TECHNICAL REPORT
FOR THE
MARCH 2010
EXECUTIVE SUMMARY
The Government of the Republic of Ghana has requested for Mixed Credit Support from the
Danish Government to construct permanent bridge structures at six (6) different sites of
critical importance for the development of the Northern part of Ghana.
As part of the requirements to assist in the evaluation of the request, Ghana Highway
Authority was to undertake Engineering Studies of the sites.
The studies undertaken involve Environmental and Social Impact Assessment, Geometric
and Drainage Designs and Geotechnical Investigations.
Region
Route
Span(m)
Kulungugu
Upper East
100
Garu
Upper East
Bawku-Missiga-Garu Road
175
Doninga
Upper East
Sandma-Doninga Road
50
Sissili
Upper West
Doninga-Walembele Road
150
Ambalara
Upper West
Bulenga-Yaala-Kundugu Road
60
Kulun
Upper West
Bulenga-Yaala-Kundugu Road
100
TABLE OF CONTENTS
SECTION 1
SECTION 2
SECTION 3
GEOTECHNICAL INVESTIGATIONS