End-of-course date
Training provider
Total
marks
Marks
Assessors name
Date
Describe the
equipment and/or
substances being used
Pre-purification unit
Grinder
Cutter
Welding machine
Lathe machine
Diesel generator
Project Manager
Area Manager
Mechanical Eng.
Electrical Eng
Chemical Eng
HSE Manager
(02)Grainding disk
(02)Cotton gloves
(01)Salt bags
(01)Crane 200 Tons
(01)
(01)
(20)
(20 pears)
(50 no)
(01)
(01)Electrical supervisor
(01)Fabricators
(01)Crane Operator and rigging crew
(01)
(01)
(01)
(02)
(6)
(6)
Equipment and
substances
Activities
Location
Description of hazard
and hazardous event
Who might be
harmed?
Work at height
Fall from height
Electric shock
Personal injury
Plant Manager
(01)
HSE inspector
(01)
Mechanical supervisor
(01)
Fitter(01)
Trained person
Full ppes
Housekeeping
Apply SSOW
Follow the TRA
Crane Operation
Falling Load
Properly damages
Personal injury
Main Road:
Slip and trip
Falling load
Personal injury
Riggers
(2)
HSE Inspector
(1)
Rigging Supervisor (1)
Management Crew (4)
Grander
Mechanical
Supervisor
Grinder operator
Management crew
Management crew
Mechanical Superviso
haering protection
machine guards
barrication
PPEs
Generator
Crane Operation
Current risk
rating*
Are further
controls needed?
Date to be
completed by
Residual risk
rating*
16
L
Barricade and tagged the next week
Area
100% tie off full body
Harness
next week
electrical cables
insulation
continuous monitoring
maintenance schedule
next week
Marks
very unlikely
insignificant no injury
unlikely
fairly likely
likely
very likely
catastrophic death
Action
2025
1516
Urgent action take immediate action and stop activity if necessary, maintain existing controls rigorously
812
36
12
No action no further action but ensure controls are maintained and reviewed
Activities
Description of hazard
and hazardous event
Filling car with petrol,
leading to spillage
Who might be
harmed?
Person filling vehicle
and others on
forecourt
Current risk
rating*
L
4
C
2
Are further
controls needed?
Date to be
completed by
Residual risk
rating*
R
8
L
Make available
paper towels, sand
and absorbent
material
By next week
C
2
R
6