FPRA & Site Star Installation Guide - PERU

David Torres
June, 2010

For internal use


1
Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

FPRA & Site Star Installation guide PERU

For internal use


2
Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation / cable entry plate removal

For internal use


3
Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation / removing plate 1

For internal use


4
Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation / removing plate 2

For internal use


5
Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation / removing FOAM 1

For internal use


6
Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation / removing inner plate 1

For internal use


7
Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation / removing inner plate 2

For internal use


8
Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation / cable entry

For internal use


9
Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation / Cable entry installation

For internal use


10
Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation / battery shelf kits, cable entry and


support rails

Side & top rails

Battery shelf kits

Cable entry

For internal use


11
Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation / Battery cable routing

For internal use


12
Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation / Battery cable routing- A/C ACpower

For internal use


13
Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation / PDA module overview


High-integrated power system
Modularized design
Flexible applications: load/battery configuration
Variable AC power connection
Control via the GUI
IP54/55

For internal use


14
Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

PDA description & functions


AC input distribution
DC output distribution
Battery control function: status test, LVD
System supervisor: LCD/LED display, alarm indication
Network connection

For internal use


15
Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Delivery contents/ preparing installation

For internal use


16
Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Preparing Installation / Test Equipment_tools


PC
Multi-meter: FLUKE 170 or equivalent
DC current clamp: FLUKE I410 or equivalent
Rubber hammer
Chisel
Hydraulic crimping tool
13 mm torque wrench
T10, 20, & 30 screwdrivers
Cutting knife
Protecting gloves & glasses.

For internal use


17
Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation / Removing PDA from shelf

For internal use


18
Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation / General view of the PDA

For internal use


19
Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation / PDA front panel overview

For internal use


20
Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation / Front panel LEDS overview

For internal use


21
Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation / rear cover removal

For internal use


22
Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation Rear internal layout


PDA rear cover

OVP DIN Rail

AC terminal block
E
D
SPD ground clamp
PDA earth cable

OVP sensor
connector
AC ground clamp

C
B

Rear cover
Retention
cable

Cable restraint
F

For internal use


23
Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation / OVP

For internal use


24
Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation Configure the AC terminal block

3-

Single-phase
3-Y

For internal use


25
Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation Prepare the AC cable

Inserting the AC cable

Stripping the wires

For internal use


26
Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation / One Phase AC with OVP

AC Terminal Block

OVP
L1 L2

L3

PE

AC mains

For internal use


27
Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation Single-phase AC connection with the OVP

Set up the OVP

For internal use


28
Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation Single-phase AC connection with the OVP

Connecting the SPD and AC terminal block


For internal use
29
Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation 3Y AC connection with the OVP

AC Terminal Block
OVP

PE

L1

L2

L3

L1

L2

L3

AC Mains

For internal use


30
Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation 3Y AC connection with the OVP

Connecting the OVP and AC terminal block


For internal use
31
Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation 3Y AC connection with the OVP

For internal use


32
Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation 3 AC connection with the OVP


AC Terminal Block
OVP

PE

L1

L2

L3

L1

L2

L3

AC mains

For internal use


33
Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation 3 AC connection with the OVP

For internal use


34
Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation Before routing the DC cables

For internal use


35
Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation Identifying the DC terminals

For internal use


36
Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation Configure the breakers

If connecting to separate load / battery blocks, the load / battery switch


lever bar and the terminal short link have to be removed.
For internal use
37
Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation Connecting the DC cable

Inserting the cable through front panel

For internal use


38
Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Securing into the clamp

Installation Configuration of DC cables

Typical
Parallel load
Parallel battery

Load & return:

35mm2

Battery & return:

35mm2

Load grounding:

25mm2

For internal use


39
Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation Finishing the DC connection

Push the front panel back and secure it


For internal use
40
Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation Finishing the DC connection

For internal use


41
Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation Drawer layout

For internal use


42
Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation Connecting the temperature cable

Connect to J22

7
8
9

TEM_GND
Red
TEM SENSE_IN White
TEMP_VCC
Black

10

EARTH

For internal use


43
Nokia Siemens Networks

Cable screen

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation Placing the temperature probe

The temperature probe should be put where might has


the highest temperature
For internal use
44
Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation Connecting the alarm cable

Connect Alarm Out cable to J22

For internal use


45
Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

3
4
5
6
7
8
9
10
11
12
13

ALARM_COM
MAINS 1
ALARM_COM
MAINS 2
ALARM_COM
MAINS 3
ALARM_COM
CRITICAL
ALARM_COM
MAJOR
ALARM_COM

14

MINOR

Installation Fixing the communication cable

Correctly grounding the cable shield is crucial to the


electromagnetic compatibility (EMC) of the entire system.

For internal use


46
Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation Putting back and secure the drawer

For internal use


47
Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation Installing the PDA into case

For internal use


48
Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation Connecting the earth cable


System earth cable

PDA earth cable


For internal use
49
Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation Connecting the Ethernet cable

For internal use


50
Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation Installing the rectifiers into case

For internal use


51
Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation Connecting the rectifiers

Connecting the power cable

Connecting the RS485 cable


For internal use
52
Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation Connecting the rectifiers

For internal use


53
Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation Recommended configuration of the cable through


cable gland

Option 1

Option 3

Option 2

For internal use


54
Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation Insert the cable through cable gland

For internal use


55
Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation Installing the cable glands with cables

For internal use


56
Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation Fixing all the cables to the case

For internal use


57
Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation Fixing the AC cable with cable restraints

For internal use


58
Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation Fixing the PDA earth cable to case

Fix the PDA earth cable to the cable gland with cable
tie so as not to block the LCD.
For internal use
59
Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation Exiting the alarm cable

The alarm cable is exiting from top of the case if required


For internal use
60
Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation Finishing the cables

For internal use


61
Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation Installing the front and back cover

Front cover

Back cover

The FPRA is IP55 after installing the front and back cover

For internal use


62
Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation FPRA General view after the installation


without conduit pipes

For internal use


63
Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation Fixing the two FPRA units

Stacking and fixing the two FPRA units


For internal use
64
Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation Paralleling the two drawers - RS-422 cables

J22 #1
11
1
2
3

Parallel cable #1

4
5
6

Parallel cable #2

12

For internal use


65
Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

J22 #2
12
4
5
6
1
2
3
11

Installation Paralleling the two drawers

Parallel
cable #2
Parallel
cable #2

Parallel
cable #1

Parallel
cable #1

Drawer #1

For internal use


66
Nokia Siemens Networks

Drawer #2

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation Paralleling the two drawers

For internal use


67
Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation / reccomended cable sizes

For internal use


68
Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation Installing the two FPRA units

Installing the two FPRA


units separately

For internal use


69
Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation Installing the three drawers

J22 #1
11
1
2
3

J22 #2
12
4
5
6

Parallel cable #1

1
2

5
6

3
11

12

Parallel
cable #2

J22 #3
For internal use
70
Nokia Siemens Networks

11 1 2 3

Parallel
cable #3

6 12

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation Installing the three drawers

Parallel
cable #1

Parallel
cable #1

Parallel
cable #2

Parallel
cable #3

Parallel
cable #3
Parallel
cable #2

1
Drawer #1

For internal use


71
Nokia Siemens Networks

2
Drawer #2

FPRA & Site Star Installation PERU / David Torres/ June, 2010

3
Drawer #3

Installation Installing the three FPRA units

For internal use


72
Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation / Interface with Site Star Cabinet

For internal use


73
Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation / 2 conduit PIPE (Battery Cables)

For internal use


74
Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation / 1 conduit Pipes


(AC input & DC output to loads)
Alluminium plates

For internal use


75
Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation / Conduit fix to FPRA

For internal use


76
Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation / Final view

For internal use


77
Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation / Cable Routing

Parallel cable

Alarms &
communications

Battery string #3,


alarms & temp
sensor

AC Shelf 2

DC to BTS
Battery strings 1 & 2
AC Shelf 1

For internal use


78
Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation / Cable routing

For internal use


79
Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation / Cabinet alarm routing

For internal use


80
Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation / Alarm routing

For internal use


81
Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation Browser and control unit setup

Configure the setup environment

For internal use


82
Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation Change the CU IP-address


Via the LCD: change the CU IP-address into local IP range
Via the GUI:
Change the user PC IP-address to the CU IP range
Connect to the CU via the GUI
Change the CU IP to the local internet/intranet IP range
Change the user PC IP-address back to the local internet/intranet IP range
Connect the CU and user PC in the local internet/intranet via the GUI

For internal use


83
Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation Change the CU IP-address via GUI

After changing the CU IP-address, need reconnect the CU manually


For internal use
84
Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation GUI home page

For internal use


85
Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Commissioning DC setup

Note: the battery voltage must be over 43Vdc.

For internal use


86
Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Commissioning Check the status

Check the data via the GUI or LCD

For internal use


87
Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Commissioning Set up the parameters

Each FPRA has already been calibrated before the shipment


For internal use
88
Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Export/Import Conf.BIN file

For internal use


89
Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Maintenance
Checking the connector seal
Checking the cable connectors
Checking the screws
Checking the rectifier fans
Replacing the OVP module, when this is necessary
Updating the system firmware

For internal use


90
Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Alarm definition CLARO PERU


MAINS 1 (Alarm 16)
REC AC UVP

( POR CADA MODULO)

MAINS 2 (Alarm 15)


REC GENERAL ERROR
REC SENSOR FAIL
REC NORM. TEMP HIGH
REC NORM TEMP LOW
REC EXCEP TEMP HIGH
REC EXCEP TEMP LOW
REC ELEMENT LOSS
REC OTP
REC FAN FAILURE
REC AC OVP
REC DC OVP

(POR CADA MODULO)


(POR CADA MODULO)
(POR CADA MODULO)
(POR CADA MODULO)
(POR CADA MODULO)
(POR CADA MODULO)
(POR CADA MODULO)
(POR CADA MODULO)
(POR CADA MODULO)
(POR CADA MODULO)
(POR CADA MODULO)

MAINS 3 (ALARM 14)


CU/PDU BATT TEST FAIL
PDA OVP

(POR CADA FPRA)


(POR CADA FPRA)

CRITICAL (ALARM 13)


BATT LOW VOLTAGE
CU/PDUCIRCUIT BREAKER 1
CU/PDUCIRCUIT BREAKER 2
CU/PDUCIRCUIT BREAKER 3
CU/PDUCIRCUIT BREAKER 4
CU/PDUCIRCUIT BREAKER 5
CU/PDU LVD ALARM
REC DC OVP

(POR CADA FPRA)


(POR CADA FPRA)
(POR CADA FPRA)
(POR CADA FPRA)
(POR CADA FPRA)
(POR CADA FPRA)
(POR CADA FPRA)
(POR CADA MODULO)

MAJOR (ALARM 12)


CU/PDU BATT TEMP. LOW
CU/PDU BATT TEMP. HIGH
REC POWER LIMIT

(POR CADA MODULO)


(POR CADA MODULO)
(POR CADA MODULO)

Alarma de puerta : Directa a la BTS (ALARM 1)


voltaje flotacion por celda=2.27 @ 25c
carga 1/10 de la capacidad por 10 horas por numero de bancos
Se dejan los jumpers entre los puertos de load y entre los puertos de battery.

La alarma CLU failure del gabinete Site Star se cablea en serie con la alarma 14
Alarma de Fan de Site Star en serie con alarma 12
Alarma de compresor de Site Star en serie con alarma 12

For internal use


91
Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Alarm definition CLARO PERU (Cont)


Alarmas asignadas al FPRA
J11

N# ALARMA

RELAY 1

PIN 3 Y 4

16

RELAY 2

PIN5 Y 6

15

RELAY 3

PIN7 Y 8

14

RELAY 4

PIN 9 y 10

13

RELAY 5

PIN 11 Y 12

12

RELAY 6

PIN 13 y 14

Alarma de Sensor de Temperatura


color de cable

For internal use


92
Nokia Siemens Networks

J22

Rojo

PIN 7

Blanco

PIN 8

negro

PIN 9

tierra

PIN 10

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Best Practices
While connecting the AC or DC cables into the FPRA system, make sure
the power switches are at the OFF position
All cables have to pass the cable glands via their indicated holes before
connecting into the system
While inserting the cable from the front panel, be careful not to destroy
the waterproof
All the screws must be tightened using proper screwdrivers with
appointed torques
Note the AC terminal block configuration for different AC mains types
The battery/load breaker switch lever bar and the corresponding clamp
short link should be removed when supporting different battery/load.
After finishing the AC or DC cables connection, user is recommended to
test at the cable inputs to ensure no short exists

For internal use


93
Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Best Practices

While commissioning with a battery input, make sure the


battery voltage is over 43Vdc before connecting to the
system
While removing the PDA from the case, the AC mains must
be switched off, but battery could also be on to power the
system
Before install a OVP to the system, the AC mains must be
switched off
The IP rating (IP54) is no longer guaranteed while
connecting the Ethernet cable

For internal use


94
Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010