You are on page 1of 3

Proposed A & A to Existing 5 Storey Main Library Building and 4-Storey Library Annex

Building (phase one)


at Singapore polytechnic PH X Micro Schedule
ID
1
2

Task

Task Name
Project Award

Start
Mon 31/8/15

Finish
Sun 5/6/16

Duration
40 wks

Generator Rooms XPA

Mon 28/9/15

Sat 5/12/15

9.86 wks

Demolition of existing caf store & Excavation of Slope

Mon 28/9/15

Sun 11/10/15

2 wks

Checking the Existing pile cap & Structure prepares &


submission of shop drawing

Mon 12/10/15

Sun 1/11/15

3 wks

Erect the RC& brick wall

Mon 2/11/15

Sun 22/11/15

3 wks

Place the EMSB and energize power from substation

Mon 23/11/15

Sun 29/11/15

1 wk

Install & mobilization of genset

Tue 1/12/15

Wed 2/12/15

2 days

Test & commissioning

Thu 3/12/15

Sat 5/12/15

3 days

Mon 19/10/15

Wed 23/3/16

22.3 wks

3 Aug '15

31 Aug '15

28 Sep '15

26 Oct '15

23 Nov '15

21 Dec '15

18 Jan '16

15 Feb '16

17 wks

FCC Room XPA

10

temporary Staging Access to FCC Concstruction work

Mon 19/10/15

Fri 23/10/15

5 days

11

Erect the hoarding to FCC Room

Mon 2/11/15

Tue 17/11/15

16 days

12

Demolition of existing Glass panels

Mon 2/11/15

Sun 8/11/15

1 wk

13

Erect the Brick wall

Mon 9/11/15

14

Install FCC DB , lightings and Power points installation


energizing

Wed 25/11/15

Wed 2/12/15

15

Installation Of main fire Alarm panels

Wed 2/12/15

Wed 16/12/15 2 wks

16

Temporary Access to SCDF Access through the Courtyard

Wed 16/12/15

Wed 30/12/15 2 wks

17

Card access main console

Wed 30/12/15

Wed 13/1/16

2 wks

18

Intercom Controls panels

Wed 13/1/16

Wed 27/1/16

2 wks

19

PWD Controls

Wed 27/1/16

Wed 10/2/16

2 wks

20

CCTV Switches Infrastructures

Wed 10/2/16

Wed 24/2/16

2 wks

21

Staircase Fans & Lobby Fans Controller & SIB installation

Wed 24/2/16

Wed 9/3/16

2 wks

22

Test & Commissions

Wed 9/3/16

Wed 23/3/16

2 wks

Mon 12/10/15

Sun 10/4/16

26 wks

10 wks

23

Courtyard XPA Demolition & XPB Steel Stucture

Wed 25/11/15 2.3 wks


1 wk

24

Hoarding and White paper installation

Mon 12/10/15

Wed 14/10/15 3 days

25

Demolition of Pavilion

Thu 15/10/15

Wed 28/10/15 2 wks

26

Excavation Of Courtyard Existing Slab

Thu 29/10/15

Fri 20/11/15

3.2 wks

27

building of RC Trench

Fri 20/11/15

Fri 27/11/15

1 wk

28

Demolition Of Library Annex Brick Wall & Door Works

Fri 27/11/15

Fri 18/12/15

3 wks

29

Placing the Chilled water pipes and riser pipes

Fri 18/12/15

Fri 25/12/15

1 wk

30

Installation of Steel Structures XPB works

Fri 25/12/15

Fri 15/1/16

3 wks

31

Level Measures & Timber Structural Installation XPB works

Fri 15/1/16

Fri 5/2/16

3 wks

32

Screenings and Staircase Erections XPB works

Fri 5/2/16

Fri 26/2/16

3 wks

33

Installation of Steel Structures XPC works

Mon 1/2/16

Sun 21/2/16

3 wks

34

Level Measures & Timber Structural Installation XPC works

Mon 22/2/16

Sun 13/3/16

3 wks

35

Screenings and Staircase Erections XPC works

Mon 14/3/16

Sun 3/4/16

3 wks

Project: Project Schedule - SP library


Date: Wed 18/11/15

26 wks

Task

Project Summary

Inactive Summary

Manual Summary

External Milestone

Progress

Split

External Tasks

Manual Task

Start-only

Baseline

Deadline

Milestone

External Milestone

Duration-only

Finish-only

Baseline Milestone

Slippage

Summary

Inactive Milestone

Manual Summary Rollup

External Tasks

Baseline Summary

Page 1

14 Mar '16

11 Apr '16

9 May '16

6 Jun '16

Proposed A & A to Existing 5 Storey Main Library Building and 4-Storey Library Annex
Building (phase one)
at Singapore polytechnic PH X Micro Schedule
ID
36
37

Task

Task Name
Hand over
Annex Staircase 4 Fire Safety Compliance Works(Story 2A
- 4A)

Start
Mon 4/4/16

Finish
Sun 10/4/16

Duration
1 wk

Mon 11/4/16

Sun 5/6/16

8 wks

38

Demolition works

Mon 11/4/16

Sun 24/4/16

2 wks

39

Brickwall

Mon 25/4/16

Sun 22/5/16

4 wks

40

Fire door

Mon 23/5/16

Sun 5/6/16

2 wks

41

42

43

44

45

46

Annex Staircase 5 Fire Safety Compliance


works(Story 2A - 4A) XPB
Hoarding works

Mon 1/2/16

Demolition work

Sat 6/2/16

Brickwall

Sat 13/2/16

Fire door

Sat 5/3/16

26 Oct '15

23 Nov '15

21 Dec '15

18 Jan '16

15 Feb '16

14 Mar '16

11 Apr '16

9 May '16

6 Jun '16

8 wks

Fri 5/2/16

5 days
1 wk

Fri 12/2/16

1 wk
2 wks

Fri 4/3/16

3 wks
2 wks

Wed 9/3/16

5 days
2 wks

Slab-Over of Staircase 3 (3rd to 5th storeys) XPC

Mon 9/11/15

Tue 29/3/16

20.29 wks

Mon 9/11/15

48

4th to 5 th storey staire case Demolition

Wed 3/2/16

Tue 16/2/16

2 wks

49

5th Story Slab Casting& removal Of Forms


Works Finishing & Hand Over

Wed 17/2/16

Tue 1/3/16

2 wks

50

3rd to 4 th storey staire case Demolition

Wed 2/3/16

Tue 15/3/16

2 wks

51

4th Story Slab Casting& removal Of Forms


Works Finishing & Hand Over

Wed 16/3/16

Tue 29/3/16

2 wks

52

2nd to 3rd storey staire case Demolition

Thu 3/12/15

Thu 17/12/15

2.1 wks

53

3rd Story Slab Casting& removal Of Forms


Works Finishing & Hand Over

Thu 17/12/15

Thu 31/12/15

2 wks

54

Demolition works

Thu 31/12/15

Thu 7/1/16

1 wk

55

2nd story Finishing works

Thu 7/1/16

Thu 21/1/16

2 wks

56

Hand Over

Tue 29/3/16

Tue 29/3/16

0 wks

20.29 wks

Wed 11/11/15 3 days

29/3

(Lift Lobby, Staircase 1 & Staircase 2 Fire Safety


Compliance Works (1st to 5th storeys)
Staire case 1 & Lift Lobby

Mon 4/1/16

Sun 5/6/16

22 wks

Mon 4/1/16

Sun 20/3/16

11 wks

59

Hoarding works

Mon 4/1/16

Sun 10/1/16

7 days

60

Demolition works

Mon 11/1/16

Sun 31/1/16

3 wks

Project: Project Schedule - SP library


Date: Wed 18/11/15

28 Sep '15

Mon 1/2/16 Wed 9/3/16 5.43 wks

Hoarding works

58

31 Aug '15

1 wk

47

57

3 Aug '15

Task

Project Summary

Inactive Summary

Manual Summary

External Milestone

Progress

Split

External Tasks

Manual Task

Start-only

Baseline

Deadline

Milestone

External Milestone

Duration-only

Finish-only

Baseline Milestone

Slippage

Summary

Inactive Milestone

Manual Summary Rollup

External Tasks

Baseline Summary

Page 2

Proposed A & A to Existing 5 Storey Main Library Building and 4-Storey Library Annex
Building (phase one)
at Singapore polytechnic PH X Micro Schedule
ID
61

MV DUCT

Start
Mon 1/2/16

Finish
Sun 21/2/16

Duration
3 wks

62

Fan Installation

Mon 22/2/16

Sun 6/3/16

2 wks

63

T&C

Mon 7/3/16

Sun 20/3/16

2 wks

Mon 21/3/16

Sun 5/6/16

11 wks

64

Task

Task Name

Staire case 2& Smoke Stop Lobby

65

Hoarding works

Mon 21/3/16

Sun 27/3/16

1 wk

66

Demolition works

Mon 28/3/16

Sun 17/4/16

3 wks

67

MV DUCT

Mon 18/4/16

Sun 8/5/16

3 wks

68

Fan Installation

Mon 9/5/16

Sun 22/5/16

2 wks

69

T&C

Mon 23/5/16

Sun 5/6/16

2 wks

Mon 14/12/15

Mon 18/1/16

70

Magazine Drawers (4th storey)


Hoarding works

Mon 14/12/15

Wed 16/12/15 3 days

72

Existing Furniture to shift

Thu 17/12/15

Wed 23/12/15 1 wk

73

New Shelves and furniture

Thu 24/12/15

Wed 13/1/16

3 wks

74

Hand over

Thu 14/1/16

Mon 18/1/16

5 days

Tue 19/1/16

Thu 3/3/16

6.43 wks

Modification of Library Director's Rooms and


staff desks

76

Hoarding works

Tue 19/1/16

Thu 21/1/16

3 days

77

Demolition works

Fri 22/1/16

Thu 28/1/16

1 wk

78

Partition Wall

Fri 29/1/16

Thu 11/2/16

2 wks

79

Flooring

Fri 12/2/16

Thu 18/2/16

1 wk

80

carpentry works

Fri 19/2/16

Thu 25/2/16

1 wk

81

Hand Over

Fri 26/2/16

Thu 3/3/16

1 wk

Project: Project Schedule - SP library


Date: Wed 18/11/15

31 Aug '15

28 Sep '15

26 Oct '15

23 Nov '15

21 Dec '15

18 Jan '16

15 Feb '16

5.14 wks

71

75

3 Aug '15

Task

Project Summary

Inactive Summary

Manual Summary

External Milestone

Progress

Split

External Tasks

Manual Task

Start-only

Baseline

Deadline

Milestone

External Milestone

Duration-only

Finish-only

Baseline Milestone

Slippage

Summary

Inactive Milestone

Manual Summary Rollup

External Tasks

Baseline Summary

Page 3

14 Mar '16

11 Apr '16

9 May '16

6 Jun '16

You might also like