SECTION 272000 - IP ACTIVE NETWORK EQUIPMENT


1

GENERAL

RELATED DOCUMENTS
A

Drawings and general provisions of the Contract, including


Conditions of Contract and Division 1 Specification Sections, apply
to this Section.
SUMMARY

This Section includes data Networking Equipment system. Work


includes:
1

Performing a needs analysis to determine exact requirements of


the Employer and Tenants.

The section specs describes the minimal technical performance


requirements for the following sub systems
a
Building Access Switching
b
Network Management system
c
Identification For Communications Systems
d
Software License for all needed component to achieve a
fully functional, highly reliable network,
Engineering and designing the Data Networking Equipment to
meet customer requirements.
Supply, install, configuration, testing and commissioning of all
the above sub systems.
Coordination to ensure data communications services are
provided for any new data system being installed.
Coordination to provide required data connections.
Coordinating cabling requirements.
Coordinating with Shameya Expansion Active Network to ensure
providing the needed line cards and chassis to connect active
network to Shameya active network.
Supply, Configuring and installing the "Data Networking
Equipment" including hubs, switches, route reflectors, firewalls,
Intrusion Prevention, and "Network Management System".
Connecting Building switches to the distribution switches

3
4
5
6
7
8
9
10

POST-MOUNTED TRAFFIC SIGNS


S12027-0100D-FD-RR-SPC-TR-01 REV 0
STD-SPC-15A1-EL-15 REV A1

02891. - Page

Makkah First Ring Road and Bus Stations Makkah First Ring RoadCopyright 2009 AIA
Length

MasterSpec Full
09/09

"JOB TITLE"

11
12

13
14
B

Vendor professional services for the assistance and verification


in preparing the Low Level Design Documentation, Network
Ready for Use, Network implementation plan.
Installing and testing data communications circuits for
administration service needs and Tenants as determined through
the needs analysis. This includes providing and installing
category 6a patch cords and station cables.
Providing training for Employer's Staff in the administration and
use of the "Data Networking Equipment" including the "Network
Management System."
Providing a warranty and maintenance service for the "Data
Networking Equipment."

Requirements of the following Sections apply to this section:


1
Division 27 Section STRUCTURED CABLING NETWORK
2
Division 27 Section Intercommunications And Program
Systems
SYSTEM DESCRIPTION

The Data Networking Equipment: State-of-the-art, fully managed,


data communications system designed to meet current and future
requirements.
SUBMITTALS

Product Data: Provide data cut sheets on each piece of equipment


including but not limited to the network switches and "Network
Management System" (hardware and software).

Shop Drawings:
1
2
3
4
5

A schematic representation of the "Data Networking Equipment"


showing connections and locations of devices. Also show
connections to any required local or long distance carriers.
Room layouts of IDFs, and any other rooms that will house data
communications components.
Rack Elevations with equipment installed Front/back
Logical Diagrams
Physical Diagram showing the quantity of switches inside each
IDF/BDF/Data center room/rack
Manufacturer's
instructions.

POST-MOUNTED TRAFFIC SIGNS


S12027-0100D-FD-RR-SPC-TR-01 REV 0
STD-SPC-15A1-EL-15 REV A1

recommended

installation

and

certification
02891. - Page

Makkah First Ring Road and Bus Stations Makkah First Ring RoadCopyright 2009 AIA
Length

MasterSpec Full
09/09

"JOB TITLE"

Low Level Design Documentation,

Network Ready for Use,

Network implementation plan.

Proposed acceptance test procedure and criteria.

Product Certificates:
Signed by manufacturers of equipment
certifying that products furnished comply with requirements.

Qualification Data:
Assurance" Article.

Field Test Reports:


Indicate and interpret test results for
compliance with performance requirements.

Warranties: Warranties specified in this Section.

Maintenance Data:
For products to include in maintenance
manuals specified in Division 1.

Maintenance Service Agreement: Provide details of the various


maintenance service agreements that are on offer from the
Manufacturer.

For firms and persons specified in "Quality

QUALITY ASSURANCE
A

Manufacturer: Companies specializing in the manufacture of digital


data communications equipment.

Installer Qualifications: Engage an experienced installer with


minimum five years of successful installation experience on
projects utilizing Data Networking Equipment similar to those
required for this project.

All materials and equipment supplied by the Contractor shall be


new and shall meet or exceed the latest published specification of
the manufacturer in all respects. The Contractor shall submit a
letter from the manufacturer with each proposed software and
hardware component grunting that the Equipment are not end of
sale or near an end of sale. All equipment shall be supported for at
least five years from the manufacturer from the day of purchasing.

All equipment shall be UL listed, or equivalent.

POST-MOUNTED TRAFFIC SIGNS


S12027-0100D-FD-RR-SPC-TR-01 REV 0
STD-SPC-15A1-EL-15 REV A1

02891. - Page

Makkah First Ring Road and Bus Stations Makkah First Ring RoadCopyright 2009 AIA
Length

MasterSpec Full
09/09

"JOB TITLE"

The Owner shall have the authority at all times, until Final
Completion and acceptance of the Work, to inspect and reject Work
and materials which in their judgment are not in conformity with
the Drawings and Specifications, and their decision in regard to
character and value of Work shall be final and conclusive on both
contracting parties. If the Owner permits said Work or materials to
remain, the Owner shall be allowed the difference in value or shall
at their election have the right to have said Work or materials
repaired or replaced, as well as the damage caused thereby, at the
expense of the Contractor, at any time within one year after the
completion of the entire project, or within such longer period as
may be covered by any guaranty and neither payments made to
the Contractor, nor any other acts of the Owner, shall be construed
as evidence of acceptance, waiver or estoppels.

Any expense incurred by the Owner in connection with the


foregoing shall be borne by the Contractor, and the Owner may
withhold money due to the Contractor or recover money already
paid to the Contractor, to the extent of such expense.

Compliance with Local Requirements: Comply with applicable local


regulations/code requirements of authorities having jurisdiction.
This will have precedence over other codes/standards nominated
for the project, unless otherwise approved in writing.

The Contractor shall comply with all of the legal regulations,


including all regulations of municipal, city, local, and other
government agencies having jurisdiction concerning the Work of
the Contractor. The Contractor shall give all notices and comply
with all laws, ordinances, codes, rules, and regulations bearing on
the conduct of the Work. If the Contractor performs any Work,
which is contrary to such laws, ordinances, codes, rules and
regulations, he/she shall make all changes to comply therewith and
bear all costs arising there from.

The Contractor must state if he intends to utilize a subcontractor,


and provide said subcontractor's name and address. The
subcontractor shall comply with all the same rules, regulations,
laws, codes and licenses, etc. as required by the Contractor and as
specified herein. The Owner reserves the right to approve or
disapprove any subcontractor proposed by Contractor.

Prior to ordering equipment/materials, the Contractor shall field


verify all conditions, with respect to dimensions and placement of
equipment/materials. Any and all discrepancies from the contract

POST-MOUNTED TRAFFIC SIGNS


S12027-0100D-FD-RR-SPC-TR-01 REV 0
STD-SPC-15A1-EL-15 REV A1

02891. - Page

Makkah First Ring Road and Bus Stations Makkah First Ring RoadCopyright 2009 AIA
Length

MasterSpec Full
09/09

"JOB TITLE"

documents shall be brought to the attention of the Technology


Consultant and Owner.
K

The Contractor shall generate all as fitted drawings and information


for the complete installation and configuration of the system. The
Contractor shall provide (or sub-contract for) the on-site installation
and configuration and shall provide on-going supervision and
coordination during the implementation phase.

The Contractor shall be responsible for the initial adjustment of the


systems as herein described and shall provide all test equipment
and software necessary for the system commissioning and
acceptance tests.

The Contractor shall utilize good housekeeping practice with


respect to their Work including the cleaning up of all packaging, dirt
and debris created by the Contractor during his installation
operations on a daily basis.

TESTING AND REPORTS


A

Test all components and circuits of the "Data Networking


Equipment" after installation to ensure functionality and
performance within industry approved guidelines.

A written report will be submitted describing testing procedure and


detailing test results.

RECORD DOCUMENTATION
A

Operation and maintenance manuals:


1
2

Submit full system documentation for the installed "Data


Networking Equipment" and all ancillary equipment such as the
"Network Management System".
System documentation shall consist of:
a
A complete set of product data for all component pants.
b
A complete set of operations manuals for all components of
the system such as the network switches, CAUs, LAMs and
any modular cards used in the system.
c
Maintenance manuals for all components of the system and
for the system as a whole.
Test procedure, data and results from acceptance testing.

POST-MOUNTED TRAFFIC SIGNS


S12027-0100D-FD-RR-SPC-TR-01 REV 0
STD-SPC-15A1-EL-15 REV A1

02891. - Page

Makkah First Ring Road and Bus Stations Makkah First Ring RoadCopyright 2009 AIA
Length

MasterSpec Full
09/09

"JOB TITLE"

WARRANTY
A

General Warranty: Special warranty specified in this Article shall


not deprive Employer of other rights Employer may have under
other provisions of the Contract Documents and shall be in addition
to, and run concurrent with, other warranties made by Contractor
under requirements of the Contract Documents.

Manufacturer's Warranty:
Provide written warranty, signed by
manufacturer and Installer agreeing to replace Data Networking
Equipment devices and equipment that fail in materials or
workmanship within specified warranty period.

Warranty Period: Two years from date of Substantial Completion.

Where a manufacturer's warranty is longer than one year, the


Contractor shall offer the extended warranty. The Contractor shall,
upon notification of any defective items, repair or replace such
items within 24 hours without cost to the Owner and to the
satisfaction of the Owner's representative.

To maintain the manufacturers warranties, equipment shall be


installed, commissioned and serviced by those installers authorized
by said manufacturer to perform those duties. If the contractor is
not authorized, by the said manufacturer, it is his sole responsibility
to make the appropriate arrangements and bear all cost and
consequences thereof.

The contractor shall include a statement of warranty on the entire


system and on the individual pieces of equipment. This warranty
shall obligate the Contractor to provide all equipment, material and
labor at no charge to the Owner, during the warranty period, in the
event of a system or equipment malfunction.

All manufacturers equipment warranties shall be activated in the


Owners name and shall commence on the date of system
acceptance.

Project Management
A

After the award of contract, the Contractor shall provide to the


Owner, as a part of the pre-installation submittal, the name of the
Project Manager that will provide all duties and responsibilities as
specified herein, during the term of the project.

POST-MOUNTED TRAFFIC SIGNS


S12027-0100D-FD-RR-SPC-TR-01 REV 0
STD-SPC-15A1-EL-15 REV A1

02891. - Page

Makkah First Ring Road and Bus Stations Makkah First Ring RoadCopyright 2009 AIA
Length

MasterSpec Full
09/09

"JOB TITLE"

The Owner reserves the right to approve or disapprove the


individual that shall be designated as the Project Manager.

If at any point during the term of the project, and for any reason,
the Project Manager is replaced, it shall be the responsibility of the
Contractor to submit such information to the owner expeditiously
for approval prior to any position replacement.

The Project Manager shall maintain the ability of making all


managerial decisions on behalf of the Contractor on a day-to-day
basis and shall retain the authority of accepting notices of
deduction, inspection reports, payment schedules and any other
project related correspondence on behalf of the owner.

The Project Manager shall schedule and attend weekly project


management meetings, during which time all system related issues
are discussed, scheduled, confirmed and/or resolved.

The project management meetings shall continue weekly until such


time that the Contractor and Owner schedule otherwise. The
scheduling of the project management meetings shall be approved
by the Owner prior to commencement of the Works.

The Project Manager shall be available during normal business


hours within two (2) hours by phone during the term of the project.

In the event that the Project Manager is not available within the
allotted time frame, the Contractor may designate another
employee to temporarily act as the Project Manager in all
correspondence with the Owner.

The Contractor shall ensure that any individual temporarily


assuming the duties of the Project Manager is equal to or at a
higher level within the Contractor's organizational structure.

Upon notification by the Owner, of any project related installation


issue, or issue that may contradict the system specifications as
stated herein, the Project Manager shall verbally respond to any
issue within an eight (8) hour period.

Responses to such issues as stated above shall include a clear


understanding of the issue, the consequences of the issue, any
remedial action required along with a tentative plan of action,
reflecting milestones and/or deadlines to resolve the issue.

POST-MOUNTED TRAFFIC SIGNS


S12027-0100D-FD-RR-SPC-TR-01 REV 0
STD-SPC-15A1-EL-15 REV A1

02891. - Page

Makkah First Ring Road and Bus Stations Makkah First Ring RoadCopyright 2009 AIA
Length

MasterSpec Full
09/09

"JOB TITLE"

The Project Manager shall follow-up their initial response with a


written response to the issue within twenty-four (24) hours of
identification of the issue.

The Project Manager shall provide a Gantt chart/scheduling plan


indicating the pertinent project milestones after award of contract,
for the completion of design, pre-installation work, on-site
installation work, commissioning and acceptance testing on a per
phase basis.

The Project Manager shall update the Gantt chart/scheduling plan


on a weekly basis to reflect the status of each key milestone as the
project installation progresses. These reports should include
information on the work completed during the week, the work to be
completed during the upcoming week and any potential scheduling
issues. The following shall be included in this status report:

10

Expected date of project submittals, including equipment cut


sheets, shop drawings, system interface designs, etc.

Anticipated completion date and percentage complete of system


build, configuration, testing and programming, prior to shipping
to the project site.

Schedule and percentage complete of on-site installation,


configuration, testing and commissioning.

Schedule for user and support training.

Schedule for systems


handover to the Owner.

checkout,

acceptance

testing

and

As the system installation progresses, the Project Manager shall be


capable of discussing any or all of the above mentioned items at
the request of the Owner, and shall address each item, as it relates
to the current status of the system installation at the weekly project
management meetings.
Codes & Standards

Applicable portions of the following codes, standards, regulations


and recommendations shall be observed in the design and
implementation of the converged network system, equipment and
associated technologies:

POST-MOUNTED TRAFFIC SIGNS


S12027-0100D-FD-RR-SPC-TR-01 REV 0
STD-SPC-15A1-EL-15 REV A1

02891. - Page

Makkah First Ring Road and Bus Stations Makkah First Ring RoadCopyright 2009 AIA
Length

MasterSpec Full
09/09

"JOB TITLE"

11

Telecommunications Industry Association/Electronics Industry


Alliance (TIA/EIA).
a

TIA/EIA/IS-811 Telephone Terminal Equipment, Performance


and Interoperability for VoIP Feature Telephones.

TIA/EIA 568-B.2 Telecommunications Cabling Standard


PART 2 : Balanced Twisted Pair Cabling Component.

Institute of Electrical & Electronics Engineers (IEEE).


a

802.1 LAN/MAN Bridging and Management.

802.3 CSMA/CD Access Methods (Ethernet).

802.11 CSMA/CA Access Methods (Wireless LANs).

Internet Engineering Task Force (IETF).

International
(ITU-T).

International Organization for Standardization (ISO).

Building Industry Consulting Service International (BICSI).

Local/National Electrical codes.

Local/National Health & Safety codes.

Local/National radio frequency regulations.

Telecommunications

UnionTelecommunications

EXTRA MATERIALS
A

12

Furnish extra materials, as per manufacturer recommendation that


match products installed and that are packaged with protective
covering for storage and identified with labels describing contents.
Spare parts shall be sufficient to maintain the "Data Networking
Equipment" for a period of five (5) years.
SUBMITTALS

Manufacturers Certification

Specialists.

POST-MOUNTED TRAFFIC SIGNS


S12027-0100D-FD-RR-SPC-TR-01 REV 0
STD-SPC-15A1-EL-15 REV A1

02891. - Page

Makkah First Ring Road and Bus Stations Makkah First Ring RoadCopyright 2009 AIA
Length

MasterSpec Full
09/09

"JOB TITLE"

Installation of the converged network system shall be


performed under the direct supervision of a specialist
trained and authorized by the manufacturer. Submit the
following:
1
Specialist Technicians name.
2
A list of three projects of comparable size and
complexity to that of this project, which were directly
supervised by the proposed specialist Technician.
3
For each project list: the name of the project, location,
project description, construction cost, name and
telephone number of the Owners representative, date
installation started and date installation was
completed.
4
Resumes of key personnel. Resumes must reflect skills
relating to Voice over IP, converged network systems,
convergence technologies, system configuration,
programming, network management systems, project
management, etc

Product Data:
a

Submit manufacturers product data sheets for all materials


and equipment proposed for use on the project.

Mark each product data sheet to show applicable choices


and options. Where product data includes information on
several products, some of which are not required, mark to
indicate the applicable information.

Manufacturers Data: For each manufactured device submit


manufacturers specifications and print photograph of
proposed devices. Include engineering descriptions,
installation
instructions,
operation
application
and
proposed model, style or size clearly indicated.

Project References:
a

Minimum of three (3) references shall be required and shall


include:

End user contact name, current e-mail address and


telephone number.

Functional description of the project.

Project scope, value, size and complexity.

POST-MOUNTED TRAFFIC SIGNS


S12027-0100D-FD-RR-SPC-TR-01 REV 0
STD-SPC-15A1-EL-15 REV A1

02891. - Page

Makkah First Ring Road and Bus Stations Makkah First Ring RoadCopyright 2009 AIA
Length

MasterSpec Full
09/09

"JOB TITLE"

Completion date.

All projects must be verifiable and completed within the


last two (3) years.

High Level Design Document: This shall be verified by all end


users to ensure all Coordination and data collection has been
performed and understood by both the contractor and
manufacturer.

Low Level Design Document: Verified by the Manufacturer

Network Implementation Plan: Verified by the manufacturer

Network Ready for Use Documents: Verified by the manufacturer

Operation and Maintenance Manuals:


a

13

Provide O&M Manuals including schematic network


diagrams, parts lists, device configurations, programming
schedules and manufacturers' information on all
equipment. Three copies of the Manuals shall be provided
on CD and in a high quality, 3-ring binder and fully indexed.

Work of Other Trades


A

Certain equipment and materials will be provided and installed by


others. Unless otherwise indicated in these specifications, or on the
related drawings, these will include the following:
1

Room lighting fixtures, power receptacle outlets and


interconnecting wiring for these circuits within the all Telecom
and Low Current system spaces

Electrical breaker panels required


equipment and associated cabinets.

Electrical boxes, junction boxes, pull boxes, conduit and other


containment as defined in the electrical contract drawings and
specifications.

Moveable furniture, desks, and chairs, except as specified


herein.

to power

the

network

It shall be the responsibility of the Contractor to participate in the


preparation of coordination drawings and attend coordination

POST-MOUNTED TRAFFIC SIGNS


S12027-0100D-FD-RR-SPC-TR-01 REV 0
STD-SPC-15A1-EL-15 REV A1

02891. - Page

Makkah First Ring Road and Bus Stations Makkah First Ring RoadCopyright 2009 AIA
Length

MasterSpec Full
09/09

"JOB TITLE"

meetings, before and during construction, at the request of the


Construction Manager. It is not anticipated that these meetings will
be held more than once a week.
14

Installation Practices
A

The Contractor shall be responsible for delivering a turnkey system


to the Owner.

The Contractor shall be responsible for the initial adjustment of the


systems as herein described and shall provide all test equipment
and software for the system checkout and acceptance tests.

The Contractor shall install all equipment in accordance with the


manufacturers recommendations, this document and the drawings.

All accessories, including rack mounting hardware, power supplies,


etc., shall be obtained from the original equipment manufacturer.
Unless otherwise noted or specified, third party accessories shall
not be used.

If, in the opinion of the Contractor an installation practice is desired


or required which is contrary to these specifications or drawings, a
written request for modification shall be made to the Technology
Consultant. Modifications shall not commence without written
approval from the Technology Consultant. Every effort will be made
to respond to all written requests, in a timely manner, as to not
delay the installation or completion of the project.

Installation shall include the delivery, storage, setting in place,


fastening within the allotted spaces, interconnection of
components, alignment, adjustment and all other work, whether or
not expressly specified which is necessary to result in a tested,
commissioned and operational system.

All equipment shall be firmly secured in place unless requirements


of portability dictate otherwise.

All installation practices shall be in accordance with, but not limited


to, the specifications and drawings. Installation shall be performed
in accordance with the applicable standards, requirements,
manufacturers guidelines and any authorities having jurisdiction.

During the installation and up to the date of final acceptance, the


Contractor shall be under obligation to protect his finished and

POST-MOUNTED TRAFFIC SIGNS


S12027-0100D-FD-RR-SPC-TR-01 REV 0
STD-SPC-15A1-EL-15 REV A1

02891. - Page

Makkah First Ring Road and Bus Stations Makkah First Ring RoadCopyright 2009 AIA
Length

MasterSpec Full
09/09

"JOB TITLE"

unfinished work against damage or loss. In the event of such


damage or loss, he shall replace or repair such work at no cost to
the Owner.
J

All boxes, equipment, etc. shall be plumb and square. The


Contractor shall take such precautions that are necessary to
prevent and guard against electromagnetic interference.

During the installation of equipment consideration shall be given to


operational efficiency as well as the overall aesthetic factors.

The Contractor shall supply and install all fittings and accessories,
whether or not they are specified, required for proper, safe, and
reliable operation of the system.

The Contractor is to examine the areas to receive the work and the
conditions under which the Work would be performed. The
Contractor shall remedy conditions detrimental to the proper and
timely completion of the Work. Do not proceed until unsatisfactory
conditions have been corrected.

The Contractor shall keep all items protected before and after
installation, with dust and water proof barrier materials as required
and ensure the integrity of protective measures throughout the
duration of the project.

Equipment in the Main Communications Rooms and Technology


Rooms shall not be installed until such time as other trades have
completed their work in that area so that the equipment will not be
moved or damaged.

The Contractor shall ensure that safe ingress and egress from all
work areas are maintained during movement and installation of
equipment/materials.

15

Network Commissioning
A

Generally accepted industry standards, as well as manufacturer's


written installation instructions, will be used for in process quality
control and final acceptance of the Work.

When the Contractor has completed his own system tests and
when the system record documents, including drawings, operation
and maintenance manuals are complete, the Architect/Engineer

POST-MOUNTED TRAFFIC SIGNS


S12027-0100D-FD-RR-SPC-TR-01 REV 0
STD-SPC-15A1-EL-15 REV A1

02891. - Page

Makkah First Ring Road and Bus Stations Makkah First Ring RoadCopyright 2009 AIA
Length

MasterSpec Full
09/09

"JOB TITLE"

and Construction Manager are to be notified that the system fulfils


the specifications and is ready for acceptance testing.
C

All acceptance tests are to be documented by the contractor and


the owner or his representatives.

The Contractor shall provide a test plan in a matrix format for the
converged network system including, but not limited to, the
following:
1

Layer 1 (physical) resilience testing.

Layer 2 re-convergence times.

Layer 3 protocol re-convergence times.

Link data rates: 10/100Mbps, 1Gbps, and 10Gbps, full duplex


configurations.

Round trip delay from an IDF to another going across the core.

Bandwidth utilization per uplink

Frame Errors shall not exceed 0.0001%: Amount of frames with


errors passing through switch ports.

Frame Sizes: Check for runt and giant frames.

CRC Errors: Ensure frames have correct CRC figures.

10

Packet Loss shall not exceed 0.01%: Amount of packets dropped


during transmission.

11

CoS/ToS & QoS including:

12

Jitter shall not exceed 25mS, the amount of variance in the


packet delay of voice packets.

Latency shall not exceed 50mS, the delay that components


in a path add to the overall response time.

Per call bandwidth utilization.

WLAN AP coverage patterns, data rates, signal strength and


seamless roaming.

POST-MOUNTED TRAFFIC SIGNS


S12027-0100D-FD-RR-SPC-TR-01 REV 0
STD-SPC-15A1-EL-15 REV A1

02891. - Page

Makkah First Ring Road and Bus Stations Makkah First Ring RoadCopyright 2009 AIA
Length

MasterSpec Full
09/09

"JOB TITLE"

13

Any other tests deemed necessary by the manufacturer,


systems integrator, consultant or owner.

A punch list for correction of defective components or operational


failures shall be provided to the Contractor after the testing
procedure.

The Contractor shall correct any deficiencies noted on the punch


list and take corrective action to assure proper operation. Once
complete re-testing of the system shall be scheduled.

Final Acceptance Testing.

The Contractor shall verify that all record documentation is


complete.

The contractor shall demonstrate operation of all systems,


equipment and peripheral devices to be in compliance with the
contract documents and configuration specification.

Upon completion
either accept the
the Contractor of
required for final
repeated.

The system shall be accepted as complete when all base contract


work has been completed and all remedial work is performed and
all documentation is complete, accurate, accepted and the Owners
representatives have received the specified training.

Complete records of the testing procedures shall be retained by the


Contractor and upon final acceptance these records shall be
submitted to the Owner.

As part of the acceptance test procedure the Contractor shall


provide hourly traffic studies for the first four hours on the first
business day following site operation and hourly for one week
commencing one week after site operation.

Thirty days after the system operational in-service date the Owner
shall either accept the system in writing or notify the Contractor in
writing, specifying in reasonable detail those particulars that the
Owner deems unacceptable.

POST-MOUNTED TRAFFIC SIGNS


S12027-0100D-FD-RR-SPC-TR-01 REV 0
STD-SPC-15A1-EL-15 REV A1

of the re-inspection, the Architect/Engineer shall


system as being substantially complete or advise
work not completed or obligations not fulfilled as
acceptance. If necessary the procedure shall be

02891. - Page

Makkah First Ring Road and Bus Stations Makkah First Ring RoadCopyright 2009 AIA
Length

MasterSpec Full
09/09

"JOB TITLE"

With respect to any such particulars that the Contractor reasonably agrees
are unacceptable, the Contractor shall provide in writing the methodology
and time line to correct them and after verification of correction thereof
the Owner shall accept the system in writing.

PRODUCTS

IDENTIFICATION FOR COMMUNICATIONS SYSTEMS


A

An effective administration system is crucial for the efficient


operation and maintenance of the converged network system and
all its' components, particularly within a multiple building, large
campus environment.

The converged network system should be provided with an


identification and administration system in accordance with the
TIA/EIA 606-A Administration standards document and in
conjunction with the current administration practices and
procedures.

Device Identification:
1

The Contractor shall be responsible for the labeling of all


network devices, both electronically during configuration and
externally on the device during installation.

As a minimum the electronic ID shall include the device name,


location and password.

As a minimum the external label shall include the device name,


IP address and software/firmware revision.

Documentation:
1

The Contractor shall be responsible for the documentation of the


installed converged network system described within this
document.

Systems Operation and Maintenance Manuals. These manuals


shall be produced by the Contractor specifically for the systems
detailed herein.

The Operation section shall describe all typical procedures


necessary to activate and monitor each system/devices

POST-MOUNTED TRAFFIC SIGNS


S12027-0100D-FD-RR-SPC-TR-01 REV 0
STD-SPC-15A1-EL-15 REV A1

02891. - Page

Makkah First Ring Road and Bus Stations Makkah First Ring RoadCopyright 2009 AIA
Length

MasterSpec Full
09/09

"JOB TITLE"

functional requirement. The reader of this document shall be


assumed to be technically competent, but unfamiliar with this
particular facility. Additionally, the Contractor shall provide a
single page of basic operating instructions for each subcomponent of the infrastructure, such as but not limited to
problem isolation, password recovery for all systems etc.
4

The Maintenance section shall provide a recommended


maintenance schedule with reference to the applicable pages in
the manufacturers maintenance manuals. Where inadequate
information is provided by the manufacturer, the Contractor
shall provide the information necessary for a proper
maintenance program to be implemented.

On completion of the project three (3) complete documentation


packs shall be provided on CD and in a paper copy, including:

Complete set of the manufacturers technical reference


manuals for all devices, modules, handsets and software
installed as part of this project.

A description of the work carried


clarifies the technical specification of
drawings provide a quick reference
connectivity to assist in planning and
adds and changes.

Schematic
systems.

Network/VoIP device inventory.

Device configuration details.

Device port assignments.

IP addressing schedule.

VLAN addressing schedule.

Layer 2 and Layer 3 protocol configurations.

Layer 3 routing paths.

diagrams

detailing

out. The description


the system whilst the
of the system interimplementing moves,

each

of

the

installed

Failure to provide the as fitted documentation shall deem the


project incomplete.

POST-MOUNTED TRAFFIC SIGNS


S12027-0100D-FD-RR-SPC-TR-01 REV 0
STD-SPC-15A1-EL-15 REV A1

02891. - Page

Makkah First Ring Road and Bus Stations Makkah First Ring RoadCopyright 2009 AIA
Length

MasterSpec Full
09/09

"JOB TITLE"

Building LAN
Building LAN consists of four types of switches:

Industrial switches to which the End user devices will be


connected.

Stackable Access switches.

Chassis Based Distribution Switches.

Campus External Services & Network Security


A

Contractor shall coordinate with the end user and Propose Internal
Network Security enhancements to Shameya Expansion Network
security that meets his requirement. The contractor shall submit
the list of services obtained from the client/end-user and include in
his proposal how he will satisfy needed isolation between servers
and security enhancements in the high level design document.

The contractor shall coordinate The network security policies


required for Makkah first ring road and tunnels with Shameya
Expansion system to provide multiple levels of logical security to
restrict and monitor access including:
1

Port Security to restrict access into a device.

VLAN implementation requiring routing between VLAN networks.

Filtering by MAC address, IP address, Protocol TCP/ UDP Port


Number or Application.

Authentication, Authorization and Accounting (AAA).

Remote Access Dial-In User Service (RADIUS) servers.

Firewalls.

Intrusion detection and prevention mechanisms.

Utilization of Access Control Lists (ACLs).

Encryption techniques.

10

Implementation of security protocols e.g. IPSec, 802.1x and


SSL/TLS or SSH.

POST-MOUNTED TRAFFIC SIGNS


S12027-0100D-FD-RR-SPC-TR-01 REV 0
STD-SPC-15A1-EL-15 REV A1

02891. - Page

Makkah First Ring Road and Bus Stations Makkah First Ring RoadCopyright 2009 AIA
Length

MasterSpec Full
09/09

"JOB TITLE"

11
C

Virtual Private Network (VPN) capabilities.

provide WAN connectivity and security to the converged network


the following functional areas shall be coordinated :
1

WAN Access devices.

Internal and perimeter Firewalls.

DMZ devices.

Load balancing devices.

QoS prioritization (802.1p, Diffserv). QoS implementation is to


provide quality and priority of voice and other time based
transmissions whilst ensuring data delivery.

Bandwidth management to provide prioritization to critical traffic.

SNMP V3 or secured SNMP V2, RMON & RMON II.

Throughput performance for all firewalls shall be 2 x times the


estimated Bandwidth requirement.

Building LAN - IP Addressing


A

Contractor Shall Proposed the IP Addressing scheme matching with


the Size of the campus and the number of services offered over the
converged network

A further address space shall be allocated for Infrastructure


Management, This shall reside within the Infrastructure base
routing topology, outside of any specific VPNs

The IP Addressing scheme shall reflect the type of device, system


and its location within the network.

The IP Address scheme shall be


management and routing purposes.

The IP Addressing scheme shall provide growth capacity, allow for


future network topology changes and be easy to implement and
maintain.

Static IP Addresses are recommended for deployments of the


following:

POST-MOUNTED TRAFFIC SIGNS


S12027-0100D-FD-RR-SPC-TR-01 REV 0
STD-SPC-15A1-EL-15 REV A1

easily

summarized

for

02891. - Page

Makkah First Ring Road and Bus Stations Makkah First Ring RoadCopyright 2009 AIA
Length

MasterSpec Full
09/09

"JOB TITLE"

Servers.

Wireless Access Points.

Network Infrastructure and Security devices.

Network Management Stations.

BMS devices and IP controllers.

AV devices and IP controllers.

DHCP Assigned IP Addresses are recommended for deployments of


the following (The contractor shall coordinate DHCP server with
Shameya Expansion to provide the DHCP service to Makkah first
ring road and tunnels Network as part of the contractor scope of
work and shall be sized to be further addition by client for his
specific application) :
a

IPT endpoints.

End-user devices (PCs).

IP Multicast
A

The Contractor shall provide details within their proposal, for review
and approval, of their recommended IP Multicast Addressing
scheme.

IP Multicast will be utilized throughout the campus for voice, video


and data.

Virtual LAN (VLANs)


A

To provide multiple groups of users access to secure services via a


single converged network system, the network shall be configured
to facilitate multiple VLANs.

A single VLAN will not host more than 250 devices.

BDF devices provide the Layer 3 boundary for VLANs.

VLANs are extended to the IDF using an IEEE802.1Q Trunk.

POST-MOUNTED TRAFFIC SIGNS


S12027-0100D-FD-RR-SPC-TR-01 REV 0
STD-SPC-15A1-EL-15 REV A1

02891. - Page

Makkah First Ring Road and Bus Stations Makkah First Ring RoadCopyright 2009 AIA
Length

MasterSpec Full
09/09

"JOB TITLE"

The Contractor shall provide details, within their proposal, for


review and approval of their recommended VLAN allocation
scheme.
IP Virtual Private Networks (VPNs)

The Infrastructure will support multiple IP VPNs, these may include;


1

Data

2
3

Security (including BMS)

4
5

SCADA

Internet Services

Out Of Band (OOB Management)

Data Backup

Each VPN shall only be routed to areas requiring connectivity to the


respective VPN.

Within the BDF, VLANs shall be assigned to their respective VPN

Routing between VPNs shall be controlled and permitted at


designated devices.

The contractor is to submit details of their VPN design proposals,


and inter-VPN Routing design.

IP Routing Protocol
A

The Contractor shall Propose the IP Routing protocol as per the


Vendor recommendation for review and approval
Service Delivery

To provide traffic prioritization for time sensitive applications and


services, the converged network shall be configured to deliver

POST-MOUNTED TRAFFIC SIGNS


S12027-0100D-FD-RR-SPC-TR-01 REV 0
STD-SPC-15A1-EL-15 REV A1

02891. - Page

Makkah First Ring Road and Bus Stations Makkah First Ring RoadCopyright 2009 AIA
Length

MasterSpec Full
09/09

"JOB TITLE"

Class of Service (CoS) at Layer 2 (L2) and Quality of Service (QoS)


at Layer 3 (L3).
B

Voice and video traffic shall be prioritized as critical, where as data


traffic shall be prioritized as routine or best effort.

Classification and marking will be undertaken at the access port


within the IDF.

Link Layer Discovery Protocol [LLDP] Media Endpoint Discovery


(LLDP-MED) shall be used to establish trust boundaries where
appropriate.

The full Diffserv QoS model will be used for classification and
marking.

End-to-End QoS will be maintained with 802.1p at L2.

802.1p CoS marking will be mapped to their respective DSCP


marking at the L2/L3 boundary when appropriate.

For IP QoS on VOIP Phones (data and voice):

10

The Switch shall detect IP phones and dynamically establish an


802.1q Trunk separating Voice and Data traffic into disparate
VLANs.

Discovery Protocol shall be used to discover endpoints and


negotiate Voice and Data VLANs, power requirements and trust
boundary extensions.

Power over Ethernet (POE)


A

11

The IEEE 802.3af standard and IEEE 802.3at PoE+ shall be adhered
to for the PoE requirements for the converged network devices.
Converged Network Management

After implementation of the converged network system, Contractor


shall coordinate network management platform with Shameya
Expansion to provide monitoring and managing the operational
requirements of the whole converged network system.

Shameya Expansion Network Management System (NMS) shall


provide the capability to manage and monitor both converged

POST-MOUNTED TRAFFIC SIGNS


S12027-0100D-FD-RR-SPC-TR-01 REV 0
STD-SPC-15A1-EL-15 REV A1

02891. - Page

Makkah First Ring Road and Bus Stations Makkah First Ring RoadCopyright 2009 AIA
Length

MasterSpec Full
09/09

"JOB TITLE"

network devices and the services delivered over the Makkah First
Ring Road and tunnels network.
C

The NMS shall provide a Graphical User Interface (GUI) to simplify


network management. A list of tasks and actions that cannot be
performed through the GUI shall be provided.

The NMS shall be capable of providing statistics and error reporting


on every port on every device within the converged network. It
shall provide graphical identification and highlighting of problem
areas, and permit further investigation of the network to be
performed from the NMS.

The proposed solution shall include all hardware and software


required to create the proposed NMS platform.

All Servers shall be redundant.

Out of band management shall be Extended.

12

Standards
A

Applicable portions of the following IETF standards, issued as RFCs,


for Network Management shall be adhered to for the Network
Management System (NMS):
RFC #

Description

1157

Simple Network Management Protocol (SNMP).

1212

Concise MIB definitions.

1213

Management Information Base for Network Management of TCP/IP


based internets (MIB2).

1757

Remote Monitoring (RMON).

2021

Remote Monitoring 2 (RMON2).

2578

Structure of Management Information v2 (SMIv2).

2819

Remote Network Monitoring Management Information Base.

3411

Architecture for describing SNMP management frameworks.

3412

Message processing and dispatching for SNMP.

3413

SNMP applications.

3414

User based Security Model (USM) for SNMPv2 (/v3).

POST-MOUNTED TRAFFIC SIGNS


S12027-0100D-FD-RR-SPC-TR-01 REV 0
STD-SPC-15A1-EL-15 REV A1

02891. - Page

Makkah First Ring Road and Bus Stations Makkah First Ring RoadCopyright 2009 AIA
Length

MasterSpec Full
09/09

"JOB TITLE"

13

3415

View based Access Control Model (VACM) for SNMP.

3416

Version 2 of Protocol Operations for SNMP.

3417

Transport Mappings for SNMP.

3418

Management Information Base (MIB) for SNMP.

Network Management Capabilities


A

The Network Management System, as a minimum, shall provide the


following features and functionality:
1

Full compatibility
equipment.

with

the

proposed

converged

network

Automatic and manual device/system configuration


discovery using standards based discovery mechanisms.

Automatic and manual Layer 2 & 3 topology configurations.

Separate VLAN and VPNs for device management.

Individual services management of operational VLANs.

Provide a fault management capability including:

and

Raise alarms when set traps and thresholds are reached.

Fault logging, fault detection and isolation.

Alarm history.

Configuration of SNMP traps and thresholds, RMON and RMON2


information gathering.

Converged network performance and operation, including:


a

Quality of Service (Packet propagation delay, jitter and


packet loss).

Converged network availability, utilization and throughput


performance.

Multicast (QoS, utilization, members).

POST-MOUNTED TRAFFIC SIGNS


S12027-0100D-FD-RR-SPC-TR-01 REV 0
STD-SPC-15A1-EL-15 REV A1

02891. - Page

Makkah First Ring Road and Bus Stations Makkah First Ring RoadCopyright 2009 AIA
Length

MasterSpec Full
09/09

"JOB TITLE"

Capability to perform remote diagnostic tests on system


resources and devices.

10

Back-up capability to allow for trend analysis.

11

Diagnose Quality of Service (QoS)/Class of Service (CoS)


problems.

12

Provide packet, protocol and traffic/bandwidth analysis.

13

Provide configuration management of all network devices,


including:
a

A historic record of all changes made to the network by


individual PNBAU operatives.

A GUI to simplify configuration changes. A list of any


device configuration parameters that cannot be performed
through the GUI shall be provided.

Automated network device configuration backup facility for


a minimum of 2 configurations.

Remote re-instatement of a device configuration.

14

Provide reports on layer 3 and 4 traffic type by source and


destination.

15

Provide secure remote access via the WAN and LAN to facilitate
moves, adds and changes through a standard web browser
interface.

16

Provide dynamic functionality for Moves, Adds and Changes


(MACs), providing the network administrators a visual graphical
user interface. It shall interpret changes as they occur. As part of
the network management system, this specifically details any
disconnected, failed or 3rd party devices being connected to the
system.

17

Diagnostic testing, performance and connectivity details about


different modules, devices and configurations comprising the
converged network.

18

WAN performance measurements including


packet loss and node to node service quality.

19

RADIUS and TACACS+ Support

POST-MOUNTED TRAFFIC SIGNS


S12027-0100D-FD-RR-SPC-TR-01 REV 0
STD-SPC-15A1-EL-15 REV A1

latency,

jitter,

02891. - Page

Makkah First Ring Road and Bus Stations Makkah First Ring RoadCopyright 2009 AIA
Length

MasterSpec Full
09/09

"JOB TITLE"

14

Device Hierarchy
A
B

The converged network design shall be based upon a hierarchical


model, providing inter-connectivity at both the physical and logical
layers for a fault tolerant network. Network architecture is under
various options selection including:
1 Floor-Based Architecture in which the network will have two types
of switches :

15

Chassis based switches are used for deployments within the


floor rooms as distribution switches.

Stackable Access layer switches that are suitable for floor rooms
or Chassis based Access layer switches.

2. Devices Connections:
1

End field devices are connected to Industrial switches or


Stackable switches.

Stackable / Chassis based Access Layer switches are dual


homed to the distribution switches

Device Types
A

Industrial switches shall provide functionality and support for the


following protocols and specifications:
a 8-Port 10/100Base-TX RJ-45
b 2-Port 10/100/1000Base-T TP combo interfaces
c 2 mini-GBIC / SFP slots shared with Gigabit copper ports and
support
d 100/1000 Dual Mode
e 1 RJ-45 Console interface for Switch basic management and setup
f

Power feeding On/Off and priority configuration

POST-MOUNTED TRAFFIC SIGNS


S12027-0100D-FD-RR-SPC-TR-01 REV 0
STD-SPC-15A1-EL-15 REV A1

02891. - Page

Makkah First Ring Road and Bus Stations Makkah First Ring RoadCopyright 2009 AIA
Length

MasterSpec Full
09/09

"JOB TITLE"

Stackable / Chassis based Access Layer switches shall provide


functionality and support for the following protocols and
specifications:
a

Provide 10/100/1000Mbps connectivity using Base-T technology


to user devices.

High speed stack throughput that exceeds 400 Gbps.

Support Full IEEE802.3at (POE+) with 30W on all ports.

Support multiple Gigabit/ 10Gigabit Ethernet connectivities.

Provided with Dual redundant, modular power supplies and


multiple fans.

Supports IPV4, IPV6, and Modular QOS.

Devices shall be remotely manageable.

The chassis based devices shall be chassis based modular devices


and shall provide functionality and support for the following
protocols and specifications:
1

Shall have redundant route processors.

Shall have dual power supplies.

Device must run all ports at line rate with no contention.

Provide multiprotocol support.

Provide support for IP Multicast, IP VPNs, MPLS, VPLS BGP and


OSPF.

All provided switches shall be equipped with a suitable Small FormFactor Pluggable Transceiver/s as needed to provide a fully
functional connectivity between the different types.

Backplane capacity and forwarding capacity has not been stated


above, however the contractor shall use the Most Powerful switches
that are available at the time of purchase for the approved vendor.

On the Telecom and other low current Network user traffic is


subject to the following bandwidth throughput projections:
1
Access to distribution network layer 20:1.
2
Others shall be as per Al-Shmiayaa requirement.

POST-MOUNTED TRAFFIC SIGNS


S12027-0100D-FD-RR-SPC-TR-01 REV 0
STD-SPC-15A1-EL-15 REV A1

02891. - Page

Makkah First Ring Road and Bus Stations Makkah First Ring RoadCopyright 2009 AIA
Length

MasterSpec Full
09/09

"JOB TITLE"

16

MANUFACTURERS
A

Approved
Manufacturers:
Subject
to
compliance
with
requirements, provide products by one of the following or approved
equal:
a
Cisco.
b
Juniper.
c
HP.
d
Alcatel Lucent

EXECUTION

DESIGN
A

The design of the "Data Networking Equipment" will consist of the


following tasks:
1

3
4

Needs
Analysis
Coordinate
with
the
Employer's
representatives, Tenants and any other company or organization
that will reside within the new facility and determine their exact
requirements for data communications services. Work with any
Data Systems Contractors and/or Subcontractors to ensure
they have the ability to connect their system to the common
"Data Networking Equipment". Information gathered shall
include but is not limited to quantities and locations of required
connections.
Engineering and Design - With the information gathered,
determine hardware and software requirements for the "Data
Networking Equipment". This shall include the quantities and
configuration of network Hubs and in the configuration of the
"Network Management System".
Determine the exact requirements for external communications
if it is determined that such services will be required for the
support of a new data system.
Coordinate with the other disciplines to ensure environmental
requirements for the Data Networking Equipment" are met.
Ensure that communications cabling is installed at the locations
specified during the needs analysis.
On Site Training

POST-MOUNTED TRAFFIC SIGNS


S12027-0100D-FD-RR-SPC-TR-01 REV 0
STD-SPC-15A1-EL-15 REV A1

02891. - Page

Makkah First Ring Road and Bus Stations Makkah First Ring RoadCopyright 2009 AIA
Length

MasterSpec Full
09/09

"JOB TITLE"

Provide training and adequate training aids in the use,


configuration and maintenance of the data communications
equipment for five (5) system administrators and five (5)
maintenance technicians.
Administrative training will be provided for five (5) Employees in
the operation of the "Network Management System" including
instructions on performing moves, adds and changes and any
other pertinent administrative functions.
Training will be provided for Technical Staff in the testing,
maintenance and fault location of the "Data Networking
Equipment."

END OF SECTION 272000