You are on page 1of 18

amanda wingenbach

cirriculum vitae
amanda wingenbach
200 Acacia Cres
Airdrie, Alberta
T4B 1G4
amanda_wingenbach@yahoo.ca

WORK EXPERIENCE
May 09-Aug 09

Wingenback Inc.
Assistant project manager & site surveyor

Milton, Ontario

Duties included - Independent travel and completion of Site surveys across Canada
for several large banks Responsible for all paperwork to be clearly labeled and
customer friendly
Ran small projects and coordinated contractors within short deadlines

May 08-June 08
April 06-Aug 07
May 05-Aug 05
May 04-Aug 04
July 02-Aug 03

Assistant project manager & site surveyor


Assistant project manager & site surveyor
Head office receptionist
Office assistant
Office assistant

Jan 08-April 08

Recreation Excellence
Red Cross Swim Instructor

Lethbridge, Alberta

Sept 05- April 06

Earls
Hostess/Server

Lethbridge, Alberta

EDUCATION
2009-2010
20032009
July-Aug 08
June 2002

Enrolled in Bachelor of Environmental Design, Dalhousie University


Bachelor of Fine Arts (Multidisciplinary), University of Lethbridge
Participant in French Explore Summer Program, University de Montreal
High School Diploma, Bert Church High School

SKILLS

Computer // Microsoft Office, Windows 98, Excel & MS Word, Adobe InDesign, Photoshop
& AutoCAD (beginner). Hand drawing, drafting, and wood modeling.

AWARDS, CERTIFICATES &


MEMBERSHIPS
2010
2009-2010
2008
2008 (spring)
2007 (fall)
2007
1999

Member of Lunenburg Art Gallery, Lunenburg, Nova Scotia


Dalhousie Architecture Student Association (ASA) representative for
the Canadian Architecture Students Association (CASA)
Jason Lang Memorial Scholarship
University of Lethbridge Scholarship
University of Lethbridge Scholarship
AWSI Red Cross Certificate & WSI Red Cross Certificate
2nd place, Regional Public Speaking

Calgary, Alberta
Calgary, Alberta
Calgary, Alberta
Calgary, Alberta
Calgary, Alberta

table of contents

house

house drawings

laneway house - case study

sphere

piazza san marco

honeycomb

stairs

room in the city

wheel

10

saxophone

11 & 12

spencers island - free lab

13 & 14

structural bay - bsi

project // house
class // b2 design
instructor // brian mackay-lyons
spring 2010
the obejective of the semester was to design
a house that was located on a 24x 36 lot in a
close urban condition. using the slope of the
site to raise the ground floor for privacy;
the first floor is the primary public space and
the house becomes more private with each
level.

house

31

9
28

26

30
34

32
33

Wood Column Meets


Concrete Floor Detail

36
3

29

27

1 2

4
5

10

37

Assembly Components
12345678910 11 12 13 14 15 16 17 18 19 20 21 22 -

11
12

39

Amanda Wingenbach
Envelope Drawing
Architecture 3208
April 2010

38

13

35

14

Scale 2" = 1'

Protection Board
Angled Rigid Insulation for Drainage

3/4" Plaster Boarding


Air / Vapor Barrier
Flashing
1" Air space
Shim Space Filled With Sealant
Interior Finish
Interior Casing
Undisturbed Earth
Disturbed Earth
23 - Drainage Pipe

Parapet and Drainage Detail


Scale 2" = 1'

25

Flashing
Rigid Insulation Blocking
Batt Insulation
2" Rigid Insulation
Roofing Membrane
2x6 Wood Stud
Stone Veneer
Steel Angle Lintel
Metal Cap
Roof Drain
Gravel

Fireplace Detail
Scale 2" = 1'

24 - 1' thick FoundationWall


25 - Mortar
26 - Anchor Bolt
27 - Steel Plate
28 - Baseboard
29 - Finished Wood Flooring
30 - Subflooring
31 - Wood Column
32 - Rebar Reinforced Slab on Grade
33 - Rebar Reinforced Foundation Wall
34 - Rigid Insulation
35 - Moisture Barrier
36 - Flue
37 - Firebrick Lining
38 - Cast Iron Damper
39 - Smoke Chamber

17
15

Exterior Concrete Floor Meets Foundation


Scale 2" = 1'

16

20
22

24

21

Window Head and Sill Detail

23

Scale 2" = 1'

21
Wall Section
Scale 1/2" = 1'

19

18

Concrete Footing Meets Foundation Wall


Scale 2" = 1'

house drawings

project // house
class // b2 design & building technology
instructor // brian mackay-lyons & emanuel
jannasch
spring 2010
after completing the initial concept and
schematic design of the house it was integrated into the building technology course.
construction details were developed for the
primary complicated points in the design.

project // case study piazza san marco


class // b3 history
instructor // maria navaro
summer 2010
a study of urban context; models and drawings
used to describe the piazza, its history and how
it was used when it was created to how it is
currently used by the city today.

piazza san marco

sphere

project // sphere
class // b2 representation
instructor // Susan Molesky
spring 2010
the objective of this project was to learn about
form thru 2-D and 3-D representation. using a plaster sphere as the primary form - the
structure designed to hold it mimics its spherical shape and properties and determines the
perspective of the audience.

project // stairs
class // b2 representation
instructor // Susan Molesky
spring 2010
the objective of this assignment was to integrate space with circulation. three spaces were
to be connected by staircases; by changing the
height and width of the stairs and the spaces
throughout the design the mobility of the
human body would be confined and create the
experience.

stairs

honeycomb

project // honeycomb
class // sculpture
instructor // nick wade
fall 2008
honey comb is 5 x 5 x 8 and welded together.
the form of this structure was determined by
the manipulation of the center cell. all the cells
dependent on the central form resulted in a
3-D object transforming into 2-D.

The inspiration for Honey Comb came from my research of strucures in nature. I became particularly interested in structures
reated by other species.

project // laneyway house - case study


class // b2 design
instructor // brian mackay-lyons
spring 2010
through drawings and models i studied the
laneway house by shimsutcliffe architects.

laneway house - case study

room in the city

project // room in the city


class // b1 design
instructor // niall savage
fall 2009
room in the city was a group case study of the
grand parade in halifax, ns. models and drawings described the space and how it is used.
this included the axis between the city hall and
the church, the layers that defined the space
and circulation.

project // wheel
class // sculpture
instructor // nick wade
spring 2009
inspired by the water wheel the objective of
this project was to integrate the skeleton of a
form with a skin.

wheel

saxophone

project // saxophone
class // sculpture
instructor // nick wade
fall 2008
saxophone was a study of two different forms
and the relationship they create when an
organic object is contained within the box.

10

project // design-build -spencers island,


nova scotia
class // b3 freelab
instructor // roger mullin
summer 2010
group members // Chris Barrie, Pete Braithwaite, Olena Chorny, Naryn Davar,
Alice Fudge, Matt Jarvis, Chad
Manley, Sarita Mann, Jordan
Rice, and Amanda Wingenbach.

spencers island - free lab

for the last two weeks of july 2010 ten students, including myself, and our instructor
worked on a design-build project in spencers
island, nova scotia. the first week was spent
primarily observing, drawing and modeling the
site and its surroundings.

11

spencers island - free lab cont.


after evaluating the site we determined the
best location to build three separate shelters
was right beside what was previously existing.
in the second week the foundations were
poured and two of the three shelters were clad.
all three shelters are built on stilts; the two that
are located beside one another are joined by
an outdoor bridge.

12

project // structural bay - structural testing


class // b3 bsi
instructor // roland hudson
summer 2010
group members: ryan pendleton, jessica
marcellus, olena chorney, samira rostami, kale
harper and amanda wingenbach
the objective was to design the most efficient
structure that could span 15m and could be
built and tested at 1:5 scale. using the bicycle
wheel as inspiration this structure was built
with tent poles acting in compression and
fishing wire hooked onto a bycycle hub acting
in tension. it was then loaded with bricks to
determine the total load it could carry.

structural bay - building systems integration

13

structural bay - building systems integration cont.

14

thank you

You might also like