TechnoFab Gammon

1.0

Howe Engineering Projects (India) Pvt. Ltd.

Drainage System for collection pit for spill prevention


For the proposed project, response system has been proposed. The proposed system
consists of drainage system, collection pit, pumps, piping network, etc. for spill
prevention. The recovered oil thus collected will be transferred to the tankage for
treatment before disposal.

At the jetty platform spillage and slops from the marine connecting hoses will be
collected into a tank with a deserved capacity. The spilled oil shall be transferred to
the sump pit provided on the platform slab from where it shall be pumped into the
slop tank of 2.0 cum capacity. The oil from tank will be pumped out from time to
time to onshore terminal for treatment. The process flow diagram for the same is
shown in Drawing 0-3568-P&ID-02.

Pipelines:

1.1

The jetty and the cross-country pipelines are to be cleaned and inspected from time
to time as per OISD requirements. Pipeline scale, muck and slops generated during
this cleaning operation will be handled and treated at the COT.

Accessory package including storage tank, absorbents, spill response equipment and
tools

Source for oil spill


The unloading arm and flexible hose between the ship and unloading platform is the
main source of oil spillage.

1.2

Spill Collection pit


Spill collection pit collect all spillage from platform area by gravity slope in platform area.

1.3

Spill Collection pit pump


Spill collection pit pump transfer oil spill from collection pit to slope tank. Pump would be
equipped with Low level gauge and would be off at the time of low level spill oil in
collection pit.

1.4

Slope tank
Slope tank will collect spill oil transfer be collection pit pump. Slope tank would be
fabricated by mild steel with dished end both side. Slope tank equipped with LHA, LLA,
LG, Drain, Vent, Inlet and Discharge.

1.5

Slope tank pump


Slope tank pump transfer spill oil from slope tank to system terminal or reticulate to
slope tank.

2.0

Broad Specifications of the Proposed System:

2.1

Collection Pit

1000mm X 1000mm X 1200mm deep RCC collection pit for collect all spill oil from

3568/E&M/DESIGN/SLOP-01

Control Philosophy of Slop System

TechnoFab Gammon

2.2

:
:
:
:
:
:

2.0m3
MS
Horizontal dish end
Saddle
HHA, LLA, Level Gauge, Drain, Vent, Inlet, Discharge
1 coat primer coating after sand blasting.
1 coat epoxy coating after primer coat.

Electrical driven Pump


o Capacity
o Head
o Type

:
:
:

1.0m3/hr.
25m
Horizontal Centrifugal Pump

Material :
PE, Seamless
Standard :

CS, ASTM A, 106 GR-B


B36.10, Sch-40

Material
Standard

:
:

ASTM A 105, WN
ASTM A16.5/16.47-B, #150, RF/125AARH

Material
Standard

:
:

ASTM A 234 GR.WPB-W/ ASTM A 105


ASTM B 16.9/ ASTM B 16.11

:
:

SP.WND SS316+GRAFIL, SPIRAL, 150#


B-16.20- ANSI B16.5

:
:

BOLT:A193 GR.B7, NUT:A194 GR.2H


B-18.2

Gasket

2.9

Capacity
Material
Type
Support Type
Nozzles
Painting

Pipe Fittings

2.8

Slope Tank
o
o
o
o
o
o

Flanges

2.7

1.0m3/hr.
25m
Submersible

Piping

2.6

:
:
:

Slope Tank Pump

2.5

Electrical driven Pump


o Capacity
o Head
o Type

Slope Tank

2.4

Jetty area.

Collection pit pump

2.3

Howe Engineering Projects (India) Pvt. Ltd.

Material
Standard

Bolt/Stud

Material
Standard

3568/E&M/DESIGN/SLOP-01

Control Philosophy of Slop System

TechnoFab Gammon

3.0

Howe Engineering Projects (India) Pvt. Ltd.

Operation Philosophy
The spill generated at sources shall be drained into the slop sump pit as created on the
platform. A sump pump (P-01) of adequate capacity shall be paced inside the sump which
shall transfer the collected spill into the slope tank as shown in referred drawing.
Another pump (P-02) which shall be installed near to the slope tank shall take the spill from
the slop tank sans transfer the same to the onshore treatment plant. The respective P&ID
for the same is shown in drawing no. 0-3568-P&ID-02.
For flushing & cleaning of the residuals for the respective oil pipelines, a 50 NB taping shall
be taken which shall be connected to the inlet of the pump P-02 with the help of the shutoff valves. The piping network shall be connected in such a way that the required process
can be performed i.e. transferring of spill either form pit to slop tank or tank to onshore
treatment plant or directly from any of the oil pipe to the treatment plant can be done.

3568/E&M/DESIGN/SLOP-01

Control Philosophy of Slop System