You are on page 1of 2

Page 1 of 2

Study the diagram above and answer the following questions:


1. Describe the aim of the CCB in Change Control in Software Engineering projects.
2. What is the typical composition of the CCB?
3. Using the above diagram as reference, describe the core activities that are related to Change Control
4. Evaluate the important aspects that need to be considered when conducting an analysis of changes
5. List and evaluate the different forms and templates that may be required to support the different change control activities
6. Identify 3 best practices for change control

Page 2 of 2

You might also like