CADANGAN MEMBINA RUMAH SESEBUAH 3 TINGKAT BERSERTA KOLAM RENANG DI ATAS LOT
46016 (PT 32614), NO. 40, JALAN PJU 3/12 MUKIM PEKAN BARU SUNGAI BULOH, DAERAH
PETALING NEGERI SELANGOR DARUL EHSAN UNTUK TETUAN DATO TING YEW TONG
Description
Schedule Progress
30.78%
19.66%
-11.13%
-45
12/18/2016
2/1/2017
Actual Progress
Ahead / Delay ( % )
Ahead / Delay ( Day )
Date of Completion ( Contract )
Estimated Date of Completion
MANPOWER AT SITE
17
17
SITE ACTIVIT
17
Activities
13
5/9/2016
5/10/2016
5/11/2016
5/12/2016
5/13/2016
5/14/2016
5/16/2016
WEATHER REPORT
1ST FLOOR
15 Staircase
ROOF
19 Roof Beam
20 RC Flat Roof Slab
21 Roof Column
22 Upper Roof Beam
23 Roof Truss
Building Work
25 Brickwall
26 Metal Beam
27 Timber Door Frame & Alumn. Frame
M & E Services
29 Electrical Wiring Work
30 Photovoltaic System
31 Security Alarm & CCTV System
Clear; 36%
Slight Rain; 7%
Cloudy; 21%
32
33
34
35
Smarthome System
Air Cond & Mech. Ventilation
Central Vacuum System
Lift System Installation
FINISHING WORK
49 Plumbing/Sanitary Fittings
50 Sewerage piping, manhole and Rain Water Sy
56 Koi pond / Swimming Pool System Installation
Slight Rain; 7%
Cloudy; 21%
NOTE :
- 1st floor brickworks started at Guest Room, Guest Bath, Bedroom 3, Bath 3, wet kitchen, pantry, Dry Kit
- All concreting works for structure are completed. The final concreting works done on the 11/05/2016
- External fencing work has started.
PREPARED BY :
VERIFIED BY :
ABDUL BASIT BIN ABD NASIR
S REPORT
FINANCIAL STATEMENT
RM3,578,347.29
Contract Sum
DI ATAS LOT
, DAERAH
ONG
Piling
Variation Order
PC Sum
Revised Contract Sum
S REPORT
Current
16/05/2016
33.25%
20.04%
-13.21%
-54
12/18/2016
2/10/2017
SITE ACTIVITY
Progress
Actual %
Scheduled
%
Remarks
100%
0%
0%
No progress
100%
100%
100%
100%
100%
100%
100%
100%
50%
0%
100%
100%
100%
100%
0%
100%
100%
33%
55%
0%
0%
55%
0%
0%
48%
50%
14%
22%
29%
0%
17%
40%
0%
0%
0%
0%
0%
0%
40%
0%
0%
0%
0%
0%
0%
68%
71%
33%
5%
50%
0%
5%
50%
0%
No new progress
No new progress
No progress
No progress
BY :
Front Elevation
Side Elevation
Side Elevation
Side Elevation
External Fencing: Cantilever
beams construction
M RENANG DI
ARU SUNGAI
TETUAN DATO
M RENANG DI
ARU SUNGAI
TETUAN DATO
en Area
rden View
Room
M RENANG DI
ARU SUNGAI
TETUAN DATO
Weather
Description
5/9/2016
Clear
5/9/2016
5/10/2016
5/10/2016
5/11/2016
Cloudy
Slight Rain
Heavy Rain
5/9/2016
5/10/2016
5/11/2016
5/12/2016
5/13/2016
Date
5/11/2016
5/12/2016
5/12/2016
5/13/2016
5/13/2016
5/14/2016
1
1
5/14/2016
5/15/2016
Clear; 36%
Slight Rain; 7%
Cloudy; 21%
5/14/2016
5/16/2016
5/16/2016
1
1
Rain; 36%
Clear; 36%
ght Rain; 7%
Cloudy; 21%
Total
5
3
1
5
Project Coordinator
Clerk of Work
Site Engineer
Safety Supervisor
Supervisor
Surveyor
Operator
Piler
Carpenter
Concretor
Barbender
General Worker
Door & Window Frame Inst.
Brick Layer
Roofer
Roof covering
Pre-Caster
Ceiling Work Inst.
Aluminium Inst.
Electrician
Plumber
Plasterer
Skim coating
G.I.Work Inst.
M.S.Work Inst.
Floor Screeder
Tiler
Drain Layer
Painter
Fume Cupboard Installer
Gas installer
Sprinkler System Installer
Airconditioning Workers
Emergency Shower Installer
Total Manpower
5/9/2016
5/10/2016
5/11/2016
5/12/2016
5/13/2016
1
3
1
3
1
3
17
17
17
13
5/16/2016
Scheduled Progress
Actual Progress
18.14%
15.00%
15.45%
10.00%
16.39%
5.00%
0.00%
3/30/2016
4/6/2016
4/13/2016
Scheduled Progress
Actual Progress
2012
Scheduled Progress
Actual Progress
PROPOSED WORK
CADANGAN MEMBINA RUMAH SESEBUAH 3 TINGKAT BERSERTA KOLAM RENANG DI ATAS LOT 46016
COMMENCEMENT DATE
Description
Preliminaries
Site Mobilization
Site Clearing
Site Survey
Site Office/Store
Signboard & Hoading
Piling & Earthwork
Setting Out
Piling Work
Site Mobilization / Building Material Order
Earthwork
Ground Floor
Footing/Stump
Ground Beam
* Delayed due to Changes Work
Alteration to Existing Ground Beam, Lift Pit
and underground sewerage pipe
Anti Termite
Ground Floor Slab
Ground Floor Column / Lift Shaft Structure / RC wall
Sub-basement Compartment for Genset and Bal. tank
Koi Pond, Balancing Tank & Pump Room
1 st Floor
1sr Floor Beam
1st Floor Slab
1st Floor Column / Lift Shaft Structure
Staircase
Second Floor
Second Floor Beam / Swimming Pool Structure
Second Floor Slab
Second Floor Column / Lift Shaft Structure
Roof
Roof Beam
RC Flat Roof Slab
Roof Column
May-15
8
18
25
Jun-15
15
22
Note: Otherwise indicated, this revised program is based on the amended Architectural Drawing
dated 2 Nov 15. Any amendment to the above drawings or additional items in future not sho
consideration in this program.
G DI ATAS LOT 46016 ( PT 32614 ), NO. 15, JALAN PJU 3/12, MUKIM PEKAN BARU SUNGAI BULOH, DAERAH PETAL
Jul-15
13
20
27
10
Aug-15
17
24
31
Sep-15
14
21
28
Oct-15
12
19
26
Nov-15
16
CHANGES ON DES
chitectural Drawings dated 23 Sept 15, Engineer Drawings dated 16 Oct 15 and Interior Design Drawings
ms in future not shows on the drawings are not taking
ULOH, DAERAH PETALING, NEGERI SELANGOR DARUL EHSAN UNTUK TETUAN DATO TING YEW TONG
REVISED COMMENCEMENT DATE: 18/05/15
Nov-15
23
30
Dec-15
14
21
Jan-16
28
11
18
25
Feb-16
15
22
16.67%
33.33%
CHANGES ON DESIGN (FROM RC TO STEEL STRUCTURE)
29
50.0%
20.00%
40.0%
60.0%
80.0%
33.33%
RE
or Design Drawings
TE: 18/05/15
Apr-16
14
21
66.67%
83.33%
100.00%
28
11
100.0%
66.7%
100.0%
50.00%
100.0%
50.00%
100.0%
50.00%
100.0%
50.00%
100.0%
18
25
May-16
16
50.00%
100.0%
25.00%
11.11%
22.2%
33.3%
44.4%
55.6%
66.7%
50.0%
75.0%
100.0%
11.11%
22.2%
33.3%
80.0%
100.0%
16.67%
33.3%
77.8%
88.9%
100.0%
20.00%
40.0%
60.0%
May-16
23
30
Schedule
Actual
Ahead/(Behind)
Overall week
Week Lapsed
Over All %
Schedule
(Overall)
100%
100%
0%
0.49%
0.49%
100%
100%
0%
0.74%
0.74%
100%
100%
0%
0.74%
0.74%
100%
100%
0%
0.99%
0.99%
100%
100%
0%
0.74%
0.74%
100%
100%
0%
0.25%
0.25%
100%
100%
0%
0.49%
0.49%
100%
100%
0%
0.74%
0.74%
100%
100%
0%
1.23%
1.23%
100%
100%
0%
0.74%
0.74%
100%
100%
0%
0.99%
0.99%
100%
100%
0%
0.49%
0.49%
100%
100%
0%
0.74%
0.74%
0%
0%
0%
1.48%
0.00%
100%
100%
0%
1.23%
1.23%
100%
100%
0%
0.74%
0.74%
100%
100%
0%
0.49%
0.49%
100%
90%
-10%
0.49%
0.49%
100%
90%
-10%
0.49%
0.49%
100%
50%
-50%
0.49%
0.49%
44.4%
50.0%
55.6%
66.7%
100%
50%
-50%
0.49%
0.49%
25%
0%
-25%
0.99%
0.25%
0%
0%
0%
2.22%
0.00%
70%
30%
-40%
2.22%
1.55%
0%
0%
0%
1.23%
0.00%
0%
0%
0%
1.48%
0.00%
0%
0%
0%
10
2.46%
0.00%
38%
38%
0%
27
11
6.65%
2.53%
0%
0%
0%
1.48%
0.00%
0%
0%
0%
14
3.45%
0.00%
0%
0%
0%
2.22%
0.00%
0%
0%
0%
1.72%
0.00%
0%
0%
0%
0.99%
0.00%
0%
0%
0%
1.48%
0.00%
0%
0%
0%
1.97%
0.00%
0%
0%
0%
11
2.71%
0.00%
0%
0%
0%
10
2.46%
0.00%
0%
0%
0%
11
2.71%
0.00%
0%
0%
0%
17
4.19%
0.00%
0%
0%
0%
1.97%
0.00%
0%
0%
0%
16
3.94%
0.00%
0%
0%
0%
1.23%
0.00%
0%
0%
0%
0.99%
0.00%
0%
0%
0%
0.74%
0.00%
0%
0%
0%
1.48%
0.00%
0%
0%
0%
11
2.71%
0.00%
0%
0%
0%
2.22%
0.00%
45%
5%
-40%
22
5.42%
2.44%
60%
50%
-10%
17
4.19%
2.51%
0%
0%
0%
11
2.71%
0.00%
Proposed
Actual
Ahead / Behi
0%
0%
0%
10
2.46%
0.00%
0%
0%
0%
1.48%
0.00%
0%
0%
0%
1.23%
0.00%
0%
0%
0%
1.23%
0.00%
0%
0%
0%
2.22%
0.00%
0%
0%
0%
15
3.69%
0.00%
0%
0%
0%
0.99%
0.00%
0%
0%
0%
0.74%
0.00%
0%
0%
0%
0.49%
0.00%
406
89
100.00%
23.07%
Actual W/Done
0.49%
0.74%
0.74%
0.99%
0.74%
0.25%
0.49%
0.74%
1.23%
0.74%
0.99%
0.49%
0.74%
0.00%
1.23%
0.74%
0.49%
0.44%
0.44%
0.25%
0.25%
0.00%
0.00%
0.67%
0.00%
0.00%
0.00%
2.53%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.27%
2.09%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
18.76%
Description
No.
Preliminaries
A
B
C
D
E
Site Mobilization
Site Clearing
Site Survey
Site Office/Store
Signboard & Hoading
Earthwork
Footing/Stump
Ground Floor
Ground Beam
* Delayed due to Changes Work
5 Alteration to Existing Ground Beam, Lift Pit
and underground sewerage pipe
6 Anti Termite
4
1 st Floor
12 1sr Floor Beam
13 1st Floor Slab
14 1st Floor Column / Lift Shaft Structure
15 Staircase
Second Floor
16 Second Floor Beam / Swimming Pool Structure
17 Second Floor Slab
18 Second Floor Column / Lift Shaft Structure
Roof
19 Roof Beam
20 RC Flat Roof Slab
21 Roof Column
22 Upper Roof Beam
May-15
8
18
Jun-15
25
15
Description
No.
23 Roof Truss
24 Roof Covering / Sky Light Cover
Building Work
25 Brickwall
26 Metal I-beam
27 Timber Door Frame & Alumn. Frame
28 Plastering
M&E Services
29 Electrical Wiring Work
30 Photovoltaic System
31 Security Alarm & CCTV System
32 Smarthome System
33 Air Cond & Mech. Ventilation
34 Central Vacuum System
35 Lift System Installation
Finishing Work
36 Install Alum. Door, Window Panel and Fix Glass
37 Internal Wall and Swimming Pool Finishes/Tiles/Stone/Mosaic
38 Internal Floor Finishes
39 Internal ceiling Finishes/Roof EaveTimber Ceiling
40 Internal Skim coat, External and Internal Painting Work
41 Metal Grille & Screen
42 Metal Handrail / Glass Handrail Railing
43 Metal Spiral Staircase
44 Timber Door Leaf
45 Timber Skirting and Architrave
46 External Wall Timber Cladding
47 Timber Varnishing Work and R.C Feature Coating
48 Timber Flooring and Staircase Finishes
49 Plumbing/Sanitary Fittings Installation
May-15
8
18
Jun-15
25
15
No.
Description
May-15
8
18
Jun-15
25
15
Jun-15
22
Jul-15
29
13
Aug-15
20
27
10
17
Sep-15
24
31
Jun-15
Jul-15
22
29
3.7%
7.4%
13
Aug-15
20
27
10
17
Sep-15
24
31
Jun-15
22
Jul-15
29
13
Aug-15
20
27
10
17
Sep-15
24
31
Sep-15
14
Oct-15
21
28
12
Nov-15
19
26
16
23
30
Sep-15
14
Oct-15
21
28
12
Nov-15
19
26
16
23
4.5%
9.1%
13.6%
18.2%
30
Sep-15
14
Oct-15
21
28
12
Nov-15
19
26
16
23
30
5.9%
11.8%
Dec-15
7
14
Jan-16
21
28
Feb-16
11
18
16.7%
33.3%
25
15
22
40.0%
60.0%
Dec-15
7
14
Jan-16
21
28
11.1%
14.8%
11
Feb-16
18
25
15
22
18.5%
22.2%
22.7%
27.3%
Dec-15
Jan-16
Feb-16
14
21
28
11
18
17.6%
23.5%
29.4%
35.3%
41.2%
47.1%
52.9%
25
15
22
11.1%
22.2%
NGAN MEMBINA RUMAH SESEBUAH 3 TINGKAT BERSERTA KOLAM RENANG DI ATAS LOT 46016 (PT 32614), NO. 40, JALAN PJU 3/12 MUKIM PEKAN BARU SUNGAI BULOH, DAER
WORK PROGRAM AS PER REVISED ON 18 APRIL 2016
Mar-16
Apr-16
29
14
21
50.0%
66.7%
83.3%
100.0%
80.0%
100.0%
33.3%
66.7%
28
11
May-16
18
100.0%
50.0%
100.0%
50.0%
100.0%
50.0%
100.0%
50.0%
100.0%
50.0%
100.0%
25
16
Mar-16
29
11.1%
25.9%
29.6%
14
22.2%
33.3%
Apr-16
21
33.3%
37.0%
28
44.4%
40.7%
55.6%
11
66.7%
44.4%
48.1%
16.7%
33.3%
May-16
18
25
25.0%
50.0%
75.0%
100.0%
11.1%
22.2%
33.3%
80.0%
100.0%
16.7%
33.3%
7.1%
14.3%
11.1%
22.2%
14.3%
28.6%
77.8%
88.9%
100.0%
20.0%
40.0%
60.0%
16
50.0%
25.0%
50.0%
16.7%
31.8%
36.4%
40.9%
45.5%
50.0%
54.5%
59.1%
63.6%
68.2%
Mar-16
29
33.3%
14
Apr-16
21
28
58.8%
64.7%
70.6%
11
May-16
18
25
16
KAN BARU SUNGAI BULOH, DAERAH PETALING NEGERI SELANGOR DARUL EHSAN UNTUK TETUAN DATO TING YEW TONG
18 APRIL 2016
May-16
Jun-16
23
30
13
Jul-16
20
27
11
Aug-16
18
25
May-16
Jun-16
23
30
44.4%
55.6%
50.0%
10.0%
20.0%
21.4%
28.6%
33.3%
44.4%
42.9%
57.1%
33.3%
50.0%
30.0%
13
Jul-16
20
27
11
18
25
66.7%
77.8%
88.9%
100.0%
100.0%
Timber Door Frame confirmed on 14/4/16, 3 weeks required for manufacture, Alumn n
40.0%
50.0%
60.0%
70.0%
80.0%
90.0%
100.0%
51.9%
55.6%
59.3%
63.0%
66.7%
70.4%
74.1%
77.8%
35.7%
42.9%
50.0%
No confirmation
No confirmation
18.2%
5.9%
6.3%
9.1%
81.8%
12.5%
25.0%
37.5%
50.0%
62.5%
27.3%
36.4%
45.5%
54.5%
63.6%
10.0%
20.0%
30.0%
9.1%
18.2%
11.8%
12.5%
20.0%
77.3%
83.3%
No confirmation
55.6%
66.7%
9.1%
72.7%
Aug-16
40.0%
18.2%
60.0%
27.3%
17.6%
23.5%
29.4%
35.3%
18.8%
25.0%
31.3%
37.5%
50.0%
66.7%
83.3%
80.0%
100.0%
16.7%
33.3%
36.4%
45.5%
May-16
Jun-16
23
30
13
Jul-16
20
27
11
10.0%
Aug-16
18
25
76.5%
82.4%
88.2%
20.0%
30.0%
44.4%
Aug-16
15
Sep-16
22
29
12
Oct-16
19
26
10
17
24
31
Aug-16
15
Sep-16
22
29
12
Oct-16
19
26
10
17
24
31
85.2%
88.9%
92.6%
96.3%
100.0%
57.1%
64.3%
71.4%
75.00%
100.0%
88.2%
81.5%
75.0%
87.5%
100.0%
72.7%
81.8%
90.9%
100.0%
40.0%
50.0%
60.0%
70.0%
80.0%
90.0%
100.0%
27.3%
36.4%
45.5%
54.5%
63.6%
72.7%
81.8%
90.9%
100.0%
47.1%
52.9%
58.8%
64.7%
70.6%
76.5%
82.4%
75.0%
87.5%
100.0%
75.0%
81.3%
87.5%
41.2%
12.5%
25.0%
37.5%
50.0%
62.5%
43.8%
50.0%
56.3%
62.5%
68.8%
25.0%
50.0%
75.0%
44.4%
55.6%
66.7%
100.0%
54.5%
63.6%
72.7%
11.1%
22.2%
33.3%
100.0%
Aug-16
Sep-16
Oct-16
15
22
29
12
19
26
9.1%
18.2%
27.3%
36.4%
45.5%
54.5%
63.6%
10
17
24
31
40.0%
50.0%
60.0%
70.0%
80.0%
16.7%
20.0%
55.6%
40.0%
60.0%
80.0%
20.0%
40.0%
60.0%
60.0%
66.7%
73.3%
66.7%
6.7%
13.3%
20.0%
26.7%
33.3%
40.0%
46.7%
53.3%
Nov-16
7
14
Dec-16
21
28
12
Jan-17
19
26
16
23
Nov-16
7
Dec-16
21
28
66.7%
83.3%
100.0%
85.7%
92.9%
100.0%
66.7%
77.8%
88.9%
100.0%
71.4%
85.7%
100.0%
66.67%
83.3%
100.0%
94.1%
100.0%
93.8%
100.0%
90.9%
100.0%
95.5%
100.0%
78.6%
14
81.8%
77.8%
88.9%
100.0%
86.4%
90.9%
12
Jan-17
19
26
16
23
Nov-16
7
14
Dec-16
21
28
94.1%
100.0%
90.9%
100.0%
66.7%
83.3%
77.8%
88.9%
100.0%
86.7%
93.3%
100.0%
25.0%
50.0%
75.0%
100.0%
33.3%
66.7%
100.0%
50.0%
100.0%
72.7%
81.8%
90.0%
100.0%
33.3%
50.0%
100.0%
100.0%
80.0%
80.0%
100.0%
12
Jan-17
19
26
16
23
Schedule
Actual
Ahead/(Behind)
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
100%
Overall week
Week Lapsed
Over All %
0%
0%
0%
0%
0%
0
0
0
0
0
0.00%
0.00%
0.00%
0.00%
0.00%
0%
0%
100%
0%
0%
0%
0
0
2
0.00%
0.00%
0.66%
100%
100%
0%
0.99%
100%
100%
0%
0.99%
100%
95%
-5%
2.98%
0%
0%
0%
0.33%
0%
0%
0%
0.66%
0%
0%
0%
0.66%
0%
0%
0%
2.65%
0%
0%
0%
1.32%
0%
0%
0%
0.66%
0%
0%
0%
0.66%
0%
0%
0%
0.33%
0%
0%
0%
1.66%
0%
0%
0%
0.99%
0%
0%
0%
0.66%
0%
0%
0%
0.66%
0%
0%
0%
0.66%
0%
0%
0%
0.66%
0%
0%
0%
0.66%
30
Schedule
Actual
Ahead/(Behind)
Overall week
Week Lapsed
Over All %
0%
0%
0%
1.32%
0%
0%
0%
1.99%
0%
0%
0%
0.66%
0%
0%
0%
1.66%
0%
0%
0%
1.99%
0%
0%
0%
1.99%
0%
0%
0%
29
9.60%
0%
0%
0%
1.99%
0%
0%
0%
1.99%
0%
0%
0%
1.99%
0%
0%
0%
1.99%
0%
0%
0%
1.32%
0%
0%
0%
1.32%
0%
0%
0%
1.66%
0%
0%
0%
12
3.97%
0%
0%
0%
2.32%
0%
0%
0%
11
3.64%
0%
0%
0%
1.66%
0%
0%
0%
1.99%
0%
0%
0%
10
3.31%
0%
0%
0%
24
7.95%
0%
0%
0%
1.66%
0%
0%
0%
0.99%
0%
0%
0%
15
4.97%
30
Schedule
Actual
Ahead/(Behind)
Overall week
Week Lapsed
Over All %
0%
0%
0%
1.99%
0%
0%
0%
1.99%
0%
0%
0%
1.99%
0%
0%
0%
11
3.64%
0%
0%
0%
0.99%
0%
0%
0%
11
3.64%
0%
0%
0%
1.66%
0%
0%
0%
1.32%
302
13
100.00%
30
A
c
t
u
a
l
Propose
0.00%
0.00%
0.00%
0.00%
0.00%
Schedule
Actual
Ahead/Behin
d
Schedule
(Overall)
Actual
W/Done
W
/
D
o
###
n
###
e
###
###
###
0.00%
0.00%
0.66%
###
###
### 100%
100%
0%
0.49%
0.49%
0.99%
### 100%
100%
0%
0.74%
0.74%
0.99%
### 100%
100%
0%
0.74%
0.74%
1.66%
### 100%
100%
0%
0.99%
0.99%
100%
100%
0%
0.74%
0.74%
0.00%
### 100%
100%
0%
0.25%
0.25%
0.00%
### 100%
100%
0%
0.49%
0.49%
0.00%
### 100%
100%
0%
0.74%
0.74%
100%
100%
0%
1.23%
1.23%
0.00%
### 100%
100%
0%
0.74%
0.74%
0.00%
### 100%
100%
0%
0.99%
0.99%
0.00%
### 100%
100%
0%
0.49%
0.49%
0.00%
### 100%
100%
0%
0.74%
0.74%
0.00%
### 100%
0%
-100%
1.48%
0.00%
0.00%
### 100%
100%
0%
1.23%
1.23%
0.00%
### 100%
100%
0%
0.74%
0.74%
0.00%
### 100%
100%
0%
0.49%
0.49%
0.00%
### 100%
100%
0%
0.49%
0.49%
0.00%
### 100%
100%
0%
0.49%
0.49%
0.00%
### 100%
100%
0%
0.49%
0.49%
0.00%
### 100%
50%
-50%
0.49%
0.25%
Propose
0.00%
A
c
t
u
a
l
W
/
D
o
###
n
e
Schedule
Actual
Ahead/Behin
d
Schedule
(Overall)
Actual
W/Done
75%
0%
-75%
0.74%
0.00%
11%
0%
-11%
0.25%
0.00%
0.00%
###
0.00%
### 100%
55%
-45%
2.22%
1.22%
0.00%
###
60%
0%
-60%
0.74%
0.00%
0.00%
###
0%
0%
0%
0.00%
0.00%
0.00%
###
0%
0%
0%
0.00%
0.00%
0.00%
###
48%
38%
-10%
3.20%
2.53%
0.00%
###
50%
0%
-50%
0.74%
0.00%
0.00%
###
0%
0%
0%
0.00%
0.00%
0.00%
###
0%
0%
0%
0.00%
0.00%
0.00%
###
0%
0%
0%
0.00%
0.00%
0.00%
###
50%
0%
-50%
0.49%
0.00%
0.00%
###
0%
0%
0%
0.00%
0.00%
0.00%
###
0%
0%
0%
0.00%
0.00%
0.00%
###
0%
0%
0%
0.00%
0.00%
0.00%
###
0%
0%
0%
0.00%
0.00%
0.00%
###
0%
0%
0%
0.00%
0.00%
0.00%
###
0%
0%
0%
0.00%
0.00%
0.00%
###
0%
0%
0%
0.00%
0.00%
0.00%
###
0%
0%
0%
0.00%
0.00%
0.00%
###
0%
0%
0%
0.00%
0.00%
0.00%
###
0%
0%
0%
0.00%
0.00%
0%
0%
0%
0.00%
0.00%
0%
0%
0%
0.00%
0.00%
0%
0%
0%
0.00%
0.00%
0.00%
###
0%
0%
0%
0.00%
0.00%
0.00%
###
64%
5%
-59%
3.45%
0.27%
Propose
A
c
t
u
a
l
W
/
D
o
n
e
Schedule
Actual
Ahead/Behin
d
Schedule
(Overall)
Actual
W/Done
71%
50%
-21%
2.96%
2.09%
0%
0%
0%
0.00%
0.00%
0.00%
###
0%
0%
0%
0.00%
0.00%
0.00%
###
0%
0%
0%
0.00%
0.00%
0%
0%
0%
0.00%
0.00%
0.00%
###
0%
0%
0%
0.00%
0.00%
0.00%
###
33%
0%
-33%
0.74%
0.00%
0.00%
###
0%
0%
0%
0.00%
0.00%
0.00%
###
0%
0%
0%
0.00%
0.00%
0.00%
###
0%
0%
0%
0.00%
0.00%
0.00%
###
0%
0%
0%
0.00%
0.00%
4.30%
###
30.78%
19.66%
CADANGAN MEMBINA RUMAH SESEBUAH 3 TINGKAT BERSERTA KOLAM RENANG DI ATAS LOT 46016 ( PT 32614 ), NO
PJU 3/12, MUKIM PEKAN BARU SUNGAI BULOH, DAERAH PETALING, NEGERI SELANGOR DARUL EHSAN UNTUK TETUA
YEW TONG
No.
Description
Preliminaries
May-16
16
Schedule
Actual
Ahead/
(Behind)
A
B
C
D
E
Site Mobilization
Site Clearing
Site Survey
Site Office/Store
Signboard & Hoading
F
G
1
100%
100%
0%
Earthwork
100%
100%
0%
Footing/Stump
100%
100%
0%
100%
100%
0%
100%
100%
0%
Ground Beam
* Delayed due to Changes Work
Alteration to Existing Ground Beam, Lift Pit
and underground sewerage pipe
Anti Termite
100%
100%
0%
100%
100%
0%
100%
100%
0%
10
100%
100%
0%
11
100%
100%
0%
12
100%
100%
0%
13
100%
100%
0%
14
100%
100%
0%
15
Staircase
100%
0%
-100%
16
Second Floor
Second Floor Beam / Swimming Pool Structure
100%
100%
0%
17
100%
100%
0%
18
100%
100%
0%
19
Roof Beam
100%
100%
0%
20
100%
100%
0%
21
Roof Column
100%
100%
0%
22
100%
100%
0%
Ground Floor
1 st Floor
Roof
CADANGAN MEMBINA RUMAH SESEBUAH 3 TINGKAT BERSERTA KOLAM RENANG DI ATAS LOT 46016 ( PT 32614 ), NO
PJU 3/12, MUKIM PEKAN BARU SUNGAI BULOH, DAERAH PETALING, NEGERI SELANGOR DARUL EHSAN UNTUK TETUA
YEW TONG
No.
23
Description
May-16
16
Roof Truss
33%
Schedule
Actual
Ahead/
(Behind)
100%
0%
-100%
33%
0%
-33%
100%
55%
-45%
24
25
Brickwall
26
Metal I-beam
100%
100%
0%
-100%
27
33%
33%
0%
-33%
28
Plastering
0%
0%
0%
29
48%
40%
-8%
30
Photovoltaic System
0%
0%
0%
31
14%
14%
0%
-14%
32
Smarthome System
22%
22%
0%
-22%
33
29%
29%
0%
-29%
34
0%
0%
0%
35
17%
0%
-17%
36
Finishing Work
Install Alum. Door, Window Panel and Fix Glass
0%
0%
0%
37
0%
0%
0%
38
0%
0%
0%
39
0%
0%
0%
40
0%
0%
0%
41
0%
0%
0%
42
0%
0%
0%
43
0%
0%
0%
44
0%
0%
0%
45
0%
0%
0%
46
0%
0%
0%
47
0%
0%
0%
48
0%
0%
0%
Building Work
M&E Services
17%
CADANGAN MEMBINA RUMAH SESEBUAH 3 TINGKAT BERSERTA KOLAM RENANG DI ATAS LOT 46016 ( PT 32614 ), NO
PJU 3/12, MUKIM PEKAN BARU SUNGAI BULOH, DAERAH PETALING, NEGERI SELANGOR DARUL EHSAN UNTUK TETUA
YEW TONG
No.
49
Description
Plumbing/Sanitary Fittings Installation
May-16
16
68%
Schedule
Actual
Ahead/
(Behind)
68%
5%
-63%
50
71%
50%
-21%
51
R.C Ramp, Dry Yard, Fencing Wall, Main and Side Gate
0%
0%
0%
52
0%
0%
0%
53
0%
0%
0%
54
0%
0%
0%
55
0%
0%
0%
56
33%
0%
-33%
57
0%
0%
0%
58
0%
0%
0%
59
0%
0%
0%
60
0%
0%
0%
: Delayed items
Overall
Scheduled
Actual W/Done
0.49%
0.49%
0.74%
0.74%
0.74%
0.74%
0.99%
0.99%
0.74%
0.74%
0.25%
0.25%
0.49%
0.49%
0.74%
0.74%
1.23%
1.23%
0.74%
0.74%
0.99%
0.99%
0.49%
0.49%
0.74%
0.74%
1.48%
0.00%
1.23%
1.23%
0.74%
0.74%
0.49%
0.49%
0.49%
0.49%
0.49%
0.49%
0.49%
0.49%
0.49%
0.49%
Overall
Scheduled
Actual W/Done
0.99%
0.00%
0.74%
0.00%
2.22%
1.22%
1.23%
0.00%
0.49%
0.00%
0.00%
0.00%
3.20%
2.66%
0.00%
0.00%
0.49%
0.00%
0.49%
0.00%
0.49%
0.00%
0.00%
0.00%
0.25%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Overall
Scheduled
Actual W/Done
3.69%
0.27%
2.96%
2.09%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.74%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
33.25%
20.04%