You are on page 1of 56

Select The Blank

An Ideal OC curve is ________ shaped curve that accpets all


the lots with quality equal to or better than AQL .
Correct Answer
Rectangular
Your Answer Rectangular
True/False
Inspection order is must even for simple jobs which can be
inspected by shop inspector with the tooling available on shop.
Correct Answer
False
Your Answer False
Select The Blank
Function concerned with fixation of time allowed to qualified
worker for a job is called ________.
Correct Answer
Work Measurement
Your Answer Time Measurement
True/False
In case of X bar-R charts,it is ensured that the assignable
causes are detected before the tolerances are violated, upper and lower
statistical limits are worked out and inserted into a chart.
Correct Answer
True
Your Answer True
Multiple Choice Single Answer
What is the reason of fluctuations, if the control chart
evaluates that the process is not in a state of statistical control?
Correct Answer
Assignable variability
Your Answer Random variability
Multiple Choice Multiple Answer
Which are different ways to show critical path in a network?
Correct Answer
Thick Line , Red Line , Double Line
Your Answer Thick Line , Red Line , Double Line
Select The Blank
OC curve of ideal sampling plan suggests that all lots less
than 3% defectives have the probability of acceptance of ________.
Correct Answer
One
Your Answer One
Multiple Choice Single Answer
Process planning is the process of
Correct Answer
establishing shortest and most economic
path of production

Your Answer establishing shortest and most economic path of


production
Select The Blank
The ________ is a pair of chart consisting of average chart
and range chart placed one below another on a piece of graph paper.
Correct Answer
X bar-R-chart
Your Answer X bar-R-chart
Multiple Choice Multiple Answer
Which are the distinct functions of scientific quality control?
Correct Answer
Acceptance function , Preventive function ,
Assurance function
Your Answer Acceptance function , Preventive function ,
Assurance function
Multiple Choice Multiple Answer
What are the uses of the instruction manual provided by the
manufacturer of a machine?
Correct Answer
It gives instructions regarding installation
and operation of the equipment , It contains note on common troubles with
causes and remedies for troubleshooting , It enlists points, frequency and
type of lubrication
Your Answer It gives instructions regarding installation and
operation of the equipment , It contains note on common troubles with
causes and remedies for troubleshooting , It enlists points, frequency and
type of lubrication
True/False
Cent percent inspection is often more practical and
economical than sampling inspection.
Correct Answer
False
Your Answer False
Select The Blank
Inspection is represented by ________ during recording for
method study.
Correct Answer
Square
Your Answer Square
Multiple Choice Multiple Answer
What are the benefits of inspection and quality control?
Correct Answer
Adequate maintenance of quality , Ensures
parts are within specified limits of accuracy , Gives economy in production
through reduction of defective work

Your Answer Adequate maintenance of quality , Ensures parts are


within specified limits of accuracy , Gives economy in production through
reduction of defective work
Multiple Choice Multiple Answer
Which are the subtasks of the maintenance phase of the
method study?
Correct Answer
Monitoring and control , Performance
appraisal , Audit on savings
Your Answer Monitoring and control , Performance appraisal ,
Audit on savings
Multiple Choice Single Answer
What is the cause of inherent variation or internal variation?
Correct Answer
Cumulative effect of number of chance
causes
Your Answer Worker's efficiency
Multiple Choice Single Answer
What is the meaning of " Product features" according to
J.M.Juran?
Correct Answer
Quality of design
Your Answer Quality of design
Select The Blank
REL chart exhibits relationship between ________ of
departments in terms of degree of closeness desired.
Correct Answer
Pairs
Your Answer types
Select The Blank
Principle underlying the Moving Average mrthod is that future
demand shall be ________ past demand.
Correct Answer
Average of
Your Answer Higher than
Multiple Choice Multiple Answer
Which of the following factors affect the quality control
function?
Correct Answer
Quality of workmanship , Production aids ,
Manufacturing facilities
Your Answer Quality of workmanship , Production aids ,
Manufacturing facilities
Multiple Choice Single Answer
Following is one of the techniques used for Material Planning
for high value material

Correct Answer
MRP
Your Answer MRP
True/False
Proper care and storage is not an essential part of a well
planned lubrication system.
Correct Answer
False
Your Answer False
True/False
In case of forward pass computation, the earliest event time of
a plain event equals the earliest event time of the preceding event plus
duration of activity emanating from the preceding event.
Correct Answer
True
Your Answer True
Multiple Choice Multiple Answer
Which three of the following are causes of continuous upward
pattern of Xbar-R control chart?
Correct Answer
Wear of tool , Abnormal rise in temperature ,
Accumulation of dirt
Your Answer Wear of tool , Abnormal rise in temperature ,
Accumulation of dirt
Multiple Choice Multiple Answer
Which of the following three methods used to select the
qualified supplier?
Correct Answer
By vendor plant surveys , By reputation , By
experience
Your Answer By vendor plant surveys , By reputation , By
experience
Multiple Choice Multiple Answer
Which of the following possibilities can be explored by using
flow process chart?
Correct Answer
Eliminating the operations or combining the
operations with another , Reducing the distance traveled by the workmen
or materials , Avoiding the waiting time and thereby reduce production
losses
Your Answer Eliminating the operations or combining the
operations with another , Reducing the distance traveled by the workmen
or materials , Avoiding the waiting time and thereby reduce production
losses
Select The Blank

The________ is characterised by manufacture of a several


number of a standard product produced and stocked in the warehouse as
finished goods awaiting sales.
Correct Answer
Mass Production
Your Answer Mass Production
Multiple Choice Single Answer
The ratio of output to input of a production system is
commonly known as
Correct Answer
Productivity
Your Answer Productivity
Multiple Choice Single Answer
Which is the ideal place to write a time allotted for an activity
in a network?
Correct Answer
Below the arrow
Your Answer Below the arrow
Multiple Choice Single Answer
Which method of critical path determination begins with the
end event and moves backward to the start event of the project network?
Correct Answer
Backward pass computation
Your Answer Backward pass computation
Select The Blank
In a Gantt chart, load can be indicated by numbers or ________.
Correct Answer
Lines
Your Answer
Lines
Multiple Choice Single Answer
What do you mean by the chart on which the major activities and
entry points of materials are recorded to have graphic view of operations
and inspections involved in the process?
Correct Answer
Operation process chart
Your Answer
Operation process chart
Multiple Choice Multiple Answer
Which three of the following options can be used to reduce the
duration of activity during project crashing?
Correct Answer
Allocating more manpower and machines than
originally planned for. , Working additional shifts or overtime. , Awarding
work to vendors who charge extra but expedite deliveries.
Your Answer
Allocating more manpower and machines than
originally planned for. , Working additional shifts or overtime. , Awarding
work to vendors who charge extra but expedite deliveries.

Select The Blank


A shop order in a batch production is accompanied by ________.
Correct Answer
Process sheet
Your Answer
Process sheet
Multiple Choice Single Answer
What do you mean by the graphical representation of the project
which is composed as series of connected arrows and circles to describe
the interrelationship of the activities involved?
Correct Answer
Network
Your Answer
Network
True/False
The plotting of activities - critical, non-critical and dummy activities- is
strictly according to their precedence relationship.
Correct Answer
True
Your Answer
True
Multiple Choice Multiple Answer
Which of the following can be subtypes of corrective maintenance?
Correct Answer
Shutdown Maintenance , Design-out Maintenance ,
Design-in Maintenance
Your Answer
Predictive Maintenance , Design-out Maintenance ,
Design-in Maintenance
Multiple Choice Single Answer
Technique of Value Engineering can be effectively employed in design
of a product to
Correct Answer
To meet the intended function at lowest cost
Your Answer
To meet the intended function at lowest cost
Multiple Choice Multiple Answer
How to exercise control over quality?
Correct Answer
Periodical analysis of inspecting reports to establish
causes of rejections , Preperation of quality standard and specifications ,
Exercising control over inputs
Your Answer
Periodical analysis of inspecting reports to establish
causes of rejections , Preperation of quality standard and specifications ,
Exercising control over inputs
Match The Following
Correct Answer
Your Answer
Bottom compartment of control board Bunch of work orders arranged in a
sequence in which they are to be processed.
Bunch of work orders
arranged in a sequence in which they are to be processed.

Control board Pictorial view of machine loading activity


Pictorial
view of machine loading activity
Top compartment of control board
Work order of item currently being
worked on the machine
Work order of item currently being worked on
the machine
Middle compartment of control board Work order of item to be processed
next on the machine
Work order of item to be processed next on the
machine
Select The Blank
In a control chart, time interval measures the time gap between
________.
Correct Answer
Two consequtive samples
Your Answer
Two consequtive samples
Multiple Choice Single Answer
A good plant layout helps in
Correct Answer
Reducing handling costs
Your Answer
Reducing handling costs
Select The Blank
Travel chart represents the quantitative data on material flow by
recording distance and ________ of movements between different pair of
departments.
Correct Answer
Frequency
Your Answer
Frequency

Multiple Choice Multiple Answer


What are the uses of the instruction manual provided by the manufacturer
of a machine?
Correct Answer It gives instructions regarding installation and operation of
the equipment , It contains note on common troubles with causes and
remedies for troubleshooting , It enlists points, frequency and type of
lubrication
Your Answer It gives instructions regarding installation and operation of
the equipment , It contains note on common troubles with causes and
remedies for troubleshooting , It enlists points, frequency and type of
lubrication
True/False
Cent percent inspection is often more practical and economical than

sampling inspection.
Correct Answer False
Your Answer False
Select The Blank
Inspection is represented by ________ during recording for method study.
Correct Answer Square
Your Answer Square
Multiple Choice Multiple Answer
What are the benefits of inspection and quality control?
Correct Answer Adequate maintenance of quality , Ensures parts are
within specified limits of accuracy , Gives economy in production through
reduction of defective work
Your Answer Adequate maintenance of quality , Ensures parts are within
specified limits of accuracy , Gives economy in production through
reduction of defective work
Multiple Choice Multiple Answer
Which are the subtasks of the maintenance phase of the method study?
Correct Answer Monitoring and control , Performance appraisal , Audit on
savings
Your Answer Monitoring and control , Performance appraisal , Audit on
savings
Multiple Choice Single Answer
What is the cause of inherent variation or internal variation?
Correct Answer Cumulative effect of number of chance causes
Your Answer Worker's efficiency
Multiple Choice Single Answer
What is the meaning of " Product features" according to J.M.Juran?
Correct Answer Quality of design
Your Answer Quality of design
Select The Blank
REL chart exhibits relationship between ________ of departments in terms

of degree of closeness desired.


Correct Answer Pairs
Your Answer types
Select The Blank
Principle underlying the Moving Average mrthod is that future demand
shall be ________ past demand.
Correct Answer Average of
Your Answer Higher than
Multiple Choice Multiple Answer
Which of the following factors affect the quality control function?
Correct Answer Quality of workmanship , Production aids , Manufacturing
facilities
Your Answer Quality of workmanship , Production aids , Manufacturing
facilities
Multiple Choice Single Answer
Following is one of the techniques used for Material Planning for high
value material
Correct Answer MRP
Your Answer MRP
True/False
Proper care and storage is not an essential part of a well planned
lubrication system.
Correct Answer False
Your Answer False
True/False
In case of forward pass computation, the earliest event time of a plain
event equals the earliest event time of the preceding event plus duration of
activity emanating from the preceding event.
Correct Answer True
Your Answer True
Multiple Choice Multiple Answer

Which three of the following are causes of continuous upward pattern of


Xbar-R control chart?
Correct Answer Wear of tool , Abnormal rise in temperature ,
Accumulation of dirt
Your Answer Wear of tool , Abnormal rise in temperature , Accumulation of
dirt
Multiple Choice Multiple Answer
Which of the following three methods used to select the qualified supplier?
Correct Answer By vendor plant surveys , By reputation , By experience
Your Answer By vendor plant surveys , By reputation , By experience
Multiple Choice Multiple Answer
Which of the following possibilities can be explored by using flow process
chart?
Correct Answer Eliminating the operations or combining the operations
with another , Reducing the distance traveled by the workmen or materials ,
Avoiding the waiting time and thereby reduce production losses
Your Answer Eliminating the operations or combining the operations with
another , Reducing the distance traveled by the workmen or materials ,
Avoiding the waiting time and thereby reduce production losses

Select The Blank


The________ is characterised by manufacture of a several number of a
standard product produced and stocked in the warehouse as finished
goods awaiting sales.
Correct Answer Mass Production
Your Answer Mass Production
Multiple Choice Single Answer
The ratio of output to input of a production system is commonly known as
Correct Answer Productivity

Your Answer Productivity


Multiple Choice Single Answer
Which is the ideal place to write a time allotted for an activity in a network?
Correct Answer Below the arrow
Your Answer Below the arrow
Multiple Choice Single Answer
Which method of critical path determination begins with the end event and
moves backward to the start event of the project network?
Correct Answer Backward pass computation
Your Answer Backward pass computation
True/False
The event numbers as far as possible reflect the logical relationships of the
activities.
Correct Answer True
Your Answer True
Multiple Choice Multiple Answer
Which are the subfactors of community facilities or social infrastructure?
Correct Answer Accomodation , Educational , Entertainment
Your Answer Educational , Entertainment , Accomodation
Select The Blank
Duration of each activity is referred to as ________.
Correct Answer Activity time
Your Answer Activity time
Multiple Choice Multiple Answer
Which of the following are examples of pure materials?
Correct Answer Bakeries , Ice factories , Woolen
Your Answer Bakeries , Ice factories , Woolen
True/False
Maintenance function must be decentralised apart from a size of a
manufacturing organisation for it's better functioning.

Correct Answer False


Your Answer True
True/False
The operator should not stop production if first piece is not approved by
the inspector.
Correct Answer False
Your Answer False
Multiple Choice Single Answer
Which of the following policies is advisable in case of low product variety
and large volumes?
Correct Answer Low Skilled Labour & Special Purpose Machines
Your Answer Low Skilled Labour & Special Purpose Machines
True/False
Cent percent inspection does not mean inspection of component for 100%
quality characteristics.
Correct Answer True
Your Answer True
Multiple Choice Single Answer
What do you mean by design modifications made to reduce time and effort
required in carrying out maintenance work ?
Correct Answer Design-in Maintenance
Your Answer Design-in Maintenance
Multiple Choice Multiple Answer
Which of the following are examples of incentives offered by the Central
and State Governments for setting up industries in particular locations?
Correct Answer Exemption from excise duty , Soft loans , Subsidy in
electrical charges
Your Answer Exemption from excise duty , Soft loans , Subsidy in
electrical charges
Select The Blank
The easiest way to bring the delayed job within the promised delivery time

by using extra shift or weekly holiday is ________.


Correct Answer Overtime working
Your Answer Overtime working
True/False
Objective of Work Study is to improve Productivity
Correct Answer True
Your Answer True
Multiple Choice Single Answer
Plant Layout decisions are considered to be
Correct Answer Strategic
Your Answer Strategic
Multiple Choice Single Answer
What do you mean by the project duration for which the total cost is
minimum?
Correct Answer Optimum duration
Your Answer Optimum duration
Select The Blank
A ________ helps to determine the time required by the operator to
complete a specified task for the defined method at the defined pace of
performance.
Correct Answer Work measurement
Your Answer Work measurement

SCDL Assignments : Production and Operation management 6


Multiple Choice Single Answer
How does the control chart of statistical quality control helps the operating
personnel?
Correct Answer Identify the presence of an assignable cause before it develops
Your Answer Identify the presence of an assignable cause before it develops
True/False
Dispatching function is not a part of Production Planning
Correct Answer True

Your Answer False


Multiple Choice Multiple Answer
Components of Production Management include
Correct Answer Capacity Planning , Job Design , Production Planning
Your Answer Capacity Planning , Job Design , Production Planning
Multiple Choice Single Answer
Plant location decisions concern following type of organizations
Correct Answer Manufacturing and service organizations
Your Answer Manufacturing and service organizations
Multiple Choice Single Answer
Where does the central line is located in case of p-chart?
Correct Answer at p bar
Your Answer at p bar
Multiple Choice Multiple Answer
Which of the following are the basic requirements of quality standard?
Correct Answer Deifinite , Undesrstandable , Economically viable
Your Answer Deifinite , Undesrstandable , Economically viable
True/False
Independent float either affects the float of preceding activities or that of
succeeding activities.
Correct Answer False
Your Answer True
Multiple Choice Multiple Answer
Which of the following are activities of corrective maintenance?
Correct Answer Modifications and improvements , Overhauling , Emergency
repairs
Your Answer Overhauling , Lubrication as per schedule , Emergency repairs
Multiple Choice Multiple Answer
Which of the following observations are expected from the preventive
maintenance person?
Correct Answer Wrong allignments , Overheating defects , Excessive play
Your Answer Wrong allignments , Overheating defects , Excessive play

Multiple Choice Single Answer


When should operator or supervisor is supposed to sign the perforated route sheet?
Correct Answer After completion of operation
Your Answer At the start of the operation
Select The Blank
The most commonly used methods employed to determine the critical path in case
of large networks are forward pass computation and ________.
Correct Answer Backward path computation
Your Answer Critical path computation
True/False
The event numbers as far as possible reflect the logical relationships of the
activities.
Correct Answer True
Your Answer True
Multiple Choice Multiple Answer
Which are the subfactors of community facilities or social infrastructure?
Correct Answer Accomodation , Educational , Entertainment
Your Answer Educational , Entertainment , Accomodation
Match The Following
Correct Answer Your Answer
Scheduling of interrelated activities of small projects with consideration of
uncertainty of duration of activities. Critical Path Analysis Critical Path Analysis
Two machines & processing time depends on sequence of job loading Johnson's
Two Machine Algorithm Johnson's Two Machine Algorithm
Sufficient orders and resonable choice of machines Index Method Index Method
Time relationship between when a product is required and when it can be made
available Critical Ratio Scheduling Critical Ratio Scheduling
Select The Blank
Duration of each activity is referred to as ________.
Correct Answer Activity time
Your Answer Activity time
Multiple Choice Multiple Answer
Which of the following are examples of pure materials?
Correct Answer Bakeries , Ice factories , Woolen

Your Answer Bakeries , Ice factories , Woolen


True/False
Maintenance function must be decentralised apart from a size of a manufacturing
organisation for it's better functioning.
Correct Answer False
Your Answer True
True/False
The operator should not stop production if first piece is not approved by the
inspector.
Correct Answer False
Your Answer False
Multiple Choice Single Answer
Which of the following policies is advisable in case of low product variety and
large volumes?
Correct Answer Low Skilled Labour & Special Purpose Machines
Your Answer Low Skilled Labour & Special Purpose Machines
True/False
Cent percent inspection does not mean inspection of component for 100% quality
characteristics.
Correct Answer True
Your Answer True
Multiple Choice Single Answer
What do you mean by design modifications made to reduce time and effort
required in carrying out maintenance work ?
Correct Answer Design-in Maintenance
Your Answer Design-in Maintenance
Multiple Choice Multiple Answer
Which of the following are examples of incentives offered by the Central and
State Governments for setting up industries in particular locations?
Correct Answer Exemption from excise duty , Soft loans , Subsidy in electrical
charges
Your Answer Exemption from excise duty , Soft loans , Subsidy in electrical
charges

Select The Blank


The easiest way to bring the delayed job within the promised delivery time by
using extra shift or weekly holiday is ________.
Correct Answer Overtime working
Your Answer Overtime working
True/False
Objective of Work Study is to improve Productivity
Correct Answer True
Your Answer True
Match The Following
Correct Answer Your Answer
Bottom compartment of control board Bunch of work orders arranged in a
sequence in which they are to be processed. Bunch of work orders arranged in a
sequence in which they are to be processed.
Control board Pictorial view of machine loading activity Pictorial view of machine
loading activity
Top compartment of control board Work order of item currently being worked on
the machine Work order of item currently being worked on the machine
Middle compartment of control board Work order of item to be processed next on
the machine Work order of item to be processed next on the machine
Multiple Choice Single Answer
Plant Layout decisions are considered to be
Correct Answer Strategic
Your Answer Strategic
Multiple Choice Single Answer
What do you mean by the project duration for which the total cost is minimum?
Correct Answer Optimum duration
Your Answer Optimum duration
Select The Blank
A ________ helps to determine the time required by the operator to complete a
specified task for the defined method at the defined pace of performance.
Correct Answer Work measurement
Your Answer Work measurement

Select The Blank


An Ideal OC curve is ________ shaped curve that accpets all the lots with quality
equal to or better than AQL .
Correct Answer Rectangular
Your Answer Rectangular
True/False
Inspection order is must even for simple jobs which can be inspected by shop
inspector with the tooling available on shop.
Correct Answer False
Your Answer False
Select The Blank
Function concerned with fixation of time allowed to qualified worker for a job is
called ________.
Correct Answer Work Measurement
Your Answer Time Measurement
True/False
In case of X bar-R charts,it is ensured that the assignable causes are detected
before the tolerances are violated, upper and lower statistical limits are worked out
and inserted into a chart.
Correct Answer True
Your Answer True
Multiple Choice Single Answer
What is the reason of fluctuations, if the control chart evaluates that the process is
not in a state of statistical control?
Correct Answer Assignable variability
Your Answer Random variability
Multiple Choice Multiple Answer
Which are different ways to show critical path in a network?
Correct Answer Thick Line , Red Line , Double Line
Your Answer Thick Line , Red Line , Double Line
Select The Blank
OC curve of ideal sampling plan suggests that all lots less than 3% defectives have
the probability of acceptance of ________.
Correct Answer One

Your Answer One


Multiple Choice Single Answer
Process planning is the process of
Correct Answer establishing shortest and most economic path of production
Your Answer establishing shortest and most economic path of production
Select The Blank
The ________ is a pair of chart consisting of average chart and range chart placed
one below another on a piece of graph paper.
Correct Answer X bar-R-chart
Your Answer X bar-R-chart
Multiple Choice Multiple Answer
Which are the distinct functions of scientific quality control?
Correct Answer Acceptance function , Preventive function , Assurance function
Your Answer Acceptance function , Preventive function , Assurance function

Production n Operations 5
Select The Blank
OC curve of ideal sampling plan suggests that all lots less than 3%
defectives have the probability of acceptance of ________.
Correct Answer One
Your Answer One
Multiple Choice Single Answer
Process planning is the process of
Correct Answer establishing shortest and most economic path of
production
Your Answer establishing shortest and most economic path of production
Select The Blank
The ________ is a pair of chart consisting of average chart and range
chart placed one below another on a piece of graph paper.
Correct Answer X bar-R-chart
Your Answer X bar-R-chart

Multiple Choice Multiple Answer


Which are the distinct functions of scientific quality control?
Correct Answer Acceptance function , Preventive function , Assurance
function
Your Answer Acceptance function , Preventive function , Assurance
function
Multiple Choice Multiple Answer
What are the uses of the instruction manual provided by the manufacturer
of a machine?
Correct Answer It gives instructions regarding installation and operation of
the equipment , It contains note on common troubles with causes and
remedies for troubleshooting , It enlists points, frequency and type of
lubrication
Your Answer It gives instructions regarding installation and operation of
the equipment , It contains note on common troubles with causes and
remedies for troubleshooting , It enlists points, frequency and type of
lubrication
True/False
Cent percent inspection is often more practical and economical than
sampling inspection.
Correct Answer False
Your Answer False
Select The Blank
Inspection is represented by ________ during recording for method study.
Correct Answer Square
Your Answer Square
Multiple Choice Multiple Answer
What are the benefits of inspection and quality control?
Correct Answer Adequate maintenance of quality , Ensures parts are
within specified limits of accuracy , Gives economy in production through

reduction of defective work


Your Answer Adequate maintenance of quality , Ensures parts are within
specified limits of accuracy , Gives economy in production through
reduction of defective work
Multiple Choice Multiple Answer
Which are the subtasks of the maintenance phase of the method study?
Correct Answer Monitoring and control , Performance appraisal , Audit on
savings
Your Answer Monitoring and control , Performance appraisal , Audit on
savings
Multiple Choice Single Answer
What is the cause of inherent variation or internal variation?
Correct Answer Cumulative effect of number of chance causes
Your Answer Worker's efficiency
Multiple Choice Single Answer
What is the meaning of " Product features" according to J.M.Juran?
Correct Answer Quality of design
Your Answer Quality of design
Select The Blank
REL chart exhibits relationship between ________ of departments in terms
of degree of closeness desired.
Correct Answer Pairs
Your Answer types
Select The Blank
Principle underlying the Moving Average mrthod is that future demand
shall be ________ past demand.
Correct Answer Average of
Your Answer Higher than

Multiple Choice Multiple Answer


Which of the following factors affect the quality control function?
Correct Answer Quality of workmanship , Production aids , Manufacturing
facilities
Your Answer Quality of workmanship , Production aids , Manufacturing
facilities
Multiple Choice Single Answer
Following is one of the techniques used for Material Planning for high
value material
Correct Answer MRP
Your Answer MRP
True/False
Proper care and storage is not an essential part of a well planned
lubrication system.
Correct Answer False
Your Answer False
True/False
In case of forward pass computation, the earliest event time of a plain
event equals the earliest event time of the preceding event plus duration of
activity emanating from the preceding event.
Correct Answer True
Your Answer True
Multiple Choice Multiple Answer
Which three of the following are causes of continuous upward pattern of
Xbar-R control chart?
Correct Answer Wear of tool , Abnormal rise in temperature ,
Accumulation of dirt
Your Answer Wear of tool , Abnormal rise in temperature , Accumulation of
dirt

Multiple Choice Multiple Answer


Which of the following three methods used to select the qualified supplier?
Correct Answer By vendor plant surveys , By reputation , By experience
Your Answer By vendor plant surveys , By reputation , By experience
Multiple Choice Multiple Answer
Which of the following possibilities can be explored by using flow process
chart?
Correct Answer Eliminating the operations or combining the operations
with another , Reducing the distance traveled by the workmen or materials ,
Avoiding the waiting time and thereby reduce production losses
Your Answer Eliminating the operations or combining the operations with
another , Reducing the distance traveled by the workmen or materials ,
Avoiding the waiting time and thereby reduce production losses
Select The Blank
The________ is characterised by manufacture of a several number of a
standard product produced and stocked in the warehouse as finished
goods awaiting sales.
Correct Answer Mass Production
Your Answer Mass Production
Multiple Choice Single Answer
The ratio of output to input of a production system is commonly known as
Correct Answer Productivity
Your Answer Productivity
Multiple Choice Single Answer
Which is the ideal place to write a time allotted for an activity in a network?
Correct Answer Below the arrow
Your Answer Below the arrow
Multiple Choice Single Answer
Which method of critical path determination begins with the end event and

moves backward to the start event of the project network?


Correct Answer Backward pass computation
Your Answer Backward pass computation
True/False
The event numbers as far as possible reflect the logical relationships of the
activities.
Correct Answer True
Your Answer True
Multiple Choice Multiple Answer
Which are the subfactors of community facilities or social infrastructure?
Correct Answer Accomodation , Educational , Entertainment
Your Answer Educational , Entertainment , Accomodation
Match The Following
Correct Answer Your Answer
Scheduling of interrelated activities of small projects with consideration of
uncertainty of duration of activities. Critical Path Analysis Critical Path
Analysis
Two machines & processing time depends on sequence of job loading
Johnson's Two Machine Algorithm Johnson's Two Machine Algorithm
Sufficient orders and resonable choice of machines Index Method Index
Method
Time relationship between when a product is required and when it can be
made available Critical Ratio Scheduling Critical Ratio Scheduling
Select The Blank
Duration of each activity is referred to as ________.
Correct Answer Activity time
Your Answer Activity time
Multiple Choice Multiple Answer
Which of the following are examples of pure materials?

Correct Answer Bakeries , Ice factories , Woolen


Your Answer Bakeries , Ice factories , Woolen
True/False
Maintenance function must be decentralised apart from a size of a
manufacturing organisation for it's better functioning.
Correct Answer False
Your Answer True
True/False
The operator should not stop production if first piece is not approved by
the inspector.
Correct Answer False
Your Answer False
Multiple Choice Single Answer
Which of the following policies is advisable in case of low product variety
and large volumes?
Correct Answer Low Skilled Labour & Special Purpose Machines
Your Answer Low Skilled Labour & Special Purpose Machines
True/False
Cent percent inspection does not mean inspection of component for 100%
quality characteristics.
Correct Answer True
Your Answer True
Multiple Choice Single Answer
What do you mean by design modifications made to reduce time and effort
required in carrying out maintenance work ?
Correct Answer Design-in Maintenance
Your Answer Design-in Maintenance
Multiple Choice Multiple Answer

Which of the following are examples of incentives offered by the Central


and State Governments for setting up industries in particular locations?
Correct Answer Exemption from excise duty , Soft loans , Subsidy in
electrical charges
Your Answer Exemption from excise duty , Soft loans , Subsidy in
electrical charges
Select The Blank
The easiest way to bring the delayed job within the promised delivery time
by using extra shift or weekly holiday is ________.
Correct Answer Overtime working
Your Answer Overtime working
True/False
Objective of Work Study is to improve Productivity
Correct Answer True
Your Answer True
Match The Following
Correct Answer Your Answer
Bottom compartment of control board Bunch of work orders arranged in a
sequence in which they are to be processed. Bunch of work orders
arranged in a sequence in which they are to be processed.
Control board Pictorial view of machine loading activity Pictorial view of
machine loading activity
Top compartment of control board Work order of item currently being
worked on the machine Work order of item currently being worked on the
machine
Middle compartment of control board Work order of item to be processed
next on the machine Work order of item to be processed next on the
machine
Multiple Choice Single Answer
Plant Layout decisions are considered to be
Correct Answer Strategic
Your Answer Strategic

Multiple Choice Single Answer


What do you mean by the project duration for which the total cost is
minimum?
Correct Answer Optimum duration
Your Answer Optimum duration
Select The Blank
A ________ helps to determine the time required by the operator to
complete a specified task for the defined method at the defined pace of
performance.
Correct Answer Work measurement
Your Answer Work measurement

Production n Operations 4
Select The Blank
The design of any layout is governed by large number of factors and the best
layout is expected to ________ all these factors.
Correct Answer Optimise
Your Answer Optimise
True/False
In case of X bar-R charts,it is ensured that the assignable causes are detected
before the tolerances are violated, upper and lower statistical limits are worked out
and inserted into a chart.
Correct Answer True
Your Answer True
Multiple Choice Multiple Answer
Expediting function is concerned with following activities
Correct Answer Communicating possible delays in delivery date commitment to
sales department , Devising cures to keep rate of production in line with schedule ,
Progress chasing to identify delays which may hold up production

Your Answer Recording progress of work , Progress chasing to identify delays


which may hold up production , Devising cures to keep rate of production in line
with schedule
Multiple Choice Multiple Answer
Scale model used for layout analysis have following advantages
Correct Answer Nontechnical person finds it easy to comprehend , Ovehead
facilities can be shown , Models can be shifted easily
Your Answer Nontechnical person finds it easy to comprehend , Ovehead facilities
can be shown , Models can be shifted easily
Multiple Choice Multiple Answer
Which features should be covered by the specifications of materials while defining
the qualitative requirement?
Correct Answer Material composition , Dimensions , Any heat treatment if
required
Your Answer Material composition , Dimensions , Any heat treatment if required
Multiple Choice Single Answer
Technique which can help an organization to reduce inventory is called
Correct Answer MRP
Your Answer MRP
Multiple Choice Single Answer
How does the control chart of statistical quality control helps the operating
personnel?
Correct Answer Identify the presence of an assignable cause before it develops
Your Answer Identify the presence of an assignable cause before it develops
True/False
Dispatching function is not a part of Production Planning
Correct Answer True
Your Answer False

Multiple Choice Multiple Answer


Components of Production Management include
Correct Answer Capacity Planning , Job Design , Production Planning
Your Answer Capacity Planning , Job Design , Production Planning
Multiple Choice Single Answer
Plant location decisions concern following type of organizations
Correct Answer Manufacturing and service organizations
Your Answer Manufacturing and service organizations
Multiple Choice Single Answer
Where does the central line is located in case of p-chart?
Correct Answer at p bar
Your Answer at p bar
Multiple Choice Multiple Answer
Which of the following are the basic requirements of quality standard?
Correct Answer Deifinite , Undesrstandable , Economically viable
Your Answer Deifinite , Undesrstandable , Economically viable
True/False
Independent float either affects the float of preceding activities or that of
succeeding activities.
Correct Answer False
Your Answer True
Multiple Choice Multiple Answer
Which of the following are activities of corrective maintenance?
Correct Answer Modifications and improvements , Overhauling , Emergency
repairs
Your Answer Overhauling , Lubrication as per schedule , Emergency repairs
Multiple Choice Multiple Answer

Which of the following observations are expected from the preventive


maintenance person?
Correct Answer Wrong allignments , Overheating defects , Excessive play
Your Answer Wrong allignments , Overheating defects , Excessive play
Multiple Choice Single Answer
When should operator or supervisor is supposed to sign the perforated route sheet?
Correct Answer After completion of operation
Your Answer At the start of the operation
Select The Blank
The most commonly used methods employed to determine the critical path in case
of large networks are forward pass computation and ________.
Correct Answer Backward path computation
Your Answer Critical path computation
True/False
The event numbers as far as possible reflect the logical relationships of the
activities.
Correct Answer True
Your Answer True
Multiple Choice Multiple Answer
Which are the subfactors of community facilities or social infrastructure?
Correct Answer Accomodation , Educational , Entertainment
Your Answer Educational , Entertainment , Accomodation
Match The Following
Correct Answer Your Answer
Scheduling of interrelated activities of small projects with consideration of
uncertainty of duration of activities. Critical Path Analysis Critical Path Analysis
Two machines & processing time depends on sequence of job loading Johnson's
Two Machine Algorithm Johnson's Two Machine Algorithm
Sufficient orders and resonable choice of machines Index Method Index Method

Time relationship between when a product is required and when it can be made
available Critical Ratio Scheduling Critical Ratio Scheduling
Select The Blank
Duration of each activity is referred to as ________.
Correct Answer Activity time
Your Answer Activity time
Multiple Choice Multiple Answer
Which of the following are examples of pure materials?
Correct Answer Bakeries , Ice factories , Woolen
Your Answer Bakeries , Ice factories , Woolen
True/False
Maintenance function must be decentralised apart from a size of a manufacturing
organisation for it's better functioning.
Correct Answer False
Your Answer True
True/False
The operator should not stop production if first piece is not approved by the
inspector.
Correct Answer False
Your Answer False
Multiple Choice Single Answer
Which of the following policies is advisable in case of low product variety and
large volumes?
Correct Answer Low Skilled Labour & Special Purpose Machines
Your Answer Low Skilled Labour & Special Purpose Machines
True/False
Cent percent inspection does not mean inspection of component for 100% quality
characteristics.

Correct Answer True


Your Answer True
Multiple Choice Single Answer
What do you mean by design modifications made to reduce time and effort
required in carrying out maintenance work ?
Correct Answer Design-in Maintenance
Your Answer Design-in Maintenance
Multiple Choice Multiple Answer
Which of the following are examples of incentives offered by the Central and
State Governments for setting up industries in particular locations?
Correct Answer Exemption from excise duty , Soft loans , Subsidy in electrical
charges
Your Answer Exemption from excise duty , Soft loans , Subsidy in electrical
charges
Select The Blank
The easiest way to bring the delayed job within the promised delivery time by
using extra shift or weekly holiday is ________.
Correct Answer Overtime working
Your Answer Overtime working
True/False
Objective of Work Study is to improve Productivity
Correct Answer True
Your Answer True
Multiple Choice Single Answer
Plant Layout decisions are considered to be
Correct Answer Strategic
Your Answer Strategic
Multiple Choice Single Answer

What do you mean by the project duration for which the total cost is minimum?
Correct Answer Optimum duration
Your Answer Optimum duration
Select The Blank
A ________ helps to determine the time required by the operator to complete a
specified task for the defined method at the defined pace of performance.
Correct Answer Work measurement
Your Answer Work measurement
Select The Blank
An Ideal OC curve is ________ shaped curve that accpets all the lots with quality
equal to or better than AQL .
Correct Answer Rectangular
Your Answer Rectangular
True/False
Inspection order is must even for simple jobs which can be inspected by shop
inspector with the tooling available on shop.
Correct Answer False
Your Answer False
Select The Blank
Function concerned with fixation of time allowed to qualified worker for a job is
called ________.
Correct Answer Work Measurement
Your Answer Time Measurement
True/False
In case of X bar-R charts,it is ensured that the assignable causes are detected
before the tolerances are violated, upper and lower statistical limits are worked out
and inserted into a chart.
Correct Answer True
Your Answer True

Multiple Choice Single Answer


What is the reason of fluctuations, if the control chart evaluates that the process is
not in a state of statistical control?
Correct Answer Assignable variability
Your Answer Random variability
Multiple Choice Multiple Answer
Which are different ways to show critical path in a network?
Correct Answer Thick Line , Red Line , Double Line
Your Answer Thick Line , Red Line , Double Line
Select The Blank
Production control work is ________ in case of floor inspection as compared with
the centralised inspection.
Correct Answer easier
Your Answer easier
Multiple Choice Single Answer
Following is not an input information for Process Planning
Correct Answer Inventory level
Your Answer Inventory level
Multiple Choice Multiple Answer
Which are the three types of float?
Correct Answer Total float , Independent float , Free float
Your Answer Total float , Independent float , Free float
Multiple Choice Single Answer
Which of the following tool is used by Industrial Engineering Department for
estimating the Performance Standard in case of new jobs?
Correct Answer Tables of synthetic standards
Your Answer Work study

True/False
As a general rule, the number of tail event of an activity is more than that of it's
head event.
Correct Answer False
Your Answer False
True/False
The time chart, if necessary, may be modified considering the limitations of
resource.
Correct Answer True
Your Answer True
Multiple Choice Multiple Answer
What is the basic minimum requirement for those who are responsible for the
quality of design?
Correct Answer In depth knowledge about alternative materials and
manufacturing processes , access to latest technology and production process
adopted by industries in the developed market , Continuous effort in product
development
Your Answer In depth knowledge about alternative materials and manufacturing
processes , access to latest technology and production process adopted by
industries in the developed market , Continuous effort in product development
Multiple Choice Single Answer
Which of the following policies is advisable in case of low product variety and
large volumes?
Correct Answer Low Skilled Labour & Special Purpose Machines
Your Answer Low Skilled Labour & Special Purpose Machines
Multiple Choice Single Answer
What do you understand by the critical analysis of existing jobs to develop easier
and effective method?
Correct Answer Method study
Your Answer Method study

True/False
Inspection Order can be a verbal order
Correct Answer True
Your Answer True
Multiple Choice Multiple Answer
Which of the following products should be produced by using mass production?
Correct Answer Refrigerator , Tyre for automobile , Television Set
Your Answer Refrigerator , Tyre for automobile , Television Set
True/False
Originating process of raw material influence Process Planning
Correct Answer True
Your Answer True
Select The Blank
In Gantt Chart, the horizontal lines devide vertical lines into sections which
represents ________.
Correct Answer No. of work centres or operations
Your Answer No. of work centres or operations
Multiple Choice Multiple Answer
What are uses of diagrams in method study?
Correct Answer Study different plant layouts and select the most optimum one ,
Study the extent of traffic over the different routes of the plant , Identify the extent
of backtracking, cross traffic and obstacles encountered during the movement of
material.
Your Answer Study different plant layouts and select the most optimum one ,
Study the extent of traffic over the different routes of the plant , Identify the extent
of backtracking, cross traffic and obstacles encountered during the movement of
material.
Multiple Choice Multiple Answer
Which of the following are illustrations of inspection?

Correct Answer Physical count of incoming material against the quantity


mentioned in delivery challan , A dimensional check with measuring instrument ,
Visual check of burrs and finish
Your Answer Physical count of incoming material against the quantity mentioned
in delivery challan , A dimensional check with measuring instrument , Visual check
of burrs and finish
True/False
Quality control determines what, when, and how much to inspect while inspection
actually conducts examination of goods.
Correct Answer True
Your Answer False
Multiple Choice Multiple Answer
Which of the following are examples of attributes?
Correct Answer Cracks , Burrs , Texture
Your Answer Cracks , Hardness , Burrs
Select The Blank
The ________ pertain to the climatic conditions which the component , product or
material should withstand.
Correct Answer Environmental specifications
Your Answer Environmental specifications
Select The Blank
The ________ is a pair of chart consisting of average chart and range chart placed
one below another on a piece of graph paper.
Correct Answer X bar-R-chart
Your Answer X bar-R-chart
True/False
Inspection should be avoided prior to long run of a manufacturing stage as it
becomes duplication of work and cost.
Correct Answer False
Your Answer True

Select The Blank


The term ________ emplies the foregone profit due to inability of company to
produce.
Correct Answer Opportunity cost
Your Answer Opportunity cost
Multiple Choice Multiple Answer
Which of the following are uses of the lubricants?
Correct Answer Retard rate of wear and tear of moving parts , Protect parts from
moisture and dust , Keep temperature of bearings within allowable limits
Your Answer Retard rate of wear and tear of moving parts , Protect parts from
moisture and dust , Keep temperature of bearings within allowable limits
Multiple Choice Single Answer
Need for change in layout can occur due to following reason
Correct Answer introduction of new product
Your Answer increase labour efficiency
True/False
Delay in completion of projects result in unwelcome additions to the fixed
manufacturing expenses.
Correct Answer True
Your Answer True
Multiple Choice Single Answer
Which kind of inspection is followed in case of product layout?
Correct Answer Pilot inspection
Your Answer Pilot inspection
Multiple Choice Single Answer
Any premise in which persons are employed for purpose of making any product/s
is called

Correct Answer Factory


Your Answer Factory
Multiple Choice Single Answer
What do you mean by the study of repetitive short cycle operations which involve
quick hand / feet motions?
Correct Answer Micromotion study
Your Answer Operation study
Select The Blank
The magnitude of an inherent variability is called ________.
Correct Answer Process capability
Your Answer Process Control
Match The Following
Correct Answer Your Answer
Consumption of physical effort Lifting Giving instructions
Information received Taking dictation Taking dictation
Change in physical characteristic Punching Lifting
Addition Assembly Posting a ledger
Multiple Choice Single Answer
Which of the following data is unnecessary for scheduling process?
Correct Answer Cost breakup of products
Your Answer Cost breakup of products
Select The Blank
________ in the plan is lost if there are frequent revisions.
Correct Answer Faith
Your Answer Data
Select The Blank
Inspection is represented by ________ during recording for method study.

Correct Answer Square


Your Answer Square
Multiple Choice Single Answer
The process of changing inputs into outputs thereby adding some value to entity
can be defined as
Correct Answer Operation
Your Answer Operation
True/False
Inspection should be conducted on all incoming materials, semifinished items,
bought out components, subcontract items prior to any operation, assembly.
Correct Answer True
Your Answer True
Multiple Choice Single Answer
Which of the following is the most popular technique for Project Production?
Correct Answer PERT & CPM
Your Answer PERT & CPM
Match The Following
Correct Answer Your Answer
Draining and refilling of oil reserviors of plunger pump Yearly Yearly
Parts lubricated with oil nipple Daily Daily
Tools and slideways two to three times a day two to three times a day
Table lubrication Weekly Weekly
Select The Blank
The ________ is a set of tools and techniques by which products are made to
comply with the specifications at minimum cost to the firm.
Correct Answer Quality control system
Your Answer Design system
Select The Blank

The________ is a very fine work measurement technique whereby the time


required to do a job is synthesized by combining the predetermined times for
different elements of the job.
Correct Answer Pre-determined Motion & Time Study
Your Answer Pre-determined Motion & Time Study
True/False
Every network does not necessarily have a critical path.
Correct Answer False
Your Answer True
Multiple Choice Multiple Answer
Which details are recorded in columns when each square of progress card is split
up into columns?
Correct Answer Date , Shift , Quantity produced
Your Answer Date , Shift , Quantity subcontracted
Multiple Choice Single Answer
Process type layout is suitable when
Correct Answer there is wide variation in processing time of operations
Your Answer Product is required in huge quantity
ultiple Choice Single Answer
One of the internal environment factors that influences management is
Correct Answer Place
Your Answer Place
Select The Blank
Management as a discipline is the function of________.
Correct Answer creativity
Your Answer creativity
Multiple Choice Single Answer
Who said, Management is management of Men, Money, Machinery Materials

and Information?
Correct Answer Anonymous
Your Answer Anonymous
Multiple Choice Multiple Answer
Under the role of management consultant, consultant acts as a
Correct Answer Motivator , Leader , Counselor
Your Answer Motivator , Leader , Counselor
Multiple Choice Multiple Answer
Name the flagship companies under the Business family "Munjals"
Correct Answer Hero Honda , Hero Cycles
Your Answer Hero Honda , Hero Cycles
True/False
Under MRP system for common items order for procurement is placed based on
requirement for each product
Correct Answer False
Your Answer False
Multiple Choice Single Answer
Which of the following technique is activity oriented ?
Correct Answer Critical Path Method
Your Answer Project Evaluation & Review Technique
Multiple Choice Single Answer
Product layout is employed for manufacturing following products
Correct Answer refrigirators
Your Answer refrigirators
Multiple Choice Multiple Answer
Following are some of the Principles of Management advocated by F W Taylor
Correct Answer Selection of best worker for each particular task , Division of
work between worker and management , Training and development of the
workmen

Your Answer Selection of best worker for each particular task , Division of work
between worker and management , Training and development of the workmen
Multiple Choice Single Answer
Which is the next stage to the inspection based quality control in the historical
development of quality management.
Correct Answer Quality assurance
Your Answer Quality assurance
Select The Blank
The term ________ emplies the foregone profit due to inability of company to
produce.
Correct Answer Opportunity cost
Your Answer Opportunity cost
Select The Blank
Process sheets for parts in job production are prepared once and maintained as
________ process sheet.
Correct Answer Standard
Your Answer Standard
True/False
The steeper the OC curve, the better is the discrimination between good and bad
lots. Correct AnswerTrue
Your Answer True
Multiple Choice Single Answer
One of the sophisticated operations research techniques used in material planning
is
Correct Answer Dynamic programming
Your Answer Dynamic programming
True/False
Process Sheets for parts in batch production are not maintained as standard

process sheet
Correct Answer False
Your Answer False
Select The Blank
The ________ is the probability that a bad lot will be accepted by the sampling
plan. Correct AnswerConsumer's risk
Your Answer Consumer's risk
Multiple Choice Single Answer
What do you understand by inspection conducted on all jobs received back from a
customer as defectives?
Correct Answer Appraisal inspection
Your Answer Appraisal inspection
Multiple Choice Multiple Answer
MRP utilises the following information
Correct Answer Master production schedule , Product structure , Lead time for
procurement/manufacturing
Your Answer Master production schedule , Product structure , Lead time for
procurement/manufacturing
Match The Following
Correct Answer Your Answer
Scheduling Device Strings Strings
Interruption for machine utilisation Preventive maintenance Preventive
maintenance
Input for scheduling Overlapping of operations Overlapping of operations
Technique of scheduling Critical Path Analysis Critical Path Analysis
Multiple Choice Single Answer
A good layout makes effective use of space. Utilization of space for a department
like Stores can be measured by
Correct Answer Proportion of Cubic volume space utilized
Your Answer Proportion of Cubic volume space utilized

Select The Blank


Inspection points should be such that defectives are ________ segregated.
Correct Answer Automatically
Your Answer Automatically
Select The Blank
The ________ is the maximum percentage defective that for the purpose of
sampling inspection can be considered satisfactory as a process average.
Correct Answer Acceptable quality level
Your Answer Acceptable quality level
Multiple Choice Multiple Answer
What are uses of diagrams in method study?
Correct Answer Study different plant layouts and select the most optimum one ,
Study the extent of traffic over the different routes of the plant , Identify the extent
of backtracking, cross traffic and obstacles encountered during the movement of
material.
Your Answer Study different plant layouts and select the most optimum one ,
Study the extent of traffic over the different routes of the plant , Identify the extent
of backtracking, cross traffic and obstacles encountered during the movement of
material.
Select The Blank
Work study is also called ________ study
Correct Answer Time and Motion
Your Answer Time and Motion
True/False
The plotting of activities - critical, non-critical and dummy activities- is strictly
according to their precedence relationship.
Correct Answer True
Your Answer True

Multiple Choice Multiple Answer


Which of the following are major inputs to scheduling?
Correct Answer Overlapping of operations , Effective Capacity per work centre ,
Performance standards
Your Answer Overlapping of operations , Effective Capacity per work centre ,
Performance standards
Multiple Choice Multiple Answer
The advantages of Factor Analysis method over Balancing advantages against
disadvantage methods are
Correct Answer Considers intangible costs/benefits , Is a rational method ,
Analysis is more objective
Your Answer Considers intangible costs/benefits , Is a rational method , Analysis
is more objective
Select The Blank
Besides charts, two types of diagrams - flow diagram and ________ are drawn
when recording details of an existing layout.
Correct Answer String diagram
Your Answer String diagram
Multiple Choice Multiple Answer
Which of the following are the major steps of making of the X bar-R control
chart?
Correct Answer Collection of data , Claculation of mean,range,grand average and
mean range , Set up control chart for average and calculate control limits of range
chart
Your Answer Collection of data , Claculation of mean,range,grand average and
mean range , Set up control chart for average and calculate control limits of range
chart
True/False
In case of backward pass computation, the latest event time of the end event
equals to the earliest event time minus duration of that activity.

Correct Answer False


Your Answer False
Multiple Choice Single Answer
What do you mean by a single event which represents the joint start of more than
one activities?
Correct Answer Burst event
Your Answer Burst event
Multiple Choice Multiple Answer
Which of the following are examples of gross materials?
Correct Answer Timber , Iron ore , Sugar cane
Your Answer Timber , Iron ore , Sugar cane
Select The Blank
A shop order in a batch production is accompanied by ________.
Correct Answer Process sheet
Your Answer Drawings
True/False
All activities must not be tied up into the network
Correct Answer False
Your Answer False
True/False
Grouping of machines gives a lot of flexibility in loading and scheduling
Correct Answer True
Your Answer True
Multiple Choice Multiple Answer
Which kind of possible defectives can be reduced due to first off inspection?
Correct Answer Due to mistakes in reading blue prints , Due to errors in tooling ,
Due to wrong machine set up

Your Answer Due to mistakes in reading blue prints , Due to errors in tooling ,
Due to wrong machine set up
Select The Blank
The ________ phase also provides an opportunity to the practitioner to assess the
effectiveness of the approach followed by him and make changes in the
methodology.
Correct Answer Maintenance
Your Answer Critical examination
Multiple Choice Multiple Answer
Order preparation process for products manufatured to order requires following
documents
Correct Answer Sales Order , Work order , Shop order
Your Answer Sales Order , Work order , Shop order
Match The Following
Correct Answer Your Answer
Material Planning for dependent demand MRP MRP
Forcasting requirement for indirect material Past consumption analysis technique
Past consumption analysis technique
Inventory control by classification ABC Analysis ABC Analysis
Structure of the product BOM BOM
Multiple Choice Single Answer
Which kind of preventive inspection detects some defects in moving parts, internal
cracks, and others , when machine is under preplanned shutdown?
Correct Answer Internal inspection
Your Answer Internal inspection
Select The Blank
A ________ is another form of subcontracting.
Correct Answer Hiring capacity
Your Answer Hiring capacity

There are ________ forces of competition.


Correct Answer Five
Your Answer Five
True/False
Emotional distress shrinks working memory.
Correct Answer True
Your Answer True
Select The Blank
Being more attuned to the feelings of those you work with is a benefit of
________.
Correct Answer Emotional Quotient
Your Answer Emotional Quotient
Match The Following
Correct Answer Your Answer
Management requires learning - Art requires knowledge - Art requires
knowledge
Science is developed - Over a period of time - Over a period of time
Management as a discipline - Has no centralized rule-making authority Has no centralized rule-making authority
Management is a multipurpose organ - That manages a business - That
manages a business
Management is understood by performance - Management is what
management does - Management is what management does
Multiple Choice Multiple Answer
General management challenges in the insurance sector are
Correct Answer training and development of insurance agents , identifying
the non-insurable population , the unspecific needs of the customer
Your Answer training and development of insurance agents , identifying
the non-insurable population , finding an actuary
Multiple Choice Single Answer

One of the external environment factors that influences Management is


Correct Answer Legal
Your Answer Legal
True/False
You should never measure the process and develop tools that will
measure your progress.
Correct Answer False
Your Answer False
True/False
Valency is the extent to which the outcome of the activity and its success
matters to the individual . (Level of motivation = Valency x Expectancy)
Correct Answer True
Your Answer True
Select The Blank
To enhance emotional intelligence, ________ must refocus their training to
include the limbic system.
Correct Answer Organisations
Your Answer Organisations
Multiple Choice Single Answer
Planning is imperative in which type of environment
Correct Answer Uncertain
Your Answer Uncertain
True/False
International artists' performance in India is diminishing in recent times.
Correct Answer False
Your Answer False
Multiple Choice Multiple Answer
Emotional intelligence is said to be the ability to sense, understand and

effectively apply the power and acumen of emotions as a source of


Correct Answer information , trust , human energy
Your Answer information , trust , human energy
Match The Following
Correct Answer Your Answer
Social effectiveness - This component allows you to settle disputes
amicably - This component allows you to settle disputes amicably
Alfred Bennet - He is the father of intelligence quotient - He is the father of
intelligence quotient
Daniel Goleman - He is an American Behavioural Scientist - He is an
American Behavioural Scientist
Empathy - It is a component of leadership due to the rapid pace of
globalisation - It is a component of leadership due to the rapid pace of
globalisation
Multiple Choice Single Answer
Who said, Management is a multiple organ that manages a business,
manages a manager and manages workers and work?
Correct Answer Peter Drucker
Your Answer Peter Drucker
Multiple Choice Single Answer
Management is the combination of Arts, Science and
Correct Answer Profession
Your Answer Profession
Multiple Choice Single Answer
Who said, 'Direction is telling people what to do and seeing that they do it
to the best of their ability'.
Correct Answer Dale
Your Answer Dale
Multiple Choice Single Answer
Management is not just a

Correct Answer Process


Your Answer Process
Multiple Choice Multiple Answer
The meaning and purpose of control is
Correct Answer knowing exactly what work is to be done , knowing that
the work has been done or being done , knowing immediately of any
delays, hold ups
Your Answer knowing exactly what work is to be done , knowing that the
work has been done or being done , knowing immediately of any delays,
hold ups
Multiple Choice Single Answer
Management is
Correct Answer Multidisciplinary
Your Answer Multidisciplinary
True/False
Ethics of statute tries to explore the traits which help the person to lead a
life that is satisfying from an ethical point of view.
Correct Answer False
Your Answer False
Multiple Choice Multiple Answer
Some of the limitations of business planning are
Correct Answer Time Consuming , Expensive device , Heavy cost of
planning
Your Answer Time Consuming , Expensive device , Heavy cost of planning
Multiple Choice Single Answer
In the process of delegation, to whom is some part of the authority
allotted?
Correct Answer Subordinate
Your Answer Superior

Multiple Choice Single Answer


Management is
Correct Answer Creative
Your Answer Creative
Select The Blank
A new sector has emerged in modern times, known as ________
management.
Correct Answer event
Your Answer event
Multiple Choice Single Answer
Theory X emphasises upon the centralisation of authority, on what aspect
of decision making process does theory Y emphasises.
Correct Answer decentralisation
Your Answer motivation
Multiple Choice Single Answer
Under the disadvantages of strategic business units what is that which is
difficult to maintain in its uniformity?
Correct Answer Corporate image
Your Answer Corporate image
Select The Blank
________ is the end of deliberate policy in making delegation of authority
to the lowest levels in the managerial hierarchy.
Correct Answer Decentralization
Your Answer Decentralization
True/False
Before 1990, Global players were allowed to enter and operate in Indian
Market.
Correct Answer False
Your Answer False

Multiple Choice Multiple Answer


Name the leading event management companies in India
Correct Answer Midas , Pinnacle , Wizcraft
Your Answer Midas , Pinnacle , Wizcraft
Select The Blank
Control, like other elements of management process has to be ________
and not an emergency operation
Correct Answer continuous
Your Answer continuous
Multiple Choice Multiple Answer
Application of general management functions to the insurance sector is
Correct Answer co-ordinating , controlling , directing
Your Answer co-ordinating , controlling , directing
Multiple Choice Single Answer
Which is the technique where the completion of all tasks is checked in the
order planned in the time scheduled is known as
Correct Answer Critical path method
Your Answer Critical path method
Select The Blank
________establishes, cause and effect relationship.
Correct Answer science
Your Answer science
Select The Blank
It is said that waking and dream world are both illusions, according to
vedanta world as ________.
Correct Answer Maya Mithya
Your Answer Maya Mithya

Multiple Choice Multiple Answer


Advantages of delegation of authority would be:
Correct Answer Prompt decision making , Opportunity to subordinates to
grow and develop , Satisfaction to subordinates in terms of recognition
Your Answer Prompt decision making , Opportunity to subordinates to
grow and develop , Satisfaction to subordinates in terms of recognition
Multiple Choice Single Answer
A business unit must meet specific criteria, if it wants to be called an SBU.
These are
Correct Answer Definable group of competitors
Your Answer Definable group of competitors
True/False
It is said that no company is allowed to deal in life and non-life insurance
as a single entity.
Correct Answer True
Your Answer True
True/False
Business families have started spending more on research and
development.
Correct Answer True
Your Answer True
Select The Blank
General Insurance corporation was nationalized in________.
Correct Answer 1972
Your Answer 1972
Multiple Choice Multiple Answer
Types of degree of delegations are:
Correct Answer Low degree , Moderate degree , High degree
Your Answer Low degree , Moderate degree , High degree

Multiple Choice Single Answer


Name one of the disadvantages of strategic business units
Correct Answer Distortion of information
Your Answer Distortion of information
Multiple Choice Single Answer
Who said, Management is the creation and maintenance of internal
environment in an enterprise, where individuals working in groups can
perform efficiently and effectively towards the attainment of gr
Correct Answer Koontz & O Donell
Your Answer Koontz & O Donell

You might also like