89 Scaffold safety
Date:
Frequency:
JSA Number:
Description
It is absolutely essential to install all the parts,
fittings and accessories required for a scaffold.
All fittings must be positive and securely
connected.--
Hazard
Equipment Failure--Fall
Fall--Equipment Failure
Page 1 of 2
Controls
Erect in accordance with manufacturers
instructions.
Ensure that all the components are in good
condition and examine them to see that they are
not damaged.
Maximum Variation from Plumb
4
5
Collapse
Dismantling
The dismantling of a scaffold proceeds in reverse
order to its erection. Each tier should be
completely dismantled and the material lowered
to the ground before dismantling of the next tier
begins. If platform sections or planks have been
left at each level during erection, it is best to
lower additional platform materials from above to
the working deck being dismantled.