United States Department of Justice

International Criminal Investigative Training Assistance Program


American Embassy Jakarta, Indonesia

REQUEST FOR PROPOSAL

Date

: August 18, 2016

Solicitation#

: RFP DOJ 16 S0051

Subject

: PROCUREMENT OF E-LIBRARY
INFRASTRUCTURE AND SERVICES FOR A
POLICE FACILITY IN PURWOKERTO
CENTRAL JAVA

This solicitation is to provide the following equipment and services:


1. Projector Screen

One (1) unit

Dimension
Type
Diagonal
Remote control
Installation

84" x 84" (213 x 213 cm)


Motorized screen with built-in motor
105"
Infra-Red System
Yes

2. Projector Bracket

One (1) unit

Material type
Height
Capacity
Cabling
Installation

Aluminum
75 cm, extendable to 120 cm
20 kg
15 meters VGA cables
Yes, including mounting projector to the bracket
(Projector is provided by owner)

3. Server Rack

One (1) unit

Dimension

19" Closed Rack 30U, depth 1150 mm

Front Door
Back Door

Glass
Metal
Page 1 of 21

United States Department of Justice


International Criminal Investigative Training Assistance Program
American Embassy Jakarta, Indonesia
Accessories

Roof Panel With 2 Fans


1 Unit Vertical Power Distribution Unit (PDU) 6
Outlet
50 pcs Cage Nut & M6 Screw

Color
Installation

Black
Yes

4. Wall-Mount Rack

One (1) unit

Dimension

19" Closed Rack 8U, depth 600 mm

Double Door

Yes

Front Door
Back Door
Accessories

Acrylic
Metal
1 Unit Single Fan
1 Unit Vertical Power Distribution Unit (PDU) 6
Outlet
20 pcs Cage Nut & M6 Screw
1 set Dynabolt

Color
Installation

Black
Yes

5. 1 PK Air Conditioner

Three (3) units

Type
Feature
Cooling capacity
Power consumption
Air circulation (outdoor)
Air flow rate (indoor)
Noise level

AC Split
Auto on and off with timer
8500 Btu/hr / 2491 kW
630 Watts
20 m3/min
6.5 m3/min
48 dBA (Outdoor High)
38 / 31 / 26 dBA (Indoor High/Medium/Low)
Liquid Side 6.35 mm/inch
Gas Side 9.52 mm/inch
10 meters for each unit
Yes

Connecting tube
Refrigerant piping
Installation

Page 2 of 21

United States Department of Justice


International Criminal Investigative Training Assistance Program
American Embassy Jakarta, Indonesia
6. Computer Desk

Ten (10) units

Type
Material
Surface
Laminated material
Dimension
Color
Thickness

Top Table Profile


Drawer

Standard computer desk assembly included


Plywood
Laminated
HPL
L:80cm x W:50cm x H:75cm
Brown
Top table: 30mm
Front panel: 18mm
Two holes; one at the top left corner, one at the top
right corner
Duck nose
No

7. Task Chair

Ten (10) units

Color
System
Dimension
Back Rest Board
Foam
Material Cover
Gas lift
Castor
Armrest

Black color vinyl


Adjustable height hydraulic system
(120-127) x 70 x 50 cm
Molded plywood
Molded foam
Ateja fabric
Hydraulic
Plastic injection standard molded 5
Gloss polyurethane with iron frame

8. Server Room Renovation

One (1) unit

Partition Wall

- Made from Gypsum


- Covering the existing wall
L:3 m x W:2 m x H:3 m
Glass Door: - Un-tempered Glass 10 mm in thickness
- Aluminum Frame 4 inch in thickness,
brown color
- Sandblast window sticker
Sill: Aluminum Frame 4 inch in thickness, brown
color installed on gypsum wall
Dimension: H:210 mm x W:100 mm
Card Reader (one unit): Connectivity:

Cable hole

Wall Dimension
Data Center Door

Page 3 of 21

United States Department of Justice


International Criminal Investigative Training Assistance Program
American Embassy Jakarta, Indonesia

Installation

RS485/Wiegand/ABA T2
Indicator: LED indicator; blue and orange
Buzzer: Yes
Weatherproof: Yes
Input Voltage: 12VDC
Current (typical): 180,A at 12 VDC
Proximity Reader: 125KHZ EM*RS485
Door Closer: Yes
Lock: Magnetic door lock
Alarm System: Mini siren with flashing light
Card: Twenty (20) formatted proximity card ISO
Standard Proximity Card-0.76mm ( EM)
Installation: Yes
- Install electrical panel in the server room
- Has one unit of grounding bar
- Has one unit of neutral bar
- Build one point of grounding system
- Install two points of LED bulbs on the ceiling of the
server room
Remove the existing wood-framed glass window,
commensurate with the area of the new server room,
then close it with brick/mortar wall, and paint finish
match to both sides of the wall
Yes

9. Data Cables Without Faceplate

Thirty two (32) points of installation

Cable Unshield Twisted Pair (UTP)

Category 6E
4-pair
F/UTP shielded copper cable
Copper conductors are 23 American Wire Gauge
(AWG) with Polyethylene (PE) insulation
Conductors within cables are twisted in pairs
Surrounded by a metallic foil shield and protected by a
flame-retardant Polyvinyl Chloride (PVC) jacket
Product Type: Modular Plug
Color: Transparent
Material: Polycarbonate
No. of Ports: 1
Performance Level: Category 5e/Class D
Plug Type: Standard Plug

Electrical System

Modifications

RJ45 Connector

Page 4 of 21

United States Department of Justice


International Criminal Investigative Training Assistance Program
American Embassy Jakarta, Indonesia
Cable Protector

Cable Label
Installation

High quality PVC cable tray


Insulation
Flame retardant
Corrosion resistant
Capable of resisting up to 25kV
Impact-resistant
All cabling must be labeled.
Yes

10. Data Cables With Faceplate

Ten (10) points of installation

Cable Unshield Twisted Pair (UTP)

Cable Label
Installation

Category 6E
4-pair
F/UTP shielded copper cable
Copper conductors are 23 American Wire Gauge
(AWG) with Polyethylene (PE) insulation
Conductors within cables are twisted in pairs
Surrounded by a metallic foil shield and protected by a
flame-retardant Polyvinyl Chloride (PVC) jacket
Outbow type
Original indoor
Single port for RJ45 module
High quality PVC cable tray
Insulation
Flame retardant
Corrosion resistant
Capable of resisting up to 25kV
Impact-resistant
All cabling must be labeled.
Yes

11. Fiber Optic Cables

One (1) set of installation

Type
Length
Patch Cord
Module

Outdoor 4 Core Multimode


250 meters
Square Connector (SC)
- 1000Base-SX
- Mini-GBIC / Small Form-Factor Pluggable (SFP)
- Multimode SC
Capacity 4 Core With Lock, rack-mount
Yes

Faceplate

Cable Protector

Fiber Optic Termination Box


Installation

Page 5 of 21

United States Department of Justice


International Criminal Investigative Training Assistance Program
American Embassy Jakarta, Indonesia

12. Power Cables

Twenty Five (25) points of installation

Standard

Persyaratan Umum Instalasi Listrik (PUIL) 2011 Standar Nasional Indonesia (SNI) 0225:2011/Amd
1:2013
- 2 x 16 mm for outdoor power cable from PLN panel
- NYM 3 x 4 mm for main power cable from building
electrical panel
- NYAF 16 mm for grounding cable from building
electrical panel
- NYM 3 x 2,5 mm for extension power cable to
equipment
Single
3 pcs
Soft Copper
25A at 30C (in the air)
300/500V
Voltage: Max 250VAC
Power: 2500 W
Current: 10 - 16A
Type: Max. four sockets
- 25 Amphere 2 units
- 10 Amphere 8 units
- outbow type
- 6 modules capacity
- transparent door
Yes

Type

Wire Type
Number of Wires
Wire Material
Max Current
Nominal Voltage
Electrical Socket Extension

Mini Circuit Breaker (MCB)


MCB Box

Installation

13. Network Equipment Setup


(equipment provided by owner)
Wireless Access Points
Server Installation
Switch (24 ports) Installation

One (1) service package


Wireless access points must be configured, installed
and mounted on the ceilings.
Server must be inserted and secured into the rack with
hardware.
Switch 24 ports must be inserted and secured into its
designated place with hardware.
Switch 24 ports installation, capable of the following
configuration:
- Username and administrator password
- IP address
Page 6 of 21

United States Department of Justice


International Criminal Investigative Training Assistance Program
American Embassy Jakarta, Indonesia

Router Installation

- Port description
- Switch hostname
Router must be inserted and secured into the rack with
hardware.
Router installation, capable of the following
configuration:
- Username and administrator password
- IP address
- Firewall
- DHCP server
- Network Address Translation (NAT)
- Username and password to access Local Area
Network (hotspot)
- Router hostname

Server LCD, Keyboard, Mouse


Installation

LCD, Keyboard, Mouse must be inserted into the rack.

Wireless PCI Cards

Wireless PCI Cards must be installed inside personal


computer in the computer lab.
UPS must be inserted into the server rack.

UPS for Server


UPS for Personal Computer
UPS for Wall-Mount Rack
UPS for Computer Lab. Switch
UPS for E-Library Switch
Network configuration

UPS must be placed under the Personal Computer table


and connected to Personal Computer power cable.
UPS must be inserted into the wall-mount rack
UPS must be placed beside the switch in the computer
lab.
UPS must be placed beside the switch in the E-Library
room
Conduct network setup, consistent with the network
topology

Page 7 of 21

United States Department of Justice


International Criminal Investigative Training Assistance Program
American Embassy Jakarta, Indonesia
STATEMENT OF WORK (SOW)

1.0

GENERAL

1.1

The United States Department of Justice International Criminal Investigative Training


Assistance Program/USDOJ ICITAP Indonesia is procuring the equipment and
installation services to support the establishment of E-Library system at a police facility
in Purwokerto, Central Java, Indonesia.

1.2

The procurement of goods and services within the scope of this SOW is listed in the
Request for Quotation (RFQ) document.

1.3

The contractor shall coordinate with USDOJ ICITAP Indonesia procurement staff for
work planning and project phases. The contractor must submit a project phasing plan for
review and approval prior to commencement of work at the facility.

1.4

All inspections of the police facility must be scheduled and coordinated through staff of
USDOJ ICITAP Indonesia involved in the procurement and installation.

1.5

The contractor must provide personnel, equipment, materials, tools and supervision as
needed to complete the services which meet the technical requirements in this SOW.

1.6

The work shall be executed in a diligent manner in accordance with the agreed fixed price
and performance period. The period of performance for all phases of the project shall be
completed in twenty five (25) work days from contract award. The work and activities
related to the procurement and installation shall be carried out on work days, between
08.00 AM and 05.00 PM, unless otherwise approved.

1.7

No later than one (1) week after bidding document is issued by USDOJ ICITAP, the
contractor shall provide a detailed project timeline based on USDOJ ICITAPs estimated
timeline (see Appendix, Table 1). Modifications to the estimated timeline may be
allowed with prior notification and approval based on the contractors capacity to
complete each activity in this project.

1.8

The contractor shall appoint a Person in Charge (PIC) who shall be responsible for the
overall management of the project and shall represent the contractor, on site, during
installation and provision of services.

1.9

The contractor must obtain the permit from the facilitys authorized personnel and
coordinate with USDOJ ICITAP Indonesia staff for work requiring modifications to the
facilitys structure.
Page 8 of 21

United States Department of Justice


International Criminal Investigative Training Assistance Program
American Embassy Jakarta, Indonesia
1.10

The contractor team members, working at the police facility, must provide a copy of
his/her ID to the facilitys authorized personnel and will be required to sign-in/sign-out
on the Contractor Entry/Exit Log when entering/exiting the police facility (see
Appendix, Table 2). Names and copy IDs of the team members shall be enclosed in the
proposal document.

1.11

The contractors PIC must attend all project meetings and provide work project progress
reports as needed/requested.

1.12

At the completion of this project, all project-related documentation will become the sole
property of USDOJ ICITAP Indonesia.

1.13

All costs associated with services subcontracted by the contractor must be borne by, and
will be the complete responsibility of, the contractor under the fixed price of this contract.

1.14

The contractor shall be responsible for the professional quality, technical accuracy, and
the coordination of all services furnished under this contract. The contractor shall,
without additional compensation, correct or revise any errors or deficiencies in its
products and services.

1.15

Any electrical work which necessitates a temporary power outage will be carried out
before 08.00 AM or after 05.00 PM.

1.16

Testing and commissioning will be held to ensure all items procured can be successfully
operationalized. Testing and commissioning format shall be approved by USDOJ ICITAP
Indonesia.

2.0
2.1

AUDIO VISUAL EQUIPMENT SET-UP


Requirements
Audio video equipment set-up in this SOW covers the proper set-up of the following
equipment:
a. Projector bracket
Bracket must be installed on the ceiling as identified in the layout (see Appendix,
Image 5).
b. Projector screen
Screen must be installed as identified in the layout (see Appendix, Image 5).

Page 9 of 21

United States Department of Justice


International Criminal Investigative Training Assistance Program
American Embassy Jakarta, Indonesia
c. Projector (item provided by owner)
Projector must be mounted to the bracket as identified in the layout (see Appendix,
Image 5).

3.0
3.1

NETWORK SET-UP
Requirements
Network equipment set-up in this SOW covers the proper set-up of the following
equipment:
a. Wireless Access Points (item provided by owner)
Capable of the following configuration:
Username and administrator password
IP address and Hostname
SSID
Channel
Access point mode
Placement:
One wireless access point must be installed and mounted on the ceiling in the
library building as identified in the layout (see Appendix, Image 3).
Two wireless access points must be installed and mounted on the ceiling in the
computer lab as identified in the layout (see Appendix, Image 5).
Ten wireless access points must be installed and mounted on the ceiling in the
classrooms corridor as identified in the layout (see Appendix, Image 2).
b. Switch (24 Ports) (item provided by owner)
One switch (24 ports) must be inserted and secured into the server rack (located in
the server room) properly. (see Appendix, Image 4).
One switch (24 ports) must be inserted and secured into the wall-mount rack
(located on the classroom corridor) properly. (see Appendix, Image 2).
One switch (24 ports) must be installed and mounted (on an angle bracket with
metal that is commensurate with the dimension of the switch) in the e-library
room as identified in the layout (see Appendix, Image 3).
One switch (24 ports) must be installed and mounted (on an angle bracket with
metal that is commensurate with the dimension of the switch) in the computer lab
as identified in the layout (see Appendix, Image 5).

Page 10 of 21

United States Department of Justice


International Criminal Investigative Training Assistance Program
American Embassy Jakarta, Indonesia
Capable of the following configuration:
Username and administrator password
IP address and Hostname
Port description
c.

Wireless PCI Cards (item provided by owner)


40 PCs located in the computer lab (see Appendix, Image 5) must be installed
with wireless PCI Cards.
The wireless PCI Cards must be physically installed inside each PCs
motherboard.
Drivers for each of the installed PCI Card must be installed in their respective
Windows Operating System.
Once all PCI Cards are installed, each PC must be connected to the Wireless
Access Points.

d. Server (item provided by owner)


Server must be inserted and secured with hardware into the rack. Server rack is
located in the server room, as identified in the layout (see Appendix, Image 4).
e. Server Rack
Rack must be placed in the server room as identified in the layout (see Appendix,
Image 3 and 4).
f. Wall-Mount Rack
Wall-mount rack must be placed on the outer wall of the dining room, as identified in
the layout (see Appendix, Image 2).
g. Router (item provided by owner)
Router must be inserted and secured with hardware into the rack (see Appendix,
Image 4).
Router installation includes the following configuration:
Username and administrator password
IP address and Hostname
Firewall
DHCP server
Network Address Translation (NAT)
Username and password to access Local Area
Network (hotspot)

Page 11 of 21

United States Department of Justice


International Criminal Investigative Training Assistance Program
American Embassy Jakarta, Indonesia
h. Server LCD, Keyboard, Mouse (item provided by owner)
LCD, Keyboard, Mouse must be inserted into the rack (see Appendix, Image 4).
i. UPS for Server (item provided by owner)
UPS must be inserted into the rack (see Appendix, Image 4).
j. UPS for Personal Computer (item provided by owner)
UPS must be placed under the Personal Computer table and connected to Personal
Computer power cables in the Library building (see Appendix, Image 3).
k. UPS For e-Library Switch (item provided by owner)
UPS must be placed beside the switch in the e-library room (see Appendix, Image
3).
l. UPS For Computer Lab Switch (item provided by owner)
UPS must be placed beside the switch in the computer lab (see Appendix, Image 5).
m. UPS for Wall-Mount Rack (item provided by owner)
UPS must be placed at wall-mount rack on the outer wall of the dining room, as
identified in the layout (see Appendix, Image 2).
n. Network Configuration
Conduct network setup, consistent with the topology in Appendix, Image 7.
4.0
4.1

AIR CONDITIONING (AC) INSTALLATION


Requirements
a. Two AC indoor units must be mounted in the server room as identified in the layout
(see Appendix, Image 4).
b. One AC indoor unit must be mounted in the e-library room as identified in the layout
(see Appendix, Image 3).
c. Two AC outdoor units must be mounted on the outside wall of the server room as
identified in the layout (see Appendix, Image 4).
d. One AC outdoor unit must be mounted on the outside wall of the library building as
identified in the layout (see Appendix, Image 3).
Page 12 of 21

United States Department of Justice


International Criminal Investigative Training Assistance Program
American Embassy Jakarta, Indonesia
e. Ventilation in the server room must be closed/covered.
f. Refrigerant piping shall be installed through the ceilings.
g. For two ACs in the server room, they shall be set to operate alternately every 12
hours.

5.0
5.1

SERVER ROOM RENOVATION


Requirements
a. Build a server room inside the administration room in the library building (see
Appendix, Image 3).
b. Divide the librarys administration room into two areas using a gypsum partition wall.
c. Build a gypsum partition wall measuring 3.6 meters in width and 3 meters in height
with a glass door with aluminum sill in the middle of the gypsum partition wall.
d. Cover the whole side of the wall of the server room that has windows with a gypsum
wall.
e. Remove the existing wood-framed glass window, commensurate with the area of the new
server room, then close it with brick/mortar wall, and paint finish match to both sides of the
wall.

f. Install an electrical system that will specifically be used for the e-Library system.
g. Install an electrical system using an electrical panel box which can be locked, placed
and installed in the back corner of the inside of the server room (see Appendix,
Image 4).
h. The electrical system shall have its electrical source from the Perusahaan Listrik
Negara (PLN) main power panel located within the premises.
i. Install 2 points of LED bulbs on the ceiling in the server room. (See Appendix,
Image 4)
j. The server room door shall be installed as indicated in Image 4 and possess the
following features:
Page 13 of 21

United States Department of Justice


International Criminal Investigative Training Assistance Program
American Embassy Jakarta, Indonesia

6.0
6.1

Automatic door closer.


Magnetic lock.
Card-type door security access
Access card shall be made in 20 copies
Access card shall be registered for the appointed IT personnel.
Door security access shall be installed on the outside part of the gypsum wall.
For the inside part of the door, button-type opener shall be installed on the
gypsum wall.
Alarm buzz when the door is open for more than two minutes.

POWER CABLE INSTALLATION


Requirements
a. The contractor must install twenty five (25) power cable points as indicated in Image
2 - 6.
b. Each power cable installation point must include installation of cable protectors,
cables, and socket extensions.
c. In compliance with the Indonesian Standards for power cable installation standards
i.e., SNI (0225:2011/Amd 1:2013).
d. Conduct installation of Miniature Circuit Breakers (MCB) in the following locations:
1. Library Building (see Appendix, Image 3 and 6)
1.1 Install one grounding system outside the library building. This grounding
system shall be connected to the grounding bar in the electrical panel box in
the server room.
1.2 Install one 25 Amp MCB in the Perusahaan Listrik Negara (PLN) main
power panel. This MCB shall distribute power to the electrical panel box in the
server room.
1.3 Install one Electrical Panel Box with the capacity of 6 MCB modules in the
server room. This box shall house all MCBs, grounding bar, and neutral bar
installed in the server room.
1.4 Install one 25 Amp MCB in the Electrical Panel Box in the server room. This
MCB shall distribute power to all the MCBs installed in the server room.
Page 14 of 21

United States Department of Justice


International Criminal Investigative Training Assistance Program
American Embassy Jakarta, Indonesia

1.5 Install one 10 Amp MCB in the Electrical Panel Box located in the server
room. This MCB shall distribute power to the electrical extension socket for
two air conditioners in the server room.
1.6 Install one 10 Amp MCB in the Electrical Panel Box located in the server
room. This MCB shall distribute power to the electrical extension socket for
equipment installed in the server rack in the server room.
1.7 Install one 10 Amp MCB in the Electrical Panel Box located in the server
room. This MCB shall distribute power to the electrical extension socket for
five personal computers in the e-library room.
1.8 Install one 10 Amp MCB in the Electrical Panel Box located in the server
room. This MCB shall distribute power to the electrical extension socket for
five personal computers in the e-library room.
1.9 Install one 10 Amp MCB in the Electrical Panel Box located in the server
room. This MCB shall distribute power to the electrical extension socket for
one unit of air conditioner, one unit of switch (24 ports), and one unit of
wireless access point located in the e-library room.
1.10 Install one 10 Amp MCB in the Electrical Panel Box located in the server
room. This MCB shall distribute power to the main MCB installed in the
computer lab.
2. Computer Lab (see Appendix, Image 5 and 6)
2.1 Install one Outbow MCB Box with the capacity of two modules in the
computer lab. This MCB shall house all the MCBs installed in the computer
lab.
2.2 Install one 10 Amp MCB in the Outbow MCB Box located in the computer
lab. This MCB shall distribute power to the electrical extension socket for one
unit of switch (24 ports), a speaker, a projector screen, a projector and two
units of wireless access points located in the computer lab.
3. Classroom Corridor (see Appendix, Image 2 and 6)
3.1 Install one Outbow MCB Box with the capacity of two modules near the wallmount rack located in the classroom corridor. This MCB shall house all the
MCBs installed in the classroom corridor.
Page 15 of 21

United States Department of Justice


International Criminal Investigative Training Assistance Program
American Embassy Jakarta, Indonesia
3.2 Install one 10 Amp MCB in the Outbow MCB Box located near the wallmount rack in the classroom corridor. This MCB shall distribute power to the
electrical extension socket for ten access points and equipment installed in the
wall-mount rack.
e. Install protectors for conjoined cables. Power cables installed on the walls must be
provided with cable trays.
f. Label each end of the installed cables.
g. Once installation is completed, provide wiring diagram for all power cables installed
in the building (Main and Secondary) as indicated in Image 2 - 6, printed and affixed
to the servers rack door.
h. Install grounding cable in all electrical extension socket which will be used by all
equipment.

6.2 Placement:
6.2.1 Library Building (see Appendix, Image 3 and 6)
a. Install one point of outdoor power cable from the PLNs electrical panel to the
Electrical Panel Box located in the server room.
b. Install one point of cable grounding from the grounding system located outside the
library building to the Electrical Panel Box located in the server room.
c. Install one point of extension cable with 4-hole electrical extension sockets from the
Electrical Panel Box in the server room, to distribute power to equipment installed in
the server rack.
d. Install two points of extension cables with 4-hole electrical extension sockets at each
point from the Electrical Panel Box in the server room, to distribute power to the
electrical extension socket for two Air Conditioners in the server room.
e. Install one point of extension cable with 4-hole electrical extension sockets from the
Electrical Panel Box in the server room, to distribute power to switch (24 ports) and
access points located in the e-library room.

Page 16 of 21

United States Department of Justice


International Criminal Investigative Training Assistance Program
American Embassy Jakarta, Indonesia
f. From the cable installed in part e, install one point of extension cable with 4-hole
electrical extension sockets, to distribute power to air conditioner in the e-library
room.
g. Install five points of extension cables with 4-hole electrical extension sockets from
the Electrical Panel Box located in the server room, to distribute power to five units
of personal computers installed in the e-library room.
h. Install five points of extension cables with 4-hole electrical extension sockets from
the Electrical Panel Box located in the server room, to distribute power to five units
of personal computers installed in the e-library room.
i. Install one point of main power cable from the Electrical Panel Box located in the
server room, to distribute power to the Outbow MCB Box located in the computer
lab.
6.2.2 Computer Lab (see Appendix, Image 5 and 6)
a. Install three points of extension cable with 4-hole electrical extension sockets from
the Outbow MCB Box in the computer lab, to distribute power to the electrical
extension socket for one unit of switch (24 ports), one unit of speaker, one unit of
projector screen, one unit of projector and two units of wireless access points located
in the computer lab.
6.2.3 Classroom Corridor (see Appendix, Image 2 and 6)
a. Install one point of main power cable from the PLNs electrical panel to the Outbow
MCB Box located near the wall-mount rack in the classroom corridor.
b. Install three points of extension cable with 4-hole electrical extension sockets from
the Outbow MCB Box near the wall-mount rack on the classroom corridor, to
distribute power to the electrical extension socket for one unit of switch (24 ports)
and ten units of wireless access points located on the classroom corridor.

7.0

DATA CABLE INSTALLATION

7.1

Requirements
a. The contractor must install ten (10) data cable points using an outbow faceplate in the
classrooms as indicated in Image 2 and 7.
b. The contractor must install thirty (30) data cable points without using an outbow
faceplate as indicated in Images 2, 3, 4, 5, and 7.
Page 17 of 21

United States Department of Justice


International Criminal Investigative Training Assistance Program
American Embassy Jakarta, Indonesia
c. Each data cable installation point must include the installation of cable protectors,
UTP Cat 6e cables, RJ45 Cat 6 connectors and outbow faceplate.
d. In compliance with data cable installation standards, the cable must not be kinked or
bent too tightly. The wire pairs must not be untwisted and the outer jacket must not be
stripped back more than 0.5 in (12.7 mm).
e. Data cables installed on the walls must be provided with cable trays.
f. Once installation is completed, provide the wiring diagram for all data cable installed
in all the buildings, printed and placed on the servers rack door.

7.2
7.2.1

Placement:
Using faceplates:
a. Ten data cable nodes with outbow faceplates must be installed on the wall in the front
left corner of each classroom, as identified in the layout (see Appendix, Images 2
and 7).
b. The classrooms to be installed with the cable nodes are classroom 1, classroom 2,
classroom 3, classroom 4, classroom 5, classroom 6, classroom 7, classroom 8,
classroom 9, and classroom 10, as identified in the layout (see Appendix, Image 2).

7.2.2

Without using faceplates:


a. Ten data cable nodes will be used as data cables for wireless access points that will be
installed on the ceiling in front of each classroom in the classrooms corridor area, as
identified in the layout (see Appendix, Images 2 and 7).
b. Ten data cable nodes will be used as data cables for personal computers that will be
installed in the e-Library room, as identified in the layout (see Appendix, Image 3
and 7).
c. One data cable node will be used as data cable for wireless access point that will be
installed on the ceiling in the library building, as identified in the layout (see
Appendix, Image 3 and 7).
d. Seven data cable nodes will be used as data cables for all the equipment installed on
the server rack, as identified in the layout (see Appendix, Images 4 and 7).
Page 18 of 21

United States Department of Justice


International Criminal Investigative Training Assistance Program
American Embassy Jakarta, Indonesia

e. Two data cable nodes will be used as data cables for two wireless access points in the
computer lab (see Appendix, Image 5 and 7).
f. Two data cable nodes will be used as data cables for the switch of the CBT room in the CBT
room (see Appendix, Image 1 and 7).

8.0

FIBER OPTIC CABLE INSTALLATION

8.1

Requirements:
a. The contractor must install one line of fiber optic cable as indicated in Image 7.
b. The fiber optic cable installation must include the installation of:
1. Two hundred and fifty meters of 4-core multimode fiber optic cable,
2. Four units of 1000Base-SX fiber optic module,
3. Four units of multimode patch cord,
4. Eight nodes of spliced fiber optic cable core,
5. Two units of rack-mount fiber optic termination box,
6. The length of the cable protectors will be commensurate with the length of the
installed fiber optic cable.
c. In compliance with data cable installation standards, the cable must not be kinked or
bent too tightly. The wire pairs must not be untwisted and the outer jacket must not be
stripped back more than 0.5 in (12.7 mm).

Page 19 of 21

United States Department of Justice


International Criminal Investigative Training Assistance Program
American Embassy Jakarta, Indonesia
HAND OVER PROJECT:
Location:
Jl. Letjend. Pol. Soemarto, Purwokerto
Dates:
See timeline in Appendix, table 1.1

ON SITE SURVEY SCHEDULE:


Location:
Purwokerto Central Java, Indonesia
Dates:
August 22, 2016
Time:
10.00 finished

SUBMISSION OF PROPOSALS:

Vendors should submit the proposal no later than August 30, 2016 at 15.00.
electronically to icitappcu@icitap-indonesia.org, cc: sidikFT@state.gov, or to our
facsimile at
+62-21-3983-5884
All equipment offered must have a minimum of 1 year warranty effective from the date
of received goods.
Quotations should include the specific goods availability and delivery cost.
Quotations should mention the estimated delivery time after Purchase Order awarded.
Quotations should be a fixed price
Quotation should be valid for one month from the date of submission.
For US Government rules and regulation reference, please read the attached Commercial
Clause document (FAR 52.212-4 and FAR 52.212-5).

CANCELLATION:
Any cancellation after PO issued and received by the contractor, US DOJ/ICITAP - US Embassy
Jakarta will only be required to pay for the goods or service rendered.
PAYMENT SCHEDULE & INVOICE SUBMISSION:

Vendors are eligible to send the original correct invoice after all the services completed
and should address the original invoice to:
Financial Section US DOJ/ICITAP - US Embassy Jakarta
Wisma Nusantara Building, 10th Floor.
Jl. MH Thamrin 59
Jakarta 10350, Indonesia

Page 20 of 21

United States Department of Justice


International Criminal Investigative Training Assistance Program
American Embassy Jakarta, Indonesia

If any Value Added Tax (VAT) is applied, vendor shall show VAT as a separate item on
invoice submitted for payment.

Term of payment will be made as details below:


1. A 20% from the total offer amount (Down payment) will be processed after the
vendor receipt a Purchase Order and USDOJ-ICITAP receipt original invoice
2. A 75% from the total offer amount (First Payment) will be processed after the the
work reach 100% completion and USDOJ-ICITAP receipt original invoice and hand
over project letter signed by DGC, contractor and USDOJ-ICITAP.
3. A 5% from the total offer amount (retention) will be held on the invoice, for a further
30 day defects liability period after snag list and hand over project process complete.
And receipt of original final invoice.
Payment process is thirty (30) working days after US DOJ/ICITAP - US Embassy Jakarta
receives the correct original/authorized invoice, complete with all supporting documents
required.
Payment will be made through Electronic Fund Transfer (EFT) to the contractor bank
account as stated on the invoice.

EVALUATION FACTORS:
Vendors should agree to accept Purchase Order (PO) from US DOJ/ICITAP, US
Embassy Jakarta.
Proposal must meet or exceed specifications required.
Award will be made to the vendor that offers the best value to the government.
Past performance and experience will be evaluated as to the areas of quality, timeliness,
and customer satisfaction, and business practices.

CONTRACTING OFFICERS:
Only the Contracting Officer can approve changes to this Statement of Work.

Page 21 of 21

APPENDIX

Appendix Page 1 of 10

Table 1. Estimated Project Timeline

Appendix Page 2 of 10

Table 2. Site Contractor Entry/Exit Log


Day / Date :
Number

Name

Cell Phone
Email Address
Number

Time
Start

Finish

Signature

1
2
3
4
5
6
7
8
9
10

Work Progress :
........................................................................................................................................................................................................................................
.........................................................................................................................................................................................................................................
.........................................................................................................................................................................................................................................
.........................................................................................................................................................................................................................................

Appendix Page 3 of 10

Image 1. Building Layout


Appendix Page 4 of 10

Image 2. Layout - Equipment Placement, Classroom


Appendix Page 5 of 10

Image 3. Layout - Equipment Placement, Library Building


Appendix Page 6 of 10

Image 4. Layout - Equipment Placement, Server Room

Appendix Page 7 of 10

Image 5. Layout - Equipment Placement, Computer Lab


Appendix Page 8 of 10

Image 6. Electricity Topology


Appendix Page 9 of 10

Image 7. Network Topology


Appendix Page 10 of 10