Nos
Nos
Nos
Nos
Nos

2
2
2
2
2
2
2

Excavation
Blinding
Raft Concreting
Placing Liner & Wall Concreting
Backfilling
Installation of Electro-mechanical Equipments

Nos
Nos
Nos
Nos
Nos
Nos

1
1
1
1
1
1

Excavation/Blinding/Footing/Wall Below Ground


Floor
Ground Floor Column & Wall
Ground Floor Slab
First Floor Column & Wall
Roof
Plastering
Painting
Lv Installation
EDD Handover

Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos

10
10
10
10
10
10
10
10
10
10

Formation of Existing Level


Sub Grade Improvement Layer
Paving for Footpath
Road Kerb Stone fixing (Type-C)

Mtr
Mtr
Mtr
Mtr

8992
8992
8992
16503

Formation of Existing Level


Sub Grade Improvement Layer
Road Kerb Stone fixing (Type-A & Type-B)

Mtr
Mtr
Mtr

8992
8992
24185

HV Road Crossing Ducts


LV Road Crossing Ducts
Street Light
Telecom (Increased-9)
Increased (Roundabout)

Nos
Nos
Nos
Nos
Nos

74
80
41
71
16

HV Road (Cables)
LV Road (Cables)

Mtr
Mtr

Telecom Plot Connection (Pipe Laying-50mm)


Telecom (2WTL-100mm)
Telecom (4WTL-100mm)
TB2 Chamber
TB4 Chamber

70

3552
3518
3518
3465
3465

3552
3518
3518
3518
3518

0
0
0
53
53

0
0
0
53
53

340
330

402
386

62
56

62
-14

67
66
65

67
67
67

0
1
2

0
1
2

63

65

2
2
1
1
1
1

87
103
0
0
0

100.00%
100.00%
100.00%
0.00%
97.01%

0
0
0
0
0
0

0
0
0
0
0
0

100.00%
100.00%
50.00%
50.00%
50.00%
50.00%

0
0
1
1
1
1

2
2
1
1

1
2
1
1
0
0
0

1
2
1
1
0
0
0

100.00%
100.00%
50.00%
50.00%
0.00%
0.00%
0.00%

0
0
1
1
2
2
2

0
0
0
0
0
0

0
0
0
0
0
0

100.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0
1
1
1
1
1

10
9
7
7
5
1
1
1
1

0
2
1
2
1
0
0
0
0

0
0
0
1
0
0
0
0
0

100.00%
90.00%
70.00%
70.00%
50.00%
10.00%
10.00%
10.00%
10.00%

0
1
3
3
5
9
9
9
9

4959
4959

0
0

0
0

55.15%
55.15%

4033
4033

167
637
606

167
637
606

57.00%
47.24%
19.89%

3867
4744
19375

58
68
65
71
27
30
62
69
4
4
Electrical Works (HV & LV Cable Laying Works)

10
6
3
7
0

10
6
3
7
0

91.89%
88.75%
73.17%
97.18%
25.00%

6
9
11
2
12

22723
47000

12874
37624
Telecom Works

14141
41732

1267
4108

1267
4108

62.23%
88.79%

8582
5268

Mtr
Mtr
Mtr
Nos
Nos

15580
19860
10404
82
14

7538
7736
8510
10
0
Street Light Works

7755
8064
9364
19
4

217
328
854
9
4

217
328
854
9
4

49.78%
40.60%
90.00%
23.17%
28.57%

7825
11796
1040
63
10

Street Light (Cable Laying)


Street light Poles (6 m High)
Street light Poles (8 m High)
Street light Poles (10 m High)
Feeder Pillar
Earth Pit

Mtr
Nos
Nos
Nos
Nos
Nos

8213
99
129
29
17
71

1450
42
18
16

850
7
8
0

850
7
8
0

17.65%
42.42%
13.95%
55.17%

6763
57
111
13

Potable
Potable
Potable
Potable
Potable
Potable

Nos
Nos
Mtr
Mtr
Mtr
Mtr

42
61
7638
248
3235
930

40
35
5980

4
8
667

4
8
667

95.24%
57.38%
78.29%

2
26
1658

984
334

349
69

349
69

30.42%
35.91%

2251
596

Mtrs

1436

438

30.50%

998

70

Oil Interceptor Construction

2
2
1
1
1
1
Outfall Construction

Pumping Station Construction

Type E (Double Storey)

6
2
1
1
1

10
7
6
5
4
1
1
1
1
Roads (Footpath Works)

4959
4959

Roads Works

10

11

12

4958
5125
3611
4248
4204
4810
Electrical Works (Duct Crossings)

600
35
10
16

Potable Water Works

13
Water
Water
Water
Water
Water
Water

(Road Crossings)
(FH Chambers)
(150mm Pipe Laying)
(200mm Pipe Laying)
(63mm Pipe Laying)
(32mm Pipe Laying)

14
Irrigation Works

*Date Updated: 17th January 2016

36
27
5313
635
265
Irrigation Works
438

1
2
2
1