another DG. One major problem observed that the cooling tower fan of the
DGs got damaged (not running) and temporarily a small fan is installed at
the body of the cooling tower to help cooling the water droplets and
evaporation. On enquiry it is revealed that the temperatures are monitored
( do not know whether tripping on high temperature of lub oil is in service or
not, but hopefully considering the costly equipment it is in service). The
cooling tower fan needs to be restored at the earliest.
These were our first observations.
Some actionable points emerged out of the visit are
1. Collecting Schematic and detailed electrical drawings from Platinum
maintenance deptt.
2. Assessing availability of maintenance spares including inventories.
3. Checking records of DG log book. Fuel consumption pattern
4. Checking Log book for pump operation, mains availability and other
parameters.
We need to interact with mechanical maintenance group so that the power
supply scheme to lifts, condition of lift machine room, emergency power
supply to lifts are known to both the team for close coordination.
Some additional suggestions which can be implemented are
1. Provision of emergency light inside every lift with auto switch over.
2. Separate switching circuit for lobby area lighting so that selective
switching can be done for necessary lighting only. This will reduce
electricity consumption for common area.
Purpose of this report is for general awareness of residents of Platinum and
deciding future course of actions.