Professional Documents
Culture Documents
S10
Hoja resumen
Obra
0403080
Localizacin
100207
Fecha Al
07/04/2010
Presupuesto base
001
002
18,523.11
(CD)
S/.
COSTO DIRECTO
363,430.32
363,430.32
46,664.45
UTILIDAD (10%)
36,343.03
=============
SUBTOTAL PRESUPUESTO
446,437.80
I.G.V. (19%)
84,823.18
=============
TOTAL DE PRESUPUESTO
531,260.98
S/.
MATERIALES
S/.
46,846.41
EQUIPOS
S/.
222,670.72
SUBCONTRATOS
S/.
S/.
93,737.81
363,254.94
07/04/2010
Fecha :
10/04/2010 06:27:05a.m.