Project Time Management

Activity Definition
Activity Sequencing
Duration Estimating
Schedule Development
Schedule Control

Activity Definition
Input

Tools and Techniques

Output

Work Breakdown
Structure

Decomposition

Activity List

Templates

Supporting Detail

Scope Statement
Historical Information
Constraints
Assumptions
Expert Judgment

Work Breakdown
Structure

Activity Sequencing
Input
Activity List
Product Description
Mandatory Dependencies

Tools and Techniques

Output

Precedence Diagram

Project Network
Diagram

Arrow Diagram

External Dependencies

Conditional Diagram
Method

Milestone

Network Template

Discretionary Dependencies

Activity list update

(Revise Activity list: delete or add


act.)

FS : Finish-to-Start Relationship
FF : Finish-to-Finish Relationship
SS : Start-to-Start Relationship
SF : Start-to-Finish Relationship
GERT
System Dynamics Model: Loop Activity

Duration Estimating
Input
Activity List
Constraint
Assumption
Resource Requirement
Resource Capability
Historical data
Risk Identification

Tools and Techniques

Output

Expert Judgment

Activity duration
estimate

Analogous Estimating
(similar past act)
Quantitative based
duration (unit rate)
Reserve time

Basis of Estimate
Activity List Update

Schedule Development
Input
Project Network Diagram

Tools and Techniques

Output

Mathematical Analysis

Project Schedule

Duration Estimate

Critical Path Method

Resource Requirement

PERT

Resource pool description


Work Calendar
Time Constraint (dead line
or milestone)
Assumption
Lead and Lag Time
Risk Management Plan
Activity Attribute

Simulation
Duration Compression

Bar chart
Network-based Schedule

Support Detail

Resource Leveling

Schedule Management
Plan

Project Management
Software

Resource Requirement
Updates

Coding Structure

Schedule Control
Input
Project Schedule
Performance Report
Change Request
Schedule Management Plan

Tools and Techniques

Output

Schedule change
control system

Schedule Update

Performance
measurement

Lesson learned

Additional Planning
Project Management
Software
Variance Analysis

Corrective Action

Work Breakdown Structure

a "check list" of work to be accomplished;


a structured approach;
the scope of the work, broken down into smaller and more specialized work;
a document in which the major project work packages are identified;
a document in which the major project outputs and responsibilities are defined; and

an integration of schedule and budget.

allow better and more detailed planning;


facilitate the budget and schedule preparation process;
facilitate assignment of responsibility to organization
and/or functional area; and
provide a structure for monitoring and reporting of
project development and progress.

Measurable
Clear definition
Deliverable
Resource, Time and Cost assignable
Acceptable duration
Independent task

Aircraft System

0.0 Aircraft System

1.0 Air Vehicle


1.1 Airframe
1.2 Propulsion
1.3 Air Vehicle Applications Software
1.4 Air Vehicle system Software
1.5 Communications/Identification
1.6 Navigation/Guidance
1.7 Central Computer
1.8 Fire Control
1.9 Data Display and Controls
1.10 Survivability
1.11 Reconnaissance
1.12 Automatic Flight Control
1.13 Central Integrated Checkout
1.14 Antisubmarine Warfare
1.15 Armament
1.16 Weapons Delivery
1.17 Auxiliary Equipment

2.0 Systems Engineering/Program


Management
3.0 System Test and Evaluation
3.1 Development Test and Evaluation
3.2 Operational Test and Evaluation
3.3 Mock-ups
3.4 Test and Evaluation Support
3.5 Test Facilities

4.0 Training
4.1 Equipment
4.2 Services
4.3 Facilities
5.0 Data
5.1 Technical Publications
5.2 Engineering Data
5.3 Management Data
5.4 Support Data
5.5 Data Depository

6.0 Peculiar Support Equipment


6.1 Test and Measurement
Equipment
6.2 Support and Handling
Equipment

7.0 Common Support Equipment

7.1 Test and Measurement


Equipment

7.2 Support and Handling


Equipment

8.0 Operational/Site Activation


8.1 System Assembly, Installation and
Checkout on Site
8.2 Contractor Technical Support
8.3 Site Construction
8.4 Site/Ship/Vehicle Conversion

9.0 Industrial Facilities


9.1 Construction/Conversion/Expansion
9.2 Equipment Acquisition or
Modernization
9.3 Maintenance

10.0 Initial Spares and Repair Parts

CPM: Critical Path Method

Deterministic Time

PERT: Program Evaluation and Review Technique

Stochastic Time
t = (a + m + b)/6
v = ((b-a)/6)2
a : optimistic time
m : most likely time
b : pessimistic time
Standard Deviation = Square Root (Variance)

Non CPM Scheduling


Bar Chart
Line of Balance

Arrow Diagram
Precedence Diagram