AWARDED SOLAR PROJECTS as of January 31, 2016

ISLAND / GRID REGION

LUZON

PROVINCE

Ilocos Norte

CITY /
MUNICIPALITY

PROJECT NAME

Currimao

Currimao Solar Power Project

Pasuquin, Burgos

Pasuquin East Solar Power


Project

Burgos

Burgos Solar Power Project


Phase I
Burgos Solar Power Project
Phase 2

Paoay

Ilocos Norte Phase I Solar


Power Project
Ilocos Norte Phase II Solar
Power Project
Paoay II Solar Power Project

Paoay III Solar Power Project

Bulacan

Laoag, Bacarra,
San Nicolas &
Paoay

Laoag Solar Power Project

San Ildefonso

Bulacan 1 Solar Power Project


Bulacan 2 Solar Power Project

COMPANY NAME

STATUS

Under Development Stage (FIT System). For


issuance of show-cause letter due to nonposting of Performance Bond.
Motion for reconsideration and DOC (FIT
Energy Logics Philippines,
System) is under evaluation. For issuance of
Inc.
reminder letter due to non compliance with
RESHERR.
Under Commercial Stage (FIT System).
Energy Development
Compliant with all work and financial
Corporation
obligations.
Under Development Stage (FIT System Energy Development
Additional Investment). For issuance of
Corporation
reminder letter due to non compliance with
RESHERR.
For issuance of Termination Letter due to nonDel Sol Energy Primera, Inc. compliance with Milestone Approach and
RESHERR.
For issuance of Termination Letter due to nonDel Sol Energy Primera, Inc. compliance with Milestone Approach and
RESHERR.
For issuance of Termination Letter due to nonDel Sol Energy Segunda, Inc. compliance with Milestone Approach and
RESHERR.
For issuance of Termination Letter due to nonDel Sol Energy Tercera, Inc. compliance with Milestone Approach and
RESHERR.
Mirae Asia Energy
Corporation

Solar Philippines Commercial On-going pre-development activities. Request


Rooftop Projects, Inc.
for reduction of contract area is on process.
Cleantech Global
Renewables, Inc.
Cleantech Global
Renewables, Inc.

Newly awarded. For payment of Signature


Bonus
Compliance with Milestone Approach is on
going.

POTENTIAL
CAPACITY
(MW)

INSTALLED
CAPACITY
(MW)

20.00

50.00

4.10

2.66

40.00

40.00

40.00

40.00

45.00
15.00
40.00

AWARDED SOLAR PROJECTS as of January 31, 2016


ISLAND / GRID REGION

LUZON

PROVINCE

Pangasinan

CITY /
MUNICIPALITY

Manaoag

Dasol

II

III

PROJECT NAME

COMPANY NAME

Pugaro Solar Power Project

AVGarcia Power Systems


Corp.

Pangasinan I Solar Power


Project
Pangasinan II Solar Power
Project

Cleantech Global
Renewables, Inc.
Cleantech Global
Renewables, Inc.

Cagayan

Aparri

Aparri Solar Power Project

GreEnergy Power Systems


Philippines, Inc.

Isabela

Ilagan

Isabela Solar Power Project

Living Projects 4 People


Philippines Inc.

Cordon

Cordon Solar Power Project

Greenergy Solutions Inc.

Sta. Maria

Sta. Maria Solar Power Project

Greenergy Solutions Inc.

Mexico

Pampanga Solar Power Project RASLAG Corp.

Pampanga

Pampanga Solar Power Project


RASLAG Corp.
Phase II

Bataan

Porac

Guagua Solar Power Project

Solar Power Utilities


Generator Corporation

Mabalacat

Clark Solar Power Project

Enfinity Philippines
Renewable Resources Inc.

Hermosa

Hermosa Solar Power Project

YH Green Energy
Incorporated
Solana Solar Alpha Inc.

STATUS
For issuance of Termination Letter due to nonposting of Performance Bond and noncompliance with Milestone Approach and
RESHERR.
Newly awarded. For payment of Signature
Bonus
Newly awarded. For payment of Signature
Bonus
For issuance of Termination Letter due to
expiration of the SESC and non compliance with
the Performance Bond, DOC, and RESHERR.
Compliant with Milestone Approach. For
issuance of reminder letter due to noncompliance with RESHERR.
Compliance with Milestone Approach is on
going.
Compliance with Milestone Approach is on
going.
Under Commercial Stage (FIT System). For
issuance of reminder letter due to noncompliance with RESHERR.
Under Development Stage (FIT System Additional Investment). For issuance of
reminder letter due to non compliance with
RESHERR.
Compliance with Milestone Approach is on
going.
Under Development Stage (FIT System). For
issuance of reminder letter due to noncompliance with RESHERR.
Under Development Stage (FIT System). For
issuance of reminder letter due to non
compliance with RESHERR.
Compliance with Milestone Approach is on
going.

POTENTIAL
CAPACITY
(MW)

INSTALLED
CAPACITY
(MW)

2.00

50.00
50.00

105.00

100.00
50.00
25.00
10.00

13.14

50.00
24.55

14.50
10.00

AWARDED SOLAR PROJECTS as of January 31, 2016


ISLAND / GRID REGION

LUZON

III

PROVINCE

Bataan

CITY /
MUNICIPALITY

Morong

Mariveles

Orani

Bulacan

San Rafael

San Ildefonso

Zambales

Palauig

Botolan

Nueva Ecija

Cabanatuan City

PROJECT NAME

COMPANY NAME

Under Development Stage (FIT System). For


issuance of reminder letter due to non
compliance with RESHERR.
DOC (FIT System) is under evaluation. For
Next Generation Power
Bataan Solar Power Project
issuance of reminder letter due to non
Technology Corp.
compliance with RESHERR.
Compliance with Milestone Approach is onnv vogt Philippines Solar
Bataan I Solar Power Project
going. For issuance of reminder letter due to
Energy Four, Inc.
non compliance with RESHERR.
Compliant with Milestone Approach. For
issuance of show-cause letter due to delayed
Bataan Solar Power Project
BWST, Inc.
implementation of its Work Program and noncompliance with RESHERR.
SPARC Solar Powered Agri- Under Development Stage (FIT System). For
San Rafael Solar Power Project Rural Communities
issuance of reminder letter due to non
Corporation
compliance with RESHERR.
DOC (FIT System) and assignment to Bulacan
Cleantech Global
Solar Energy Corp. are under evaluation. For
Bulacan 3 Solar Power Project
Renewables, Inc.
issuance of reminder letter due to non
compliance with RESHERR.
SPARC Solar Powered Agri- Under Development Stage (FIT System). For
Palauig Solar Power Project
Rural Communities
issuance of reminder letter due to non
Corporation
compliance with RESHERR.
DOC (FIT System) is under evaluation. For
Solar Power Utilities
Salasa Solar Power Project
issuance of reminder letter due to non
Generator Corporation
compliance with RESHERR.
DOC (FIT System) is under evaluation. For
Solar Power Utilities
Bulawen Solar Power Project
issuance of reminder letter due to non
Generator Corporation
compliance with RESHERR.
DOC (FIT System) is under evaluation. For
Solar Power Utilities
Botolan Solar Power Project
issuance of reminder letter due to non
Generator Corporation
compliance with RESHERR.
Under Development Stage (FIT System). For
First Cabanatuan Renewable
Cabanatuan Solar Power Project
issuance of reminder letter due to non
Ventures, Inc.
compliance with RESHERR.
Morong Solar Power Project

SPARC Solar Powered AgriRural Communities


Corporation

STATUS

POTENTIAL
CAPACITY
(MW)
5.02

20.00

55.00

150.00

3.82

45.00

5.02

50.00

40.00

40.00

10.06

INSTALLED
CAPACITY
(MW)

AWARDED SOLAR PROJECTS as of January 31, 2016


ISLAND / GRID REGION

LUZON

III

PROVINCE

CITY /
MUNICIPALITY

PROJECT NAME

COMPANY NAME

Bataan

Morong -Hermosa Sta. Rita Solar Power Project

Jobin-Sqm Inc.

Tarlac

Concepcion

Concepcion Solar Power Project

Enfinity Philippines
Renewable Resources Inc.

Tarlac City

Tarlac Solar Power Project

nv vogt Philippines Solar


Energy Three, Inc.
PetroSolar Corporation

Tarlac and
Pampanga
Nueva Ecija
Nuev Ecija

IV-A

Tarlac,
Concepcion, La
Tarlac Solar Power Project
Paz & Victoria
Concepcion,
Capas & Bamban
Concepcion Solar Power Project
and Magalang &
Mabalacat
San Jose City and
San Jose Solar Power Project
Lupao
San Jose & Lupao San Jose Solar Power Project

STATUS
Under Development Stage (FIT System). For
issuance of reminder letter due to non
compliance with RESHERR.
Under Development Stage (FIT System). For
issuance of show-cause letter due to delayed
implementation of 5-Year Work Plan and noncompliance with RESHERR.
Compliance with Milestone Approach is ongoing. For issuance of reminder letter due to
non compliance with RESHERR.
Under Development Stage (FIT System). For
issuance of reminder letter due to non
compliance with RESHERR.

POTENTIAL
CAPACITY
(MW)
100.44

50.55

55.00

50.00

Solar Philippines Commercial On-going pre-development activities. Request


Rooftop Projects, Inc.
for reduction of contract area is on process.

100.00

Solar Philippines Commercial On-going pre-development activities. Request


Rooftop Projects, Inc.
for reduction of contract area is on process.

75.00

SJC SolarPower Corporation


V-Mars Solar Energy
Corporation

Pantabangan

Nueva Ecija Solar Power Project Firmgreen Phils. Inc.

Tarlac

Tarlac City,
Concepcion &
Capas

Tarlac Solar Power Project

Firmgreen Phils. Inc.

Cavite

Rosario and
General Trias

Cavite Economic Zone Solar


Power Project

Majestics Energy
Corporation

Naic

Sabang Solar Power Project

G.A. Philkor Multi Energy


Corp.

Compliance with Milestone Approach is on


going.
Compliance with Milestone Approach is on
going.
Compliance with Milestone Approach is on
going.
Compliance with Milestone Approach is on
going.
Under Commercial Stage (FIT System). For
issuance of reminder letter due to non
compliance with RESHERR.
DOC (FIT System) is under evaluation. For
issuance of reminder letter due to non
compliance with RESHERR.

INSTALLED
CAPACITY
(MW)

10.00
10.00
100.00
50.00

41.30

50.00

AWARDED SOLAR PROJECTS as of January 31, 2016


ISLAND / GRID REGION

LUZON

IV-A

PROVINCE

Cavite

CITY /
MUNICIPALITY

PROJECT NAME

Rizal

Rodriguez

Laguna

Calamba

Binan

Cabuyao

Luisiana

Batangas

Sto. Tomas

Quezon

Candelaria

STATUS

Under Development Stage (FIT System). For


issuance of show-cause letter due to delayed
implementation of 5-Year Work Plan and noncompliance with RESHERR.
For issuance of Termination Letter due to nonSolar Philippines Commercial posting of Performance Bond and nonDasmarias Solar Power Project
Rooftop Projects, Inc.
compliance with Milestone Approach and
RESHERR.
Under Development Stage (FIT System). For
ATN Philippines Solar Energy issuance of show-cause letter due to nonMacabud Solar Power Project
Group, Inc.
posting of Performance Bond and noncompliance with RESHERR.

Noveleta, Rosario,
Cavite Solar Power Project
Gen. Trias, Tanza

Dasmarias

COMPANY NAME

Canlubang Solar Power Project

Enfinity Philippines
Renewable Resources Inc.

Transnational Renewable
Energy Corporation

Motion for reconsideration is not acceptable.


For issuance of Termination Letter with finality.

Under Development Stage (PSA with Central


Central Mall Bian Solar Power Solar Philippines Commercial Mall Binan). For issuance of show-cause letter
Project
Rooftop Projects, Inc.
due to non-posting of Performance Bond and
non-compliance with RESHERR.
For issuance of Termination Letter due to nonSolar Philippines Commercial posting of Performance Bond and nonCabuyao Solar Power Project
Rooftop Projects, Inc.
compliance with Milestone Approach and
RESHERR.
For issuance of Termination letter due to non
Solar Power Utilities
Luisiana Solar Power Project
compliance with Milestone Approach and
Generator Corporation
RESHERR.
For issuance of Termination Letter due nonFPIP Batangas Solar Power
posting of Performance Bond, non-compliance
First Gen Visayas Energy Inc.
Project
with Milestone Approach, and non-compliance
with RESHERR.
For issuance of Termination letter due to non
Solar Power Utilities
Candelaria Solar Power Project
compliance with Milestone Approach and
Generator Corporation
RESHERR.

POTENTIAL
CAPACITY
(MW)

3.00

0.80

30.00

0.206

0.70047

16.00

30.00

50.00

INSTALLED
CAPACITY
(MW)

AWARDED SOLAR PROJECTS as of January 31, 2016


ISLAND / GRID REGION

LUZON

IV-A

PROVINCE

Batangas

Rizal

IV-B

NCR

Palawan

Metro Manila

Metro Manila

CITY /
MUNICIPALITY

PROJECT NAME

COMPANY NAME

Calatagan

Calatagan Solar Power Project

Solar Philippines Calatagan


Corporation

Lian

Lian Solar Power Project

Absolut Distillers, Inc.

Balayan

Batangas Solar Power Project

EarthEnergy Corp.

STATUS
Under Development Stage (FIT System).
Amendment of DOC (FIT System) is on process.
For issuance of reminder letter due to non
compliance with RESHERR.
DOC (FIT System) is under evaluation. For
issuance of reminder letter due to non
compliance with RESHERR.
Compliant with Milestone Approach. For
issuance of reminder letter due to noncompliance with RESHERR.
Compliance with Milestone Approach is on
going.
Newly awarded. For payment of Signature
Bonus

Nasugbu and Tuy Nasugbu Solar Power Project

Roxas Green Energy


Corporation

Rosario

Rosario Solar Power Project

EEI Power Corporation

Taytay

Taytay Solar Power Project

Solar Philippines Commercial On-going pre-development activities. Request


Rooftop Projects, Inc.
for reduction of contract area is on process.

Palawan Solar Power Project

Sabang Renewable Energy


Corp.

Puerto Princesa

El Nido Island

El Nido Solar Power Project

Quezon City

SM North Solar Power Project

Quezon City

Quezon City 1 Solar Power


Project

Request for exemption on Milestone Approach


due to its peculiarity as QTP is under
evaluation. For issuance of reminder letter due
to non compliance with RESHERR.
For issuance of Termination Letter due to nonPhil. Solar Farm-Palawan,
posting of Performance Bond and nonInc.
compliance with Milestone Approach and
RESHERR.
DOC is under evaluation. For issuance of
SolarPacific Energy
reminder Letter due to non-compliance with
Corporation
RESHERR.
Under Commercial Stage (FIT System). For
Solar Philippines Commercial
issuance of reminder letter due to non
Rooftop Projects, Inc.
compliance with RESHERR.
For issuance of Termination Letter due to nonSolar Philippines Commercial payment of Signature Bonus, non-posting of
Rooftop Projects, Inc.
Performance Bond, and non-compliance with
Milestone Approach and RESHERR.

POTENTIAL
CAPACITY
(MW)

INSTALLED
CAPACITY
(MW)

46.78

2.00

30.00
30.00
10.00
1.50

10.00

3.00

1.50

1.20

AWARDED SOLAR PROJECTS as of January 31, 2016


ISLAND / GRID REGION

LUZON

NCR

PROVINCE

Metro Manila

CITY /
MUNICIPALITY

COMPANY NAME

STATUS

Compliance with Milestone Approach is onSolar Philippines Commercial


going. For issuance of reminder letter due to
Rooftop Projects, Inc.
non compliance with RESHERR.

Pasay City

Pasay City Solar Power Project

Valenzuela City

Valenzuela Solar Power Project Valenzuela Solar Energy Inc. DOC (FIT System) is under evaluation.

Camarines Sur Pili

Catanduanes

PROJECT NAME

Pili Solar Power Project

Emerging Power Inc.

Calabanga

Calabanga Solar Power Project

Calabanga Renewable
Energy (CARE), Inc.

Caramoran

Catanduanes Solar Power


Project

Local Government Unit of


Caramoran

Cadiz Solar Power Project

Helios Solar Energy Corp.


(formerly Phil-Power Solar
Energy Corp.)

For issuance of Termination Letter due to noncompliance with Milestone Approach and
RESHERR.
Compliance with Milestone Approach is on
going.
DOC (PPA with FICELCO) is under evaluation.
For issuance of reminder letter due to non
compliance with RESHERR.

LUZON Sum
VISAYAS

POTENTIAL
CAPACITY
(MW)
3.20
8.50
12.00
50.00
1.00
2,241.65

VI

Negros
Occidental

Cadiz City

San Carlos City

San Carlos Solar Power Project


Phase I-A and I-B (SACASOL IA&I-B)
San Carlos Solar Power Project
Phase I-C and I-D (SACASOL IC&I-D)

San Carlos Solar Energy Inc.

San Carlos Solar Energy Inc.

La Carlota City

La Carlota Solar Power Project


(SACASOL II-A)

San Carlos Solar Energy Inc.

Bago

Bago Solar Power Project

Energy Development
Corporation

Manapla and
Cadiz

Manapla Solar Power Project


(SACASOL III)

Negros Island Solar Power


Inc.

Under Development Stage (FIT System).


Compliant with all work and financial
obligations.
Under Commercial Stage (FIT System). For
issuance of reminder letter due to non
compliance with RESHERR.
Under Commercial Stage (FIT System). For
issuance of reminder letter due to non
compliance with RESHERR.
Under Development Stage (FIT System).
Request for Assignment/Transfer is on process.
For issuance of reminder letter due to non
compliance with RESHERR.
Request for voluntary surrender of the SESC is
under evaluation.
Under Development Stage (FIT System).
Request for amendment of DOC (FIT System) is
under evaluation. For issuance of reminder
letter due to non compliance with RESHERR.

INSTALLED
CAPACITY
(MW)

56.90

132.50

22.00

23.00

18.00

48.00

AWARDED SOLAR PROJECTS as of January 31, 2016


ISLAND / GRID REGION

VISAYAS

VI

PROVINCE

Negros
Occidental

CITY /
MUNICIPALITY

PROJECT NAME

Bais City

Bais City Solar Power Project


(SACASOL IV)

Murcia

Murcia Solar Power Project

Victorias City

Victorias Solar Power Project

La Carlota City

La Carlota Solar Power Project


(SACASOL II-B)
La Carlota Solar Power Project

Silay City

Silay City Solar Power Project

San Carlos City

SACASUN Solar Power Project

Bacolod City

Bacolod City Solar Power


Project II
Bacolod Solar Power Project

Iloilo

Bacolod City and


Murcia

Murcia Solar Power Project

Manapla

Manapla Solar Power Project

Miag-ao

Miag-ao Solar Power Project

COMPANY NAME

STATUS

Under Development Stage (FIT System). For


issuance of reminder letter due to non
compliance with RESHERR.
For issuance of Termination Letter due to nonEnergy Development
compliance with Milestone Approach and
Corporation
RESHERR.
VictoriaSolar Energy Corp.
DOC (FIT System) is under evaluation. For
(formerly SunAsia Energy
issuance of reminder letter due to non
Inc.)
compliance with RESHERR.
Under Development Stage (FIT System). For
Negros Island Solar Power
issuance of reminder letter due to non
Inc.
compliance with RESHERR.
Compliance with Milestone Approach is on
Megawatt Clean Energy, Inc.
going.
DOC (FIT System) and assignment/transfer to
Silay Solar Power, Inc. are under evaluation. For
Megawatt Clean Energy, Inc.
issuance of reminder letter due to non
compliance with RESHERR.
Under Development Stage (FIT System). For
San Carlos Sun Power Inc.
issuance of reminder letter due to non
compliance with RESHERR.
Compliance with Milestone Approach is onNegros PH Solar Inc.
going. For issuance of reminder letter due noncompliance with RESHERR.
Amatera Renewable Energy Compliance with Milestone Approach is on
Corporation
going.
Compliance with Milestone Approach is on
PH Solar Advance Corp.
going.
Oxy Solar Manapla
Compliance with Milestone Approach is on
Corporation
going.
Under Development Stage (FIT System). For
Cosmo Solar Energy, Inc.
issuance of reminder letter due to non
compliance with RESHERR.
Monte Solar Energy Inc.

POTENTIAL
CAPACITY
(MW)
18.00

60.00

14.00

33.00

58.98

200.00
50.00
120.00
5.00
5.67

INSTALLED
CAPACITY
(MW)

AWARDED SOLAR PROJECTS as of January 31, 2016


ISLAND / GRID REGION

VISAYAS

VI

VII

VIII

PROVINCE

CITY /
MUNICIPALITY

COMPANY NAME

Tigbauan

Tigbauan Solar Power Project

Capiz

Roxas City

Roxas City Solar Power Project

Cebu

DaanBantayan

Daanbantayan Solar Power


Project

Toledo

Toledo Solar Power Project

Bogo

Bogo Solar Power Project

Energy Development
Corporation

Naga

Naga Solar Power Project

Menlo Renewable Energy


Corp.

Negros
Oriental

Mabinay

Mabinay Solar Power Project

Lohas & Soul Lighting Inc.

Leyte

Ormoc

Leyte Solar Power Project II

Phil. Solar Farm-Leyte, Inc.

Ormoc Solar Power Project

Phil. Solar Farm-Leyte, Inc.

Biliran

Biliran

Palo Solar Power Project

Biliran Solar Power Project

STATUS

Under Development Stage (FIT System). For


Solexar Energy International, issuance of show-cause letter due to delayed
Inc.
implementation of 5-Year Work Plan and noncompliance with RESHERR.

Iloilo

Tacloban, Santa
Fe and Palo

VISAYAS Sum

PROJECT NAME

Compliance with Milestone Approach is onSolar Philippines Commercial


going. For issuance of reminder letter due to
Rooftop Projects, Inc.
non compliance with RESHERR.
For issuance of Termination letter due to non
Ceko Solar Farm Systems
compliance with Milestone Approach and
Corporation
RESHERR.
First Toledo Solar Energy
DOC (FIT System) is under evaluation.For
Corp. (formerly SunAsia
issuance of reminder letter due to non
Energy Inc.)
compliance with RESHERR.

INSTALLED
CAPACITY
(MW)

34.30

0.70

25.00

60.00

Compliance with Milestone Approach is ongoing. For issuance of reminder letter due to
non compliance with RESHERR.
Newly awarded. For payment of Signature
Bonus
Compliance with Milestone Approach is on
going.
Request for reconsideration of its compliance
under milestone approach is under evaluation.

Under Commercial Stage (FIT System).


Compliant with all work and financial
obligations.
DOC (FIT System) is under evaluation. For
Sulu Electric Power and Light
issuance of reminder letter due to non
(Phils.), Inc.
compliance with RESHERR.

E & P Green Energy, Inc.

POTENTIAL
CAPACITY
(MW)

Under Development Stage (FIT System). For


issuance of show-cause letter due to delayed
implementation of 5-Year Work Plan and noncompliance with RESHERR.

60.00
90.00
30.00

30.00

50.00

25.00

1,138.15

75.00

AWARDED SOLAR PROJECTS as of January 31, 2016


ISLAND / GRID REGION

MINDANAO

IX

PROVINCE

Zamboanga del La Libertad and


Norte
Dapitan

PROJECT NAME

Zamboanga del Norte Solar


Power Project

COMPANY NAME

STATUS

Astronergy Development
Dipolog Inc.

DOC (FIT System) is under evaluation. For


issuance of reminder letter due to non
compliance with RESHERR.

POTENTIAL
CAPACITY
(MW)

Misamis
Oriental

Villanueva

Kirahon Solar Power Project

Kirahon Solar Energy


Corporation

Bukidnon

Kibawe

Kibawe Solar Power Project

Asian Greenenergy Corp.

Under Development Stage (FIT System). For


issuance of reminder letter due to non
compliance with RESHERR.

10.49

Laguindingan

Laguindingan Solar Power


Project

Liberty Solar Energy


Corporation (formerly
Cagayan Electric Power &
Light Company, Inc.)

On going pre-development activities. For


issuance of reminder letter due to non
compliance with RESHERR.

20.00

Claveria

Claveria Solar Power Project

The Ark Green Dynamic


Resources Corp.

Balingasag

Misamis Oriental Solar Power


Project

Astronergy Development
Mindanao, Inc.

Davao del Sur

Compliant with Milestone Approach. On going


pre-development activities. For issuance of
reminder letter due to non compliance with
RESHERR.
For issuance of Termination Letter due to noncompliance with Milestone Approach and
RESHERR.

INSTALLED
CAPACITY
(MW)

5.00

Under Development Stage (PSA with CEPALCO ERC approved Php8.75). DOC and partial
assignment to its Kirahon Two Energy Corp. are
under evaluation. For issuance of reminder
letter due to non compliance with RESHERR.

Misamis
Oriental

XI

CITY /
MUNICIPALITY

12.50

60.00

Tagoloan &
Cagayan de Oro
City and Libona, Tagoloan Solar Power Project
Manolo Fortich &
Malitbog

Solar Philippines Commercial On-going pre-development activities. Request


Rooftop Projects, Inc.
for reduction of contract area is on process.

Jasaan

Jasaan Solar Power Project

Lohas & Soul Lighting Inc.

Compliance with Milestone Approach is on


going.

60.00

Sta. Cruz

Darong Solar Power Project

PhilNewEnergy, Inc.

Expired SESC. For issuance of reminder letter to


settle all its Financial Obligations (i.e. Training
Assistance and Development Assistance).

35.00

45.00

AWARDED SOLAR PROJECTS as of January 31, 2016


ISLAND / GRID REGION

MINDANAO

XI

PROVINCE

CITY /
MUNICIPALITY

PROJECT NAME

Davao Oriental Mati City

Davao Oriental Solar Power


Project

Davao del Sur

Digos Solar Power Project


Phase I

Digos City

Digos Solar Power Project


Phase II

North
Cotabato

XII

Midsayap

South Cotabato Surallah

General Santos
City

COMPANY NAME

Sun Option for Livelihood


Alternative Resources Inc.
Enfinity Philippines
Renewable Resources
Fourth, Inc.
Enfinity Philippines
Renewable Resources
Fourth, Inc.

Midsayap Solar Power Project

SunAsia Energy Inc.

Centrala Solar Power Project

nv vogt Philippines Solar


Energy One, Inc.

General Santos City 1 Solar


Power Project

Enfinity Philippines
Renewable Resources Inc.

South Cotabato Solar Power


Project

Astronergy Development
GenSan Inc.

GenSan Solar Power Project


Phase I

Del Sol Energy CGS, Inc.

GenSan Solar Power Project


Phase II

Del Sol Energy CGS, Inc.

STATUS
On-going pre-development activities. For
issuance of reminder letter due to noncompliance with RESHERR.
Under Development Stage (FIT System). For
issuance of reminder letter due to non
compliance with RESHERR.
Under Development Stage (FIT System). For
issuance of reminder letter due to non
compliance with RESHERR.
For issuance of Termination Letter due to nonpayment of Signature Bonus, non-posting of
Performance Bond, and non-compliance with
Milestone Approach and RESHERR.
Under Development Stage (FIT System ). For
issuance of reminder letter due to noncompliance with RESHERR.
For issuance of Termination Letter due to nonposting of Performance Bond and noncompliance with Milestone Approach and
RESHERR.
Additional requirements for partial assignment
to Astronergy Development F1 Inc. and
Astronergy Development F2 Inc. is under
evaluation. For issuance of reminder letter due
to non- compliance with RESHERR.
Under Development Stage (FIT System). For
issuance of show-cause letter due to delayed
implementation of 5-Year Work Plan and noncompliance with RESHERR.
Under Development Stage (FIT System). For
issuance of show-cause letter due to delayed
implementation of 5-Year Work Plan and noncompliance with RESHERR.

POTENTIAL
CAPACITY
(MW)

10.00

19.58

2.50

6.23

10.00

20.00

48.00

48.00

INSTALLED
CAPACITY
(MW)

AWARDED SOLAR PROJECTS as of January 31, 2016


ISLAND / GRID REGION

MINDANAO

XII

XIII

PROVINCE

CITY /
MUNICIPALITY

PROJECT NAME

COMPANY NAME

Sarangani

Alabel

Alabel Solar Power Project

SolarPacific Energy
Corporation

North
Cotabato

President Roxas
and Magpet

President Roxas Solar Power


Project

Energy Development
Corporation

Matalam

Kilada-Matalam Solar Power


Project

Energy Development
Corporation

Kabacan

Kabacan Solar Power Project

Solarus Partners Inc.

Sarangani

Alabel

Alabel Solar Power Project

El Elyon Power Plant Phils.


Inc.

Agusan del
Norte

Butuan City

Butuan City 1 Solar Power


Project

Enfinity Philippines
Renewable Resources Inc.

San Francisco Solar Power


Project

GPower Inc.

Agusan del Sur San Francisco

STATUS
Request for suspension of its obligation or
moratorium is under evaluation. For issuance
of reminder Letter due to non-compliance with
RESHERR.
For issuance of Termination Letter due to noncompliance with Milestone Approach and
RESHERR.
For issuance of Termination letter due to non
compliance with Milestone Approach and
RESHERR. With correction of the location as per
SESC.
For issuance of Termination Letter due to nonpayment of Signature Bonus, non-posting of
Performance Bond, and non-compliance with
Milestone Approach
DOC (FIT System) is under evaluation. For
issuance of reminder letter due to noncompliance with RESHERR.
For issuance of Termination Letter due to noncompliance with Milestone Approach and
RESHERR.
Compliance with Milestone Approach is on
going.

ARMM

Lanao del Sur

Tagoloan II,
Saguiaran &
Marawi City

ICOM Solar Power Project

Local Government Unit of


the Islamic City of Marawi

For issuance of Termination Letter due to


expiration of SESC, non-posting of Performance
Bond, non-compliance with RESHERR, delayed
implementation of 2-Year Work Program, and
non-submission of documentary requirements
for its DOC (FIT System).

Bukidnon

Sumilao

Bukidnon Solar Power Project

SunAsia Energy Inc.

For issuance of Termination Letter due to noncompliance with Milestone Approach (proof of
land rights acquisition) and RESHERR.

MINDANAO Sum
Grand Total

POTENTIAL
CAPACITY
(MW)

INSTALLED
CAPACITY
(MW)

15.00

14.50

160.00

10.00

35.00

2.00
636.30
4,016.10

12.50
144.40