GESTIN DE

EQUIPO PESADO
Carrera: Ingeniera de Minas
Ciclo: X
Docente: Ing. Alfonso Vergara Arzapalo

UNIDAD 3
PROCESO GERENCIAL DE
GESTION DE
MANTENIMIENTO

PLANEAMIENTO (Plan)

MINE MAINTENANCE MANAGEMENT


PERFORMANCE ANALYSIS
(Check- Daily/Weekly/Monthly)
STRATEGY - > 60 days (Intellect)
Year / Quarterly

Deliverability

Availability

PLANNING - < 60 days (Efficiency)


Monthly / Weekly /Daily/Shift

Reliability

CPH

EXECUTION (Quality)
Daily/Shift

Preventive Maintenance PM

Preventive Maintenance PM

Mine Planning

Programmed Component
Replacement - PCR

Programmed Component
Replacement - PCR

Mine Operations

Backlogs

Backlogs

Application & Operation

EM - Strategy

Daily Tactics

Loss Prevention

Strategic Planning /
Budgeting
Health

Corrective

Component Life Cycle


Mgmt

OEM Warranty Mgmt

Diagnostics

Maintenance Efficiency

Work-Order Administration

Execution

Reliability Engineering

Technology Deployment

Health Inspections

FACILITIES MGMT
Equipment Health

Data Capture
Facilities Maintenance

Downtime

Condition Monitoring
Environmental Control

Maintenance Efficiency

GET / Tires & U/C


Facility Projects

Prognostic / Diagnostic
Analysis

COST ACCOUNTING
(Weekly/Monthly/Quarterly/Year

CAPEX

OPEX

Work-Order

Risk
Management

Financial
Health

PLANNING PROCESS
PLANNING - < 60 days (Efficiency)
Preventive Maintenance PM
Programmed Component
Replacement - PCR
Backlogs

Formula I
Philosophy

Health
OEM Warranty Mgmt

Facilities

Work-Order Administration

Parts

Tools

Labor

4.1.- PROCESO DE PLANIFICACION SEMANAL


Miercoles

Planners
Salud de Equipo

11:00

Viernes

14:00

PROCESO DE PLANIFICACION
DIARIA

(3)

(4.2)

Actualiza horas de equipos que ingresaron


durante la semana actual y semana pasada
para la nueva proyeccion de equipos que
ingresaran la semana siguiente
(CORVU- AMT)

Reporta mediante formato, equipos que


ingresan en forma programa a su PM
(P2005-0X-0X Flota.xls)

Garantias
FESA

Jueves

PROCESO DE GENERACION DE
PEDIDOS BACKLOGS

Envia reporte a personal


de Predictivo y Garantias
de maquinas que van ha
ingresar la siguiente
semana indicando tipo de
PM y fechas de ingreso.
(Plan 200x-0x-xx
Flota.xls)
----Borrador -----

PROCESO DE SALUD
DE EQUIPO

(12)

Publica plan
semanal en
taller

Revisa reporte de cambios


de acietes para evaluar la
proyeccion con las horas

Operaciones/
Ingenieria M.

Asistente de
Planeamiento

Martes

Se reunen para
revision de plan
semana de la
siguiente
semana, Equipo
Carguio y
Acarreo

- Se reunen
para tomar
desiciones por
Monotoreo con
respecto a
evaluaciones
y/o cambio de
componentes
que deben
ejecutarse
para la
semana
proyectada ,en
caso hubiera
relevancia en
algn
componente o
Evaluacin de
una maquina
debe
planificarse lo
mas antes
posible.

- Revisa la
MSQ740 del
sistema ellipse
e identifica su
Grupo de
trabajo y se
ubica en la
siguiente
semana que
se va ha
Proyectar

Coloca Bls y cambio de


componentes en la MSQ740 de la
semana proyectada
- Evalua balance de mano de obra
para ver si los backlogs colocados
compensan la mano de obra
disponible.

Genera O/ts
producto de la
de la reunin.

Envia Plan semanal


con modificaciones
ocurridas en la reunion
del plan semanal a
todo grupo
mantenimiento y
supervisores de
Operaciones

Anota
variaciones
con respecto a
coordinacione
s ocurridas en
plan Semanal

Proyecta la siguiente semana en la


MSQ740.
Identifica todos los PMs que se
encuentran en el formato de
reporte de horas y las coloca en la
semana que se va ha proyectar
Estima horas de detencion de
equipo

Compromete la
semana siguente
en la MSQ740

Reunion de
planeamiento
Se rene planners
de Camiones
Cargadores
,tractores, motos,
perforadoras,
Soporte, liviano
Soldadura y llantas
con personal de
predicativo y
personal de garanta
Fesa para coordinar
optimizacin de
tiempos, recursos y
facilidades
necesarias para la
buena ejecucin de
los Backlogs.

Reprograma
Bls producto
de la
coordinacion
entre areas

Actualiza el Ellipse
con las ultimas
modificaciones

PLAN SEMANAL GENERAL . ES COLOCADO EN EL PROSPECTOR

PLAN SEMANAL DETALLADO POR EQUIPO: ES REVISADO Y DISCUTIDO TODAS LAS


SEMANAS RIGE DE LUNES A DOMINGO

INDICADORES DE PLANEAMIENTO
EDAD DE BLs CAT793C
%
60.00%

400
350
300
250
200
150
100
50
0

50.00%

ESPERA
1-2

40.00%
30.00%

3-4

20.00%

5-6
7-8

10.00%

>8

0.00%
al
31/3/09

al
al
al
al
al
al
al
al
al
31/3/09 07/4/09 14/4/09 21/4/09 28/4/09 05/5/09 12/5/09 19/5/09 26/5/09

al
07/4/09

al
14/4/09

al
21/4/09

793C
100%
90%
80%
70%
60%
50%
40%
30%
20%
10%
0%

111

al
05/5/09

al
12/5/09

al
19/5/09

133

150

122

182

100%
23

80%

35

41

37

48

39

24

52

60%
225

299

246

211

259

251

279

40%

141

120

18
/0
5/
09

65

Sem
13/04/09

Sem
20/04/09

118
112

0%
Sem
30/03/09

em

11
/0
5/
09

em

04
/0
5/
09

em

27
/0
4/
09

em

20
/0
4/
09

em

13
/0
4/
09

em

06
/0
4/
09

em

30
/0
3/
09

# TOTAL O/Ts EJECUTADOS

107

147

83

39

20%

em

al
26/5/09

793C
159

147

154

al
28/4/09

Semana

Semana

Cantidad

EDAD DE BLs CAT793C


Cantidad

Sem
06/04/09

# BLS PLAN EJEC

# TOTAL O/Ts CORRECTIVO

Sem
27/04/09

Sem
04/05/09

# BLS PLAN REPROG

Sem
11/05/09

Sem
18/05/09

# BLS PLAN PROCESO

EPDZ
% Efectividad Program ada Vs. Actual ( Duracion )

793C
% Efectividad Programada Vs. Actual ( Duracion )
180%

180%
168%

160%

160%
151%
140%

159%

140%

138%

136%
128%

120%

148%

124%

134%

120%

119%

113%
103%

100%

100%

124.53%

122%

117%

114%

80%

80%
LSL
60%
(14)S 30-

(15)S 06-

03

04

(16)S 13- (17)S 2004

04

(18)S 27- (19)S 0404

05

(20)S 11-

(21)S 18-

05

05

USL
793C

LSL

60%
(14)S30-

(15)S06-

(16)S13-

(17)S20-

(18)S27-

(19)S04-

(20)S11-

(21)S18-

03

04

03

04

04

05

05

05

USL
EPDZ

4.2 PROCESO DE PLANIFICACION DIARIA


Dia -2
PROCESO DE PLANIFICACION
SEMANAL

PROCESO DE SALUD
DE EQUIPO

(4.1)

(12)

Realiza plan diario con 2 dias de


anticipacion tomando como base
el plan semanal
- Ingresa a la MSQ740, coloca en la semana
comprometida y desde esta pantalla ingresa a
la MSQ620 seleccionando la Maquina que
entrar a PM, para revisar o aadir ordenes que
han cambiado de estado

Planners

- inspector no coloca
en su debido
momento repuestos

SOLDADURA/
LLANTAS

- Coordina con
Planner de
soldaura

Backlogs es
evaluacion, trabajo
para contratista o
soldaura-llantas?
CONTRATISTA
-Coordina con
areas
contratistas para
su reparacion,
avisando ingreso
de equipo

PROCESO DE ENTREGA
DE CANASTAS BLS

PROCESO EJECUCION
PM+BLS+CC

(3)

(5)

(6)

Proceso de pedido (EP)

Backlogs tienen
Repuestos que se
encuentran :

- Llama a expediting para que O/T


sea procesada y se verique
situacion de repuestos en caso
sea prioridad 2 y comentarios
mencionan que es critico.

Espera (ER)

-Coordina con Expediting para verificar nueva fecha de


llegada en caso este proximo al ingreso planificado
-Si fecha es lejana con respecto al ingresp planificado
del equipo, se hara seguimiento para ver la mejor forma
de que llegue el repuesto lo antes posible, caso
contrario ser programdo para el siguiente PMr
Envia a FSAA para
revision y validacion de
las garantias con
repuestos que seran
retirados del store 76S

EVALUACION
/ AJUSTES
Completos (RC)
- Coordina con
Personal de
Predictivo

PROCESO DE GENERACION DE
PEDIDOS BACKLOGS

Informa a
planeamiento
O/t por
condicion que
no fueron
incluidas en el
plan semanal

- ingresa O/T por O/T en la MSQ620 revisando:


- prioridad de backlogs
- situacion de backlogs( dependiendo del estado
que se encuentra la O/T para planificar)

Sin pedido (SR)

Verifica facilidades(Taller y gruas) y


equipo
Verifica Mano de Obra (Tiempo
Total Horas Hombre)
Verifica Comentarios del inspector
en el edit description
- Coloca el Backlogs de la MSQ620
a la MSQ740

Ejecuta el MS
PROJECT desde
la MSQ740,
seleccionando el
equipo que
ingresara a PM y
la fecha que esta
comprometida
para balancear la
CARTA GANTT

Valida Cartta gantt


con la Supervsion
para evaluar tiempos
y la secuencias

- Envia Carta Gantt a


expediting para
revision y
preparacion de
canastas

Asistente de Planeamiento

Dia -1

Prepara archivo para plan diario :


- Checklist de maquina ( Evaluacin de parmetros)
- Hoja de llenado de aceites (Todas las flotas)
- Hoja de cambio de componentes (Todas las Flotas)
- Hoja de desgaste de frenos (Dependiendo del PM y flota)
- Hoja de calibracin de vlvulas (Dependiendo del PM y flota)
- Hoja de Inspeccin de eje de levas((Dependiendo del PM y flota)
- Hoja de la Pre- inspeccion indicando que trabajos fueron atendidos segn observavion del
operador

Imprime carta gantt con sus


Job Chart de cada Backlogs
y PSTs adjuntandolo al
archivo del plan diario de la
maquina que va ha ingresar

-Coordina con Expeditor,


para validar repuestos que
estarn en canasta segn
CARTA GANTT
Levanta las observaciones
hechas por areas de apoyo,
Expediting y Garantias
planificadas de FSAA y
reenvia CARTA GANTTT
En caso no proceda la
garantia planteada a FSAA el
planner deber cambiar el
Work order Type de WA a IN

- Envia Carta Gantt a


Soldadura/llantas, contratistas,
Supervisores de linea y
,Asistente para su impresin.

Recepciona formato
SIMS llenados por
FSAA de las garantias
que se adjuntan a
CARTA GANTT

Entrega Plan
Diario a
supevsior de
Lineas.

PLAN DIARIO
3-Jun-2009
PLAN DIARIO TURNO A

CDIGO
MODELO
HT138 BLS
793D
HT113 BLS
793C
RT026 BLS
844
HT121 PM2
793C
LD013 PREPM
992G
HT029 ARRANQUE 777D
HT068 PM2
785C

Inicio de
Traslado

Ingreso a talleres

Mach Hrs.

Termino de PM

04:00
06:00
10:00
09:00
11:00
15:00
16:00

03/06/09 05:00
03/06/09 07:00
03/06/09 11:00
03/06/09 10:00
03/06/09 11:00
03/06/09 15:00
03/06/09 17:00

6.00

6.00

03/06/09 05:00
03/06/09 07:00
03/06/09 11:00
03/06/09 16:00
03/06/09 11:00
03/06/09 15:00
03/06/09 23:00

B1-TPM
CAMPO
CAMPO
B2-TPM

Mach Hrs. Termino de Backlogs

BAHIA
B6-T2
B5-T2

37.50
30.00
10.00
18.00
2.00
52.00
TURNO B
25.00
10.00

DZ024 PM6
CB080 PM4

D11R
Lowboy

19:00
22:00

03/06/09 21:00
03/06/09 23:00

6.00
6.00

04/06/09 03:00
04/06/09 05:00

B10-T1
B3-TPM

GR022 PM3
TD014 PM8

24H
DML

00:00
22:00

04/06/09 01:00
04/06/09 03:00

6.00
6.00

04/06/09 07:00
04/06/09 09:00

B9-T1
T.PERFOS

21.00
20.00

BAHIA
B6-T2
B5-T2

04/06/09 18:30
04/06/09 13:00
03/06/09 21:00
04/06/09 10:00
03/06/09 13:00
03/06/09 15:00
06/06/09 03:00

B1-TPM
CAMPO
CAMPO
B2-TPM

05/06/09 04:00
04/06/09 15:00

B10-T1
B3-TPM

05/06/09 04:00
05/06/09 05:00

B9-T1
T.PERFOS

COMMENTS
SS56197 DESMONTAR Y MONTAR LLANTAS POS. 1 Y 2
SS56199 BOREO ALOJAMIENTOS ROD CONTROLSS55388 SOLDAR RIEL TRANSVERSAL DE SUPERESTRUCTURA
EVAL. MOTOR POR PROBLEMA DE TURBOS, NO INGRESA A LAVADERO
Ingresa a las 10:00 para Inspeccin PrePm y luego a lavadero SS44632 SOLDAR SOPORTE DE RIEL DE PLATAFORMASS55402 SOLDAR RIEL LADO DERECHO POSTERIORSS55740 INVERTIR

SS55745 REPARAR BASE DE BARANDA DERECHASS54858 SOLDAR RIEL DE TOLVA POSTERIOR IZQ.SS55866 CAMBIO DE LLANTA POS 4 CBR REPAIR
SS53928 REPARAC. PARCIAL BULLDOZER TRACTOR D11R
SS56027 EXTRAER PERNO ROTO REJILLA LEVANTE LHSS54480 Cambio de llantas 3y4 - LB080

PM NO EJECUTADOS
12B009 PM1
12B006 PM3
232007 PM1

LUBRICADOR 05:30
CAMION GRUA 07:30
TORRE DE ILUMINACION
11:00

03/06/09 06:30
03/06/09 08:30
03/06/09 12:00

8.00
3.00

EQUIPO DE SOPORTE
6.00
03/06/09 12:30
5.00
03/06/09 21:30
03/06/09 15:00

03/06/09 06:30
03/06/09 16:30
03/06/09 15:00

La Quinua a las 08:00 AM.


Nivel 3636, 3624 Push back
Yanacocha a las 13:00 PM.
Nivel 3862, Los Pinos

TALLER
TALLER
TALLER

Cesar Vasquez Izquierdo RPC


976228270
EQUIPO DE APOYO

EQUIPOS
Grua 90 Ton
(166001)
Grua
45 TM (161001)
HIAB 500(125004)
HIAB 071(120010)
FRANNA ( 12J001)
FRANNA( 12J002)
MANLIFT (16C001 DIESEL)
MANLIFT (16B001 ELEC)
MANLIFT (12B002 ELEC)
CAMABAJA (121007)
CISTERNA DE AGUA 120002
157001 (8 Ton)
15C001 (10 Ton)
12H002
12B007
12B004
LD2106
TD030
054030
Perforadora
LD014
022014
Cargador Frontal
HT135
014135
Camiones
HT108
014108
Camiones
RT028
03A028

SONIC

TRABAJOS
TRASLADO CISTERNA DE CAL DEL MIRADOR A EQUIPOS DE BAJA
APOYO PALA SH003 HASTA LAS 12:00
APOYO PALA SH003 HASTA LAS 12:00
Stand By
Uso Hitachi
Apoyo en taller T2 Todo el da ( X Gra puente inoperativa )
Carlos Chacaltana
Uso Hitachi
Stand By
Stand By
TRASLADO CISTERNA DE CAL DEL MIRADOR A EQUIPOS DE BAJA
Regado de taller Mantto AM ( 5:00 y 10:00 AM ) PM (13:00 y 16:00 PM )El regado en turnonoche confirma SG de guardia
Stand By
EN MANTTO
EQUIPOS: ENGRASE Y LUBRICACIN
Engrase - Lubricacion
TD014
Engrase - Lubricacion
TD020
Engrase - Lubricacion
TD022
Engrase - Lubricacion
TD023
INSPECCION DIARIA DE EQUIPOS
Y2169614
Inspeccin PRE PM
03/06/09 11:00

992G

YA186236

793D

281927
282745

793C

844

DESCARGA DE VIMS (Personal Inspecciones Campo)

03/06/09 11:00

Inspeccin PRE PM
C/ Crucetas de Mando de Bombas por FESA

03/06/09 09:00

YA191710

MUESTRAS
PD Muestra de aceite por seguimiento de Sodio

03/06/09 09:00

SS52427

INSPECCION DE NEUMATICOS

OBSERVACIONES

Engrase - Lubricacion
Engrase - Lubricacion
Engrase - Lubricacion
Engrase - Lubricacion

#REF!

PALAS

SH003
060003
Explicacion:

EX5500

CAMBIO DE TX DE GIRO FRONTAL RH

03/06 02:32

03/06 12:00 6100

NO PROG

CAMIONES

HT073
013073
B6-T2

793B

SHOP

CAMBIO MANDO FINAL RH (WA)


02/06 04:55 04/06 00:55 5625
PROG
CAMBIO DE CIL DE LEVANTE
18189
PROG
BACKLOGS
SS50162 REPARACION PARCIAL TOLVA 793BSS55892 SOLDAR SOPORTE DE RIEL DE PLATAFORMASS54788 CAMBIO DE LLANTA POS 5.REPARAR

CARTA GANTT POR EQUIPO PREPARADA DIARIAMENTE PARA ENTREGAR A


EJECUCIN CON TODOS LOS TRABAJOS PROGRAMADOS

Planeamiento adjunta al file del


PM documentos para recabar
informacin (Task Record, Hoja de
CC; Hoja de rellenos de aceite,
Hoja de demoras, etc)

ARMADO Y ENTREGA DE CANASTAS

- Expeditting ubica todos los Bls rotulados programados en la


canasta asignada al equipo que ingresar a PM y lo deja en
la zona donde se realizar el PM.

Ejecucin (Do)

MINE MAINTENANCE MANAGEMENT


PERFORMANCE ANALYSIS
(Check- Daily/Weekly/Monthly)
STRATEGY - > 60 days (Intellect)
Year / Quarterly

Deliverability

Availability

PLANNING - < 60 days (Efficiency)


Monthly / Weekly /Daily/Shift

Reliability

CPH

EXECUTION (Quality)
Daily/Shift

Preventive Maintenance PM

Preventive Maintenance PM

Mine Planning

Programmed Component
Replacement - PCR

Programmed Component
Replacement - PCR

Mine Operations

Backlogs

Backlogs

Application & Operation

EM - Strategy

Daily Tactics

Loss Prevention

Strategic Planning /
Budgeting
Health

Corrective

Component Life Cycle


Mgmt

OEM Warranty Mgmt

Diagnostics

Maintenance Efficiency

Work-Order Administration

Execution

Reliability Engineering

Technology Deployment

Health Inspections

FACILITIES MGMT
Equipment Health

Data Capture
Facilities Maintenance

Downtime

Condition Monitoring
Environmental Control

Maintenance Efficiency

GET/Tires & U/C/NDT/LUB


Facility Projects

Prognostic / Diagnostic
Analysis

COST ACCOUNTING
(Weekly/Monthly/Quarterly/Year

CAPEX

OPEX

Work-Order

Risk
Management

Financial
Health

FLUJO PROCESO DE EJECUCIN

Operacin Mantenimiento
Camiones

Proceso de
Mantenimiento
Correctivo

20%

Entrada
Camin Inoperativo

Proceso de
Inspecciones

Proceso de Taller &


Cambio componentes

Proceso de PM

80%
Proceso de logstica

Indirectos

Proceso de planeamiento

Salida
Camin reparado

6.- PROCESO DE EJECUCION DEL PM + BLS + CC + RP


Da -1

Da 0
PROCESO
INSPECCION
EN PM

PROCESO DE
PLANIFICACION DIARIA

(4.2)

Registra en
carta Gantt
Trabajos
correctivos

(10)

Planeamiento
SUPERVISOR
PMS
MYSRL
SUPERVISOR BACKLOGS&CORRECT
MYSRL

Jefe General
de Guardia
MYSRL
SUPERVISOR
FSAA

Da +1
PROCESO DE DEVOLUCION
(COMPONENT/PARTES/CORES)

PROCESO DE NEGOCIACION
DE GARANTIAS/CORES

(7)

(9)

Lavado de
Equipo

Realiza trabajos de
cambio de fluidos,
Climps&Clamps Segn
la CARTA GANTT.

NTD
Ingresa a
realizar trabajos
de deteccion

SOLDADURA
LLANTAS
Contratista ingresa y/o realiza
Ingresa a realizar trabajos de
Ingresa a realizar
trabajos o reparaciones segn
reparacion bajo CARTA GANTT o trabajos de Cambio y/
trabajos coordinados en
Correctivos Detectados por NDT
o rotacion
CARTA GANTT
PROCESO DE ENTREGA
DE CANASTAS BLS

(5)
Realiza los Bls segn
CARTA GANTT y
correctivos aadidos en la
Inspeccin con prioridad (1)

FSAA tiene
recursos para
trabajos de Garantia
en Partes ?

Ejecuta trabajos con


repuestos en Canasta
de Bls (no garantia),
Cierra Ots y carga
Horas Hombre reales en
la YAQ850 o MSO850.

NO
(MYSRL)

Ejecuta trabajos bajo


garantia
WA con repuestos
entregados por Fessa
(Store 76S)

Limpia/ Embala
Items salientes

Responsable del cierre de


la O/T con el Llenado de
las Horas Hombre usadas
en la garantia no asumida
por FSAA (Tareo YAQ850
o MSO850) reales
recepciona formatos llenos de
formato SIMS(2 copias) tanto
por trabajos planeado y
correctivos

SI
(FSAA)

Ejecuta trabajos
bajo garanta
WA con repuestos
separados en su
almacn (Store 76S)

Consolida /
Embala
repuestos
salientes y lo
almacena para
su reclamo

Trabajo Planificado :
Coge Formatos adjunto a la CARTA
GANTT y entrega 2 Copias de
formato SIMS a Supervisor MYSRL
terminado el trabajo
Trabajo Correctivo :
- Llena formato SIMS(3 copias) y
entrega 2 copias a Supervisor
MYSRL terminado el trabajo
- Registra O/T FSAA con mano de
obra (en fisico)

Consigna en ellipse, en el
campo Orig Doc Type a
Ferreyros y en No con las
Iniciales SIMSPYXXXX el
documento SIMS
Se hara en el
ellipse para
bajar y
controlar en
los reportes
Corvu

Entrega a
Garantias&Repara
formato SIMS (se
queda 1 copia)

Implementacin 5S y control de
contaminacin en talleres

Talleres y facilidades correctamente distribuidos e implementadas


Disminucin de riesgos
Disminucin de tiempos
Incremento de la productividad

Shovels Execution
Field Response facilities to reduce PM downtime,
improving safety, work conditions and efficiency.
Trailer contains offices with wireless connection, Small
Warehouse, Dinning Room and Locker Rooms

Service Truck with Oils, Electric Power, Air


Compressor, 2nd floor repair platform
Slide 21

INDICADORES BSICOS: FOCALIZARSE EN


MEJORAR SUSTANCIALMENTE LA CALIDAD
PROCESO PM

PROCESO PM

Cumplimiento del Ingreso Plan Diario

Horas Ejecutadas Vs.


Horas Planeadas PM's

69.17%

140.00%
55.83%

60.00%
40.00%

160.00%

90.00%

80.00%

61.67%

33.57%
31.49%

20.00%

71.79%

39.61%

Porcentaje

% Cumplimiento

100.00%

127.03%

122.42%

133.47%

120.00%
100.00%
80.00%

89.35%

92.32%

July

August

84.62%

60.00%

0.00%
March

April

May

June

July

August

March

Septem ber

April

May

Target 110%

Cumplimiento Plan Diario

PROCESO PM

Tendencia

June

Septem ber

Mes

Mes
Budget 90%

110.00%

121.56%

Hrs. Ejec. Vs. Hrs. Plan

Tendencia

Si Porcentaje <= Target entonces "BUENO"

Si Porcentaje >= Target entonces "BUENO"

PROCESO PM & TALLER

Cantidad de Tareas Ejecutadas Vs.


Cantidad de Tareas Planeadas PM's

Primera Parada despus del PM


60:00

100.00%

Porcentaje

100.00%
95.00%
90.00%

91.96%

92.32%

87.88%

91.40%

89.91%

85.00%

89.35%

Tiempo (hh:mm)

50:00

105.00%

48:00
36:56

40:00

36:00
24:00

28:30
30:41

29:48

30:37
22:08

12:00

84.62%

80.00%

00:00

75.00%

March

March

April

May

June

July

August

April

Septem ber

May

June

July

August

Septem ber

Mes

Mes
Cant. Task. Exec Vs. Cant. Task. Real

Budget 110%

Tendencia
Si Porcentaje = Target entonces "BUENO"

FSAPM

Target 50:00

Tendencia

Si Tiem po >= Target entonces "BUENO"

Modelo de Check
List de Inspeccin
para Excavadoras

Plan de Ejecucin

CHECK

MINE MAINTENANCE MANAGEMENT


PERFORMANCE ANALYSIS
(Hourly/Daily/Weekly/Monthly)
STRATEGY - > 60 days (Intellect)
Year / Quarterly

Deliverability

Availability

PLANNING - < 60 days (Efficiency)


Monthly / Weekly /Daily/Shift

Reliability

CPH

EXECUTION (Quality)
Daily/Shift

Preventive Maintenance PM

Preventive Maintenance PM

Mine Planning

Programmed Component
Replacement - PCR

Programmed Component
Replacement - PCR

Mine Operations

Backlogs

Backlogs

Application & Operation

EM - Strategy

Daily Tactics

Loss Prevention

Strategic Planning /
Budgeting
Health

Corrective

Component Life Cycle


Mgmt

OEM Warranty Mgmt

Diagnostics

Maintenance Efficiency

Work-Order Administration

Execution

Reliability Engineering

Technology Deployment

Health Inspections

FACILITIES MGMT
Equipment Health

Data Capture
Facilities Maintenance

Downtime

Condition Monitoring
Environmental Control

Maintenance Efficiency

GET / Tires & U/C


Facility Projects

Prognostic / Diagnostic
Analysis

COST ACCOUNTING
(Weekly/Monthly/Quarterly/Year

CAPEX

OPEX

Work-Order

Risk
Management

Financial
Health

MINE MAINTENANCE MANAGEMENT


PERFORMANCE ANALYSIS
(Check- Daily/Weekly/Monthly)
STRATEGY - > 60 days (Intellect)
Year / Quarterly

Deliverability

Availability

PLANNING - < 60 days (Efficiency)


Monthly / Weekly /Daily/Shift

Reliability

CPH

EXECUTION (Quality)
Daily/Shift

Preventive Maintenance PM

Preventive Maintenance PM

Mine Planning

Programmed Component
Replacement - PCR

Programmed Component
Replacement - PCR

Mine Operations

Backlogs

Backlogs

Application & Operation

EM - Strategy

Daily Tactics

Loss Prevention

Strategic Planning /
Budgeting
Health

Corrective

Component Life Cycle


Mgmt

OEM Warranty Mgmt

Diagnostics

Maintenance Efficiency

Work-Order Administration

Execution

Reliability Engineering

Technology Deployment

Health Inspections

FACILITIES MGMT
Equipment Health

Data Capture
Facilities Maintenance

Downtime

Condition Monitoring
Environmental Control

Maintenance Efficiency

GET / Tires & U/C


Facility Projects

Prognostic / Diagnostic
Analysis

COST ACCOUNTING
(Weekly/Monthly/Quarterly/Year

CAPEX

OPEX

Work-Order

Risk
Management

Financial
Health

ENTREGABILIDAD CAMIONES
Hauling Deliverability - Hauling Machines (Qty) - May08 - May09
76

Upper Specification Limit

74

72

Planned Number
of Trucks for Operation

70

68

66

64

Lower Specification Limit


62

60

Actual Number of Trucks


Available

18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 1
May-08

Jun-08

Jul-08

Ago-08

Sep-08

Oct-08

Nov-08

Dic-08

Ene-09

8
Feb-09

10 11 12 13 14 15 16 17 18 19 20 21 22
Mar-09

Abr-09

May-09

# Eq Plan 66 66 67 67 66 66 64 68 68 69 69 68 68 67 68 69 69 68 68 68 68 68 68 68 67 68 68 67 66 68 67 67.5 67.7 66.3 67.9 67.3 67.2 70.5 70.6 70.6 71.9 71.1 70.9 71.2 72.9 72.8 72.2 72.4 70.9 71.9 70.3 69.8 69.0 68.5 68.8 68.8 68.8
# Eq Act 66 66 65 64 65 64 62 65 66 67 66 66 65 66 66 66 66 66 66 66 65 66 67 67 64 62 62 63 65 65 63 64.1 65.6 65.2 66.7 67.3 66.8 67.5 66.0 65.7 66.2 68.6 66.4 66.4 68.9 67.7 68.5 69.1 68.6 69.0 67.4 67.7 67.0 66.0 68.5 68.5 67.6
USL

67 67 68 67 68 67 66 69 69 70 70 68 69 68 69 69 70 69 69 69 69 69 69 69 68 68 68 68 67 68 68 68.2 68.7 67.4 69 68.3 68.8 71.1 71.5 71.8 72.7 72.9 72.1 72.2 74.1 74.6 73.9 74.0 72.2 72.8 71.6 71.3 69.9 69.7 70.0 69.8 70.1

LSL

66 66 66 66 65 65 63 67 67 68 68 67 67 66 66 68 67 67 67 67 67 67 66 67 66 67 67 66 66 67 66 66.7 66.7 65.3 66.8 66.2 65.6 70.0 69.6 69.4 71.1 69.2 69.7 70.3 71.7 71 70.4 70.8 69.6 70.9 68.9 68.4 68.1 67.4 67.6 67.8 67.6

Total Acarreo por Equipo Semana 25 al 31 de May 2009


74.00

72.00

70.00
68.00

70.80
69.9
68.55
67.8

68.46

68.12

67.97

68.81
68.1

67.9
66.00

70.1

69.47

67.8

68.2

68.0

67.6

65.7
65.7

64.00
25-May

26-May

27-May

Plan Dia

Eq Hauling
25-May
26-May
27-May
28-May
29-May
30-May
31-May

DVPlan+

28-May
DVPlan-

Real Dia

29-May
DVAct+

30-May
DVAct-

31-May

Budget

Plan Dia // X plan DVPlan+ DVPlan- Real Dia // X Act DVAct+ DVAct68.55
67.97
68.12
68.46
68.81
69.47
70.80
68.88 DV

68.9
68.9
68.9
68.9
68.9
68.9
68.9

plan

70.1
70.1
70.1
70.1
70.1
70.1
70.1
1.2

67.6
67.6
67.6
67.6
67.6
67.6
67.6

67.8
67.8
67.9
67.8
68.0
67.8
68.2
67.8
68.1
67.8
65.7
67.8
67.8
67.8
67.6 DV Real

69.9
69.9
69.9
69.9
69.9
69.9
69.9
2.1

65.7
65.7
65.7
65.7
65.7
65.7
65.7

Budget
67.5
67.5
67.5
67.5
67.5
67.5
67.5
67.5

PROGRAMADO 793C
HT102 reprogramado por
demoras HT123
HT104 est en proceso
HT106 est en proceso
HT112 falta energa,
carga suspensiones y
NP llanta P5
HT110 en proceso

HT108 No
cumplimiento del
secuencia y falta
herramienta PTO

HT122 PM se adelant

HT113 reprogramado
por demoras del HT123

HT111 reprogramado
por demoras del HT123

HT123 pin pivot agarrotado de tolva, falta de apoyo del


personal de gra, operaciones y coordinacin de
planeamiento

HT124 Falta de compromiso por parte de FESA para


trabajos programado cambio de RDD 19,345 horas voltear
de izquierda a derecha y falta de experiencia.

MINE MAINTENANCE MANAGEMENT


PERFORMANCE ANALYSIS
(Check- Daily/Weekly/Monthly)
STRATEGY - > 60 days (Intellect)
Year / Quarterly

Deliverability

Availability

PLANNING - < 60 days (Efficiency)


Monthly / Weekly /Daily/Shift

Reliability

CPH

EXECUTION (Quality)
Daily/Shift

Preventive Maintenance PM

Preventive Maintenance PM

Mine Planning

Programmed Component
Replacement - PCR

Programmed Component
Replacement - PCR

Mine Operations

Backlogs

Backlogs

Application & Operation

EM - Strategy

Daily Tactics

Loss Prevention

Strategic Planning /
Budgeting
Health

Corrective

Component Life Cycle


Mgmt

OEM Warranty Mgmt

Diagnostics

Maintenance Efficiency

Work-Order Administration

Execution

Reliability Engineering

Technology Deployment

Health Inspections

FACILITIES MGMT
Equipment Health

Data Capture
Facilities Maintenance

Downtime

Condition Monitoring
Environmental Control

Maintenance Efficiency

GET / Tires & U/C


Facility Projects

Prognostic / Diagnostic
Analysis

COST ACCOUNTING
(Weekly/Monthly/Quarterly/Year

CAPEX

OPEX

Work-Order

Risk
Management

Financial
Health

DISPONIBLIDAD 783C
Availability 793C
2008-2009
92%
90%
88%
86%
84%
82%
80%

May

Jun

Jul

Aug

Sep

Oct

Nov

Dec

Jan

Feb

Mar

Abr

May

Acum Budget 89.6% 89.3% 89.1% 89.1% 89.2% 89.2% 89.1% 89.1% 89.0% 88.9% 88.8% 88.7% 88.6%
Acum Actual

88.8% 88.5% 88.3% 88.2% 88.1% 87.8% 87.5% 87.4% 87.2% 87.1% 87.0% 86.9% 86.7%

Budget

89.8% 87.9% 87.6% 89.3% 89.8% 89.0% 88.8% 89.1% 87.6% 87.5% 87.7% 87.0% 87.2%

Actual

88.9% 87.1% 87.3% 87.0% 87.3% 85.1% 85.1% 86.6% 83.9% 85.5% 85.8% 85.8% 84.3%
Acum Budget

Acum Actual

Budget

Actual

MINE MAINTENANCE MANAGEMENT


PERFORMANCE ANALYSIS
(Hourly/Daily/Weekly/Monthly)
STRATEGY - > 60 days (Intellect)
Year / Quarterly

Deliverability

Availability

PLANNING - < 60 days (Efficiency)


Monthly / Weekly /Daily/Shift

Reliability

CPH

EXECUTION (Quality)
Daily/Shift

Preventive Maintenance PM

Preventive Maintenance PM

Mine Planning

Programmed Component
Replacement - PCR

Programmed Component
Replacement - PCR

Mine Operations

Backlogs

Backlogs

Application & Operation

EM - Strategy

Daily Tactics

Loss Prevention

Strategic Planning /
Budgeting
Health

Corrective

Component Life Cycle


Mgmt

OEM Warranty Mgmt

Diagnostics

Maintenance Efficiency

Work-Order Administration

Execution

Reliability Engineering

Technology Deployment

Health Inspections

FACILITIES MGMT
Equipment Health

Data Capture
Facilities Maintenance

Downtime

Condition Monitoring
Environmental Control

Maintenance Efficiency

GET / Tires & U/C


Facility Projects

Prognostic / Diagnostic
Analysis

COST ACCOUNTING
(Weekly/Monthly/Quarterly/Year

CAPEX

OPEX

Work-Order

Risk
Management

Financial
Health

Realibility
MTBS CAT793C

MTTR CAT793C

2008-2009

2008-2009
8.0

80
70

60 hrs

60

7.0
6.0

50

5.0

40

4.0

30

3.0

20

5hrs

2.0

10

1.0

May-08 Jun-08 Jul-08 Ago-08 Sep-08 Oct-08 Nov-08 Dic-08 Ene-09 Feb-09 Mar-09 Abr-09 May-09

May-08 Jun-08

Jul-08

Ago-08 Sep-08 Oct-08 Nov-08 Dic-08 Ene-09 Feb-09 Mar-09 Abr-09 May-09

FSAPM CAT793C

Plan & Corrective CAT793C

2008-2009

2008-2009
100%

120:00
108:00
96:00
84:00
72:00
60:00
48:00
36:00
24:00
12:00
0:00
May-08 Jun-08 Jul-08 Ago-08 Sep-08 Oct-08 Nov-08 Dic-08 Ene-09 Feb-09 Mar-09 Abr-09 May-09

50hrs

80%

60%

60%
40%
20%
0%
May-08

Jun-08

Jul-08

Ago-08

Sep-08

Oct -08

Nov-08

Dic-08

Ene-09

Feb-09

Mar-09

Abr-09

May-09

May-08 Jun-08 Jul-08 Ago-08 Sep-08 Oct-08 Nov-08 Dic-08 Ene-09 Feb-09 Mar-09 Abr-09 May-09
CAT793C

50%

53%

54%

52%

44%

32%

41%

45%

34%

49%

47%

51%

49%

PRECISION DE SERVICIO CAT793C

Backlogs aging > 60 Days CAT793C

2008-2009

2008-2009

50%

50%

85%

40%

40%

30%

30%

20%

20%

5%

10%

10%

0%
0%

M ay-08
M ay-08

Jun-08

Jul -08

Ago-08

Sep-08

Oct-08

Nov-08

Di c-08

Ene-09

Feb-09

M ar -09

Abr -09

4%

0%

4%

8%

0%

8%

4%

6%

10%

30%

16%

17%

Jul -08

Ago-08

Sep-08

Oct-08

Nov-08

Di c-08

Ene-09

Feb-09

M ar -09

Abr -09

M ay-09

May-08 Jun-08 Jul-08 Ago-08 Sep-08 Oct-08 Nov-08 Dic-08 Ene-09 Feb-09 Mar-09 Abr-09 May-09

May-08 Jun-08 Jul-08 Ago-08 Sep-08 Oct-08 Nov-08 Dic-08 Ene-09 Feb-09 Mar-09 Abr-09 May-09
CAT793C

Jun-08

M ay-09

CAT793C 22%

6%

NP/SM NP

EFECTIVIDAD DEL PLAN (TIME) CAT793C


2008-2009

eqmt (All)

Week (All)

14%

18%

21%

FLOTA NON PROGRAMMED AT FIELD 793C

24%

20%

Modo de falla (All)

21%

19%

17%

21%

23%

21%

15%

25

17 15 7 16

Lugar (All)

793C SUBSYSTEM DOWNTIME TREND BY MONTH OHT FLEET - 2009

Top Five

Month
Ene

Feb

Mar

Abr

700
646
600

200%
500

180%
160%
140%

VALUE

400

110%

120%

331
300

290
267

246
220

215

100%

200
May-08

Jun-08

Jul-08

Ago-08

Sep-08

Oct-08

Nov-08

Dic-08

Ene-09

Feb-09

Mar -09

Abr -09

163

May-09

May-08 Jun-08 Jul-08 Ago-08 Sep-08 Oct-08 Nov-08 Dic-08 Ene-09 Feb-09 Mar-09 Abr-09 May-09

166
139
115

100

87

78

60
32

CAT793C 164% 144% 131% 132% 105% 143% 141% 120% 123% 142% 145% 135% 145%

113

107
72 72

19

35

54 63

31

91
73 83
38 43 32 30

59
22

10

0
Maint: 10001 NP - Maint: 13501 NP - Maint: 42001 NP - Maint: 42501 NP - Maint: 72581 NP - Maint: 10001 NP - Maint: 13501 NP - Maint: 42001 NP - Maint: 42501 NP - Maint: 72581 NP MOTOR
SISTEMA DE
LLANTAS Y AROS
SISTEMA DE
TOLVA, TORRE
MOTOR
SISTEMA DE
LLANTAS Y AROS
SISTEMA DE
TOLVA, TORRE
ENFRIAMIENTO
FRENO
DE
ENFRIAMIENTO
FRENO
DE
PERFORADORA
PERFORADORA
Sum of Demora2

Sum of Eventos
SUBSYSTEM
Data

nameb (Reason)

Ranking de Paralizaciones codificado


Flota OHT Jan-June 2013
Codigo
5000
4209
1429
9600
4250
7300
1000
7319
9100
9500
4200
1350
7200

Descripcin
Hydraulic System
Tires & Rims
Lights
Wait on Mechanic
Wheel Brake System
Oper. Compartment
Engine
Mirrors
Aux. Equipment
PM
Wheel System
Cooling System
Suspension

Horas
Horas Operacin= 14769
Paralizacin # Paralizac. MTTR MTBS
824.44
130
6.34
114
298.58
92
3.25
161
70.26
67
1.05
220
78.61
48
1.64
308
328.28
46
7.14
321
75.75
43
1.76
343
248.68
41
6.07
360
15.04
37
0.41
399
43.51
36
1.21
410
1553.88
32
48.56
462
595.34
32
18.60
462
262.49
29
9.05
509
39.83
29
1.37
509

Cul es la frecuencia y localizacin de los problemas?


P
R
O
B
L
E
M
S
.D
I
S
T
R
I
B
U
T
I
O
N
P
E
R
S
Y
S
T
E
M
S
S
h
u
t
d
o
w
n
s
p
e
r
S
y
s
t
e
m

I
n
f
l
u
e
n
c
e
o
n
R
e
l
i
a
b
i
l
i
t
y
(
M
T
B
S
)

I
n
f
l
u
e
n
c
e
o
n
R
e
l
i
a
b
i
l
i
t
y

L
a
s
t6
M
o
n
t
h
s
3
0

4
0
E
n
g
i
n
e

2
7
.
0
%
7
.
0
%

4
.
0
%

4
.
0
%
8
.
0
%
2
5
.
0
%

3
0

D
i
f
f
/
F
i
n
a
l
s

2
0

E
l
e
c
t
r
i
c
a
l
F
r
a
m
e

1
5

2
0
H
y
d
r
a
u
l
i
c

OveralMTBS(hours)

9
.
0
%

E
n
g
i
n
e
X
M
S
N
/
T
C
D
i
f
/
F
i
n
a
l
s
E
l
e
c
t
r
i
c
a
l
F
r
a
m
e
H
y
d
r
a
u
l
i
c
T
i
r
e
s
P
M
s
O
t
h
e
r
s

%ofinfluenceperSystem

5
.
0
%

X
M
S
N
/
T
C

2
5

1
0

1
0

T
i
r
e
s
P
M
s
O
t
h
e
r
s

1
1
.
0
%

M
T
B
F
T
r
e
n
d

J
u
l
y

A
u
g
u
s
t

S
e
p
t
e
m
b
e
r

O
c
t
o
b
e
r

N
o
v
e
m
b
e
r

D
e
c
e
m
b
e
r

D
e
c
e
m
b
e
r
1
9
9
x
(
l
a
s
tm
o
n
t
h
)

S
h
u
t
d
o
w
n
s
p
e
r
S
y
s
t
e
m
s

I
n
f
l
u
e
n
c
e
o
n
T
u
r
n
a
r
o
u
n
d
(
M
T
T
R
)

I
n
f
l
u
e
n
c
e
o
n
T
u
r
n
a
r
o
u
n
d

L
a
s
t6
M
o
n
t
h
s
4
0

7
E
n
g
i
n
e

7
.
0
%
8
.
0
%

1
.
0
%
2
8
.
0
%

1
7
.
0
%

X
M
S
N
/
T
C
D
i
f
f
/
F
i
n
a
l
s
E
l
e
c
t
r
i
c
a
l

4
2
0
3

OveralMTR(hours)

1
0
.
0
%

3
0

E
n
g
i
n
e
X
M
S
N
/
T
C
D
i
f
/
F
i
n
a
l
s
E
l
e
c
t
r
i
c
a
l
F
r
a
m
e
H
y
d
r
a
u
l
i
c
T
i
r
e
s
P
M
s
O
t
h
e
r
s

%ofinfluenceperSystem

7
.
0
%
1
2
.
0
%

1
0

F
r
a
m
e
H
y
d
r
a
u
l
i
c
T
i
r
e
s
P
M
s
O
t
h
e
r
s
M
T
T
R
T
r
e
n
d

1
0
.
0
%

J
u
l
y

A
u
g
u
s
t

S
e
p
t
e
m
b
e
r

O
c
t
o
b
e
r

N
o
v
e
m
b
e
r

D
e
c
e
m
b
e
r
1
9
9
x
(
l
a
s
tm
o
n
t
h
)

R
E
L
I
A
B
I
L
I
T
Y
(
M
T
B
S
)
&
T
U
R
N
A
R
O
U
N
D
(
M
T
T
R
)
I
N
F
L
U
E
N
C
E

D
e
c
e
m
b
e
r

MINE MAINTENANCE MANAGEMENT


PERFORMANCE ANALYSIS
(HourlyDaily/Weekly/Monthly)
STRATEGY - > 60 days (Intellect)
Year / Quarterly

Deliverability

Availability

PLANNING - < 60 days (Efficiency)


Monthly / Weekly /Daily/Shift

Reliability

CPH

EXECUTION (Quality)
Daily/Shift

Preventive Maintenance PM

Preventive Maintenance PM

Mine Planning

Programmed Component
Replacement - PCR

Programmed Component
Replacement - PCR

Mine Operations

Backlogs

Backlogs

Application & Operation

EM - Strategy

Daily Tactics

Loss Prevention

Strategic Planning /
Budgeting
Health

Corrective

Component Life Cycle


Mgmt

OEM Warranty Mgmt

Diagnostics

Maintenance Efficiency

Work-Order Administration

Execution

Reliability Engineering

Technology Deployment

Health Inspections

FACILITIES MGMT
Equipment Health

Data Capture
Facilities Maintenance

Downtime

Condition Monitoring
Environmental Control

Maintenance Efficiency

GET / Tires & U/C


Facility Projects

Prognostic / Diagnostic
Analysis

COST ACCOUNTING
(Weekly/Monthly/Quarterly/Year

CAPEX

OPEX

Work-Order

Risk
Management

Financial
Health

High Level Comparison

MINE MAINTENANCE MANAGEMENT


PERFORMANCE ANALYSIS
(Hourly/Daily/Weekly/Monthly)
STRATEGY - > 60 days (Intellect)
Year / Quarterly

Deliverability

Availability

PLANNING - < 60 days (Efficiency)


Monthly / Weekly /Daily/Shift

Reliability

CPH

EXECUTION (Quality)
Daily/Shift

Preventive Maintenance PM

Preventive Maintenance PM

Mine Planning

Programmed Component
Replacement - PCR

Programmed Component
Replacement - PCR

Mine Operations

Backlogs

Backlogs

Application & Operation

EM - Strategy

Daily Tactics

Loss Prevention

Strategic Planning /
Budgeting
Health

Corrective

Component Life Cycle


Mgmt

OEM Warranty Mgmt

Diagnostics

Maintenance Efficiency

Work-Order Administration

Execution

Reliability Engineering

Technology Deployment

Health Inspections

FACILITIES MGMT
Equipment Health

Data Capture
Facilities Maintenance

Downtime

Condition Monitoring
Environmental Control

Maintenance Efficiency

GET / Tires & U/C


Facility Projects

Prognostic / Diagnostic
Analysis

COST ACCOUNTING
(Weekly/Monthly/Quarterly/Year

CAPEX

OPEX

Work-Order

Risk
Management

Financial
Health

HYPERION

Budget Projections, Forecasts,


Cost Analysis
Maintenance
Scheduling
Tasks

Work
Orders

Equipment, Scheduling, Work Orders, Tracing, CM, OS


Financial Transitions

41

STRATEGY PROCESS

Appli/Operat
Machine
Configuration

Building
Strategy

MSTs, APLs,
Standard Job
(Ellipse)

Budget
Planning

Analyze and Improve

SEVERITY APLICATION
COMMON ARRANGE
MACHINE ATTACHMENT

BCRF (Budget Component Request Form)


SYSTEMS-SUBSYSTEMS
COMPOENENTES
PLANNINGS AND NON PLANNING TASK
STRATEGY INTENT
STRATEGY SPECIFIC

AVAILABILIY
RVIC
COMPONENTS PROJECTION

LIFE COMPONENTES REAL VS BCRF


GR US$ HISTORICAL VS BDRF
SM REAL VS BCRF
% UNNASIGNED

BUDGETING PROCESS
Now
Mine Maintenance analyze the
equipments shut down according RVIC
Mine Maintenance Calculate
Mechanical Availability in AMT in base
of BCRF and strategy
Mine Maintenance update this Input in
AMT from Hyperion
All components are in AMT according
BCRF and strategy task

The last change of these components


were updated automatically (we have
projections on line for Life of Mine)
Data Base with Automatically Reports
and Interface to Hyperion focus on
process

3 days

COST CONTROL PROCESS

Data Health

Budget vs.
Actual
Comparison

Identify
Variations
Level: Fleet,
Equipment,
Component,etc

Forecast

Weekly
Meeting &
Action Plan

Attendants:
Strategist, Planner,
Condition Monitoring
and Execution

AMT REPORTS:
DATA VALIDATION WORK ORDER MANAGER
OVERDUE TASKS
UNASSIGNED COST ANALYSIS
HIGH LEVEL COMPARISON
COST ANALYSIS TO DATE
EQUIPMENT COST ANALYSIS
COMPLIANCE TO PLAN
FORECAST COST ANALYSIS

Follow Up

Setting Life Cycle budgets and aligning to Ellipse - Trazabilidad


Equipment
Hierarchy

Actual component lives


and costs (workorders)
come from Ellipse

Life Cycle Budget for


each equipment

Strategy items linked to


Ellipse MST

Two way interface between AMT


Strategy and Ellipse MST

Review Life Cycle Strategy


Review Component
Life Distribution

Review Historical
Workorders

Modify strategy or
make changes to
achieve strategy

Optimise Maintenance Plan


Identify components
with highest cost
Review the changeout
schedule of key
components

Space changeouts
optimally for available
resources

Determine Economic time to Retire Equipment


Current Retirement
Date

Better Retirement
Date

Measure Residual
Value of Equipment
over time

Get AMT to automatically


determine best retirement point
(lowest RVIC) within a certain
date range

Anlisis de vida econmica


M
T
B
F
F
l
e
e
tN
o
.x
x
8
0

M
o
n
t
h
l
y
M
T
B
F

7
0

R
o
l
l
.1
2
M
T
B
F

6
0
5
0

MTBF(Hours)

4
0
3
0

F
l
e
e
tI
n
f
o
r
m
a
t
i
o
n
2
0
1
0
1
9
9
3

1
9
9
4

1
9
9
5

1
9
9
6

1
9
9
7

M
a
n
u
f
a
c
t
u
r
e
r
T
r
u
c
k
M
o
d
e
l
A
c
q
u
i
s
i
t
i
o
n
Y
e
a
r
N
u
m
b
e
r
o
fT
r
u
c
k
s

M
a
i
n
t
e
n
a
n
c
e
C
o
s
t
/
h
r
F
l
e
e
tN
o
.x
x
S
i
t
u
a
t
i
o
n
A
n
a
l
y
s
i
s

3
5

M
o
n
t
h
l
y
C
o
s
t
R
o
l
l
i
n
g
1
2

3
0
2
5

CostUS$/hr

2
0
1
5
1
0
5
0
1
9
9
3

1
9
9
4

1
9
9
5

1
9
9
6

1
9
9
7

F
L
E
E
T
A
G
E
A
N
A
L
Y
S
I
S

11/10/2015

49

:
:
:
:

X
Y
Z
A
A
A
1
9
9
3
8

Budget Creation and Performance Monitoring

Budget Creation

Save finalised budget as an


archive

Budget Performance
Monitoring

AMT ELLIPSE INTEGRATION


BCRF DOCUMENT / CURRENT
PROJECTION

BUDGETING PROCESS
Mine Maintenance
, Mine Operations
and Mine Planning
reviews RVIC by
machine and
agree about
Machine End
Dates

Mine Maintenance
export data from
AMT and pump it
to HYPERION
MAINT cube.
Consolidation
process.
Confirmation to
Mine Operations

Mine Maintenance
extracts Operation
Hours from
HYPERION STAT
and populate them
in AMT (manual
process)

Mine Maintenance
updates End
Dates by machine,
according to the
agreed dates.

Mine Operations
extracts
Mechanical
Availability from
HYPERION
MAINT and load
HYPERION STAT

Mine Maintenance
calculates its
Budget Projection,
based on the
parameters
defined. Final
revision

Mine Operations and


Mine Planning adjust
the Quantity of
Machines by each
period and put those
numbers in
HYPERION Web
Forms pointing to
HYPERION STATS
cube

Mine Planning
calculates Tons,
for Loading and
Hauling fleets

Mine Maintenance
exports data from
AMT and pump it
to HYPERION
MAINT. Control
process AMT MAINT

Maintenance
calculates Mechanical
Availability in AMT,
based in Operation
Hours from last
Budget / Forecast
exercise. Final review
with owners.

Mine Operation
calculates
Operation hours
for all fleets
(Auxiliary, Hauling/
Loading, Drilling)
in HYPERION
STAT

Mine Maintenance
reviews whether
the parameters in
MAINT match with
the existing in
STATS
(availability,
quantity of
machines, etc).

Mine Maintenance
loads data from
HYPERION
MAINT to
HYPERION
OPEX. Control
process MAINT OPEX

End

HIGH LEVEL COMPARISON

WORK ORDER MANAGER

COMPONENT STATUS

EQUIPMENT COST ANALYSIS

Es nuestra situacin estable y predecible?


B
a
c
k
l
o
g
s
Q
u
a
n
t
i
t
y

B
l
o
g
s
>
3
0
D
a
y
s
(
%
o
f
T
o
t
a
l
)

E
s
t
i
m
a
t
e
d
T
i
m
e
t
o
R
e
p
a
i
r

2
4
0
T
o
n
T
r
u
c
k
F
l
e
e
t

2
4
0
T
o
n
T
r
u
c
k
F
l
e
e
t

2
4
0
T
o
n
T
r
u
c
k
F
l
e
e
t

4
0
0

1
0
0

0
0
0
Q
u
a
n
t
i
t
y 1
E
x
e
c
u
t
e
d

9
0
8
0
0

3
0
0

8
0
6
0
0

7
0

1
0
0

Percentage%

Downtime(hrs)

QuantiyofBL

2
0
0
4
0
0

6
0

5
0
2
0
0

4
0
0
A
p
r
i
l

J
u
n
e
M
a
y

J
u
l
y

A
u
g
u
s
t
O
c
t
u
b
e
r
D
e
c
e
m
b
e
r
S
e
p
t
e
m
b
e
r
N
o
v
i
e
m
b
e
r

0
A
p
r
i
l

J
u
n
e
M
a
y

J
u
l
y

A
u
g
u
s
t
O
c
t
o
b
e
r
D
e
c
e
m
b
e
r
S
e
p
t
e
m
b
e
r
N
o
v
e
m
b
e
r

B
a
c
k
l
o
g
S
t
a
t
u
s

3
0
A
p
r
i
l

J
u
n
e
M
a
y

J
u
l
y

A
u
g
u
s
t
O
c
t
o
b
e
r
D
e
c
e
m
b
e
r
S
e
p
t
e
m
b
e
r
N
o
v
e
m
b
e
r

B
a
c
k
l
o
g
s
p
e
r
S
y
s
t
e
m

2
4
0
T
o
n
T
r
u
c
k
F
l
e
e
t
1
0
0

0
.
7
7
0
.
5
9

8
0

3
.
2
4
1
.
4
7

2
.
4

Percentage%

2
.
4
4

0
.
9
3

6
0

4
0

1
.
3
5

3
.
0
4
2
0

1
.
0
3

0
A
p
r
i
l

J
u
n
e
M
a
y

J
u
l
y

A
u
g
u
s
t
O
c
t
o
b
e
r
D
e
c
e
m
b
e
r
S
e
p
t
e
m
b
e
r
N
o
v
e
m
b
e
r

4
.
1
1

3
.
0
4

E
n
g
i
n
e
E
l
e
c
t
r
i
c
a
l
T
r
a
n
s
m
i
s
s
i
o
n
H
y
d
r
a
u
l
i
c
s
S
t
e
e
r
i
n
g
A
i
r
S
y
s
.
P
M
T
i
r
e
s
D
i
f
f
e
r
e
n
t
i
a
l
F
i
n
a
lD
r
i
v
e
s
B
r
a
k
e
s
S
u
s
p
e
n
s
i
o
n
s
F
.
W
h
e
e
l
s
F
i
r
e
S
u
p
.
A
c
c
i
d
e
n
t
s
A
i
r
/
C
o
n
d

0
.
6
5

S
i
t
u
a
t
i
o
n
A
n
a
l
y
s
i
s
T
h
e
B
e
n
c
h
m
a
r
k
s
o
r
T
a
r
g
e
t
s
f
o
r
Q
u
a
n
t
i
t
y
,E
T
T
R
w
i
l
lb
e
e
s
t
a
b
l
i
s
h
e
d
.I
ti
s
n
o
t
i
c
e
a
b
l
e
t
h
e
i
n
c
r
e
a
s
e
o
fB
a
c
k
l
o
g
s
a
n
d
e
s
t
i
m
a
t
e
d
t
i
m
e
t
o
r
e
p
a
i
r
t
h
e
m
(
E
T
T
R
)
.
T
h
i
s
i
s
v
e
r
y
d
a
n
g
e
r
o
u
s
;w
e
h
a
v
e
t
o
i
m
p
r
o
v
e
o
u
r
r
e
a
c
t
i
o
n
(
c
l
e
a
n
B
L
L
i
s
t
)
.T
h
e
N
b
r
.o
fB
L
e
x
e
c
u
t
e
d
i
s
l
o
w
a
n
d
c
o
n
s
t
a
n
t
.T
h
e
q
u
a
n
t
i
t
y
o
fB
a
c
k
l
o
g
s
w
a
i
t
i
n
g
f
o
r
b
e
i
n
g
p
r
o
c
e
s
s
i
s
a
f
f
e
c
t
e
d
b
y
t
h
e
l
o
c
a
t
i
o
n
o
ft
h
e
w
a
r
e
h
o
u
s
e
.T
h
e
B
L
w
a
i
t
i
n
g
f
o
r
p
a
r
t
s
a
r
e
a
f
f
e
c
t
i
n
g
d
i
r
e
c
t
l
y
o
n
t
h
e
a
g
e
o
ft
h
e
m
,B
L
(
>
3
0
)
C
o
r
r
e
c
t
i
v
e
A
c
t
i
o
n
s
C
o
n
s
i
d
e
r
i
n
g
t
h
e
a
m
o
u
n
to
fB
L
"
r
e
a
d
y
t
o
g
o
"
(
G
r
e
e
n
)
w
e
w
i
l
ls
t
a
r
ts
c
h
e
d
u
l
i
n
g
m
o
r
e
B
L
w
i
t
h
i
n
t
h
e
p
l
a
n
n
e
d
a
c
t
i
v
i
t
i
e
s
a
n
d
i
n
s
t
r
u
c
t
i
n
g
t
h
e
s
u
p
e
r
v
i
s
o
r
s
t
o
i
n
c
r
e
a
s
e
t
h
e
u
s
e
o
ft
h
e
w
i
n
d
o
w
o
fo
p
p
o
r
t
u
n
i
t
i
e
s
o
ft
h
e
u
n
s
c
h
e
d
u
l
e
d
r
e
p
a
i
r
s
.
W
e
a
r
e
w
o
r
k
i
n
g
i
n
t
h
e
r
e
l
o
c
a
t
i
o
n
o
ft
h
e
w
a
r
e
h
o
u
s
e
.
W
e
w
i
l
li
n
c
r
e
a
s
e
t
h
e
s
c
h
e
d
u
l
i
n
g
o
fB
L
a
n
d
t
h
e
s
h
o
p
w
i
l
lb
e
i
n
s
t
r
u
c
t
e
d
t
o
e
x
e
c
u
t
e
d
1
0
0
%
o
ft
h
e
p
l
a
n
n
e
d
j
o
b
s
.

11/10/2015

57

Que tan bien hacemos los PMs?


P
M
E
f
f
e
c
t
i
v
e
n
e
s
s

B
a
c
k
l
o
g
s
e
x
e
c
u
t
e
d
d
u
r
i
n
g
P
M

7
0
O
v
e
r
a
l
lM
T
B
F
6
0

2
0

M
T
B
F
a
f
t
e
r
P
M

5
0

M
T
B
F
T
a
r
g
e
t

1
5

4
0
1
0

QuantiyperTruck

MTBF(Hours)

3
0
2
0

1
0
0
J
a
n
u
a
r
y M
a
r
c
h M
a
y
J
u
l
y S
e
p
t
e
m
b
e
r
N
o
v
e
m
b
e
r
F
e
b
r
u
a
r
y A
p
r
i
l
J
u
n
e A
u
g
u
s
t O
c
t
o
b
e
rD
e
c
e
m
b
e
r

0
J
a
n
u
a
r
y M
a
r
c
h
M
a
y
J
u
l
y S
e
p
t
e
m
b
e
rN
o
v
e
m
b
e
r
F
e
b
r
u
a
r
y A
p
r
i
l
J
u
n
e A
u
g
u
s
t O
c
t
o
b
e
rD
e
c
e
m
b
e
r

P
M
E
f
f
i
c
i
e
n
c
y
1
4
1
2

P
M
2
5
0

S
i
t
u
a
t
i
o
n
A
n
a
l
y
s
i
s

P
M
5
0
0
P
M
1
0
0
0

1
0
P
M
2
0
0
0

Hours

8
6
4

T
a
r
g
e
t
2
0
J
a
n
u
a
r
y M
a
r
c
h
M
a
y
J
u
l
y S
e
p
t
e
m
b
e
r
N
o
v
e
m
b
e
r
F
e
b
r
u
a
r
y A
p
r
i
l
J
u
n
e A
u
g
u
s
t O
c
t
o
b
e
rD
e
c
e
m
b
e
r

P
M
E
X
E
C
U
T
I
O
N

11/10/2015

58

BCRF
Term of analysis in Engine Hours
Engine Hours at start of analysis
Expected Engine Hours per annum
Expected term of analysis (years)

MYSRL-793C
Yanacocha
793C
ATY

Budget ID
Site
Model
Serial No Range

95,000
0
7,000
9.0

01/01/2006

PARTS PRICE DATE:

$15.00
$15.00

R&I LABOR COST PER HOUR:


LABOR COST PER HOUR:

COST/SERVICE METER HOUR:


TOTAL CONTRACT COST:

$70.16
$6,665,158

793C BUDGET - MYSRL Yanacocha


Task Type

Task Counter

Planning Task

Modifier Code

023

CC

00

020

00

GR

00

023

IZ

LT

CC

HP

020

DR

RI

CC

HP

020

1052

IZ

LT

CC

LP

020

1050

1052

DR

CC

LP

020

2098

1057

RI
00

CC

00

510

MUFFLER
CILINDER HEADS

2098

1062

00

GR

00

510

00

GR

023

VALVE ADJUSTMENT

2098

1000

1000

AIR INDUCTION & EXHAUST SYS

2098

1050

TURBOCHARGER-HIGH PRESSURE

2098

1050

1052

TURBOCHARGER-HIGH PRESSURE

2098

1050

1052

TURBOCHARGER-LOW PRESSURE

2098

1050

TURBOCHARGER-LOW PRESSURE

2098

EXHAUST BY PASS VALVE

Component
Code

ENGINE

COMPONENT/SYSTEM/STRUCTURE DETAILS

Job Code

Ellispe
Modifier

00

00

Ellispe Code

UN
0

MYRSL
Expense
Element
(EE)

LIFE CYCLE INTERVAL COSTS


FIRST
CHANGE

LIFE
CYCLE
INTERVAL

Overhaul / Replacement Cost

Removal & Instalation & Maintain Cost


LABOUR
HOURS

LABOUR
COST

Parts &
Materials

LABOUR
COST

LABOUR HOURS

Parts &
Materials

Event Duration
(Hrs)

TOTAL
INTERVAL
COST

TOTAL
EVENTS

COST / SMH

TOTAL COST

1000 - ENGINE
1000

Unscheduled - Engine

1100
2098

1102

1102

00

SM

00

041

ACCESSORY DRIVE - PTO

2098

1207

BM

PD

CC

00

020

ACCESSORY DRIVE - ALTERNATOR


CAMSHAFT

2098
2098

0
0

1207
1210

0
0

AX

00

00

CC
GR

00

020
513

FUEL SYSTEM

2098

1250

00

GR

00

041

FUEL TRANSFER PUMP

2098

1256

00

GR

00

513

FUEL TANK

2098

1273

00

GR

00

023

UNIT INJECTOR

2098

1290

00

2098

1300

GR
GR

00

LUBRICATION SYSTEM

0
0

513
023

PRELUBE PUMP
OIL RENEWAL SYSTEM

2098
2105

0
0

1319
1349

0
0

00

00

00

CC
GR

00

510
023

COOLING SYSTEM

2098

1350

00

GR

00

023

RADIATOR

2098

1350

1353

RA

00

CC

00

020

WATER REGULATOR - THERMOSTAT

2098

1355

00

CC

00

510

FAN - SPIDER

2098

1356

00

CC

00

510

V-BELTS-OF FAN DRIVE

2098

1357

PR

MV

GR

00

510

V-BELTS- OF ALTERNATOR, COMPRESSOR

2098

1357

AX

GR

00

510

BELT TIGHTENER

2098

1358

CC

00

020

FAN DRIVE

2098

1359

00
00

CC

00

513

WATER PUMP - MAIN

2098

1361

00

GR

00

513

AFTERCOOLER WATER PUMP

2098

1363

00

CC

00

510

STARTING SYSTEM

2098

1450

00

GR

00

041

AIR STARTING MOTOR

2098

1451

00

CC

00

513

AIR COMPRESSOR

2098

1803

1803

00

GR

00

513

ENGINE ELECTRONIC CONTROL SYSTEMS

2098

1900

00

GR

00

510

00

00

T
P
T
T
T
T
T
P
T
T
P
T
P
T
T
T
T
T
T
P
T
T
P
P
P
T
T
P
T
T
P
T
T
T
T

0.00

240,320

1,201,600

12.65

24

1,210

7,260

0.08

11,183

67,098

0.71

10,603

11,183

67,098

0.71

10,603

11,183

67,098

0.71

10,603

11,183

67,098

0.71

50

1,500

1,610

9,660

0.10

5,600

5,675

11,350

0.12

16,000

16,000

288

4,320

7,000

229,000

48

8,000

16,000

24

360

850

9,000

16,000

12

180

400

10,603

9,000

16,000

12

180

400

9,000

16,000

12

180

400

9,000

16,000

12

180

400

9,000

16,000

60

32,000

32,000

75

9,000

16,000

250

4,000

90

300

390

24

9,360

0.10

9,000

16,000

90

350

440

2,640

0.03

9,000

16,000

90

200

144

434

2,604

0.03

8,000

16,000

48

720

6,000

24

6,720

40,320

0.42

8,000

16,000

12

180

500

12

680

4,080

0.04

8,000

16,000

30

400

430

2,580

0.03

16,000

16,000

16

240

900

1,140

5,700

0.06

8,000

16,000

32

480

250

7,000

16

7,730

46,380

0.49

2,000

2,000

90

90

47

4,230

0.04

16,000

16,000

30

170

4,500

4,700

23,500

0.25

16,000

16,000

60

250

310

1,550

0.02

2,000

2,000

90

90

47

4,230

0.04

16,000

16,000

24

360

1,800

6,000

12

8,160

40,800

0.43

6,000

6,000

60

400

460

15

6,900

0.07

32,000

32,000

45

5,500

5,545

11,090

0.12

6,000

6,000

90

550

640

15

9,600

0.10

3,000

3,000

60

60

120

31

3,720

0.04

9,000

16,000

60

700

760

4,560

0.05

9,000

16,000

16

240

9,000

9,240

55,440

0.58

8,000

16,000

10

150

30

800

980

5,880

0.06

9,000

16,000

10

150

120

1,600

1,870

11,220

0.12

8,000

8,000

120

100

220

11

2,420

0.03

16,000

16,000

45

2,800

2,845

14,225

0.15

16,000

16,000

120

150

1,650

1,920

9,600

0.10

16,000

16,000

24

360

1,000

24

1,360

6,800

0.07

95

0.00

3000 - TRANSMISSION & DRIVE LINE


Unscheduled - Transmission & Drive Line

3000

UN

00

1,000

1,000

Planeamiento, programacin y control


Planificando

+ Secuencia de actividades (PERT)


+ Tiempo que tomar
+ Recursos a utilizarse
+ Herramientas necesarias
+ Instrucciones, literatura, etc.
+ Personas que estn capacitadas
+ Costo estimado
+ Listados de verificacin
+ qu mas?

Planeamiento, programacin y control


Resumiendo:

+ Planeamiento = Anticipar actividades


+ Programacin = Hacer cronogramas (Gantt)
+ Controlar = Supervisar y retroalimentar

MANTENIMIENTO DE CLASE MUNDIAL


Se le llama Mantenimiento de Clase Mundial
cuando la organizacin logra una confiabilidad de los
equipos en el rango superior de lo correspondiente al
sector en el que se desempea, de manera sostenida
a lo largo del tiempo y consecuente con las
decisiones tomadas, ejecutando programas que se
basan en informacin precisa, oportuna y completa.
Se requiere de sinergias en la organizacin.

MANTENIMIENTO DE CLASE MUNDIAL

Verifique
su
progreso
Repita las
evaluaciones
segn sea
necesario

Haga de la mejora
continua una
poltica de trabajo, y
establezca como
objetivo lograr un
mantenimiento de
clase mundial

Solicite
evaluacines
peridicas
Establezca
una tcnica
de
evaluacin
efectiva

Empezando el ciclo
Verifique qu
estndares
utilizados
darn como
resultado una
operacin de
clase mundial

La gerencia debe iniciar el proceso de


enrumbarse hacia un mantenimiento de
clase mundial
Utilice los
benchmarks
para adaptar
las prcticas
que le sean de
utilidad

Paul D. Tomlingson; E&MJ, March 2007, pag 39


www.mining-media.com

Utilice los
KPI como un
suplemento
a su
evaluacin

Identifique y
priorice sus
necesidades
de mejora

Realice la
evaluacin
inicial
(Linea
Base)

Gracias