WEEKLY PROJECT PROGRESS REPORT

FROM : 09/05/2016 - 16/05/2016


PROJECT TITLE :

CADANGAN MEMBINA RUMAH SESEBUAH 3 TINGKAT BERSERTA KOLAM RENANG DI ATAS LOT
46016 (PT 32614), NO. 40, JALAN PJU 3/12 MUKIM PEKAN BARU SUNGAI BULOH, DAERAH
PETALING NEGERI SELANGOR DARUL EHSAN UNTUK TETUAN DATO TING YEW TONG

SUMMARY PHYSICAL PROGRESS REPORT


Previous
09/05/2016

Description
Schedule Progress

30.78%
19.66%
-11.13%
-45
12/18/2016
2/1/2017

Actual Progress
Ahead / Delay ( % )
Ahead / Delay ( Day )
Date of Completion ( Contract )
Estimated Date of Completion

MANPOWER AT SITE
17

17

SITE ACTIVIT

17

Activities
13

5/9/2016
5/10/2016
5/11/2016
5/12/2016
5/13/2016
5/14/2016
5/16/2016

WEATHER REPORT

1ST FLOOR
15 Staircase
ROOF
19 Roof Beam
20 RC Flat Roof Slab
21 Roof Column
22 Upper Roof Beam
23 Roof Truss
Building Work
25 Brickwall
26 Metal Beam
27 Timber Door Frame & Alumn. Frame
M & E Services
29 Electrical Wiring Work
30 Photovoltaic System
31 Security Alarm & CCTV System

Heavy Rain; 36%

Clear; 36%

Slight Rain; 7%
Cloudy; 21%

32
33
34
35

Smarthome System
Air Cond & Mech. Ventilation
Central Vacuum System
Lift System Installation

FINISHING WORK
49 Plumbing/Sanitary Fittings
50 Sewerage piping, manhole and Rain Water Sy
56 Koi pond / Swimming Pool System Installation

Slight Rain; 7%
Cloudy; 21%

NOTE :

- 1st floor brickworks started at Guest Room, Guest Bath, Bedroom 3, Bath 3, wet kitchen, pantry, Dry Kit
- All concreting works for structure are completed. The final concreting works done on the 11/05/2016
- External fencing work has started.

PREPARED BY :

VERIFIED BY :
ABDUL BASIT BIN ABD NASIR

S REPORT
FINANCIAL STATEMENT
RM3,578,347.29

Contract Sum

DI ATAS LOT
, DAERAH
ONG

Piling
Variation Order
PC Sum
Revised Contract Sum

S REPORT
Current
16/05/2016
33.25%
20.04%
-13.21%
-54
12/18/2016
2/10/2017

SITE ACTIVITY
Progress
Actual %
Scheduled
%

Remarks

Last Week This Week

100%

0%

0%

No progress

100%
100%
100%
100%
100%

100%
100%
100%
50%
0%

100%
100%
100%
100%
0%

100%
100%
33%

55%
0%
0%

55%
0%
0%

1st floor on progress


No progress
No progress

48%
50%
14%
22%
29%
0%
17%

40%
0%
0%
0%
0%
0%
0%

40%
0%
0%
0%
0%
0%
0%

Ducting & conduit


No progress
No progress
No progress
No progress
No progress
No progress

68%
71%
33%

5%
50%
0%

5%
50%
0%

No new progress
No new progress
No progress

removing sides fwk


removing sides fwk
removing sides fwk
removing sides fwk

No progress

, pantry, Dry Kitchen, Dining Room


e 11/05/2016

BY :

WEEKLY PROJECT PROGRESS REPORT


FROM : 09/05/2016 - 16/05/2016
PROJECT TITLE :

CADANGAN MEMBINA RUMAH SESEBUAH 3 TINGKAT BERSERTA KOLAM RENANG DI


ATAS LOT 46016 (PT 32614), NO. 40, JALAN PJU 3/12 MUKIM PEKAN BARU SUNGAI
BULOH, DAERAH PETALING NEGERI SELANGOR DARUL EHSAN UNTUK TETUAN DATO
TING YEW TONG

Front Elevation

Side Elevation
Side Elevation

Side Elevation
External Fencing: Cantilever
beams construction

WEEKLY PROJECT PROGRESS REPORT


FROM : 09/05/2016 - 16/05/2016
PROJECT TITLE :

CADANGAN MEMBINA RUMAH SESEBUAH 3 TINGKAT BERSERTA KOLAM RENANG DI


ATAS LOT 46016 (PT 32614), NO. 40, JALAN PJU 3/12 MUKIM PEKAN BARU SUNGAI
BULOH, DAERAH PETALING NEGERI SELANGOR DARUL EHSAN UNTUK TETUAN DATO
TING YEW TONG

1st Flr : Rumpus Room

1st Flr : Guest Room

2nd Flr : Pool Side View

2nd Flr : Bedroom 2 View

1st Flr : Dry Kitchen Area

1st Flr : External Garden View

2nd Flr : Study Room

Roof Level : Roof Beam & Upper Roof


Beam

WEEKLY PROJECT PROGRESS REPORT


FROM : 09/05/2016 - 16/05/2016
PROJECT TITLE :

CADANGAN MEMBINA RUMAH SESEBUAH 3 TINGKAT BERSERTA KOLAM RENANG DI


ATAS LOT 46016 (PT 32614), NO. 40, JALAN PJU 3/12 MUKIM PEKAN BARU SUNGAI
BULOH, DAERAH PETALING NEGERI SELANGOR DARUL EHSAN UNTUK TETUAN DATO
TING YEW TONG

M RENANG DI
ARU SUNGAI
TETUAN DATO

M RENANG DI
ARU SUNGAI
TETUAN DATO

en Area

rden View

Room

& Upper Roof

M RENANG DI
ARU SUNGAI
TETUAN DATO

Weather
Description

5/9/2016

Clear

5/9/2016

5/10/2016

5/10/2016

5/11/2016

Cloudy

Slight Rain
Heavy Rain

5/9/2016

5/10/2016

5/11/2016

5/12/2016

5/13/2016

Date
5/11/2016

5/12/2016

5/12/2016

5/13/2016

5/13/2016

5/14/2016

1
1

5/14/2016

5/15/2016

Heavy Rain; 36%

Clear; 36%

Slight Rain; 7%
Cloudy; 21%

5/14/2016

5/16/2016

5/16/2016

1
1

Rain; 36%

Clear; 36%

ght Rain; 7%
Cloudy; 21%

Total
5
3
1
5

CADANGAN MEMBINA RUMAH SESEBUAH 3 TINGKAT BERSERTA KOLAM RENANG DI ATAS


46016 (PT 32614), NO. 40, JALAN PJU 3/12 MUKIM PEKAN BARU SUNGAI BULOH, DAER
PETALING NEGERI SELANGOR DARUL EHSAN UNTUK TETUAN DATO TING YEW TONG
Manpower

Project Coordinator
Clerk of Work
Site Engineer
Safety Supervisor
Supervisor
Surveyor
Operator
Piler
Carpenter
Concretor
Barbender
General Worker
Door & Window Frame Inst.
Brick Layer
Roofer
Roof covering
Pre-Caster
Ceiling Work Inst.
Aluminium Inst.
Electrician
Plumber
Plasterer
Skim coating
G.I.Work Inst.
M.S.Work Inst.
Floor Screeder
Tiler
Drain Layer
Painter
Fume Cupboard Installer
Gas installer
Sprinkler System Installer
Airconditioning Workers
Emergency Shower Installer

Total Manpower

5/9/2016

5/10/2016

5/11/2016

5/12/2016

5/13/2016

1
3

1
3

1
3

17

17

17

13

OLAM RENANG DI ATAS LOT


SUNGAI BULOH, DAERAH
DATO TING YEW TONG
5/14/2016

5/16/2016

Scheduled Progress
Actual Progress

3/30/2016 4/13/2016 4/18/2016


17.16%
18.14%
15.45%
16.39%

Project Performance From January 2012


50.00%
45.00%
40.00%
35.00%
30.00%
% Progress 25.00%
17.16%
20.00%

18.14%

15.00%
15.45%
10.00%

16.39%

5.00%
0.00%

3/30/2016

4/6/2016

4/13/2016

Scheduled Progress
Actual Progress

2012

Scheduled Progress

Actual Progress

PROPOSED WORK
CADANGAN MEMBINA RUMAH SESEBUAH 3 TINGKAT BERSERTA KOLAM RENANG DI ATAS LOT 46016
COMMENCEMENT DATE

Description
Preliminaries
Site Mobilization
Site Clearing
Site Survey
Site Office/Store
Signboard & Hoading
Piling & Earthwork
Setting Out
Piling Work
Site Mobilization / Building Material Order
Earthwork
Ground Floor
Footing/Stump
Ground Beam
* Delayed due to Changes Work
Alteration to Existing Ground Beam, Lift Pit
and underground sewerage pipe
Anti Termite
Ground Floor Slab
Ground Floor Column / Lift Shaft Structure / RC wall
Sub-basement Compartment for Genset and Bal. tank
Koi Pond, Balancing Tank & Pump Room
1 st Floor
1sr Floor Beam
1st Floor Slab
1st Floor Column / Lift Shaft Structure
Staircase
Second Floor
Second Floor Beam / Swimming Pool Structure
Second Floor Slab
Second Floor Column / Lift Shaft Structure
Roof
Roof Beam
RC Flat Roof Slab
Roof Column

May-15
8
18

25

Jun-15
15
22

Upper Roof Beam


Roof Truss
Roof Covering / Sky Light Cover
Building Work
Brickwall
Metal I-beam
Timber Door Frame & Alumn. Frame
Plastering
M&E Services
Electrical Wiring Work
Photovoltaic System
Security Alarm & CCTV System
Smarthome System
Air Cond & Mech. Ventilation
Central Vacuum System
Lift System Installation
Finishing Work
Install Alum. Door, Window Panel and Fix Glass
Internal Wall and Swimming Pool Finishes/Tiles/Stone/Mosaic
Internal Floor Finishes
Internal ceiling Finishes/Roof EaveTimber Ceiling
Internal Skim coat, External and Internal Painting Work
Metal Grille & Screen
Metal Handrail / Glass Handrail Railing
Metal Spiral Staircase
Timber Door Leaf
Timber Skirting and Architrave
External Wall Timber Cladding
Timber Varnishing Work and R.C Feature Coating
Timber Flooring and Staircase Finishes
Plumbing/Sanitary Fittings Installation
Sewage Piping, Manhole and Rain Water System
R.C Ramp, Dry Yard, Fencing Wall, Main and Side Gate

External Wall Finishes


External Floor Finishes and Koi Pond Finishes
Timber Decking Koi Pond and Pump Room
Lighting and Electrical Work Installation
Koi pond / Swimming Pool System Installation
Built-in Furniture and ID Works
Turfing / Lanscape Work
Touch-up and Cleaning
Testing, Commissioning and Hand Over

Note: Otherwise indicated, this revised program is based on the amended Architectural Drawing
dated 2 Nov 15. Any amendment to the above drawings or additional items in future not sho
consideration in this program.

PROPOSED WORK PROGRAMME (Revision # 5) - 4th May 2016

G DI ATAS LOT 46016 ( PT 32614 ), NO. 15, JALAN PJU 3/12, MUKIM PEKAN BARU SUNGAI BULOH, DAERAH PETAL

COMMENCEMENT DATE : 16/01/2015


Jun-15
29

Jul-15
13
20

27

COMPLETION DATE : 15/04/2016

10

Aug-15
17
24

31

Sep-15
14
21

28

Oct-15
12
19

26

Nov-15
16

CHANGES ON DES

chitectural Drawings dated 23 Sept 15, Engineer Drawings dated 16 Oct 15 and Interior Design Drawings
ms in future not shows on the drawings are not taking

ULOH, DAERAH PETALING, NEGERI SELANGOR DARUL EHSAN UNTUK TETUAN DATO TING YEW TONG
REVISED COMMENCEMENT DATE: 18/05/15
Nov-15
23

30

Dec-15
14
21

Jan-16
28

11

18

25

Feb-16
15

22

16.67%
33.33%
CHANGES ON DESIGN (FROM RC TO STEEL STRUCTURE)

29

50.0%

20.00%

40.0%

60.0%

80.0%
33.33%

RE

Change of skirting design and construction method

or Design Drawings

TING YEW TONG

TE: 18/05/15

REVISED COMPLETION DATE: 10/12/16


Mar-16

Apr-16

14

21

66.67%

83.33%

100.00%

28

11

100.0%
66.7%

100.0%
50.00%

100.0%

50.00%

100.0%
50.00%

100.0%
50.00%

100.0%

18

25

May-16
16

50.00%

100.0%
25.00%

11.11%

22.2%

design and construction method

33.3%

44.4%

55.6%

66.7%

50.0%

75.0%

100.0%

11.11%

22.2%

33.3%

80.0%

100.0%

16.67%

33.3%

77.8%

88.9%

100.0%

20.00%

40.0%

60.0%

May-16
23

30

Schedule

Actual

Ahead/(Behind)

Overall week

Week Lapsed

Over All %

Schedule
(Overall)

100%

100%

0%

0.49%

0.49%

100%

100%

0%

0.74%

0.74%

100%

100%

0%

0.74%

0.74%

100%

100%

0%

0.99%

0.99%

100%

100%

0%

0.74%

0.74%

100%

100%

0%

0.25%

0.25%

100%

100%

0%

0.49%

0.49%

100%

100%

0%

0.74%

0.74%

100%

100%

0%

1.23%

1.23%

100%

100%

0%

0.74%

0.74%

100%

100%

0%

0.99%

0.99%

100%

100%

0%

0.49%

0.49%

100%

100%

0%

0.74%

0.74%

0%

0%

0%

1.48%

0.00%

100%

100%

0%

1.23%

1.23%

100%

100%

0%

0.74%

0.74%

100%

100%

0%

0.49%

0.49%

100%

90%

-10%

0.49%

0.49%

100%

90%

-10%

0.49%

0.49%

100%

50%

-50%

0.49%

0.49%

44.4%

50.0%

55.6%

66.7%

100%

50%

-50%

0.49%

0.49%

25%

0%

-25%

0.99%

0.25%

0%

0%

0%

2.22%

0.00%

70%

30%

-40%

2.22%

1.55%

0%

0%

0%

1.23%

0.00%

0%

0%

0%

1.48%

0.00%

0%

0%

0%

10

2.46%

0.00%

38%

38%

0%

27

11

6.65%

2.53%

0%

0%

0%

1.48%

0.00%

0%

0%

0%

14

3.45%

0.00%

0%

0%

0%

2.22%

0.00%

0%

0%

0%

1.72%

0.00%

0%

0%

0%

0.99%

0.00%

0%

0%

0%

1.48%

0.00%

0%

0%

0%

1.97%

0.00%

0%

0%

0%

11

2.71%

0.00%

0%

0%

0%

10

2.46%

0.00%

0%

0%

0%

11

2.71%

0.00%

0%

0%

0%

17

4.19%

0.00%

0%

0%

0%

1.97%

0.00%

0%

0%

0%

16

3.94%

0.00%

0%

0%

0%

1.23%

0.00%

0%

0%

0%

0.99%

0.00%

0%

0%

0%

0.74%

0.00%

0%

0%

0%

1.48%

0.00%

0%

0%

0%

11

2.71%

0.00%

0%

0%

0%

2.22%

0.00%

45%

5%

-40%

22

5.42%

2.44%

60%

50%

-10%

17

4.19%

2.51%

0%

0%

0%

11

2.71%

0.00%

Proposed
Actual

Ahead / Behi

0%

0%

0%

10

2.46%

0.00%

0%

0%

0%

1.48%

0.00%

0%

0%

0%

1.23%

0.00%

0%

0%

0%

1.23%

0.00%

0%

0%

0%

2.22%

0.00%

0%

0%

0%

15

3.69%

0.00%

0%

0%

0%

0.99%

0.00%

0%

0%

0%

0.74%

0.00%

0%

0%

0%

0.49%

0.00%

406

89

100.00%

23.07%

Actual W/Done

0.49%
0.74%

0.74%
0.99%
0.74%
0.25%
0.49%
0.74%
1.23%
0.74%

0.99%
0.49%
0.74%
0.00%

1.23%
0.74%
0.49%

0.44%
0.44%
0.25%

0.25%
0.00%
0.00%

0.67%
0.00%
0.00%
0.00%

2.53%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.27%
2.09%
0.00%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

18.76%

Description

No.

Preliminaries
A
B
C
D
E

Site Mobilization
Site Clearing
Site Survey
Site Office/Store
Signboard & Hoading

Piling & Earthwork


Setting Out
G Piling Work
1 Site Mobilization / Building Material Order
F

Earthwork

Footing/Stump

Ground Floor

Ground Beam
* Delayed due to Changes Work
5 Alteration to Existing Ground Beam, Lift Pit
and underground sewerage pipe
6 Anti Termite
4

Ground Floor Slab

Ground Floor Column / Lift Shaft Structure / RC wall

10 Sub-basement Compartment for Genset and Bal. tank


11 Koi Pond, Balancing Tank & Pump Room

1 st Floor
12 1sr Floor Beam
13 1st Floor Slab
14 1st Floor Column / Lift Shaft Structure
15 Staircase

Second Floor
16 Second Floor Beam / Swimming Pool Structure
17 Second Floor Slab
18 Second Floor Column / Lift Shaft Structure

Roof
19 Roof Beam
20 RC Flat Roof Slab
21 Roof Column
22 Upper Roof Beam

May-15
8
18

Jun-15
25

15

Description

No.

23 Roof Truss
24 Roof Covering / Sky Light Cover

Building Work
25 Brickwall
26 Metal I-beam
27 Timber Door Frame & Alumn. Frame
28 Plastering

M&E Services
29 Electrical Wiring Work
30 Photovoltaic System
31 Security Alarm & CCTV System
32 Smarthome System
33 Air Cond & Mech. Ventilation
34 Central Vacuum System
35 Lift System Installation

Finishing Work
36 Install Alum. Door, Window Panel and Fix Glass
37 Internal Wall and Swimming Pool Finishes/Tiles/Stone/Mosaic
38 Internal Floor Finishes
39 Internal ceiling Finishes/Roof EaveTimber Ceiling
40 Internal Skim coat, External and Internal Painting Work
41 Metal Grille & Screen
42 Metal Handrail / Glass Handrail Railing
43 Metal Spiral Staircase
44 Timber Door Leaf
45 Timber Skirting and Architrave
46 External Wall Timber Cladding
47 Timber Varnishing Work and R.C Feature Coating
48 Timber Flooring and Staircase Finishes
49 Plumbing/Sanitary Fittings Installation

May-15
8
18

Jun-15
25

15

No.

Description

50 Sewage Piping, Manhole and Rain Water System


51 R.C Ramp, Dry Yard, Fencing Wall, Main and Side Gate
52 External Wall Finishes
53 External Floor Finishes and Koi Pond Finishes
54 Timber Decking Koi Pond and Pump Room
55 Lighting and Electrical Work Installation
56 Koi pond / Swimming Pool System Installation
57 Built-in Furniture and ID Works
58 Turfing / Lanscape Work
59 Touch-up and Cleaning
60 Testing, Commissioning and Hand Over

May-15
8
18

Jun-15
25

15

Jun-15
22

Jul-15
29

13

Aug-15
20

27

10

17

Sep-15
24

31

Jun-15

Jul-15

22

29

3.7%

7.4%

13

Aug-15
20

27

10

17

Sep-15
24

31

Jun-15
22

Jul-15
29

13

Aug-15
20

27

10

17

Sep-15
24

31

Sep-15
14

Oct-15
21

28

12

Nov-15
19

26

16

23

30

Sep-15
14

Oct-15
21

28

12

Nov-15
19

26

16

23

4.5%

9.1%

13.6%

18.2%

30

Sep-15
14

Oct-15
21

28

12

Nov-15
19

26

16

23

30

5.9%

11.8%

CADANGAN MEMBINA RUMAH SESEBUA

Dec-15
7

14

Jan-16
21

28

Feb-16

11

18

16.7%

33.3%

25

15

22

40.0%

60.0%

CHANGES ON DESIGN (FROM RC TO STEEL STRUCTURE)


20.0%

Dec-15
7

14

Jan-16
21

28

11.1%

14.8%

11

Feb-16
18

25

15

22

18.5%

22.2%

Change of skirting design and construction me

22.7%

27.3%

Dec-15

Jan-16

Feb-16

14

21

28

11

18

17.6%

23.5%

29.4%

35.3%

41.2%

47.1%

52.9%

25

15

22

11.1%

22.2%

NGAN MEMBINA RUMAH SESEBUAH 3 TINGKAT BERSERTA KOLAM RENANG DI ATAS LOT 46016 (PT 32614), NO. 40, JALAN PJU 3/12 MUKIM PEKAN BARU SUNGAI BULOH, DAER
WORK PROGRAM AS PER REVISED ON 18 APRIL 2016

Mar-16

Apr-16

29

14

21

50.0%

66.7%

83.3%

100.0%

80.0%

100.0%

33.3%

66.7%

28

11

May-16
18

100.0%
50.0%

100.0%

50.0%

100.0%
50.0%

100.0%
50.0%

100.0%
50.0%

100.0%

25

16

Mar-16
29

11.1%

25.9%

29.6%

14

22.2%

33.3%

Apr-16
21

33.3%

37.0%

28

44.4%

40.7%

55.6%

11

66.7%

44.4%

48.1%

16.7%

33.3%

May-16
18

25

25.0%

50.0%

75.0%

100.0%

11.1%

22.2%

33.3%

80.0%

100.0%

16.7%

33.3%

7.1%

14.3%

11.1%

22.2%

14.3%

28.6%

77.8%

88.9%

100.0%

20.0%

40.0%

60.0%

16

50.0%

25.0%

50.0%
16.7%

of skirting design and construction method

31.8%

36.4%

40.9%

45.5%

50.0%

54.5%

59.1%

63.6%

68.2%

Mar-16
29

33.3%

14

Apr-16
21

28

58.8%

64.7%

70.6%

11

May-16
18

25

16

KAN BARU SUNGAI BULOH, DAERAH PETALING NEGERI SELANGOR DARUL EHSAN UNTUK TETUAN DATO TING YEW TONG

18 APRIL 2016
May-16

Jun-16
23

30

13

Jul-16
20

27

11

Aug-16
18

25

May-16

Jun-16
23

30

44.4%

55.6%

50.0%
10.0%

20.0%

21.4%

28.6%

33.3%

44.4%

42.9%

57.1%

33.3%

50.0%

30.0%

13

Jul-16
20

27

11

18

25

66.7%

77.8%

88.9%

100.0%

100.0%

Timber Door Frame confirmed on 14/4/16, 3 weeks required for manufacture, Alumn n

40.0%

50.0%

60.0%

70.0%

80.0%

90.0%

100.0%

51.9%

55.6%

59.3%

63.0%

66.7%

70.4%

74.1%

77.8%

35.7%

42.9%

50.0%

Plastering cannot proceed due to

No confirmation
No confirmation

18.2%

5.9%

6.3%

9.1%

81.8%

12.5%

25.0%

37.5%

50.0%

62.5%

27.3%

36.4%

45.5%

54.5%

63.6%

10.0%

20.0%

30.0%

9.1%

18.2%

11.8%

12.5%
20.0%

77.3%

83.3%

No confirmation
55.6%

66.7%

9.1%

72.7%

Aug-16

40.0%

18.2%

60.0%

27.3%

17.6%

23.5%

29.4%

35.3%

18.8%

25.0%

31.3%

37.5%

50.0%

66.7%

83.3%

80.0%

100.0%

16.7%

33.3%

36.4%

45.5%

May-16

Jun-16
23

30

13

Jul-16
20

27

11

10.0%

Aug-16
18

25

76.5%

82.4%

88.2%

20.0%

30.0%

44.4%

Aug-16
15

Sep-16
22

29

12

Oct-16
19

26

10

17

24

31

Aug-16
15

Sep-16
22

29

12

Oct-16
19

26

10

17

24

31

85.2%

88.9%

92.6%

96.3%

100.0%

57.1%

64.3%

71.4%

75.00%

100.0%

88.2%

eks required for manufacture, Alumn no confirmation yet


Plastering cannot proceed due to concealed smarthome/alarm wiring not confirmed

81.5%

75.0%

87.5%

100.0%

72.7%

81.8%

90.9%

100.0%

40.0%

50.0%

60.0%

70.0%

80.0%

90.0%

100.0%

27.3%

36.4%

45.5%

54.5%

63.6%

72.7%

81.8%

90.9%

100.0%

47.1%

52.9%

58.8%

64.7%

70.6%

76.5%

82.4%

75.0%

87.5%

100.0%
75.0%

81.3%

87.5%

41.2%
12.5%

25.0%

37.5%

50.0%

62.5%

43.8%

50.0%

56.3%

62.5%

68.8%

25.0%

50.0%

75.0%

44.4%

55.6%

66.7%

100.0%
54.5%

63.6%

72.7%

11.1%

22.2%

33.3%

100.0%

Aug-16

Sep-16

Oct-16

15

22

29

12

19

26

9.1%

18.2%

27.3%

36.4%

45.5%

54.5%

63.6%

10

17

24

31

40.0%

50.0%

60.0%

70.0%

80.0%
16.7%

20.0%

55.6%

40.0%

60.0%

80.0%

20.0%

40.0%

60.0%

60.0%

66.7%

73.3%

66.7%
6.7%

13.3%

20.0%

26.7%

33.3%

40.0%

46.7%

53.3%

Nov-16
7

14

Dec-16
21

28

12

Jan-17
19

26

16

23

Nov-16
7

Dec-16
21

28

66.7%

83.3%

100.0%

85.7%

92.9%

100.0%

66.7%

77.8%

88.9%

100.0%

71.4%

85.7%

100.0%

66.67%

83.3%

100.0%

94.1%

100.0%

93.8%

100.0%

90.9%

100.0%

95.5%

100.0%

78.6%

14

81.8%
77.8%

88.9%

100.0%

86.4%

90.9%

12

Jan-17
19

26

16

23

Nov-16
7

14

Dec-16
21

28

94.1%

100.0%

90.9%

100.0%

66.7%

83.3%

77.8%

88.9%

100.0%

86.7%

93.3%

100.0%

25.0%

50.0%

75.0%

100.0%

33.3%

66.7%

100.0%

50.0%

100.0%

72.7%

81.8%

90.0%

100.0%

33.3%

50.0%

100.0%

100.0%
80.0%

80.0%

100.0%

12

Jan-17
19

26

16

23

Schedule

Actual

Ahead/(Behind)

0%
0%
0%
0%
0%

0%
0%
0%
0%
0%

0%
0%
100%

Overall week

Week Lapsed

Over All %

0%
0%
0%
0%
0%

0
0
0
0
0

0.00%
0.00%
0.00%
0.00%
0.00%

0%
0%
100%

0%
0%
0%

0
0
2

0.00%
0.00%
0.66%

100%

100%

0%

0.99%

100%

100%

0%

0.99%

100%

95%

-5%

2.98%

0%

0%

0%

0.33%

0%

0%

0%

0.66%

0%

0%

0%

0.66%

0%

0%

0%

2.65%

0%

0%

0%

1.32%

0%

0%

0%

0.66%

0%

0%

0%

0.66%

0%

0%

0%

0.33%

0%

0%

0%

1.66%

0%

0%

0%

0.99%

0%

0%

0%

0.66%

0%

0%

0%

0.66%

0%

0%

0%

0.66%

0%

0%

0%

0.66%

0%

0%

0%

0.66%

30

Schedule

Actual

Ahead/(Behind)

Overall week

Week Lapsed

Over All %

0%

0%

0%

1.32%

0%

0%

0%

1.99%

0%

0%

0%

0.66%

0%

0%

0%

1.66%

0%

0%

0%

1.99%

0%

0%

0%

1.99%

0%

0%

0%

29

9.60%

0%

0%

0%

1.99%

0%

0%

0%

1.99%

0%

0%

0%

1.99%

0%

0%

0%

1.99%

0%

0%

0%

1.32%

0%

0%

0%

1.32%

0%

0%

0%

1.66%

0%

0%

0%

12

3.97%

0%

0%

0%

2.32%

0%

0%

0%

11

3.64%

0%

0%

0%

1.66%

0%

0%

0%

1.99%

0%

0%

0%

10

3.31%

0%

0%

0%

24

7.95%

0%

0%

0%

1.66%

0%

0%

0%

0.99%

0%

0%

0%

15

4.97%

30

Schedule

Actual

Ahead/(Behind)

Overall week

Week Lapsed

Over All %

0%

0%

0%

1.99%

0%

0%

0%

1.99%

0%

0%

0%

1.99%

0%

0%

0%

11

3.64%

0%

0%

0%

0.99%

0%

0%

0%

11

3.64%

0%

0%

0%

1.66%

0%

0%

0%

1.32%

302

13

100.00%

30

A
c
t
u
a
l
Propose

0.00%
0.00%
0.00%
0.00%
0.00%

Schedule

Actual

Ahead/Behin
d

Schedule
(Overall)

Actual
W/Done

W
/
D
o
###
n
###
e

###
###
###

0.00%
0.00%
0.66%

###
###
### 100%

100%

0%

0.49%

0.49%

0.99%

### 100%

100%

0%

0.74%

0.74%

0.99%

### 100%

100%

0%

0.74%

0.74%

1.66%

### 100%

100%

0%

0.99%

0.99%

100%

100%

0%

0.74%

0.74%

0.00%

### 100%

100%

0%

0.25%

0.25%

0.00%

### 100%

100%

0%

0.49%

0.49%

0.00%

### 100%

100%

0%

0.74%

0.74%

100%

100%

0%

1.23%

1.23%

0.00%

### 100%

100%

0%

0.74%

0.74%

0.00%

### 100%

100%

0%

0.99%

0.99%

0.00%

### 100%

100%

0%

0.49%

0.49%

0.00%

### 100%

100%

0%

0.74%

0.74%

0.00%

### 100%

0%

-100%

1.48%

0.00%

0.00%

### 100%

100%

0%

1.23%

1.23%

0.00%

### 100%

100%

0%

0.74%

0.74%

0.00%

### 100%

100%

0%

0.49%

0.49%

0.00%

### 100%

100%

0%

0.49%

0.49%

0.00%

### 100%

100%

0%

0.49%

0.49%

0.00%

### 100%

100%

0%

0.49%

0.49%

0.00%

### 100%

50%

-50%

0.49%

0.25%

Propose

0.00%

A
c
t
u
a
l
W
/
D
o
###
n
e

Schedule

Actual

Ahead/Behin
d

Schedule
(Overall)

Actual
W/Done

75%

0%

-75%

0.74%

0.00%

11%

0%

-11%

0.25%

0.00%

0.00%

###

0.00%

### 100%

55%

-45%

2.22%

1.22%

0.00%

###

60%

0%

-60%

0.74%

0.00%

0.00%

###

0%

0%

0%

0.00%

0.00%

0.00%

###

0%

0%

0%

0.00%

0.00%

0.00%

###

48%

38%

-10%

3.20%

2.53%

0.00%

###

50%

0%

-50%

0.74%

0.00%

0.00%

###

0%

0%

0%

0.00%

0.00%

0.00%

###

0%

0%

0%

0.00%

0.00%

0.00%

###

0%

0%

0%

0.00%

0.00%

0.00%

###

50%

0%

-50%

0.49%

0.00%

0.00%

###

0%

0%

0%

0.00%

0.00%

0.00%

###

0%

0%

0%

0.00%

0.00%

0.00%

###

0%

0%

0%

0.00%

0.00%

0.00%

###

0%

0%

0%

0.00%

0.00%

0.00%

###

0%

0%

0%

0.00%

0.00%

0.00%

###

0%

0%

0%

0.00%

0.00%

0.00%

###

0%

0%

0%

0.00%

0.00%

0.00%

###

0%

0%

0%

0.00%

0.00%

0.00%

###

0%

0%

0%

0.00%

0.00%

0.00%

###

0%

0%

0%

0.00%

0.00%

0%

0%

0%

0.00%

0.00%

0%

0%

0%

0.00%

0.00%

0%

0%

0%

0.00%

0.00%

0.00%

###

0%

0%

0%

0.00%

0.00%

0.00%

###

64%

5%

-59%

3.45%

0.27%

Propose

A
c
t
u
a
l
W
/
D
o
n
e

Schedule

Actual

Ahead/Behin
d

Schedule
(Overall)

Actual
W/Done

71%

50%

-21%

2.96%

2.09%

0%

0%

0%

0.00%

0.00%

0.00%

###

0%

0%

0%

0.00%

0.00%

0.00%

###

0%

0%

0%

0.00%

0.00%

0%

0%

0%

0.00%

0.00%

0.00%

###

0%

0%

0%

0.00%

0.00%

0.00%

###

33%

0%

-33%

0.74%

0.00%

0.00%

###

0%

0%

0%

0.00%

0.00%

0.00%

###

0%

0%

0%

0.00%

0.00%

0.00%

###

0%

0%

0%

0.00%

0.00%

0.00%

###

0%

0%

0%

0.00%

0.00%

4.30%

###

30.78%

19.66%

CADANGAN MEMBINA RUMAH SESEBUAH 3 TINGKAT BERSERTA KOLAM RENANG DI ATAS LOT 46016 ( PT 32614 ), NO
PJU 3/12, MUKIM PEKAN BARU SUNGAI BULOH, DAERAH PETALING, NEGERI SELANGOR DARUL EHSAN UNTUK TETUA
YEW TONG

No.

Description
Preliminaries

May-16
16

Schedule

Actual

Ahead/
(Behind)

A
B
C
D
E

Site Mobilization
Site Clearing
Site Survey
Site Office/Store
Signboard & Hoading

F
G
1

Piling & Earthwork


Setting Out
Piling Work
Site Mobilization / Building Material Order

100%

100%

0%

Earthwork

100%

100%

0%

Footing/Stump

100%

100%

0%

100%

100%

0%

100%

100%

0%

Ground Beam
* Delayed due to Changes Work
Alteration to Existing Ground Beam, Lift Pit
and underground sewerage pipe
Anti Termite

100%

100%

0%

Ground Floor Slab

100%

100%

0%

Ground Floor Column / Lift Shaft Structure / RC wall

100%

100%

0%

10

Sub-basement Compartment for Genset and Bal. tank

100%

100%

0%

11

Koi Pond, Balancing Tank & Pump Room

100%

100%

0%

12

1sr Floor Beam

100%

100%

0%

13

1st Floor Slab

100%

100%

0%

14

1st Floor Column / Lift Shaft Structure

100%

100%

0%

15

Staircase

100%

0%

-100%

16

Second Floor
Second Floor Beam / Swimming Pool Structure

100%

100%

0%

17

Second Floor Slab

100%

100%

0%

18

Second Floor Column / Lift Shaft Structure

100%

100%

0%

19

Roof Beam

100%

100%

0%

20

RC Flat Roof Slab

100%

100%

0%

21

Roof Column

100%

100%

0%

22

Upper Roof Beam

100%

100%

0%

Ground Floor

1 st Floor

Roof

CADANGAN MEMBINA RUMAH SESEBUAH 3 TINGKAT BERSERTA KOLAM RENANG DI ATAS LOT 46016 ( PT 32614 ), NO
PJU 3/12, MUKIM PEKAN BARU SUNGAI BULOH, DAERAH PETALING, NEGERI SELANGOR DARUL EHSAN UNTUK TETUA
YEW TONG

No.
23

Description

May-16
16

Roof Truss
33%

Schedule

Actual

Ahead/
(Behind)

100%

0%

-100%

33%

0%

-33%

100%

55%

-45%

24

Roof Covering / Sky Light Cover

25

Brickwall

26

Metal I-beam

100%

100%

0%

-100%

27

Timber Door Frame & Alumn. Frame

33%

33%

0%

-33%

28

Plastering

0%

0%

0%

29

Electrical Wiring Work

48%

40%

-8%

30

Photovoltaic System

0%

0%

0%

31

Security Alarm & CCTV System

14%

14%

0%

-14%

32

Smarthome System

22%

22%

0%

-22%

33

Air Cond & Mech. Ventilation

29%

29%

0%

-29%

34

Central Vacuum System

0%

0%

0%

35

Lift System Installation

17%

0%

-17%

36

Finishing Work
Install Alum. Door, Window Panel and Fix Glass

0%

0%

0%

37

Internal Wall and Swimming Pool Finishes/Tiles/Stone/Mosaic

0%

0%

0%

38

Internal Floor Finishes

0%

0%

0%

39

Internal ceiling Finishes/Roof EaveTimber Ceiling

0%

0%

0%

40

Internal Skim coat, External and Internal Painting Work

0%

0%

0%

41

Metal Grille & Screen

0%

0%

0%

42

Metal Handrail / Glass Handrail Railing

0%

0%

0%

43

Metal Spiral Staircase

0%

0%

0%

44

Timber Door Leaf

0%

0%

0%

45

Timber Skirting and Architrave

0%

0%

0%

46

External Wall Timber Cladding

0%

0%

0%

47

Timber Varnishing Work and R.C Feature Coating

0%

0%

0%

48

Timber Flooring and Staircase Finishes

0%

0%

0%

Building Work

M&E Services

17%

CADANGAN MEMBINA RUMAH SESEBUAH 3 TINGKAT BERSERTA KOLAM RENANG DI ATAS LOT 46016 ( PT 32614 ), NO
PJU 3/12, MUKIM PEKAN BARU SUNGAI BULOH, DAERAH PETALING, NEGERI SELANGOR DARUL EHSAN UNTUK TETUA
YEW TONG

No.
49

Description
Plumbing/Sanitary Fittings Installation

May-16
16
68%

Schedule

Actual

Ahead/
(Behind)

68%

5%

-63%

50

Sewage Piping, Manhole and Rain Water System

71%

50%

-21%

51

R.C Ramp, Dry Yard, Fencing Wall, Main and Side Gate

0%

0%

0%

52

External Wall Finishes

0%

0%

0%

53

External Floor Finishes and Koi Pond Finishes

0%

0%

0%

54

Timber Decking Koi Pond and Pump Room

0%

0%

0%

55

Lighting and Electrical Work Installation

0%

0%

0%

56

Koi pond / Swimming Pool System Installation

33%

0%

-33%

57

Built-in Furniture and ID Works

0%

0%

0%

58

Turfing / Lanscape Work

0%

0%

0%

59

Touch-up and Cleaning

0%

0%

0%

60

Testing, Commissioning and Hand Over

0%

0%

0%

: Delayed items

T 32614 ), NO. 15, JALAN


NTUK TETUAN DATO TING

Overall
Scheduled

Actual W/Done

0.49%

0.49%

0.74%

0.74%

0.74%

0.74%

0.99%

0.99%

0.74%

0.74%

0.25%

0.25%

0.49%

0.49%

0.74%

0.74%

1.23%

1.23%

0.74%

0.74%

0.99%

0.99%

0.49%

0.49%

0.74%

0.74%

1.48%

0.00%

1.23%

1.23%

0.74%

0.74%

0.49%

0.49%

0.49%

0.49%

0.49%

0.49%

0.49%

0.49%

0.49%

0.49%

T 32614 ), NO. 15, JALAN


NTUK TETUAN DATO TING

Overall
Scheduled

Actual W/Done

0.99%

0.00%

0.74%

0.00%

2.22%

1.22%

1.23%

0.00%

0.49%

0.00%

0.00%

0.00%

3.20%

2.66%

0.00%

0.00%

0.49%

0.00%

0.49%

0.00%

0.49%

0.00%

0.00%

0.00%

0.25%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

T 32614 ), NO. 15, JALAN


NTUK TETUAN DATO TING

Overall
Scheduled

Actual W/Done

3.69%

0.27%

2.96%

2.09%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.74%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

33.25%

20.04%