Professional Documents
Culture Documents
Chatham
051-0066-0
06
LAZERATTO CREEK
SR00026
US 80, SR 26
Location:
10 MI SE OF SAVANNAH
Dot District:
2012
24
Date: 12/10/2015
Date:
02/01/1901
60
Date:
09/21/2015
00
Date: 02/01/1901
* 4 Place Code:
00000
*5 Inventory Route(O/U):
Type:
2 - U.S. Numbered
Designation:
1- Mainline
Number:
00080
Direction:
0. Not applicable
*16 Latitude:
32.0000- 0.9498
*17 Longtitude:
HMMS Prefix:SR
MP: 32.43
98 Border Bridge:
99 ID Number:
*100 STRAHNET:
% Shared:00
000000000000000
511002600
0.00
2- Two Way
032.49
Initials: TWL
Area 05
JTB
051-00026D-032.43E
Engineer's Initials:
* Location ID No:
F - Primary.
0. Not applicable
0
0030.53
218 Datum:
No:
00641
1- Open Scuppers.
0- None present.
Height:
0.00
Width:
0.00
1
1- Concrete.
99
239 Handrail
1- Concrete.
*20 Toll:
0- None.
*21 Maintanance:
*22 Owner:
5- HS 20
37 Historical Significance:
Fwrd:
3- Both sides.
001
0- None.
27 Year Constructed:
1960
Oppo. Fwrd:
0- None.
33 Bridge Median
:
34 Skew:
0-None
0- None.
55
35 Structure Flared:
No
0.00
38 Navigation Control:
234 Delineator:
1.00
1-Highway
5-Waterway
O - Multiple- O.
combinations
sure the
different
types are on file).
Concrete- N.(be
Steel-Co
Concrete
- O.
4-Steel (Continuous)
2-Stringer/Multi-Beam or Girder
45 No.Spans Main:
5- Prestressed Concrete
46 No Spans Appr:
2Stringer/Mu
19
Vert: 1.00
0
3- Both sides.
Water:
Electric:
Telephone:
Sewer:
1- Concrete.
Navigation:
Aerial:
00
Page 1 of 2
Processed Date:2/2/2016
Structure ID:051-0066-0
Programming Data
201 Project No:
202 Plans Available:
Measurements:
F-064-1 (6)
HPP-STP-064-1 (41)
0000
251 PI Number:
522490-
02/01/2008
00000
75 Type Work:
94 Bridge Imp: Cost:
34- Widening
with deck
$5,599
$560
109 %Trucks:
* 28 Lanes On:
00
154
* 49 Structure Length:
1433
28.00
52 Deck Width:
34.30
28
$8399
2.00
76 Imp Length:
1647
97 Imp Year:
2013
12330
8220 Year:2011
*29 ADT
4- Plans in InfoImage.
Under:0
Under:00
Rear Lt:
2.00
Fwd. Lt:
Hydralic Data
215Waterway Data:
0003.6
Year:1900
Flood Elev:
0000.0
Freq:00
Rear:
0 Fwd: 1
2- Inspected feature meets acceptable construction date standards.
App. G. Rail:
25.7
220 Dolphin:
Fwd:0
99'99"
27 0
34 0
24
41
5 - Fair Condition
30 0
Timber:
7- Butyl
Rubber.
25 0
59 Superstructure Condition:
Transition:
Type 3:
Type 3s2:
000000
27 0
5 - Fair Condition
Area of Opening:
21
HS-Modified:
58 Deck Condition:
00000
Br.Height:40.8
H-Modified:
Rt:4
Drainage Area:
2 - HS loading. Rating: 37
67 Structural Evaluation:
64 Operating Type:
Rt:5
Pavement Width:
2 - HS loading. Rating: 22
Piggyback:
35
66 Inventory Type:
231Calculated Loads:
0.00'0.00"
5 - Fair Condition
5 - Fair Condition
5 - Fair Condition
71 Waterway Adequacy:
68 Deck Geometry:
69 UnderClr. Horz/Vert:
72 Appr. Alignment:
62 Culvert:
N - Not Applicable
Posting Data
99 ' 99"
000
Oppo. Dir:
99' 99"
Type:
0- Not Applicable
00' 00"
A. Open, no restriction
No. Barrels:
Oppo. Dir:
00'00 "
Width:
0.00
Height:0
0.00
Apron:0
0.00
H-Modified:
00
Diver:JWO
HS-Modified:
00
*Location ID No:
051-00026D-032.43E
035 Horiz:120
Type 3:
00
035
Type 3s2:
00
8.00
8.00
Timber:
00
0.00
Piggyback
00
Sup:1994 Sub:0000
Length:
02/01/1901
02/01/1901
Page 2 of 2