You are on page 1of 2

Form

TEST PROGRAM

LF- E 037

Revision
Page

Vessel Name :

PERIOD OF PMS REPORT

TB AUDAH
April 2015

Date Last Overhoul April 2012

PMS No.

5
5.1
5.1A

5.1B
5.1C

5.2
5.2A

5.2B

Unit / System

Check cable connections and cable entries to the sensor.


Check that there is no leakage of oil or water over the sensor
or earth connections. If any, clean the sensor and make
arrangements to avoid further leakage.

Periksa kabel koneksi dan kabel yang masuk ke sensor


Periksa bahwa tidak ada kebocoran oli atau air dari sensor
atau koneksi sensor. Jika ada , bersihkan sensor dan perbaiki
untuk menghindari kebocoran lebih lanjut.

PRESSURE SWITCHES

PRESSURE SWITCHES

Connect the test equipment to the test cock. Raise the test
pressure to the value above the switch setting and then
slowly reduce the pressure until the pressure switch contacts
work.
Observe the alarm lamp on the engine alarm panel. Check
the pressure gauge on the test equipment (pressure test
pump) during the test.

Hubungkan peralatan pengujian untuk cock uji . Tingkatkan


tekanan tes dengan nilai di atas pengaturan switch dan
kemudian perlahan-lahan kurangi tekanan sampai kontak
saklar tekanan bekerja.
Amati lampu alarm pada panel alarm mesin . Periksa
pengukur tekanan pada alat uji ( tes tekanan pompa ) selama
pengujian

5.4A
5.4B
5.4D
5.4E
5.4F
5.4H
5.4I
5.4J
5.4K
5.5
5.5A
5.5B
5.6
5.6A
5.7
5.7A
5.7B
5.8
5.8A
5.9
5.9A
5.9B
5.9C
5.9D
5.9E

2015
Interval
Months Hours

Est. Next Due

Jan-15

Feb-15

Mar-15

Apr-15

May-15

: Scheduled Maintenance
: Completed Maintenance

2014
Jun-15

Jul-15

PIC

C/E

18/Apr/15

18-Jul-15

17/Apr/15

17-May-15

17/Apr/15

17-May-15

18/Apr/15

18-Jul-15

18/Apr/15

18-Jul-15

18/Apr/15

18-Jul-15

17/Apr/15

17-May-15

17/Apr/15

17-May-15

17/Apr/15

17-May-15

17/Apr/15
17/Apr/15

0
0

1
1

17-May-15
17-May-15

C
C

S
S

17/Apr/15
17/Apr/15
17/Apr/15
17/Apr/15
17/Apr/15
17/Apr/15
17/Apr/15
17/Apr/15
17/Apr/15

0
0
0
0
0
0
0
0
0

1
1
1
1
1
1
1
1
1

17-May-15
17-May-15
17-May-15
17-May-15
17-May-15
17-May-15
17-May-15
17-May-15
17-May-15

C
C
C
C
C
C
C
C
C

S
S
S
S
S
S
S
S
S

17/Apr/15
17/Apr/15

0
0

1
1

17-May-15
17-May-15

C
C

S
S

17/Apr/15

17-May-15

17/Apr/15
17/Apr/15

0
0

1
1

17-May-15
17-May-15

C
C

S
S

17/Apr/15

17-May-15

17/Apr/15
17/Apr/15
17/Apr/15
17/Apr/15
17/Apr/15

0
0
0
0
0

1
1
1
1
1

17-May-15
17-May-15
17-May-15
17-May-15
17-May-15

C
C
C
C
C

S
S
S
S
S

C/E

5.2D

5.3B
5.3C
5.4

30

S
C

Visual inspection:

Visual inspection:
Check cable connections and cable entries to the sensor.

5.3

YEARS

Last Maint. Date Running Hours

Last Month Total Running Hours


This Month Running Hours
Current Total Running Hours
TEST PROGRAM
TEMPERATURE SWITCHES
Lepas sensor dari tempatnya, dan masukkan ke dalam
kalibrator suhu . Naikkan atau turunkan suhu perlahan-lahan
sampai kontak suhu bekerja . Perhatikan lampu alarm pada
panel alarm mesin . Periksa suhu pada alat uji selama
pengujian . Jika set point tidak sesuai dengan pengaturan
sebelumnya , sesuaikan kembali set point nya

If the set-point is not in accordance with the previous setting Jika set -point tidak sesuai dengan pengaturan sebelumnya readjust if necessary.
sesuaikan kembali jika perlu.

5.3A

MONTH

Unit / System

Last Month Total Running Hours


This Month Running Hours
Current Total Running Hours
TEST PROGRAM
TEMPERATURE SWITCHES
Remove the sensor from the protecting well, and put it into
the temperature calibrator. Raise or lower the temperature
slowly until the temperature contact works. Observe the
alarm lamps at the engine alarm panel. Check the
temperature on the test equipment during the test. If the set
point is not in accordance with previous setting, readjust if
necessary.
Visual inspection:

5.2C

5.2E

Symbol

DATE

1 Of 2

Visual inspection:
Periksa kabel koneksi dan kabel yang masuk ke sensor

C/E

Check that there is no leakage of oil or water inside the


Periksa bahwa tidak ada kebocoran oli atau air dari sensor
sensor. If any, clean the sensor and make repairs to eliminate atau koneksi sensor. Jika ada , bersihkan sensor dan perbaiki
further leakage.
untuk menghindari kebocoran lebih lanjut.
LEVEL SWITCH
Simulation of low/high level manually only or by immersion
in the tank with water.
Visual inspection:
Check cable connections and cable entries to the sensor.
Check level switch and leak-proofing of floating element.

LEVEL SWITCH
Simulasikan tinggi / rendah level secara manual atau dengan
direndam di tangki air
Visual inspection:
Periksa kabel koneksi dan kabel yang masuk ke sensor
Periksa level switch dan leak proof dari floating element.

C/E

GENERAL
Insulation of exhaust pipes
Emergency stop of main engine from bridge
Test Fire pump
Test quick closing valve
Test emergency stop FO pump
Test emergency lighting
Test emergency steering
Control consoles
Test Communication system

GENERAL
Isolasi pipa gas buang
Emergency stop mesin induk dari bridge
Test fire pump
Test quick closing valve
Test emergency stop FO pump
Test emergency lighting
Test emergency steering
konsol control
Test system komunikasi

C/E

FUEL OIL SYSTEM


D.O. service tank alarm level high / low
F.O. tank alarm level high / low

FUEL OIL SYSTEM


D.O. service tank alarm level low
H.O. service tank alarm level low

C/E

LUBRICATING OIL SYSTEM


L.O. alarm low pressure stop A.E.

LUBRICATING OIL SYSTEM


L.O. alarm low pressure stop A.E.

C/E

BILGE & BALLAST SYSTEM


E.R. bilge high level alarm
Steering bilge high level alarm

BILGE & BALLAST SYSTEM


E.R. bilge high level alarm
Steering bilge high level alarm

C/E

POWER SUPPLY
Battery alarm no charging for navigation

POWER SUPPLY
Battery alarm no charging for navigation

C/E

ADDITIONAL ALARMS
Overspeed alarm auto stop M.E.
Overspeed alarm auto stop A.E.
Gas detector alarm
Fire cabinet on bridge
Communication system

ADDITIONAL ALARMS
Overspeed alarm auto stop M.E.
Overspeed alarm auto stop A.E.
Gas detector alarm
Fire cabinet on bridge
Communication system

C/E

C/E

ITEM MAINTENANCE FOR


April-15

31

PERFORMANCE

PMS MAIN PROPULSION


PORTSIDE FOR THIS MONTH

ITEM OVERDUE FOR

100%

EXCELLENT

Aug-15

Sep-15

Oct-15

Nov-15

Dec-15

0
April-15

PMS MAIN PROPULSION


PORTSIDE FOR THIS MONTH

EXCELLENT

Summary of Overdue Maintenance


Item Maintenance

PMS No.

Reason

Remarks

FREDERIKUS
Chief Engineer
Date :

Technical Superintendent
Date :

LF- C 051/DES 2012

Written by :INA

Approved by : VP / DPA

Retention Period : 1 Year