You are on page 1of 21

University of Wollongong Thesis Collections

University of Wollongong Thesis Collection


University of Wollongong

Year

A new approach in determining the load


transfer mechanism in fully grouted bolts
Hossein Jalalifar
University of Wollongong

Jalalifar, Hossein, A new approach in determining the load transfer mechanism in fully
grouted bolts, PhD thesis, School of Civil, Mining and Environmental Engineering, University
of Wollongong, 2006. http://ro.uow.edu.au/theses/855
This paper is posted at Research Online.
http://ro.uow.edu.au/theses/855

NOTE
This online version of the thesis may have different page formatting and pagination
from the paper copy held in the University of Wollongong Library.

UNIVERSITY OF WOLLONGONG
COPYRIGHT WARNING
You may print or download ONE copy of this document for the purpose of your own research or
study. The University does not authorise you to copy, communicate or otherwise make available
electronically to any other person any copyright material contained on this site. You are
reminded of the following:
Copyright owners are entitled to take legal action against persons who infringe their copyright. A
reproduction of material that is protected by copyright may be a copyright infringement. A court
may impose penalties and award damages in relation to offences and infringements relating to
copyright material. Higher penalties may apply, and higher damages may be awarded, for
offences and infringements involving the conversion of material into digital or electronic form.

References

REFERENCES
Abedi, K., Afshin, H. and Ferdousi, A. (2003), Investigation into the behaviour of a
novel steel section for concrete filled tubular columns under axial and cyclic
loadings, Int. Symp. of Advances in structures, Australia, pp.891-897.
Afridi, A. J., Kown S and Wilson J.W. (2001), Investigation of rock failure in a
direct shear machine, Journal of Mining technology, 110(3), pp.158-162.
Ansell, A. (2005), Laboratory testing of a new type of energy absorbing rock bolt,
Journal of Tunnelling and underground space technology, 20(4), pp.291-300.
Aydan, O. and Kawamoto, T. (1992), Shear reinforcement effect of rock bolts in
discontinuous rock masses, Int. Sym. of Rock support in mining and underground
construction, Canada, pp.483-489.
Aydan, O. (1989), The stabilisation of rock engineering structures by rock bolts,
Geotechnical Engineering, Ph.D. Thesis, Nagoya, Nagoya University, 202p.
Aydan, O, Ichikawa.Y and Kawamoto.T. (1985), Load bearing capacity and stress
distribution in/along rockbolts with elastic behaviour of interfaces, 5th Int. Conf. on
Numerical Methods in Geomechanics, Nagoya, pp.1281-1292.
Aziz, N. I. (2004), Bolt surface profiles-an important parameter in load transfer
capacity appraisal, Int. Symp. on Ground support in mining and underground
construction, Perth, Western Australia, pp.221-231.
Aziz, N. I. and Webb.B. (2003), Load transfer appraisal capacity of bolts using short
encapsulation push test, 4th Underground Coal Operators' Conference, University of
Wollongong, Australia, pp.72-81.
Aziz, Z., Campbel, D. and Levay, J. (1992), Experience with resin anchored bolts in
large permanent underground excavation, Int. Symp. of Rock Support in Mining and
Underground Construction, Canada, pp.467-472.

313

References

Azuar.J.J. (1977), Stabilisation des massif rocheux fissures par barres dacier scellees,
Rap.de Rech.LPC No.73, Lab.Central des Ponts et Chaussees, (Cited in Spang and
Egger 1990).
Barton. D.B. (1967), A history of tin mining and smelting in Cornwall, Publisher,
Barton, 302p.
Benmokran, B., Xu, H. and Bellavance, E. (1996), Bond strength of cement grouted
glass fibre reinforced plastic (GFRP) anchor bolts, Int. J. of Rock Mechanics and
Min. Sci. & Geomech. Absts., 33(5), pp.455-465.
Bhashyam.G.R. (2002), Ansys Mechanical-A powerful nonlinear simulation tool,
2004, Ansys,Inc. 275 Technology Drive Canonsburge, PA 15317.
Bieniawski, Z. T. (1984), Rock mechanics design in mining and tunnelling, Balkema
publishers, 272p.
Bjornfot.F and Stephansson.O. (1983), Interaction of grouted rock bolts and hard
rock masses at variable loading in a test drift of the Kiirunavaara mine,Sweden,
Proc. of Int. Symp. of Rock bolting, Sweden, pp.86-104.
Bjurstrom, S. (1974), Shear strength of hard rock joints reinforced by grouted
untensioned bolts, International congress of rock mechanics, pp.1194-1199.
Bolstad.D and Hill.J. (1983), Bureau of Mines rock bolting research, Proceedings of
the International Symposium on Rock Bolting, Abisko, Sweden, pp.313-320.
Brady.B.H.G and Brown.E.T. (1985), Rock mechanics for underground mining,
second Ed., London, George Allen and Unwin Ltd, 571p.
Brian.A and Chappel, B. A. (1989), Rock bolts and shear stiffness in jointed rock
masses, Journal of Geotechnical Engineering, 115(2), pp.179-197.
Cai, Y., Esaki, T. and Jiang, Y. (2004), An analytical model to predict axial load in
grouted rock bolt for soft rock tunnelling, Journal of Tunnelling and Underground
Space Technology XXX, pp.1-12.

314

References

Campbel. R and Mould.R.J. (2005), Impacts of gloving and un-mixed resin in fully
encapsulated roof bolts on geotechnical design assumptions and strata control in coal
mines, Int. J. of Coal Geology xx, pp.1-10.
Campoli, A., Milis, P. S., Todo, P. and Dever, K. (2002), Optimizing rebar resin
annulus, Journal of Mining engineering, 54(3), pp.42-44.
Carr.F. (1971), Recent development in strata bolting in National Coal Board mines in
United Kingdom, Aus. IMM Symposium on rock bolting, pp.11p (Cited in Dight
1982).
Cha.E.J, Choi.S.M and Kim.Y. (2003), A moment-rotation curve for CFT square
column and steel beams according to reliability analysis, Int. Conference on
Advances in Structures, Sydney-Australia, pp.943-950.
Chappel, B. A. (1989), Rock bolts and shear stiffness in jointed rock masses, Int. J.
of Rock Mechanics and Min. Sci. & Geomech. Absts., 115(2), pp.179-195.
Chappell, B. A. (1987), Predicted and measured rock mass moduli, Int. J. of Mining
Science and Technology, 6(1), pp.89-104.
Chen, S. H. and Egger, P. (1999), Three dimensional elasto-viscoplastic finite
element and its application, Int. J. for Numerical and analytical methods in
Geomechanics, 23, pp.61-78.
Chen, S. H. and Pande, G. N. (1994), Rheological model and finite element analysis
of jointed rock masses reinforced by passive, fully-grouted bolts, Int. J. of Rock
Mechanics and Min. Sci. & Geomech. Absts, 31(3), pp.273-277.
Chen, S. H., Qiang, S. and Chen, S. F. (2004), Composite element model of the fully
grouted rock bolt, Journal of Rock mechanics and rock engineering, 37(3), pp.193212.

315

References

Coates.D.F and Yu.Y.S. (1970), Three dimensional stress distribution around a


cylindrical hole and anchor, Proceeding of 2nd Int. Cong. Rock Mechanics, pp.175182.
Compton.C and Oyler.D. (2005), Investigation of Fully Grouted Roof Bolts Installed
Under In Situ Conditions, Proceedings of the 24th International Conference on
Ground Control in Mining. Morgantown, West Virginia University, pp.302-312.
Crawley.S.W and Dillon.R.M. (1984), Steel buildings: analysis and design, 3rd Ed.
New York, Wiley. 673p.
Dey.A. (2001), Shear behaviour of fully grouted bolts under constant normal
stiffness

condition,

Civil,

Mining

and

Environmental

Eng.,

Ph.D.Thesis,

Wollongong, Wollongong University, 268p.


Dight.P.M. (1982), Improvements to the stability of rock walls to open pit mines,
Ph.D.Thesis, Melborn, Monash University, 495p.
Dulacska.H. (1972), Dowel action of reinforcement crossing cracks in concrete,
Journal of the American Concrete Institute, 69(12), pp.754-757.
Ebisu.S, Aydan.O and Komura.S. (1993), Mechanism of interface failure of rock
anchors, Int.Conf. of Assessment and Prevention of Failure Phenomena in Rock
Engineering, pp.677-685.
Egger.P and Fernandes.H. (1983), A novel triaxial press-study of anchored jointed
models, 5th Congr. on rock mechanics, ISRM, Melbourn, pp.171-175.
Egger.P and Zabuski. L. (1991), Behaviour of rough bolted joints in direct shear
tests, 7th Int. Congress on rock mechanics, Aachen, Germany, A.A. Balkema,
pp.1285-1288.
Fabjanczyk, M. W., Hurt, K. and Hindmarsh, D. (1998), Optimisation of roof bolt
performance, Int. Conf. on Geomechanics / ground control in mining and
underground construction, Wollongong University, pp.413-424.

316

References

Fabjanczyk, M. W. and Tarrant, G. C. (1992), Load transfer mechanisms in


reinforcing tendons, International conference on ground control in mining,
Wollongong University, pp.212-218.
Fanning, P. (2001), Nonlinear models of reinforced and post tensioned concrete
beams, Structural engineering, pp.111-119.
Farmer, I. W. (1975), Stress distribution along a resin grouted rock anchor, Int. J. of
Rock Mechanics and Min. Sci. & Geomech. Absts., 12, pp.347-351.
Feng.P, Lu.X.Z and Ye.L.P. (2002), Experimental research and finite element
analysis of square concrete column confined by FRP under uniaxial compression,
17th Australian Conference on the Mechanics of Structures and Materials, Gold
Coast, Australia, pp.60-65.
Ferrero. A.M. (1995), The shear strength of reinforced rock joints, Int. J. of Rock
Mechanics and Min. Sci. & Geomech. Absts., 32(6), pp.595-605.
Flow

science

Inc.

(2005),

Implicit

Versus

Explicit

Methods,

2005,

http://www.flow3d.com/Cfd-101/impvexp.htm. Access 2005.


Franklin.J.A and Dusseault.M.B. (1989), Rock Engineering, McGraw-Hill, New
York, USA, 600p.
Fuller, P. G. and Cox, R. H. T. (1975), Mechanics of load transfer from steel tendons
to cement based grout, Proc. of 5th. Australian Conference on the mechanics of
structures and materials, Melbourne, 14p.
Fundamentals), e. E. (2005),
http://www.efunda.com/formulae/solid_mechanics/failure_criteria/failure_criteria_d
uctile.cfm(Accessed in Dec 2005).
Gale, W. J. and Blackwood, R. L. (1987), stress distribution and rock failure around
coalmine roadway, Int. J. of Rock Mechanics and Min. Sci. & Geomech. Absts.,
24(3), pp.165-173.

317

References

Gardner, F. J. (1971), History of rock bolting, Int. Symposium on rock bolting, The
Australia Institute of mining and metallurgy, pp.14p.
Gerdeen, J. C., Snyder, V. W. and Viegelahn.G.L. (1997), Design criteria for roofbolting plans using fully resin grouted nontensioned bolts to reinforce bedded mine
roof.
Gerrard.C. (1983), Rock bolting in theory, Int. Symposium. on rock bolting, Sweden,
pp.131-160.
Giraldo L., Cotten S., Farrand J., Pile J. and Bessinger S. (2005), Improved pull out
strength of fully grouted roof bolts through hole geometry modification, 24th Int.
conference on ground control in mining, West Virginia, pp.279-284.
Goris. J.M, Martin. L.A and Curtin. R. (1996), Shear behaviour of Cable bolt
supports in horizontal, bedded deposits, Proceeding of 15th Int. Conference on
ground control in mining, WV. USA, Colorado School of Mines, pp.511-521.
Grasselli, G. (2005), 3D Behaviour of bolted rock joints: experimental and numerical
study, Int. J. of Rock Mechanics and Min. Sci. & Geomech. Absts, 42(1), pp.13-24.
Grasselli, G., Kharachfi, M. and Egger, P. (1999), Experimental and numerical
comparison between fully grouted and frictional bolts, Proce. 9th Int. Symp. on Rock
Mechanics, ISRM, Paris, pp.903-907.
Gray, P. A., Hunt, N. and Fabjanczyk, M. W. (1998), New development in ground
support with particular reference to high capacity, High load transfer rock bolts, Int.
Conf. On Geomechanics/ ground control in mining and underground construction,
Wollongong University, pp.513-5124.
Hagan, P. C. (2003), Observation on the differences in load transfer of a fully
encapsulated rock bolt, 1st Australian ground control in mining, Australia, pp.10-13.
Hagan, P. C. (2004), Variation in load transfer of a fully encapsulated rock bolt,
proceeding of the 23rd Int. Conference. on Ground Control in Mining, WV.
Morgantown, pp.15p.

318

References

Hagan. P.C. (2003), The variability of some rock bolt parameters and their potential
impact on anchorage performance in coal mines, UNSW, Research centre. 8 p.
Harrison.N.J. (1987), The design of roof bolting systems, Colliery Guardian, 235(9),
pp.366-372 (Cited in Jafary 1994).
Hartman.W and Hebblewhite.B. (2003), Understanding the performance of rock
reinforcement elements under shear loading through laboratory testing-A 30 year
history, 1st ACGM Conference, Australia, 7p.
Hass, C. J. (1981), Analysis of rock bolting to prevent shear movement in fractured
ground, Mining engineering, 33, pp.698-704.
Hass.C.J. (1976), Shear resistance of rock bolt, Journal of Transactions, Society of
Mining Engineers of AIME, pp.32-40.
Hebblewhite.B.K.

(2005),

Status

of

roof

bolting

research

at

UNSW,

http://www.mining.unsw.edu.au/Publications/publi_staffpubli.htm#hebblewhite, 17p.
Hematian.J. (1994), Stability of roadways and intersections, Civil and Mining Eng,
Ph.D. Thesis, Wollongong, Wollongong university, 268p.
Hetenyi.M. (1961), Beams on elastic foundation, Ann Arbor, The University of
Michigan Press. Sixth printing (cited in Holmberge 1991).
Hibino.S and Motijima.M. (1981), Effects of rock bolting in jointy rocks, Proceeding
of the Int. Sym. on weak rock, pp.1057-1062.
Hoek.E and Wood.D.F. (1988), Rock support, Mining Magazine, 159(4), 5p (cited in
Jafary 1994).
Hollingshead.G.W. (1971), Stress distribution in rock anchors, Canadian
Geotechnical Journal, 8, pp.588-592.
Holmberge.M. (1991), The mechanical behaviour of untensioned grouted rock bolts,
Ph.D. Thesis, Stockholm, Royal Institute of Technology, 127p.

319

References

Holmberge.M and Stille.H. (1992), The mechanical behaviour of a single grouted


bolt, Int. Sym. of Rock support in mining and underground construction, Canada,
pp.473-481.
Hong.S.D, Choi.S.M and Kim.Y. (2003), A moment-rotation curve for CFT square
columns and steel beams, Int. Conference on Advances in Structures, SydneyAustralia, pp.951-956.
Hyett, A. J., Bawden, W. F., Macsporran, G. R. and Moosavi, M. (1995), A
constitutive law for bond failure of fully-grouted cable bolts using a modified Hoek
cell, Int. J. of Rock Mechanics and Min. Sci. & Geomech. Abstrs., 32(1), pp.11-36.
Hyett, A. J., Bawden, W. F. and Reichert, R. D. (1992), The effect of rock mass
confinement on the bond strength of fully grouted cable bolts, Int. J. Rock mechanics
and Min.Sci.&Geomech.Abstr., 29(5), pp.503-524.
Hyett. A.J, Mossavi.M and Bawden. W.F. (1996), Load distribution along fully
grouted bolts, with emphasis on cable bolt reinforcement, Int.J. for Numerical and
Analytical Methods in Geomechanics, 20, pp.517-544.
Indraratna. B and Haque.A. (2000), Shear behaviour of rock joints, Rotterdam,
Netherlands, Balkema. 165p.
Indraratna.B and Kaiser. P. K. (1990), Design for grouted rock bolts based on the
convergence control method, Int. J. of Rock Mechanics and Min. Sci. & Geomech.
Abstrs, 27(4), pp.269-281.
Indraratna.B and Kaiser.P.K. (1990), Analytical model for the design of grouted rock
bolts, Int.J. for Numerical and Analytical Methods in Geomechanics, 14, pp.227-251.
Ivanovic.A, Starkey.A, Neilson.R.D and Rodger.A.A. (2003), The influence of load
on the frequency response of rock bolt anchorage, Journal of Advances in
engineering software, 34, pp.697-705.
Jafari, A. and Vutukuri, V. S. (1998), Numerical modelling of conventional and pretensioned roof bolting methods in an underground coal mines, Int. Conf. on

320

References

Geomechanics/ground control in mining and underground construction, Wollongong


University, pp.987-996.
Jafari.A. (1994), Application of high pre-tension to full-column grouted bolts in
roadway support in underground coal mines, Ph.D. Thesis, Sydney, New South
Wales.
John.C.M and Van Dillen.D.E. (1983), Rock bolts: A new numerical representation
and its application in tunnel design, Proc. 24th U.S. Symp. Rock Mech., Texas A&M
University, pp.13-25 (Cited in Moosavi 1994).
Junlu.L. (1999), A new rock bolt design criterion and knowledge -based expert
system for stratified roof, Virginia Polytechnic Institute and State University. Ph.D
Thesis, 190p.
Kaiser, P. K., Yazici, S. and Nose, J. (1992), Effect of stress change on the bond
strength of fully grouted cables, Int. J. of Rock Mechanics and Min. Sci. & Geomech.
Abstrs, 29(3), pp.293-306.
Karanam.U.M.R

and

Dasyapu.S.K.

(2005),

Experimental

and

numerical

investigations of stresses in a fully grouted rock bolts, Int. J. of Geotechnical and


Geological Engineering, 23, pp.297-308.
Kharchafi.M, Grasselli.G and Egger.P. (1998), 3D behaviour of bolted rock joints:
Experimental and numerical study, Int. Sym. of Mechanics of jointed and faulted
rock, pp.299-304.
Kilic .A and Anil. M. (1999), The effects of grout properties to the bolt capacity,
16th Mining congress, Turkey, pp.189-196 (cited in Kilic et al. 2002).
Kilic .A, Yasar. E and Celik. A.G. (2002), Effect of grout properties on the pull out
load capacity of fully grouted rock bolt, Journal of Tunnelling and underground
space technology, 17, pp.355-362.

321

References

Kilic, A., Yasar, E. and Atis, C. D. (2003), Effect of bar shape on the pull-out
capacity of fully-grouted rockbolts, Tunnelling and underground space technology,
18(1), pp.1-6.
Koshti.A. (2002), Simulation of effect of bending stress on the beam, Proceeding of
SPIE, pp.148-156.
Koshti.A. (2002), Simulation of ultrasonic measurement on a bolt in a shear joint,
Proceeding of SPIE, pp.411-422.
Lang.T.A, Bischoff.J.A and Wagner.P.L. (1979), A program plan for determining
optimum roof bolt tension-theory and application of rock reinforcement systems in
coal mines, USBM, 256p (Cited in Jafary 1994).
Larsson.H and Olofsson.T. (1983), Bolt action in jointed rock, Proceeding. Int.
Symp.of Rock Bolting, Sweden, pp.179-192.
Li, C. and Stillborg, B. (1999), Analytical models for rock bolts, Int. J. of Rock
Mechanics and Min. Sci. & Geomech. Abstrs, 36(8), pp.1013-1029.
Littlejohn.G.S and Bruce.D.A. (1975), Rock anchors-state of the art, Part 1:design,
Ground Engineering, pp.25-32 (Cited in Dey 2001).
Littlejohn.S. (1993), Rock reinforcement-technology, testing, design and evaluation.
Comprehensive

Rock

Engineering

Principals,

Practice

and

Projects

(Ed.J.A.Hudson),V.4, pp. 413-451.


Lorig, L. J. (1985), A simple numerical representation of fully bonded, Journal of
Computers and Geotechnic, 10, pp.79-87.
Ludvig. B. (1983), Shear tests on rock bolts, Proceeding of the Int. Symp. On rock
bolting, Sweden, pp.193-203.
Mahony.L, Hagan.P, Hebblewhite.B and Hartman.W (2005), Development of a
facility for testing shear performance of installed rock reinforcement tendons. Proc.

322

References

of 24th Int. Conf. on Ground Control in Mining, WV. Morgantown.USA. pp.357365.


Maleki, H. (1992), Significance of bolt tension in ground control, Int. Symp. on rock
support in mining and underground construction, Canada, pp.439-443.
Maplesoft V.9.01, (2003), A division of waterloo maple inc.
Marence.M and Swobodea. M (1995), Numerical model for rock bolt with
consideration of rock joint movements. Rock Mechanics & Rock Engineering 28(3):
pp.145-165.
Mark.C., Compton.C, Oyler.D and Dolinar.D (2002), Anchorage pull testing for
fully grouted roof bolts. 21st International Conference on Ground Control in Mining,
Morgantown,W.V. pp.105-113.
Mikula.P.A (2004), Changing to the Posimix4 resin bolt for Jumbo and QuickChenat Mt Charlotte mine. Proc. of the Fifth Int. Symp. on Ground support in mining
and underground construction, Perth,Western Australia, pp.211-221.
Moosavi.M (1997), load distribution along fully grouted cable bolts based on
constitutive models obtained from modified Hoek cells. Mining Eng. Ph.D. Thesis.
Ontario, Queen university, 287p.
Moosavi, M. and W. F. Bawden (2003), Shear strength of Portland cement grout,
Journal of Cement and Concrete Composites 25(7): 729-735.
Moussa.A and Swoboda.G (1995), Interaction of rock bolts and shotcrete tunnel
lining. Int.Sym. of Numerical models in Geomechanics, pp.443-449.
Nitzsche. R. N and Haas. C. J (1976), Installation induced stresses for grouted roof
bolts. Int. J. of Rock Mechanics and Min. Sci. & Geomech. Abstrs 13(1), pp.17-24.
Norusis. M.J (1997), SPSS, guide to data analysis, Upper Saddle River, N.J: Prentice
Hall, SPSS Inc. 553p.

323

References

Obert.L and Duvall.W.I (1967), Rock mechanics and the design of structures in rock.
Wiley,New York, 650p.
Orsta Company, (2005), The optimal solution for rock bolting, http://www.ctbolt.com/default.asp? Page=30 (Access Dec 2005).
Ostreberge. J.O and Gill. S.A. (1973), Load transfer mechanism for piers,
Proceedings of the 9th Canadian rock mechanics symposium, Montreal, Canada,
Mines Brance, Department of Energy, Mines and Resources, pp.235-262.
Pal.S and Wathugala.G.W. (1999), Distribution state model for sand-geosynthetic
interfaces and application to pull out tests. Int.J. for Numerical and Analytical
Methods in Geomechanics 23, pp.1873-1892.
Palmer.W.T, Bailey.S.G and Fuller.P.G. (1976), Experience with pre-placed supports
in timber and cut and fill stopes, Proc. AMIRA tech. Meeting, Wollongong, pp.45-71.
Panek.L.A. (1956), Theory of model testing as applied to roof bolting: U.S.Bureau of
Mines, R.I.5154, (cited in Moosavi 1994).
Parker.H, Hargraves.R.P.N, Ramsell.R and Hawkins.A. (1973), Strata reinforcement
using the technique of long hole resin dowelling. The Mining Engineer, pp.519-532,
(Cited in Dight 1982).
Pell. P.J.N. (1974), The behaviour of fully bonded rock bolts. Int. Congress on rock
mechanics, Rotterdam, S.N.pp.1212-1217.
Pellet.F. (1994), Strength and deformability of jointed rock masses reinforced by
rock bolts. Civil Engineering.Ph.D.Thesis. Lausanne, Institute of Technology, 206p.
Pellet.F and Boulon.M. (1995), A constitutive model for the mechanical behaviour of
bolted rock joint. Int. Symp. on Mechanics of jointed and faulted rock, pp.179-183.
Pellet.F and Egger P. (1996), Analytical model for the mechanical behaviour of
bolted rock joints subjected to shearing. Journal of Rock mechanic and rock
engineering 29 (2), pp.73-97.

324

References

Pellet.F, Egger.P and Ferrero.A.M (1995), Contribution of fully bonded rock bolts to
the shear strength of joints: Analytical and experimental evaluation, Int. Symp. on
Mechanics of Jointed and Faulted rock, pp.873-878.
Peng, S. and S. Guo (1992), An improved numerical model of grouted bolt-roof rock
interaction in underground openings. Int. Symp. on Rock support in mining and
underground construction, Canada, pp.67-74.
Peng. S and Chiang. H. S. (1984), Longwall mining, Wiley, International Publication,
267p.
Peng.S. (1986), Coal mining ground control, A Wiley-Interscience publication, 2nd
Ed, 486p.
Peng.S and Guo.L.B. (1988), A hybrid element-finite element method of stress
analysis for bolt-reinforced inhomogeneous ground. Journal of Mining Science and
Technology 7, pp.1-18.
Pool.G, Cheng.Y and Mandel.J. (2003), Advancing analysis capabilities in Ansys
through solver technology, Electronic transactions on numerical analysis 15,
pp.106-121.
Reed.J.J. (1974), Rock reinforcement and stabilization-bolting alternatives, Mining
Congress, pp.40-45 (Cited in Dight 1982).
Robert. DP. (1995), Testing of mining tunnel support elements and systems for hard
rock mines, Master of Science in Engineering to Department of Mechanical
Engineering, University of Natal, South Africa, 206p.
Saeb, S. and Amadei B. (1992), Modelling rock joints under shear and normal
loading, Int. J. of Rock Mechanics and Min. Sci. & Geomech. Abstrs 29 (3), pp.267278.
Saeb.S and Amadei.B. (1990), Finite element implementation of a new model for
rock joints, Proceeding of the Int. Symp. of Rock Joints, pp.707-712.

325

References

Sakurai.S and Kawashima.I. (1992), Modelling of jointed rock masses reinforced by


rock bolts, Int. Symp. of Rock support in mining and underground construction,
Canada, pp.547-550.
Schach. R, Garshol. K and Heltzen. A.M. (1979), Rock bolting, A practical
handbook, Wheaton & Co.Ltd.,Exeter.
Schubert.P. (1984), The bearing capacity of fully grouted rock bolts at shearing
joints, Ph.D. Thesis, Leoben, Montan University, 176p.
Schwab. P.M (1976), An elasticity and finite element study of the fully grouted resin
roof bolt under transverse loading, Eng. Department, Michigan: MSc. Thesis, 87p.
Serbouski, M. O. and Singer S. P. (1987), Linear load transfer mechanics of fully
grouted roof bolts, US Bureau of Mines, 15p.
Sharma K. G. and Pande G. N. (1988), Stability of rock masses reinforced by
passive, fully-grouted rock bolts. Int. J. of Rock Mechanics and Min. Sci. &
Geomech. Abstrs, 25(5), pp.273-285.
Siab, L. (2001), Stability analysis of jointed rock slopes reinforced by passive, fully
grouted bolts. Computers and Geotechnic, 28, pp.325-347.
Signer. S. P and Jones S. D. (1990), Case study on the use of grouted roof bolt
loading in a two-entry gate road, 31st US. Symp. on Rock Mechanics, pp.145-152.
Signer. S. P and Raines.R. (2001), Effects of bolt spacing and bolt length and roof
span on bolt loading in a Trona mine, 20th Intl Conf on Ground Control in Mining,
Morgantown, West Virginia University, pp.302-308.
Singer, S. P. (1990), Field verification of load transfer mechanics of fully grouted
roof bolts, US Bureau of Mines, (9301).
Sinha.R.S and Schoeman.K.D. (1983), Rock tunnels and rock reinforcement. Int.
Symp. of Rock bolting, Sweden, pp.310-321.

326

References

Skybey. G. (1992), A new rock bolting concept for underground roadways, 11th
International Conference on Ground Control in Mining, Wollongong University,
pp.236-239.
Snyder, W. V. (1983), Analysis of beam building using fully grouted roof bolts, Int.
Symp. on. Rock bolting, Sweden, pp.246-255.
Spang, K. and Egger. P. (1990), Mode of action and calculation of fully grouted rock
bolts as reinforcement in stratified or jointed rock mass, Int. J. of Rock Mechanics
and Min. Sci. & Geomech. Abstrs 7(4), pp.181-189.
Spang.K and Egger.P. (1990), Action of fully grouted bolts in jointed rock and
factors of influence, Rock mechanic and rock engineering, 23, pp. 201-229.
Stankus.J.C and Guo.S. (1996), Computer automated finite element analysis-A
powerful tool for fast mine design and ground control problem diagnosis and solving,
5th Conference on the use of computer in the coal industry, West Virginia-USA,
pp.108-115.
Stankus.J.C and Guo.S. (1997), New design criteria for roof bolt systems,
Proceeding of 16th Int. Conf. on Ground Control in Mining, WV.Morgantown,
pp.157-168.
Stillborg, B. (1986), Professional users handbook for rock bolting, ClausthalZellerfeld, Germany, Trans Tech, 145 p.
Stillborg. B. (1994), Professional users handbook for rock bolting, Series on rock and
soil mechanics, 2nd Ed. Atalas Copco. Sweden. pp.1-85.
Stille.H. (1992), Rock support in theory and practice, Int. Symp. of Rock support in
Mining and Underground Construction, Canada, pp.421-437.
Stille.H, Holmberge.M and Nord.G. (1989), Support of weak rock with grouted bolts
and shotcrete, Int. J. of Rock Mechanics and Min. Sci. & Geomech. Abstrs., 26(1),
pp.99-113.

327

References

Stimpson, B. (1983), The influence of rock bolt location on the reinforcement of


horizontally bedded roofs by full column grouted bolts, Int. Conf. of Rock bolting,
Sweden, pp.256-265.
Stjern, G. and Myrvang, A. (1998), The influence of blasting on grouted rock bolts,
Journal of Tunnelling and underground space technology, 13(1), pp.65-70.
Surajit, P. and Wije Wathugala, G. (1999), Disturbed state model for sandgeosynthetic interfaces and application to pull-out tests, Int. J. for Numerical and
analytical methods in Geomechanics, 23, pp.1873-1892.
Swoboda.G and Marence.M. (1992), Numerical modelling of rock bolts in
interaction with fault system, Int.Sym. of Numerical modelling in Geomechanics,
pp.729-737.
Tadolini.S and Mitri.H.S. (2002), Field and Numerical Analysis of Resin-Grouted
Cable Bolts Used for Coal Mine Longwall Roof Support, Proc. of North American
Rock Mechanics Symp, University of Toronto, pp.713-719.
Tadoloni.S.C and Ulrich.B.F. (1986), Evaluation of bearing plates installed on full
column resin grouted bolts, Bureau of Mines, Denver, 17p.
Tang.B, Mitri.H.S and Bouteldja.M. (2000), Finite Element Modelling of Rock
Anchors, Journal of Ground Improvement, 4(2), pp.65-71.
Tarrant. G. (2002), Assessment of support requirements associated longwall
reorientation, SCT, Report No:MET2431, 30 p.
Tassien.A, Zhang.Y, Han.J and Peng.S. (2002), Comparison of some aspects of
bolting mechanism between fully-grouted resin and tensioned bolts in underground
mine entries, 21st International Conference on Ground Control in Mining,
Morgantown, W.V., pp.114-125.
Thompson, A. and Finn, D. J. (2001), The performance of grouted split tube rock
bolt systems, rock technology Library, 13 p.

328

References

Thompson.A.G. (1992), Tensioning reinforcing cables, Proc. Int. Sym. of Rock


support in mining and underground construction, Ontario, Canada, pp.285-291.
Ulrich.B.F, Wuest.W.J, J. and Stateham.R.M. (1991), Relationships between annulus
thickness and the integrity of resin grouted roof bolts, US Bureau of Mines, RI
9253,13p.
Unrug, K. and Thompson, E. (2002), Field testing of the fully grouted thrust
tensioned bolts, 21th Int. Conf. on ground control in mining, WV. Morgantown,
pp.141-144.
Wang.B and Garga.V.K. (1992), A numerical model for rock bolts, Int. Symposium
of rock support in mining and underground construction, Ontario, Canada, pp.57-65.
Whitaker.A. (1998), Critical assessment of past research into rock bolt, Mining,
Thesis, Sydney, New South Wales, 2p.
http://www.mines.unsw.edu.au/Publications/abstracts/WhitakerA_1998.pdf (Access 2005).

Whitaker.B.N and Grant.A.S. (1980), Time dependence, load relaxation and


performance aspects of polyester resin grouted reinforcing bars in sedimentary
rocks., Int.Conf.on Structure. Founds. on Rocks, ISRM, Sydney, pp.77-85 (cited in
Dight 1982).
Windsor, C. R. and Thompson, A. (1996), Terminology in rock reinforcement
practice, NARMA96, Canada, 8p.
Windsor. C.R. (1996), Rock reinforcement system, EUROCK 96, Italy, 30p.
Windsor.C.R and Thmpson.A.G. (1993), Rock reinforcement-technology, testing,
design and evaluation. Comprehensive Rock Engineering Principals, Practice and
Projects (Ed.J.A.Hudson), V.4, pp. 451-484.
Winsdor CR. (1997), Rock reinforcement systems, Int. J. of Rock Mechanics and
Min. Sci. & Geomech. Abstrs., 34(6), pp.919-951.

329

References

Winsdor. C.R. (2004), Rock reinforcement practice, Report, Perth, Rock


Technology. 400p.
Xinzheng.LU, Erxiang.S and Jiangjing.J. (2004), Analysis on the safety margin and
damage model for the excavation support structure in a very deep pit, 4rd Int. Symp.
on Safety Science and Technology (ISSST), Shanghai, China, pp.368-373.
Xiu.Z, Wang.X and Wang.A. (1997), Strategies for the application of rock bolting
technology to longwall gateroads in Chinese coal mines, Proceedings of 16th
Conference on Ground Control in Mining, Morgantown, WV, pp.191-198.
Xueyi.S. (1983), Grouted rock bolt used in underground engineering in soft
surrounding rock or in highly stresses regions, Int.Sym.on Rock bolting, Sweden,
pp.266-272.
Yap, L. P. and Rodger, A. A. (1984), A study of the behaviour of vertical rock
anchors using the finite element method, Int. J. of Rock Mechanics and Min. Sci. &
Geomech. Abstrs, 21(2), pp.47-61.
Yassein.A, Wahab.K and Peng.S. (2004), 3D FEM simulation for fully grouted bolts,
23rd International conference on ground control in mining, West Virginia, pp.273277.
Yassein.A, Zhang, Y., Han.J and Peng, S. (2002), Comparison of some aspects of
bolting mechanism between fully-grouted resin and tensioned bolts in underground
mine entries, 21st International Conference on Ground Control in Mining,
Morgantown.W.V, pp.114-125.
Yazici, S. and Kaiser, P. K. (1992), Bond strength of grouted cable bolts, Int. J. of
Rock Mechanics and Min. Sci. & Geomech. Abstrs, 29(3), pp.279-292.
Yoshinaka, R., Sakaguch, S., Shimizu, T., Arai, H. and Kato, E. (1987),
Experimental study on the rock bolt reinforcement in discontinuous rocks, Proc. of
Int. Society for rock Mechanics, Australia, NWU, Balkema and Canadian rock
Mechanics Association, pp.1329-1332.

330

References

Zhang.Y and Peng.S. (2002), Design considerations for tensioned bolts, Proc. of 21st
International Conference on ground control in Mining, West Virginia, pp.131-140.
Zhen-Yu.T and Xian.C. (1983), Behaviour of rock bolting as tunnelling support, Int.
Symp. on Rock bolting, Sweden, pp.273-278.

331

You might also like