You are on page 1of 8

LAPCHE HYDRO ELECTRIC POWER PROJECT

ANTICIPATED CONSTRUCTION POWER REQUIREMENTS


Sr.No
1
1.1

Location

Equipment details

HEAD WORKS
Diversion Dam
Dewatering Pumps
Concrete Pumps
Lighting load
Miscellaneous

96
32
16
16
160
112

120
40
20
20
200
140

Connected Load
Maximum Demand @ 70% demand Factor

120
40
120
60
32
16
16
404
282.8

150
50
150
75
40
20
20
505
354

Link between desander and tunnel


Electric Compressor
Ventilation Fans
Dewatering Pumps
Concrete Pumps
Lighting load
Miscellaneous
Connected Load
Maximum Demand @ 70% demand Factor

40
75.2
60
32
12
16
235.2
164.64

50
94
75
40
15
20
294
206

Construction Plants/yards
Batching plant
Equipment yard no.1
Dumping site
Storage area
Connected Load
Maximum Demand @ 70% demand Factor

188
6.4
3.2
3.2
200.8
140.56

235
8
4
4
251
176

Total load of item 1


Maximum Demand @ 70% demand Factor

1000
700

1250
875

Connected Load
Maximum Demand @ 70% demand Factor
1.2

Intake/Desander
Tower Crane
Electric Compressor
Ventilation Fans
Dewatering Pumps
Concrete Pumps
Lighting load
Miscellaneous

1.3

1.4

Note:

Power Reqr.
KW
KVA

The drilling jumbos required is considered as Disel Operated, so no electrical load


due to this is assessed in above requriments.

2
2.1

TUNNEL WORKS
From Adit1
Electric Compressor
Ventilation Fans
Dewatering Pumps
Concrete Pumps
Lighting load
Miscellaneous

2.2

2.3

2.4

40
75.2
60
32
24
16
247.2
173.04

50
94
75
40
30
20
309
216

80
150.4
64
120
48
16
478.4
334.88

100
188
80
150
60
20
598
419

60
8
68
47.6

75
10
85
59.5

Connected Load
Maximum Demand @ 70% demand Factor

80
12
40
132
92.4

100
15
50
165
116

Total load of item 2


Maximum Demand @ 70% demand Factor

925.6
647.92

1157
809.9

Connected Load
Maximum Demand @ 70% demand Factor
From Adit II
Electric Compressor
Ventilation Fans
Concrete Pumps
Dewatering Pumps
Lighting load
Miscellaneous
Connected Load
Maximum Demand @ 70% demand Factor
Workshop for Fabrication
Hydro mechanical workshop
Miscellaneous
Connected Load
Maximum Demand @ 70% demand Factor
Yards/Camps
Labour camp no1
Dumping site
Contractor's camp

Note:

The drilling jumbos required is considered as Disel Operated, so no electrical load


due to this is assessed in above requriments.

3
3.1

3.2

SURGE TANK/PRESSURE SHAFT AND PENSTOCK


Tunnel from Adit III
Electric Compressor
Ventilation Fans
Concrete Pumps
Dewatering Pumps
Lighting load
Miscellaneous
Connected Load

40
75.2
64
60
24
16
279.2

50
94
80
75
30
20
349

Maximum Demand @ 70% demand Factor

195.44

244

60
40
75.2
60
16
16
267.2
187.04

75
50
94
75
20
20
334
233.8

Connected Load
Maximum Demand @ 70% demand Factor

60
40
75.2
60
16
16
267.2
187.04

75
50
94
75
20
20
334
233.8

Fabrication workshop
Penstock workshop
Miscellaneous
Connected Load
Maximum Demand @ 70% demand Factor

160
16
176
123.2

200
20
220
154

Total Laod of item 3


Maximum Demand @ 70% demand Factor

989.6
692.72

1237
865.9

Surge tank
Raise Climber
Electric Compressor
Ventilation Fans
Dewatering Pumps
Lighting load
Miscellaneous
Connected Load
Maximum Demand @ 70% demand Factor

3.3

Pressure Shaft
Raise Climber
Electric Compressor
Ventilation Fans
Dewatering Pumps
Lighting load
Miscellaneous

3.4

Note:

The drilling jumbos required is considered as Disel Operated, so no electrical load


due to this is assessed in above requriments.

4
4.1

4.2

POWER HOUSE/TAILRACE
Power house
Ventilation Fans
Dewatering Pumps
Concrete Pumps
Lighting load
Miscellaneous
Connected Load
Maximum Demand @ 70% demand Factor

80
100
40
14.4
24
258.4
180.88

100
125
50
18
30
323
226

Connected Load
Maximum Demand @ 70% demand Factor

60
12
8
80
56

75
15
10
100
70

Construction plants/camps
Batching plant
Crushing plant 1
Crushing plant 2
Labour camp
Contractor's camp
Enginerr's camp
Quarry site 1 and 2
Connected Load
Maximum Demand @ 70% demand Factor

140.8
188
188
40
40
40
4.8
641.6
449.12

176
235
235
50
50
50
6
802
561

Total Load of item 4


Maximum Demand @ 70% demand Factor

980
686.00

1225
857.50

3895.2
2726.64

4869
3408

Tailrace channel
Dewatering Pumps
Lighting load
Miscellaneous

4.3

5
5.1

SWITCHYARD
LOAD
This
load shall be
met from existing load considered
above for Power house
TOTAL CONNECTED LOAD (1 TO 4)
MAXIMUM DEMAND @ 70% DEMAND FACTOR

60
40
5
105
74

150
50
60
60
40
5
365
256

187.5

Dewatering Pump
Concrete Pumps
Lighting load
Tower Crane
Electric Compressor
Ventilation Fans
Batching plant
Crusher Yard
Mechanical Yard
Labour Camp
Contractor Camp
Storage, Dumping Site

120
120
25
120
100
75
200
250
30
10
15
5
1070
749

Electric Compressor
Ventilation Fans
Dewatering Pumps
Concrete Pumps
Lighting load
Labour Camp

120
80
75
50
30
5
360
252

Electric Compressor
Ventilation Fans
Dewatering Pumps
Concrete Pumps
Lighting load
Labour Camp

60
40
40
50
25
5
220
154

Electric Compressor
Ventilation Fans
Dewatering Pumps
Concrete Pumps
Lighting load
Engineers Camp
Raise Climber
Equipment Yard and Disposal
Area

30
30
30
30
15
15
60
10
220
154

Ventilation Fans
Dewatering Pumps
Concrete Pumps
Lighting load
Batching plant
Crushing plant
Penstock workshop
Contractor's camp
Quarry site

40
80
80
20
200
250
30
10
10
720
504

You might also like