Annexure Ia

IC Process Complex Topside Recertification


Final Audit: 12th to 13th March 2016
Platform: ICD
Audit Findings

S No.

Observation

Category

DNV-GL Comments/
Recommendations

Status

To be taken up
immediately

Open

Main deck well head hatch and deck plates found corroded
with undulations

Replace or painting to be
carried out

Open

Sump Casing is not operational

Sump casing to be made


operational

Open

Helideck ESD/FSD Pull Stations tagging is not available

3
A

Open

Movement observed in well # 10

Pressure observed in 'A' & 'B' annulus section of wells #


10, 11 & 12

Obstruction noticed at well head access platform due the


gas injection line

Alternate access ladder to


Open
be provided

Fire wall integrity to be


maintained and all
openings to be closed

7
Two openings observed in the fire-wall at well head area

Movement to be arrested
Pressure to be bled

Open

Open

8
9

Trapped pressure observed in receiver barrel of IQ - ICD /


RS5 & RS2 - ICD / ZB - ICD
SD - ICD no pressure gauge in receiver barrel
Electrical & Instrumentation

Pressure to be bled and


check whether ball valve is
passing
Open

Provide missing pressure


gauge

Open

10

Lighting Fixture Support at Stairway to Helideck is heavily


Corroded. There is hazard of falling.

New Support to be
provided immediately

Open

11

Wellhead Area , Tubing tray is hanging and supported by


rope.

Proper supports to be
provided

Open

12

Wellhead Area , Fusible loop tubing is hanging and away


from well.

to be secured in trays and


orientation to be rectified. Open

A
13

All Instrument JB Ingress Protection integrity has


deteriorated

14

Riser Lines for IS & IQ : Actuators for Shutdown Valves are


not available.

15

Wellhead Control Panel SDP-100: Well No 4 SSV is in Bypass


mode

16

Wellhead Control Panel SDP-100: Cables are hanging with


gland plate.

17

Shutdown valve XSDV -210 is in forced open condition

18

Gas Injection Line ; 8" ICD to WB XSDV is in Forced open


condition.

19

SDP 300 : Test Separator Panel in Bypass condition

A
A
A

Check for IP integrity

Open

Install actuators and


normalize the shutdown
valves

Open

Normalize the SSV

Open

Proper Glanding to be done Open


Normalize the XSDV

Open

Normalize the XSDV

Open

Normalize the Panel

Open

20

Fire & Gas Detection System: HC detectors are in Inhibit


Conditions

21

Fire & Gas Detection System: UV detectors are in Test


Conditions

22

Fire & Gas Detection System: H2S detectors are no in use

Normalize the Detectors

Open

Normalize the Detectors

Open

Normalize the Detectors or


provide MOC
Open

ONGC ATR

Complied
EDC : Jun-2016
It is operational as
and when required ,
so the point may be
dropped
Complied

Final Audit
Observation(on
12th & 13th
March 2016

Status

verified ok

closed

EDC: June 2016

Open

verified ok

closed

Wooden wedges
placed

closed

verified ok
Complied
Cleared wellhead
access from west side
.
Complied verified ok

Job in Progress
Job in progress

closed

closed

Open

verified ok

closed

verified ok

closed

verified ok

closed

Complied
Complied

Complied

Open

EDC : Dec-2016

Open
EDC : Mar-2016

Complied

Junction Boxes
provided with
proper gaskets and closed
nut bolts are
tightened

Complied

Actuators are
installed &
shutdown valves
are normalized
Normalize the SSV

Complied
EDC : May-2016

verified ok
Normalize the XSDV
Normalize the XSDV

Job in progress

Normalize the Panel

closed

Open
closed
Open
Open
Open

Normalize the
Detectors

Open

Normalize the
Detectors

Open

Normalize the
Detectors or
provide MOC

Open

Annexure Ib
IC Process Complex Topside Recertification
Final Audit: 12th to 13th March 2016
Platform: ICPR
Audit Findings
S No.

Observation

Category

DNV-GL Comments/
Recommendations

Status

Skimmer pump suction and discharge line insulation is


missing

provide insulation on
skimmer piping, wherever
missing

Open

Insulation cladding missing at the water side piping of the


skimmer vessel

Provide cladding wherever


missing

Open

Skimmer vessel standby pump is not in operation

Provide a standby skimmer


vessel pump

Open

Fire hose box is damaged completely near KOD

Replace damaged fire hose


box

Open

Electrical & Instrumentation


CCD Area: Welding Receptacle Socket Caps not available.

Provide caps

Open

CCD Area:JBFL-300 is hanging

Secure it with its support

Open

CCD Area: Lighting Fixture Cover has crossed inside the


insulation of Piping.

Relocate the fixture and


maintain distance from
piping.

Open

Air Compressor 4610,4620 enclosure walls are kept open

Enclosure to be kept
closed.

Open

Air Compressor 4610,4620 : Pump overload ,Fan overload &


Low Flow alarm found at Local panel

Check & Rectify

Open

10

Fire Water Pump : Not operational as it is under


maintenance

Make Fire water pump


operational

Open

11

Fuel Gas Manifold area: Heat Tracing JB is hanging

Secure it with its support

Open

12

Fire & Gas Detection System: HC Detectors at Transformer


room area (East & West) are in Fault condition

Check & Rectify

Open

13

Fire & Gas Detection System: HC Detectors at Inlet Duct


AHU & Cyclone separator are in fault condition.

Check & Rectify

Open

14

Fire & Gas Detection System: HC Detectors at Upper Deck


G1-L4.0-1 to 4 are in fault condition.

Check & Rectify

Open

15

Fire & Gas Detection System: HC Detectors at Lower Deck


G1-2.0-5 ,6,7,8,10 ; G1-3.0-1 ,2 ;G1-4.0-1 ,2 are in fault
condition.

Check & Rectify

Open

16

Fire & Gas Detection System: Smoke Detectors at building


Module ,S-L2-IFC-LOOP1 ,S-L2-ICM-LOOP1;
S-L2-IFC-LOOP2 ,S-L2-ICM-LOOP2; S-L2-2FC-LOOP1,
S-L2-2CM-LOOP1,S-L2-2FC-LOOP2,
S-L2-2CM-LOOP2 ; S-L3-1FC-LOOP1,S-L3-1CM-LOOP1
S-L3-2CM-LOOP1 are in Inhibit Condition.

Check & Rectify

Open

17

Fire & Gas Detection System: Thermal Detectors at Building


module , all are in inhibit condition

Check & Rectify

Open

18

Fire & Gas Detection System: All H2S Detectors are in


inhibit condition.

Check & Rectify

Open

19

Fire & Gas Detection System:UV Detectors at Lower


Deck ,Middle Deck ,Level 1, 2 ,3 4 are in inhibit condition.

Check & Rectify

Open

20

HVAC System: Fire dampers 7551&7140 status is neither


open or closed. Fire dampers 7107 , 7108 , 7212 ,7302,
7306 ,7650 are in closed condition

Check & Rectify

Open

21

Novec System 6 No's; PSL are in alarm

Check & Rectify

Open

22

UPS-1101n : UPS A & B - Rectifier fault ,Earth fault & UPS


common alarm is observed

Check & Rectify

Open

ONGC ATR

Final Audit
Observation(on
Status
12th & 13th
March 2016

EDC : Dec-2016
Open
EDC : Dec-2016
Order Placed.
EDC : Dec2016
Complied

Complied
Complied

Complied

Open
Not available

Open

verified ok

closed

Caps Provided.
Verified

closed

Not secured with


supports. Cable Open
ties are used.
Fixture is
relocated.

closed

verified ok

closed

Complied

verified ok

closed

Case initiated for repairing Make Fire water


of pump.
pump operational Open
EDC May 2016

Properly secured .
Complied

verified ok

Requirement given
EDC : Dec-2016

closed
Open

Complied

Complied

verified ok

closed

verified ok

closed

Requirement given,
EDC : Dec-2016

Open

Complied

verified ok

Requirement placed for


spares .
EDC : Dec-2016
Requirement placed for
spares .
EDC : Dec-2016

closed

Thermal
detectors are in closed
Normal condition.
Open

Requirement placed for


spares .
EDC : Dec-2016
Actuator under
procurement.

Open
Fire dampers
7104 ,
7302,7551,7650
are pending

Requirement placed . EDC


: Jun-2016
Complied

Open

Open
verified ok

Open

Annexure Ic
IC Process Complex Topside Recertification
Final Audit: 12th to 13th March 2016
Platform: ICW
Audit Findings
S No.
Observation
1

Category
B

Online turbidity analyzer is not in use


2
3
4

Instrument /utility air receiver piping are heavily corroded


Level gauges are corroded and sight glass is not visible
Fume hood and exhaust are not available in the chemical
lab

B
B

Status

Provide details of alternate


arrangement
Open
Painting to be taken up

Open

Replace/Rectify

Open

Provide sufficient exhaust

Open

Painting to be taken up

Open

B
Water maker 5520 skid and supports are corroded

DNV-GL Comments/
Recommendations

Seawater lift pump P1020 is not in use

Leakage found in header (Sea water Lift Pump)

B
B

B
MIP 1620/1630 not in use

Proper tagging to be done Open


if it is under maintenance
Leakage to be arrested.

Open

Proper tagging to be done


if it is under maintenance Open

10
11

Lot of loose materials found on the deck


Electrical & Instrumentation
SWLP-1020 : Velocity type vibration meter glanding is not
proper
Booster Pump 1510 : JB is tied with Rope

12

Provide Proper Glanding

Open

Secure JB with Proper


supports

Open

Secure switches with


Proper supports

Open

Provided Proper Glanding

Open

Provide Name plate


indication for Gauges

Open

Replace/Rectify

Open

Provide Proper Glanding

Open

Secure with Proper


supports

Open

Check and Rectify

Open

Check and Rectify

Open

All MIP : Switches are Kept hanging


13

All MIP : Glanding is not proper for Switches , JBs,

14

B
B

All MIP :Name plate indication for Gauges is not there


15

MIP-1610 - pump suction PG is not working.

16

Chemical Injection Skid: Glanding has come out for most of


the Jbs at Skid

17

Chemical Injection Skid: LCS for motor PM 1880 ,1810 is


Hanging without support

18

Utility Air Receiver : PT is not working , PSL is not


working/damaged.

19
20
21
22
23

Instrument Air Receiver: PSl is not working and not in line.


Chlorinator Package CHLO-1060 ,1070 both are not in use.
DO Tower Train A : Outlet TI is not working.
DO Tower Train B : Outlet TI is not available.
Wire Line Shop: Illumination level is low as many of the
ceiling Light Fixtures are not working or damaged

House keeping is required Open

A
B
B
B
B

Make Operational
Open
Check and Rectify
Open
Provide TI
Open
Provide proper illumination
level
Open

24

Fire & Gas Detection System: H2S system is not in use

25

Open
Make the system
operational or Provide MOC

Make the system


operational or Provide MOC Open
Check and Rectify
Open

FM 200: Central weight monitoring Panel is not operational


26

Fire & Gas Detection System: HC Gas Detectors - G1-1-9 ,11


; G1-2-4 ,6 ; G1-3.2-5,7,8 ; G1-3.3-7 ; G1-5.1-3 ,G2-5.4-2 are
in fault condition

27

A
Fire & Gas Detection System: All UV Detectors are kept in
Test mode

28

HVAC System: 2nos Fire Dampers ICW-FSG-S-1-1 L/Q W ;


ICW-FSG-R1-3L/Q w is in closed Condition
SWLP- 1010 : TE-1012D is bypassed

29

Check and Rectify

Open

Check and Rectify

Open

Check and Rectify

Open

Check and Rectify

Open

Check and Rectify

Open

Check and Rectify

Open

Check and Rectify

Open

A
SWLP-1030 : TE 1032 C , D. E are showing not ok

30

31

32
33

A
BP-1520 : Velocity vibration XVP-1521B is bypassed , XVP1520A is showing not ok

BP-1520 : Velocity vibration XVP-1530A is bypassed , XVP1530B is showing not ok


DG Remote Panel: Coolant Level low alarm is there.

A
A

ONGC ATR

Final Audit
Observation(on
Status
12th & 13th March
2016

Turbidity is being measured


regularly with Chemistry lab inst. verified ok
Point may be dropped.

closed

Painting is planned .
EDC : Dec-2016

planned

open

further rectify

open

Complied

Case initiated for procurement of in progress


fume hood. EDC : Dec-2016
Painting done.
Complied

open

Damaged skid parts


Open
to be rectified

Motor fitted & Unit in operation.


verified ok
Complied.

closed

Rectified leakage .
Complied

Verified ok

closed

Equipment under maintenance


tag is done. Complied

verified tagging ok
equipment under
maintenance

closed

House keeping done. Complied


Provided Proper Glanding.
Complied.

verified ok

closed

verified.

closed

JB Secured with Proper supports. verified


Complied.

closed

Switches are not


secured with
supports

open

verified.

closed

Provide Name plate indication for


verified.
Gauges.
Complied

closed

Pump suction PG is replaced.


Complied.

closed

Switches Secured with Proper


supports. Complied
Provide Proper Glanding.
Complied.

Job in Progress .
EDC : Mar-2016
Secured with Proper supports.
Complied
Job in Progress
Job in Progress

verified.

open
verified.

closed

New PT & PSL is


installed

closed

New Installed

closed

Under replacement.

open

EDC : Jun-2016
Provided TI. Complied
Lighting repairing done.
Complied.

verified

open
closed

verified

closed

Make the system


Not in use . Although sufficient
portable H2S detectors provided . operational or
Provide MOC

open

Make the system


operational or
Provide MOC

open

Not in use. MOC is being


Prepared.
Requirement placed for spares .

open

EDC : Dec-2016

UV detectors are still


in test mode.
open
Detectors to be kept
Due to Welding Jobs, UV detectors in normal mode.
were kept in Test Mode.
Problem rectified.
verified
closed
Complied
Can be rectified during the Motor
Overhaul.
EDC
: Dec-2016

open

Can be rectified during the Motor


Overhaul.
EDC
: Dec-2016

open

Problem solved. Velocity vibration


verified.
XVP-1521B is put online.
Complied.

closed

Problem solved. Velocity vibration


verified.
XVP-1530A is put online.
Complied.

closed

Problem solved.
Complied.

closed

verified.

Annexure Id
IC Process Complex Topside Recertification
Final Audit: 12th to 13th March 2016
Platform: ICG
Audit Findings
S No.

Observation

Category

DNV-GL Comments/
Recommendations

Status

Fusible loop to be made in


line
Open

Replace/painting to be
taken up

Open

3 Piping and valves are heavily corroded

Painting to be taken up

Open

4 Staircase and handrails are heavily corroded

Painting to be taken up

Open

Trapped pressure to be
bled and check whether
ball valve is passing

Open

Provide missing handle

Open

Skirt to be rectified

Open

1 Skimmer Vessel fusible loop not in line


2 Fusible loop supports completely corroded

Receiver barrel 16" B192-5 - ICG, PSV is isolated and


5 trapped pressure found in the receiver barrel (26 Kg/cm 2)
6 16" (WB - ICG) receiver barrel valve handle to be provided
Volume bottle near (XCV 4675 deluge) skirt is completely
7 corroded

Glycol regeneration unit stand-by pump is not in use


8

B
B

B
Stand-by pump to be made
operational
Open

9 Potable water pump (P-4645) leakage found

To be rectified

Open

Train C Glycol regeneration unit stand-by pump is not


10 functional.

Stand-by pump to be made


operational
Open

Test date / due date to be mentioned on pressurized bottles


11 (DCP-4810)

Test dates to be mentioned


on the bottles
Open

12 New davit for life boat ICG#4 to be installed

To be installed at the
earliest and provide details
of alternate arrangement Open

B
13 Corrosion observed in structure / piping (General)
14 Firewall revamp is in progress
15 Drains are chocked (General)

Painting to be taken up

Open

Completion certificate to
be provided

Open

Choked drains to be
cleared

Open

Materials to be stored only


in the designated areas
Open

Damage piping insulation


to be repaired

Open

Make operational

Open

Secure it with proper


support

Open

16 Loose materials lying on the deck (General)

17 Piping insulation damaged (General)


Electrical & Instrumentation
B
18 Skimmer Vessel: Heat Tracing system is not in use.
19 Skimmer Vessel area: JBF - 020 is hanging with rope.

Skimmer Vessel area: Instrument JB Ingress Protection


20 integrity has deteriorated

Skimmer Vessel area: Jb is resting on Pump 4820/4815


21 discharge line.

Skimmer Vessel area: Start Knob of LCS for Pump


22 4820/4815 is broken.

Skimmer Vessel area: Most of the Lighting Fixtures supports


23 corroded

Skimmer Vessel area: Flashing Beacon is tied with rope and


24 hanging

16" Export gas from B192-5 Receiver Barrel PSV is


25 bypassed.
26 16" WB to ICG receiver PSV is bypassed

Cellar Deck Riser Area: Most of the Instrument Stanchion


27 Supports are corroded and broken and tied with ropes

UV sensor above 16" Export gas from B192-5 is hanging by


28 cable without support
29 PSHH-4002 ,PSLL 4001 for KOD V-4000 is bypassed
30 PSHL-4990-01 for RS-17 line is bypassed
31 SDP 3000 : PSLL-4462 is bypassed

Open

Secure it with proper


support

Open

Replace/rectify

Open
Open

Secure it with proper


support

Open

Take PSV in Line.


Take PSV in Line.

Open
Open

Secure it with proper


support

Open

Secure it with proper


support

Open

Normalize the PSHH &


PSLL
Normalize the PSHL
Normalize the PSHL

Open
Open
Open

Replace/rectify

Open

Normalize the detectors

Open

Check and rectify.

Open

Normalize the detectors

Open

A
A

Injection Pump GCI 4346; Emergency Stop button is


32 damaged

Fire & Gas Detection System: Heat Detectors HF-LQ-2.02 - 1


33 to 6 loop is isolated.

Halon System FM-200 System: HSD-UD-8-1 & HSD-LQ34 1.05-1 solenoid B is in fault.

Fire & Gas Detection System: Most of the UV Detectors are


35 in test position.

Check for IP integrity

Fire & Gas Detection System: UV Detectors for below deck


36 and living quarters controller is not powered up.

Fire & Gas Detection System: Smoke Detectors S-LQ-2.04-1


37 to 25 is in fault condition.
Manual Call Points: Upper Deck - 2nos ,Lower Deck -1nos ,
Living quarters - 4nos and below deck -all call points , are
38 in isolated condition
HVAC System: H2S system is in bypass

A
Open

Normalize the detectors

Open

Make the Call points


operational.

Open

A
39
A
40 Fire & Gas Detection System: H2S system is not in use
Fire & Gas Detection System: HC detector at Lower Deck
GB-LD-1.06-3 ; Living quarter - GD-LQ-1.03-6,
41 GD-LQ-2.04-4, GD-LQ-2.04-5 are isolated.

Normalize the detectors

Make it operational/Provide
MOC
Open

Make it operational/Provide
MOC
Open

A
Normalize the detectors

Open

Final Audit
Observation(on 12th &
13th March 2016

Status

fusible plug missing

open

planned

open

Painting job is planned.


EDC : May- planned
2016

open

EDC :May-2016

planned

open

PSV put online, trapped


pressure released.
Complied

verified ok

Closed

planned

open

Painting job is planned.


EDC : May- planned
2016

open

Standby pumps are


available for Tr-B & C .
Requirement placed for
03 no. pumps.
EDC : Jun-2017

Open

ONGC ATR

Complied.
EDC : May-2016

EDC : Jun-2016

TrainA - under
maintenance, Train CComplied

Leakage rectified.
Complied
Rectified standby pump.

verified ok

Closed

verified ok

Closed

verified ok

Closed

verified ok

Closed

Complied

Complied.
New Davit installed .
Complied

Painting job is planned.


EDC : May- planned
2016

open

verified ok

Closed

verified ok

Closed

verified ok

Closed

planned

open

Heat Tracing system


made online. Complied

Verified ok

Closed

Secured hanging JB .
Complied

Verified ok

Closed

EDC : Mar-2016
Cleared chocked drains.
Complied

Complied.

EDC : Dec-2016

Complied.
Complied.
Provided start knob in
both LCS. Complied

Verified ok

Closed

Verified ok

Closed

Verified ok

Closed
open

EDC : Dec-2016
Complied.
Complied.
Complied.

Verified ok

Closed

PSV is inline

Closed

PSV is inline

Closed

EDC : Dec-2016

Complied.
Complied.
Complied.
Complied.
Detectors put online.
Complied.
Complied.

Due to welding jobs, it


was in Test Mode

open
Not secured. Still hanging
by cable.

open

Normalized

Closed

Normalized
Normalized

Closed
Closed

Replaced

Closed

Still Isolated

open

verified ok

Closed

UV detectors are still in test


mode. Detectors to be kept open
in normal mode.

open
Job in progress.
Kept 01 loop in line, rest
to be rectified. EDC :
Jun-2016

Normalize the detectors


open
Normalize the detectors

Complied.

Below Deck all manual call


points are in isolated
open
condition.

Not in use. Although


provided sufficient
portable H2S detectors
Complied

Make it operational/Provide
open
MOC

Not in use. Although


provided sufficient
portable H2S detectors
Complied

Make it operational/Provide
open
MOC

Normalized.
Complied

HC detector Living quarter


open
- GD-LQ-1.03-6, is isolated.

Annexure Ie
IC Process Complex Topside Recertification
Final Audit: 12th to 13th March 2016
Platform: ICP
Audit Findings
S No.

Observation

Discipline

Near 12" riser (IB - ICP) oil spillage & closed drains
1 observed

(BHS - ICP) trapped pressure 45 Kg/cm2 found in the pig


2 barrel

(IA - ICP) 12" receiver barrel PG is not available.

B
Painting to be taken up

House keeping to be maintained on the access platform.


5 Damaged piping insulation at many locations
A

Materials to be kept only in their


designated areas
Scaffolding to be removed

Insulation damage to be
repaired

Damage in FPF coating to be


repaired

7 Train C separator piping insulation damage


FPF coating damage observed on crane pedestal of ICP 8 South

Trapped pressure to be bled and


check whether ball valve is
passing

Provide missing pressure gauge

6 Temporary scaffolding to be removed at train B separator

Chocked drains to be cleared

3
Well fluid heater platform train A and B pipe supports and
4 instrument tubing supports are corroded.

DNV-GL Comments/
Recommendations

9 Loose materials lying on the auto sampler skid

Materials to be kept only in their


designated areas

Provide proper tagging if under


maintenance

10 Pump P-1410 near HP KOD is not in use


11 HP and LP KOD insulation damaged
12 Drain of LP KOD is not in use and SDV is not operational
13 Fire wall damage observed at FWP room

14 Crude transfer pump is not in use 2 nos.

B
B
A

Repair the damaged insulation


Replace SDV
To be repaired

Provide MOC

Insulation damage to be
repaired

Main deck
15 Fuel gas skid piping insulation damaged
16 Hot oil filter deck drains choked
17 Two PPD and demulsifier tanks not in use
18 Hot water trough is heavily corroded and is leaking
19 Hot oil pump hoist not in use
20 IA receiver (V-2970) corrosion observed
21 Crude oil heater piping insulation damaged
22 IA/UA compressors (2910 & 2920) not in use

B
C
A
C
B

Chocked drains to be cleared


Provide MOC
Leakage to be rectified
Alternate arrangement to be
provided
Painting to be taken up

Insulation damage to be
repaired

Proper tagging to be done if it is


under maintenance

Surge tank V-1300 gratings damaged and water logging on


23 deck observed
Electrical & Instrumentation
24 BHS-ICP 12" Riser line: Fusible loop is touching the line
25 BHS-ICP 12" Riser line: Riser line PT is not working
26 BHS-ICP 12" Riser line: Pressure switch is isolated
IB 12" Riser line: PSHL gauges for sensor pressure & output
27 pressure are damaged
28 IA 12" Riser line: PSHL is not working /Bypassed
29 ICP -IB 10" Riser line: Fusible loop is touching the line
30 24" ICP to WIS Line: PSV isolation valve Handle not present.
31 24"
32 24"
33 12"
34 12"

ICP to WIS Line:PG is damaged for Barrel Pressure


ICP to WIS Line:PSHL is not inline/Bypassed.
WF ICP-SM: PSV not available
WF ICP-SM: PT ,TT are not working/operational.

A
B
A
A
A
A
B
B
A
A
B

24" SHP gas Export Line :PSV isolation valve Handle not
35 present.
36 PSHL for 24" ICP-SHP line is isolates

12' RS11 - ICP WF Riser : PSV is not present at barrel


37 ,instead chickson loop is attached.
38 Riser Area: Many of the AFR Gauges are damaged

SDP-1000: PSHL -1050 ,1080, 1340 ,1400 ,1405 ,240,1550


39 are in Bypass.

40 SDP-7040 : LSHH-7401 is bypassed

Damaged gratings to be
replaced and choked drains to
be cleared

Maintain Proper Distance


Make it operational
Make it operational
Rectify/Replace
Make it operational
Maintain Proper Distance
Provide isolation Valve handle
Provide Pressure gauge for
Barrel Pressure
Make it operational
Provide PSV
Make it operational
Provide isolation Valve handle
Make it operational
Provide PSV
Rectify/Replace
Make it operational
Make it operational

41 SDP-6040 : LSHH-6041 is bypassed


42 PSLL for Heat exchanger 5031 is not in line/bypassed

A
A

SDP-5040 : PSHH-5042, 5033 .ILSLL-5048, LSLL-5042 ,


43 PSLL-5033 ,LSHH-5041 ,TSHH-5035 are in bypassed
44 SDP-1210 : Many of the Gauges are damaged

SDP-1210 : PSHL-1152, PSL-1210 ,LSH-1213,LSL-1212 are


45 in bypassed

SDP-1220 : PSHL-1162, PSH-1220 ,PSL-1220 , LSH-1223


46 ,LSL-1222 are in bypassed

Switchgear Room: Panel BC2 ICP common alarm , under


voltage alarm , Line failure alarm ,Load MCCb Trip alarm are
47 present.

Switchgear Room: Panel BC1-A ICP ground fault , fan failure


48 alarm are present.

Switchgear Room: Panel BC1-B ICP Overvoltage ,under


voltage ,line failure ,Load MCCB trip ,Rectifier failure
,ground fault , fan failure ,Battery MCCB trip failure alarms
49 are present.

50 ICP Emergency Generator under maintenance

Make it operational
Make it operational
Make it operational
Rectify/Replace
Make it operational
Make it operational

Check / Rectify
Check / Rectify

Check / Rectify
A

Make it operational

A
51 Fire & Gas Detection System: H2S system is not in use

Make it operational/Provide MOC


A

52 FM 200: Central weight monitoring Panel is not operational


Fire & Gas Detection System: HC Gas Detectors at Lower
Deck-2nos, Main Deck - 1nos, Battery Room - 1nos & TG
53 room - 2nos are in fault condition

Make it operational/Provide MOC


A
Check / Rectify

Fire & Gas Detection System: Smoke Detectors at AHU


54 ROOM zone 3.5 & zone 5.6 are in fault condition.

A
Check / Rectify
A

55 FM 200 : Zone 5.3 A & Zone 5.5A solenoid fault is present.


Fire & Gas Detection System: All UV Detectors are kept in
56 Test mode

Check / Rectify
A
Make it operational

Final Audit
Observation(on 12th &
13th March 2016

Status

Verified ok

closed

verified ok

closed

Pig barrel removed. Point May be closed


/dropped.
Complied. Verified ok

closed

Complied.

Verified ok

closed

House keeping done on access platforms.


Complied.
Consolidated req. given for
insulation replacement.
EDC June 2016

Verified ok

closed

Open

Scaffolding removed.
Complied.

Verified ok

closed

planned

Open

Open

Consolidated req. given for insulation


replacement.
EDC : June 2016

planned

open

ONGC ATR
Status
Open

Area cleaned. Drain choke removed.


Complied
Bled pressure in the pig barrel.

Complied

Open

Open

Open

Open

EDC : April-2016
Open

Loose material removed. Complied


Open
Not in use provided. Power isolated.
Complied.
Open

verified ok

closed

not in use(pump not required


open
as per IC production team)

Open

Consolidated req. given for insulation


replacement. EDC June 2016

planned

Open

Open

SDV actuator replaced. Made operational.


Complied.

verified ok

closed

verified ok

closed

verified ok

closed

planned

open

Fire wall damage was repaired. Complied


Open

Open

Open

CTP 1330 & 1340 are in working condition


and in Stand By mode. CTP 1320 motor
Feeder was converted into line feeder for
OGIP. Point May be closed.

Consolidated req. given for insulation


replacement. EDC June 2016

Open

verified ok
Deck drain Chock cleared. Complied.
Provided MOC
not in use
Leakage rectified. Complied.
verified ok
Alternate arrangement is being provided as
verified ok
and when required.
Painting done. Complied
painting balance
Consolidated req. given for insulation
planned
replacement. EDC June 2016

Open

"Equipment under revamping tag" is


provided. Complied.

Open
Open
Open
Open
Open

not in use

close
open
close
close
open
open
open

Damaged grating replaced. Complied.


verified ok

close

verified

Closed

verified

Closed

Complied.
Complied.

verified

Closed

verified

Closed

Line not in use


Complied.

verified

Closed

verified

Closed

verified

Closed

verified

Closed

Open
Complied.
Open
Open
Open
Open
Open

Rectified PT.
Complied.

Open
Open
Open
Open
Open
Open
Open
Open
Open
Open

Provided isolation Valve handle. Complied


Complied.

PSHL made operational. Complied.


verified
In SM- ICP line Punch point.
Provide PSV
PT ,TT are made operational. Complied.
verified
Provided isolation Valve handle. Complied
verified

Closed
Open
Closed

Complied.
New riser is coming up under MHSR

Closed

Provide PSV
Job in progress
Put on line. Complied

Open
Put on line. Complied
Open

verified

Closed

Open
Open

verified

Closed

Pressure Switches 7041 ,


7042, 7043 are bypassed

Open

Put on line. Complied

Pressure Switches 6042,6043


Open
are bypassed

Complied.

Not Complied. Make it


operational

Open

Complied.

Not Complied. Make it


operational

Open

Open
Open
Open
Open

EDC : Dec-2016
Complied.

Open
Complied.
Open

Open
Not Complied. Make it
operational

Open

Not Complied. Make it


operational

Open

verified

Closed

verified

Closed

verified

Closed

Complied.
Open
Complied.
Open
Complied.

Open
Open

Work order placed for repair of the engine.


EDC Dec 2016

Make it operational

Open

Make it operational/Provide MOC


Open

Make it operational/Provide
MOC

Open

Make it operational/Provide
MOC

Open

Make it operational/Provide MOC


Open
Requirement placed for spares .
EDC : Dec-2016
Open

Open
Check / Rectify

Requirement placed for spares .


EDC : Dec-2016
Open

Open
Check / Rectify

SOV in 2-nd bank of both the Zones are ok .


Although requirements placed for new SOVs.
Open

Open

EDC : Dec-16

Open
Check / Rectify

Generally kept in test mode during hot job . UV detectors are still in test
mode. Detectors to be kept in Open
normal mode.

Annexure II
IC Process Complex Topside Recertification
Initial Audit: 23rd to 26th November 2015
Functional Checks
S No.

Platform

Functional Check

Observations

Results

1 ICD

Closing and opening of SSV of well #1


from wellhead shutdown panel

Opening and closing of SSV observed

Satisfactory

2 ICD

SSSV of well #1 was closed from


SSV closed immediately and 2 mins later Satisfactory
wellhead shutdown panel in bypass mode observed loss in SSSV control line
by closing the SSSV control line needle
pressure in the wellhead shutdown panel
valve

3 ICD

Helideck foam monitor operated

Coverage over the entire helideck with


sufficient force

4 ICP

ICP South crane operation checked

Boom movement, raising and lowering of Satisfactory


the boom checked

5 ICP

Fire water hose reel (FWHR: 3560)


operation checked

Observed spraying of water with


sufficient force

6 ICP-R

Deluge valve DV-4990 operation checked Downstream of deluge valve diverted to Satisfactory
overboard line

7 ICP

Auto start of fire water pump P-3410


Fire water pump started automatically
observed due to lowering of header
pressure as a result of opening of deluge
valve DV-4990

Satisfactory

Satisfactory

Satisfactory

8 ICW

F&G detectors S-3-2-6B & S-3-2-1A in the Indication observed in the control room
LQ actuated

Satisfactory

9 ICW

Thermal detector T-3.1-1 in the kitchen


actuated using UV lamp

Indication observed in the control room

Satisfactory

Life Boat LB #3 operation checked

Engine start, both by cranking and


hydraulic actuation observed. Lowering
and raising of life boat observed

Satisfactory

10 ICG

Final Audit: 12th to 13th March 2016


FUNCTIONAL TEST DURING FINAL AUDIT 12TH & 13TH March 2016
S No.

Platform

Functional Check during FObservations

ICD

Functioning test for operation fully functional


of firewater pump,deludge
valve and sprinklers

ICG

Functional test of Boat No-4


both fully functional
,Manual start by cranking and
hydraulically starting

ICG

Functional check by operating


fully functional
Davit No- 1514008

ICG

Operating Fire Hose reel

fully functional

ICG

Operating the North Crane

fully functional

March 2016
Results
Satisfactory

Satisfactory

Satisfactory

satisfactory
satisfactory

Annexure III
IC Process Complex Topside Recertification
Final Audit: 12th to 13th March 2016
Document Review
S No.

Description

Observations

Remarks

1 Crane inspection record ICP South


CEIL/9509/RBZ/0035 Dt. 20/02/2015

1. MPI of main structural


members and lifting hooks,
before and after load test is
not done.

MPI to be performed before


and after load test

2 Crane inspection record ICPR South


CEIL/9509/GG/0033 Dt. 24/01/2015

1. MPI of main structural


members and lifting hooks,
before and after load test is
not done.
2. Cabin lights not working

1. MPI to be performed before


and after load test.
2. Cabin lights to be made
operational

3 Crane inspection record ICPR North


CEIL/9509/GG/0032 Dt. 24/01/2015

1. MPI of main structural


members and lifting hooks,
before and after load test is
not done.
2. Cabin lights not working

1. MPI to be performed before


and after load test.
2. Cabin lights to be made
operational

4 Crane inspection record ICW North


1. MPI of main structural
IRS Report: MUM/RRK/ICW(N)/05&06 Dt. 06/05/2014 members and lifting hooks,
before and after load test is
not done.
2. Many alarms and gauge
indicators are not functional

1. MPI to be performed before


and after load test.
2. All alarms and gauge
indicators to be made
operational

5 Crane inspection record ICW South


1. MPI of main structural
IRS Report: MUM/RRK/ICW(S)/05&06 Dt. 06/05/2014 members and lifting hooks,
before and after load test is
not done.
2. Many alarms and gauge
indicators are not functional

1. MPI to be performed before


and after load test.
2. All alarms and gauge
indicators to be made
operational

6 Crane inspection record ICP North


IRS Report: MUM/RRK/ICP(N)/05 Dt. 28/04/2015

1. MPI of main structural


members and lifting hooks,
before and after load test is
not done.
2. Many alarms and gauge
indicators are not functional

1. MPI to be performed before


and after load test.
2. All alarms and gauge
indicators to be made
operational

7 Crane inspection record ICG South


IRS Report: MUM/RRK/ICG(S)/06 Dt. 05/05/2015

1. MPI of main structural


members and lifting hooks,
before and after load test is
not done.
2. Many alarms and gauge
indicators are not functional

1. MPI to be performed before


and after load test.
2. All alarms and gauge
indicators to be made
operational

8 Crane inspection record ICD


IRS Report: MUM/RRK/ICD)/05 Dt. 29/04/2015

1. MPI of main structural


members and lifting hooks,
before and after load test is
not done.
2. Many alarms and gauge
indicators are not functional

1. MPI to be performed before


and after load test.
2. All alarms and gauge
indicators to be made
operational

9 Crane inspection record ICG North

Only inspection report and no Load test and MPI to be


load test records are available performed

10 IRR of wells

1. Trapped pressure found in A 1. Trapped pressure to be bled


& B Section annulus
2. Jammed/Hard valves to be
2. Some of the annulus
repaired or replaced
section valves are hard and
some are non operational

11 DCP and CO2 Portable Cylinders inspection records

Reports for Nov 2015 verified Nil

12 Hydro testing of BA Cylinders

Reports verified

Nil

13 Inspection of DCP Skid

Reports verified

Nil

14 Inspection of Fire Water Hose Reel

Reports verified

Nil

15 Inspection of deluge valve & sprinklers

Reports for Nov 2015 verified Nil

16 HAZOP report IND.M.4.09.0063-BVI-TC Dt.


05/02/2009 reviewed

Hazop close-out report for


enhancement of well fluid
handling facility at ICP
platform

Nil

17 External QHSE Audit (IRS)

All OFI's have been complied


and no NC's issued

Nil

18 Master Calibration equipment's


19 Field instruments
Riser instruments

Documents verified

Nil
Nil

Documents verified

20 PSV Calibration records

18 No's PSV are due for


Calibrate PSV.
calibration's 5320, 5275 ,
6275,4350,4360,4361,4150,5
150,6150,4151,5151,6151,41
40,5140,6140,3511,3690,
3691

21 Fire and Gas detectors Calibration Records

ICPR : 24 no's UV detectors


are reported not Ok. 11 No's
Smoke detector are reported
showing no response during
calibration.

Rectify /Replace.

22 Equipment's coming in Hazardous Area


visual inspection as per OISD std 137

ICG ,ICW, ICP,ICPR is due for


Monthly ,Quarterly & Half
yearly inspection.

Inspection to be carried out as


per Frequency.

23 HVAC Maint. Records : ICP, ICG, ICW, ICPR

HVAC & Refrigeration :


Carry out the maintenance
Check for serviceability of all inspection as per frequency.
relays , CB ,Contactor ,
selector switch , Timer
delays ,Push Buttons , Lights &
alarms for proper sequence is
due,(6 months)

24 Switch gear protection relay :

Annual Calibration is done in


2014 for ICP ,ICW ,ICG. ICPR
Relay calibration is pending

Calibrate Relays as per due


date

25 Breakers

Testing document verified.


Last serviced date is
September 14.

Follow the service schedule.

26 HV& LT motors

Motor IR and PI record


verified .

Nil

27 Riser shut down valves

Functional test of Trunk line


XSDV of IC complex carried
out on 6/11/2015.
ICP-BHS 12" XSDV 1390
ICP-Heera 30" XSDV 1403
ICP-MSP 20" XSDV 6901 ,
status reported is ok.

Nil

28 Riser shut down valves

Functional test of all XSDV


tested on 6/08/15 is reported
as ok

Nil

Additional Reports verified during Final Audit


on 12th and 13th March 2016
29 Hydro test Report(Test Pressure-18.2 Kg/cm2 ) of
Vessel No- V-1310, V-1380,V-1220,V-1210- Verified
ok

Verified and found ok

30 IOGPT/WP/FR-01/REV00/99
Visual observation of wells for safe operation dated
13.10.15 verified

Frequency is 2 months. This


IRR is due.

Inspection to be carried out as


per Frequency.

31 IOGPT/WP/FR-02/REV00/99
SCSSV operation and leak test dated 14.10.15
verified

Frequency is 6 months and it


is maintained. Status reported
is ok

32 IOGPT/WP/FR-03/REV00/99
Frequency is 6 months and it
SSV operation and leak test dated 14.10.15 verified is maintained. Status reported
is ok
33 IOGPT/WP/FR-04/REV00/99
Frequency is 6 months and it
Xmas tree & wellhead valves dated 14.10.15 verified is maintained. Status reported
is ok
34 IOGPT/WP/FR-04/REV00/99
Frequency is 6 months and it
Test separator safety devices dated 14.10.15 verified is maintained. Status reported
is ok

Remarks

Final Audit Points(on 12th &


13th March 2016
same

cabin light working


1. Point not closed
2. Cabin light working. Verified
ok
cabin light working
1. Point not closed
2. Cabin light working. Verified
ok
Alarm working.
Only rpm gauge N
OK

1. Point not closed


2. Alarm working, only rpm
gauge not ok

Alarm working.
Only rpm gauge Not
OK

1. Point not closed


2. Alarm working, only rpm
gauge not ok

Alarm working.
Only rpm gauge Not
1. Point not closed
OK
2. Alarm working, only rpm
gauge not ok 3. Crane not in
function

Alarm working.
Only rpm gauge N
OK

Alarm working.
Only rpm gauge Not
OK

Under revamping

1. Point not closed


2. Alarm working, only rpm
gauge not ok

1. Point not closed


2. Alarm working, only rpm
gauge not ok

1. MPI not done


2. Load test record not
available.

Complied
Reports up to March 2016
verified and found ok.
Hydro test certificate is not
available
1.Hydrotest report of Feb 2016
verified and found ok. 2. Foam
level observed is 20% to 30 %
which is less
Reports up to March 2016
verified and found ok.
Reports up to March 2016
verified and found ok.
Status of Compliance by BV
(Bureau Veritas) dated 18.07.15"Provide GRE line downstream of
isolation valve"- not complied

verified ok
Documents verified
ICP/QHSE/INSTT/REC/03
,ICP/QHSE/INSTT/REC/04 records
verified.

12 No's are pending , PSV


5320,5275,6275,4350,4360,
4361,4150,6150,4151,6151 ,
4140,6140
Requirement Placed
ICP/QHSE/INSTT/REC/01 verified.
Frequency is maintained.
Records for H2S detector
calibration are not available.

Monthly Quarterly & Annual


inspection is done for ICG ,ICP,
ICP-R. ICW is in progress.
Operation and
maintenance
contract in place.

Done in 2014

HVAC DPR records from


01.01.2016 to 14.02.2016
verified. Frequency is
maintained.

ICPR Relay calibration is


pending. Calibrate Relays as per
due date

ICP/QHSE/IR/REC
,ICG/QHSE/IR/REC
ICW/QHSE/IR/REC records
All HT breakers are verified. Frequency is
checked annually. maintained.

Done annually.

ICP/QHSE/IR/REC
,ICG/QHSE/IR/REC
ICW/QHSE/IR/REC records
verified. Frequency is
maintained.

Functional test of XSDV 220 ,


230 ,4301 of oil line attached to
ICP tested on 10/03/16 and is
reported as ok

Observations brought forward from previous certification: 4t


Sl. No. as
per OISD
letter

Sr, No.
1

DNV Final ONGC response as per


Audit
Recommen
dation
ONGC
Status
Observation
Action
Reports
4.
Complied
Modifications: pertaining to the
MOC docs are safety studies
of Liquid
mostly
Enhancement
available.
project, ICP R
Reports
are made
related to
available (soft
safety studies, copy enclosed).
ONGC ATR dtd
design
16.8.2011
approval
Soft copies of
report, third
safety studies
party
of Liquid
inspection/cert Enhancement
ification docs project & ICP-R
to be made
projects are
attached.
available.
As on
24.10.11- Soft
copies of Safety
studies of ICP
REVAMP &
ICP-R project
are Submitted.
ONGC ATR dtd
21.12.12
EERA study for
IC Complex has
been
completed. M/s
BV has
submitted draft
report.
Project for QRA
study of Entire
IC Complex has
been given to
IEOT.
Complilation of
input data
required for
QRA is in

Soft copies not


attached. Pl. provide
the same for review.

DNV resp

34

HAZOP report ONGC ATR


Complied
of ICP
on 16.8.11
Wellfluid
Soft copy of
Enhancement HAZOP
: Status of
Report of ICP
various
Wellfluid
recommendati Enhancement
ons given as Project is
per BV's
attached.
Report #
Covered in
IND.M.4.09.00 Point no 4
63-BVI-TC not above.
submitted. Asbuilt P&IDs
are available
though.
ONGC
BV report be response as
made
on 24.10.11available.
HAZOP report
by BV is
provided

Observations brought forward from previous certification: Third Annual S


7

Observations brought forward from previous certification: Second Annua


8

Implementa
tion of RBI
recommen
dations

Routine visual
inspections are
being carried out
but no correlation
with the RBI
recommendation
established.

ICW
Corrossion
Condition

Gratings and
deckplate are
corroding. Many
components in the
Chemical injection
skid are badly
corroded .

Observations brought forward from previous certification: First annual su


10

11

ICP: Newly
extended
deck portion
for Oil
enhanceme
nt area

12

ICD
Southside
Piping

ONGC ATR
on 21.12.12
Shall be
taken up
after the
Open, EDCfinalisation
March-14
of the
painting
contract.

Annexure IV

IC Process Complex Topside Recertific

Outstanding audit points from previous Ce


Initial Audit: 23rd to 26th November

revious certification: 4th Annual Audit


DNV response

Remark /
Recommendation

DNV First annual surveillance


visit 20 &21 June 2012

Soft copy not provided the


same be provided.
DNV response dtd
24.10.11
HAZOP & HAZID safety
studies report provided.
QRA, EERA and SIL
studies be made
available.
Recommendations In the
BV's HAZOP closeout
report # IND.M.4.09.0063BVI-TC are not closed.
Recommendations duly
closed & approved by
ONGC to be made
available.
Design approval report,
third party
inspection/certification
docs to be made available.

DNV visit on 20 & 21 June 2012


QRA report to be provided by ONGC
base office
ONGC informed EERA study for IC
complex is under tendering process.
HAZARD & Operability study
(HAZOP) close out report for
Enhancement of well fluid handling at
ICP platform is available, but the
recommendations are not closed.
ONGC to close recommendations and
provide close-out report for review.
DNV Response on 17.1.13
Noted. Provide both reports on
finalisation

Status on 21.6.12

Open
[Cat-B]

DNV response on
28.9.11
No reports provided.
DNV response on
24.10.11
Close out report for BV
recommendation not
provided. Refer at Sl.
No. 4.

DNV visit on 20 & 21 June 2012


HAZARD & Operability study
(HAZOP) close out report for
Enhancement of well fluid
handling at ICP platform is
available, but the
recommendations are not closed.
ONGC to close recommendations
and provide close-out report for
review.

ous certification: Third Annual Surveillance

Open

ous certification: Second Annual Surveillance Audit, Dt. 08 and 09 July 2013

ONGC to
implement plan
as per priority
(manual time to
inspect category
0 & 2 to be taken
up first). RBI
Implementation
report for
category 0 to be
submitted by Dec
2013 and
category 2 to be
submitted by
May 2014.

ous certification: First annual surveillance during 20 & 21st June 2012
HC detector for gas manifold not
available in ICD.

Open
[Cat-A]

Only FP loop available. UV


detectors, HC gas detectors to be
considered for installation.
Open
[Cat-A]

Piping found corroded. Cleaning


and painting required.

Open
[Cat-B]

Annexure IV

s Complex Topside Recertification

udit points from previous Certification

dit: 23rd to 26th November 2015

DNV Second annual


surveillance visit 08 &09
July 2013

DNV Third annual surveillance visit 06 &07 July 2014


Status on 09.07.13

DNV audit observations

Implementation of EERA
recommendations to be
completed , this activity is in
process.

DNV audit observations


Provide the BVIS accptance Reports. And QRA
reports

Open
[Cat-B]

Compliance to 1st
surveillance audit
recommendation to be
completed .

Open

Refer the Point 4

ICD - Crane- Cabin Shed corroded.

and 09 July 2013


Visual observation and
wall thickness
measurement by UT
being carried out.
ONGC to provide
inspection report for the
inspection due as per
RBI plan by Dec 2013.
ONGC to provide
advance UT plan as per
RBI recommendations
by May 2014.

Open

Revamp of
Chemical injection
skid . Painting in
this area needs to
be undertaken

Visual, NDT and wall thickness


measurement by UT has been carried out
by ONGC. For details pl refer Attachment1B Sl. No. 11 to 14. The WT and NDT plan
and report reviewed by TPI is made
abailabe by ONGC for IC complex.ONGC to
assimilate the same inline with RBI category
'0' & category '2'. That means category '0' &
category '2' is considered ongoing as per
present NDT contract of ONGC.
Regarding implementation of advance UT
as per recommendations of RBI plan no
progress observed till date. However ONGC
has informed that tender for new contract for
Advance UT has been floated by ONGC and
the process of qualifying NDT contractor will
be finalised soon for IC complex. ONGC has
provided advance UT plan . ONGC to take
necessary action to comply all requirements
as recommended by RBI prior to
July/August 2015 when the next annual
audit is due.

Open

t June 2012
Compliance pending

Open
[Cat-A]

Compliance pending

Compliance pending

Open
[Cat-A]

Compliance pending

Open
[Cat-B]

Action to be taken

ance visit 06 &07 July 2014

DNV GL Fourth annual surveillance visit 13 & 14 Aug2015

Status on 7.08.14

Status on 14.08.15
DNV GL audit observations
Pending recommendation regarding
review of F&G adequacy site survey for
installation of detector done by
honeywell engineer .Budgetory quote
received Proposal with OMG EDC Dec
2015

Open
[Cat-B]

Open

Open

Open (Cat B)

80% completed(out of 10 nos


observation of Hazop report 8 nos
completed.)
ONGC informed that, pending
Recommendation regarding
"Review of F&G adequecy" Site
survey for installation of detector
done by Honeywell Engineer.
Budgotery Quotes received.
Proposal with OMG
EDC :
Dec'2015

Open
[Cat A]

ICD platform: UV detectors in


extended launcher & receiver
area, and HC detectors for gas
manifold area and Launcher area
not provided.

Open

(Cat A)

ICP newly extended deck portion


for oil enhancement area - only
FP loop available. UV detectors,
HC gas detectors not provided.

Open

(Cat A)

Heat Tracer - glands comes out


from JB at ICP ICD bridge

Open

(Cat B)

CD Shut Down Panel (SDP-300)


- many pressure gauges found
faulty.

Open

(Cat A)

ICW
Corrosion
condition:
Revamp of Chemical injection
skid. Painting in this area needs
to be undertaken.

Open

(Cat B)

Job is under Progress

Open

Open

UT survey by M/s IXAR is in


progress as per RBI
recommendation. ONGC to map the
available NDT data as per RBI
requirement. ONGC has informed
that the new advance NDT contract
has been finalised and planned to
complete remaining ongoing NDT
inline with RBI recommendations.
EDC:DEC 2015

Open [Cat A]

Open

Painting Contractor team to be


mobilised post monsoon.

Open

Open
[Cat-A]

ONGC informed scope firming in


progress. Proposal with OMG EDC
31.05.2016

Open

Open
[Cat-A]

Pending recommendation regarding


review of F&G adequacy site survey for
installation of detector done by
honeywell engineer .Budgetory quote
received Proposal with OMG EDC Dec
2015

Open

Open
[Cat-B]

Painting Contractor teamed to be


mobilised post monsoon.Notice of
award of contract is issued.