You are on page 1of 12

ENSAYOS GRANULOMETRICO POR TAMIZADO

(ASTM D 422 / ASSHTO T -08 / MTC CE - 117))


Proyecto

TAMIZ

Abertura

PESO

% RETEN

% RETEN

% QUE

ASTM

(mm)

RETENIDO (gr.)

PARCIAL

ACUMULADO

PASA

3"

76.200

21/2"
2"

63.500
50.800

11/2"
1"

38.100
25.400

996.00
766.00

13.20
10.10

13.20
23.30

86.80
76.70

3/4"
1/2"

19.050
12.500

379.00
979.00

5.00
12.90

28.30
41.20

71.70
58.80

3/8"
1/4"

9.500
6.350

281.00

3.70

44.90

55.10

N 4
N 8

4.750
2.360

977.00

12.90

57.80

42.20

N 10
N 20
N 30

2.000
1.190
0.600

122.80
95.00
34.00

10.40
8.00
2.90

68.20
76.20
79.10

31.80
23.80
20.90

N 40
N 50

0.420
0.300

18.20
11.30

1.50
1.00

80.60
81.60

19.40
18.40

N 100
N 200

0.150
0.075

41.30
29.00

3.45
2.45

85.05
87.50

14.95
12.50

148.40

12.50

100.00

100

100.00

> N 200
Lavado

4878.00

TOTAL

2
1

2
1

2
1

2
1

2
1

A BERT URA

CUR VA GR ANU LUMTR ICA

ANLISIS GRANULOMTRICO POR TAMIZADO

Solicitante
Descripcin
Feha
Profundidad

: CREACIN DEL SERVICIO DE TRANSITABILIDAD DEL CAMINO VECINAL PATIBAMBA CCOLLPA APACORRAL, EN EL DISTRITO DE SAN MIGUEL PROV
REGIN AYACUCHO.
: Municipalidad Provincial de San Miguel
Dep.
: Analisis Gralumetrico Sedimento
Provincia
: Agosto 2,015
Distrito
: 0.00 - 0.50mts
Ubicacin

D E M A L L A (m m )

D50 = 7.2 mm

ENSAYOS GRANULOMETRICO POR TAMIZADO


(ASTM D 422 / ASSHTO T -08 / MTC CE - 117))

SITABILIDAD DEL CAMINO VECINAL PATIBAMBA CCOLLPA APACORRAL, EN EL DISTRITO DE SAN MIGUEL PROVINCIA LA MAR
: Ayacucho
: Huamanga
: San Miguel

: Km. 0+028.00 (Rio Torobama)


DATOS DEL ANLISIS GRANULOMTRICO

CARACTERISTICAS FISICAS - MECANICAS

Lmite Lquido

25.00

Lmite Plstico
ndice de Plasticidad

:
:

20.90
4.10

Clasificacin SUCS
Clasificacin AASTHO

:
:

GP-GM
A-1 - a(0)

M.D.S.
O.C.H.

:
:

%
%

CBR AL 100% M.D.S.


CBR AL 95% M.D.S.

:
:

%
%

DATOS ADICIONALES

D10
D30

:
:

0
1.74

D60
Cu

:
:

13.3
-4688.2

-80.1

Cc

PESOS INICIALES

:
:

7571.0 gr
500.0 gr

U RVA GR ANU LUMTR ICA


100
90
80
70
60
50
40
30
20

A BERT U RA

D E M A L L A (m m )

10
0

P O R C E N T A J E Q U E P A S A (%)

PESO TOTAL
PESO FINO

PARAMETROS GEOMORFOLOGICOS DE LA CUENCA RIO CASHIROVENI PUENTE L=30.0 ML (Km. 0+840.00)


UBICACIN GEOMETRICA
RIO

Qda. RIO TOROBAMBA

COORD. NORTE (m)

COORD. ESTE (m)

ELEVACION
(msnm)

8,556,176.951

614,850.900

2,397.79

AREA DE
CUENCA
( Km2 )

531.060

LARGO DE
ANCHO DE
PERIMETRO DE
CUENCA
( Km CUENCA
( Km
CUENCA ( Km )
)
)

123.30

34.33

26.66

_ Factor de forma Ff = Ancho/Largo


_ Indice de compacidad Ic =
_ Tiempo de concentracin Tc =

(0.28 P)/VA

0.90L

0.0799909615

0.385

LONGITUD DEL CURSO


PRINCIPAL ( Km )

COTA MAS ALTA


(msnm )

DESNIVEL (m)

PENDIENTE (%)

42.48

4,950.00

2,552.21

6.01%

LA CUENCA RIO CASHIROVENI PUENTE L=30.0 ML (Km. 0+840.00)

FACTOR DE
FORMA

INDICE DE
COMPACID.

TIEMPO DE
CONCENTR.
(HORAS)

0.78

1.50

3.56

SOCAVACION EN LOS ESTRIBOS DEL PUENTE


PROYECTO :

CREACIN DEL SERVICIO DE TRANSITABILIDAD DEL CAMINO VECINAL PATIBAMBA CCOLLPA APACORRAL, EN EL DISTRITO
DE SAN MIGUEL PROVINCIA LA MAR REGIN AYACUCHO.

OBRA

CONSTRUCCION PUENTE TOROBAMBA (KM. 0+028.00)

La socavacin que se produce en un ro no puede ser calculada con exactitud, solo estimada, muchos factores intervienen en la ocurrencia
de este fenmeno, tales como:
El caudal.
Tamao y conformacin del material del cauce.
Cantidad de transporte de slidos.
Las ecuaciones que se presentan a continuacin son una gua para estimar la geometra hidrulica del cauce de un ro. Las mismas estn
en funcin del material del cauce.

SOCAVACION GENERAL DEL CAUCE:


Es aquella que se produce a todo lo ancho del cauce cuando ocurre una crecida debido al efecto hidrulico de un estrechamiento de la
seccin; la degradacin del fondo de cauce se detiene cuando se alcanzan nuevas condiciones de equilibrio por disminucin de la velocidad
a causa del aumento de la seccin transversal debido al proceso de erosin.
Para la determinacin de la socavacin general se emplear el criterio de Lischtvan - Levediev :
Velocidad erosiva que es la velocidad media que se requiere para degradar el fondo esta dado por las siguientes expresiones:

En donde:
Ve =
gd =
b=
x=
Hs =
dm =

m/seg

suelos cohesivos (TIPO I)

Vc = 0.68 b dm 0.28 Hsx

m/seg

suelos no cohesivos (TIPO II)

Velocidad media suficiente para degradar el cauce en m/seg.


Peso volumtrico del material seco que se encuentra a una profundidad Hs, medida desde la superficie del agua (Ton/m3)
Coeficiente que depende de la frecuencia con que se repite la avenida que se estudia. Ver tabla N 3
Es un exponente variable que esta en funcin del peso volumtrico gs del material seco (Ton/m3 )
Tirante considerado, a cuya profundidad se desea conocer que valor de Ve se requiere para arrastrar y levantar
al material ( m )
Es el dimetro medio ( en mm ) de los granos del fondo obtenido segn la expresin.

dm =
En el cual
di =
pi =

Ve = 0.60 gd1.18 b Hsx

0.01 S di pi
Dimetro medio, en mm, de una fraccin en la curva granulomtrica de la muestra total que se analiza
Peso de esa misma porcin, comparada respecto al peso total de la muestra. Las fracciones escogidas no deben ser
iguales entre s.

( 1 ) - Perfil antes de la erosin.


( 2 ) - Perfil despus de la erosin

Hs

Ho

ds

Clculo de la profundidad de la socavacin en suelos homogneos:


Suelos cohesivos:
Hs

a Ho5/3
0.60b g

1 / (1 + x)

1.18
d

Suelos no cohesivos:
Hs

a Ho5/3

1 / (1 + x)

0.68b dm0.28

Donde:

Qd / (Hm5/3 Be m)
a =
Qd = caudal de diseo (m3/seg)
Be = ancho efectivo de la superficie del lquido en la seccin transversal
m = coeficiente de contraccin. Ver tabla N 1
Hm = profundidad media de la seccin = Area / Be
x = exponente variable que depende del dimetro del material y se encuentra en la tabla N 2
dm = dimetro medio (mm)

Socavacin

5 DE 12

TABLA N 1
COEFICIENTE DE CONTRACCION, m
Velocidad media en la

Longitud libre entre dos estribos


42
52
63
106
124

seccin, en m / seg

10

13

16

18

21

25

30

Menor de 1
1.00
1.50
2.00
2.50
3.00
3.50
4.00 o mayor

1.00
0.96
0.94
0.93
0.90
0.89
0.87
0.85

1.00
0.97
0.96
0.94
0.93
0.91
0.90
0.89

1.00
0.98
0.97
0.95
0.94
0.93
0.92
0.91

1.00
0.99
0.97
0.96
0.95
0.94
0.93
0.92

1.00
0.99
0.97
0.97
0.96
0.95
0.94
0.93

1.00
0.99
0.98
0.97
0.96
0.96
0.95
0.94

1.00
1.00
0.99
0.98
0.97
0.96
0.96
0.95

1.00
1.00
0.99
0.98
0.98
0.97
0.97
0.96

1.00
1.00
0.99
0.99
0.98
0.98
0.98
0.97

1.00
1.00
0.99
0.99
0.99
0.98
0.98
0.98

1.00
1.00
1.00
0.99
0.99
0.99
0.99
0.99

1.00
1.00
1.00
0.99
0.99
0.99
0.99
0.99

200
1.00
1.00
1.00
1.00
1.00
0.99
0.99
0.99

TABLA N 2
VALORES DE X PARA SUELOS COHESIVOS Y NO COHESIVOS
SUELOS COHESIVOS
P. especfico gd (T/m3)

0.80
0.83
0.86
0.88
0.90
0.93
0.96
0.98
1.00
1.04
1.08
1.12
1.16
1.20
1.24
1.28
1.34
1.40
1.46
1.52
1.58
1.64
1.71
1.80
1.89
2.00

SUELOS NO COHESIVOS

x
0.52
0.51
0.50
0.49
0.48
0.47
0.46
0.45
0.44
0.43
0.42
0.41
0.40
0.39
0.38
0.37
0.36
0.35
0.34
0.33
0.32
0.31
0.30
0.29
0.28
0.27

dm (mm)
0.05
0.15
0.50
1.00
1.50
2.50
4.00
6.00
8.00
10.00
15.00
20.00
25.00
40.00
60.00
90.00
140.00
190.00
250.00
310.00
370.00
450.00
570.00
750.00
1000.00

x
0.43
0.42
0.41
0.40
0.39
0.38
0.37
0.36
0.35
0.34
0.33
0.32
0.31
0.30
0.29
0.28
0.27
0.26
0.25
0.24
0.23
0.22
0.21
0.20
0.19

TABLA N 3
VALORES DEL COEFICIENTE b
Coeficiente
Periodo de retorno
b
del gasto de diseo
( aos )

2
5
10
20
50
100
500

0.82
0.86
0.90
0.94
0.97
1.00
1.05

SOCAVACION AL PIE DE LOS ESTRIBOS:

St

Ho

So

El mtodo que ser expuesto se debe a K. F. Artamonov y permite estimar no solo la profundidad de socavacin al pie de
estribos, sino adems al pie de espigones. Esta erosin depende del gasto que tericamente es interseptado por el espign,
relacionando con el gasto total que escurre por el ro, del talud que tienen los lados del estribo y del ngulo que el eje
longitudinal de la obra forma con la corriente. El tirante incrementado al pie de un estribo medido desde la superficie libre de
la corriente, esta dada por:
St = Pa Pq PR Ho
Socavacin

6 DE 12

en que
Pa = coeficiente que depende del ngulo a que forma el eje del puente con la corriente, como se indica en la figura
siguiente; su valor se puede encontrar en la tabla N 4
Pq = coeficiente que depende de la relacin Q1/Q, en que Q1 es el gasto que tericamente pasaria por el lugar ocupado por
el estribo si ste no existiera y Q, es el gasto total que escurre por el ro. El valor de P q puede encontrarse en la
tabla N 5
PR = coeficiente que depende del talud que tienen los lados del estribo, su valor puede obtenerse en la tabla N 6
Ho = tirante que se tiene en la zona cercana al estribo antes de la erosin
ESTRIBO

EJE DEL ESTRIBO

Q1
Q2

TALUD DEL ESTRIBO R : 1

Q - ( Q1 + Q2 )
TABLA N 4
VALORES DEL COEFICIENTE CORRECTIVO Pa EN FUNCION DE a
a
Pa

30
0.84

60
0.94

90
1.00

120
1.07

150
1.19

TABLA N 5
VALORES DEL COEFICIENTE CORRECTIVO Pq EN FUNCION DE Q1/Q
Q1/Q
Pq

0.10

0.20

0.30

0.40

0.50

0.60

0.70

2.00

2.65

3.22

3.45

3.67

3.87

4.06

1.50
0.83

2.00
0.61

3.00
0.51

TABLA N 6
VALORES DEL COEFICIENTE CORRECTIVO PR EN FUNCION DE R
TALUD R

PR

0.00
1.00

0.50
0.91

1.00
0.85

DETERMINACION DE LA PROFUNDIDAD DE SOCAVACION


TIPO DE CAUCE

(ver cuadro adjunto)

CAUCE

TIPO

SUELO COHESIVO

SUELO NO COHESIVO

A.- Clculo de la socavacin general en el cauce:


PERIODO DE RETORNO
TR_50
TR_100

Hs = profundidad de socavacin (m)


Qd = caudal de diseo
Be = ancho efectivo de la superficie de agua
Ho = tirante antes de la erosin
Vm = velocidad media en la seccin

m = coeficiente de contraccion. Ver tabla N 1


gd = peso especifico del suelo del cauce
dm = dimetro medio
x = exponente variable. Ver tabla N 2
Tr = Periodo de retorno del gasto de diseo
b =coeficiente que depende de la frecuencia del caudal de diseo. Ver tabla N 3
A = rea de la seccin hidrulica
Hm = profundidad media de la seccin
a =

Socavacin

162.10
30.00
0.76
3.75

181.70
30.00
0.72
3.86

0.95

0.95

1.80
60.00
0.290
50.00
0.97
43.23
1.441
3.094

1.80
60.00
0.290
100.00
1.00
47.03
1.568
3.014

m3/seg
m
m
m/seg
Tn/m3
mm
aos
m2
m

7 DE 12

Entonces,

Hs (Profundidad de Socavacin) =
ds (Profundidad de Socavacin respecto al fondo del cauce) =

0.956
0.196

0.853
0.133

m
m

Asumimos ds =

0.500

0.500

B.- Clculo de la socavacin al pie de estribos:


1.- Estribo margen izquierda aguas abajo
St = tirante incrementado al pie del estribo debido a la socavacin en mts.
Ho = tirante que se tiene en la zona cercana al estribo antes de la erosion
Q = caudal de diseo
Q1 = caudal que tericamente pasara por el lugar ocupado por el estribo de la margen izquierda
Q1/Q =
Pq = coeficiente que depende de la relacin Q1/Q. Ver tabla N 5
a = ngulo que forma el eje del estribo con la corriente
Pa = coeficiente que depende del ngulo a . Ver tabla N 4
R = talud que tiene el estribo
PR = coeficiente que depende del talud que tiene el estribo. Ver tabla N 6
Entonces,

St (Tirante incrementado al pie del estribo debido al extrechamiento) =


So (Profundidad de Socavacin respecto al fondo del cauce) =
Asumimos So (Estribo Sobre Roca) =

PERIODO DE RETORNO
TR_50
TR_100

0.04
162.10
0.00
0
2.00
90.00
1.00
0.00

0.32
181.70
0.00
0
2.00
90.00
1.00
0.00

1.00
0.080
0.040
0.100

1.00
0.640
0.320
0.500

2.- Estribo margen derecha aguas abajo


St = tirante incrementado al pie del estribo debido a la socavacin en mts.
Ho = tirante que se tiene en la zona cercana al estribo antes de la erosin
Q = caudal de diseo
Q1 = caudal que tericamente pasara por el lugar ocupado por el estribo de la margen derecha
Q1/Q =
Pq = coeficiente que depende de la relacin Q1/Q. Ver tabla N 5
a = ngulo que forma el eje del estribo con la corriente
Pa = coeficiente que depende del ngulo a . Ver tabla N 4
R = talud que tiene el estribo
PR = coeficiente que depende del talud que tiene el estribo. Ver tabla N 6
Entonces,

St (Tirante incrementado al pie del estribo debido al extrechamiento) =


So (Profundidad de Socavacin respecto al fondo del cauce) =
Asumimos So =

Socavacin

PERIODO DE RETORNO
TR_50
TR_100

0.09
162.10
0.00
0
2.00
90.00
1.00
0.00
1.00
0.172
0.086
0.100

0.58
181.70
0.00
0
2.00
90.00
1.00
0.00
1.00
1.160
0.580
0.700

8 DE 12

AVACION EN LOS ESTRIBOS DEL PUENTE

RANSITABILIDAD DEL CAMINO VECINAL PATIBAMBA CCOLLPA APACORRAL, EN EL DISTRITO


MAR REGIN AYACUCHO.

Socavacin

9 DE 12

TABLA N 1
COEFICIENTE DE CONTRACCION, m

Longitud libre entre dos estribos

Socavacin

10 DE 12

0.80
4.20

Socavacin

11 DE 12

m
m3/seg
m3/seg

m
m
m

m
m3/seg
m3/seg

m
m
m

Socavacin

12 DE 12