HOJA DE METRADOS DE OBRA

MEJORAMIENTO DE LOS SERVICIOS DE EDUCACIN PRIMARIA DE LA I. E. N 10789 DEL CASERIO


FERREAFE - DEPARTAMENTO DE LAMBAYE

Proyecto:

PLANILLA DE METRADO

CONSTRUCCIN DEL TERCER NIVEL


ITEM

05.00

DESCRIPCIN

UNIDAD

OBRAS DE CONCRETO ARMADO


05.10 COLUMNAS, CONCRETO, FC =210 KG/CM2
C1

C2

05.11 ENCOFRADO Y DESENCOFRADO PARA COLUMNAS


C1

C2

05.12 COLUMNAS, ACERO 4,200 KG/CM2

KG

04.13 VIGAS, CONCRETO, FC =210 KG/CM2


V-102 (.30x.60)

V-103 (.25x.20)

04.14 ENCOFRADO Y DESENCOFRADO PARA VIGAS


V-102 (.30x.60)

V-103 (.25x.20)

04.15 VIGAS, ACERO 4,200 KG/CM2

KG

ITEM

DESCRIPCIN

UNIDAD

04.16 CONCRETO, LOSA ALIGERADA FC=210 KG/CM2


TRAMO 1-2 ( A-B )

M
0.0875

04.17 ENCOFRADO Y DESENCOFRADO, LOSA ALIGERADA


TRAMO 1-2 ( A-B )

04.18 LOSA , ACERO FY=4200 KG/CM2


04.19 LADRILLO PARA TECHO,15 x 30 x 30 CM
TRAMO 1-2 ( A-B )

06.00

KG
UND
8.33

05.10 ESCALERA, CONCRETO, FC =210 KG/CM2

05.11 ENCOFRADO Y DESENCOFRADO PARA ESCALERA

05.12 ESCALERA, ACERO 4,200 KG/CM2

KG

MUROS Y TABIQUES
06.01 MURO DE LADRILLO KK 18 HUECOS 9X12X24 /DE SOGA

M
0.00
0.00

ITEM

07.00

DESCRIPCIN

UNIDAD

REVOQUES, ENLUCIDOS Y MOLDURAS


07.01 TARRAJEO EN INTERIORES (MORTERO 1:5)

M
0.00
0.00

07.02 TARRAJEO EN EXTERIORES (MORTERO 1:5), ANDAMIO

M
0.00

07.03 TARRAJEO EN COLUMNAS


C1

C2

07.05 TARRAJEO EN VIGAS


V-102 (.30x.60)

M
0.00

V-103 (.25x.20)

07.07 VESTIDURAS DE DERRAMES CON MORTERO 1:5


P-1 / VERTICAL
V-1 / HORIZONTAL
V-2 / HORIZONTAL

ML

ITEM

08.00

09.00

DESCRIPCIN

UNIDAD

CIELORRASOS
08.01 CIELO RASO CON MEZCLA C:A 1:5
TRAMO 1-2-3 (A-B-C)

PISOS Y PAVIMENTOS
09.02 CONTRAPISO DE 25mm

PISO CERAMICO ANTIDESLIZANTE CELIMA 40x40

12.00

CARPINTERA DE MADERA
12.01 PUERTA DE MADERA MACIZA/CEDRO
P-1
P-2

12.02 VENTANA DE MADERA CEDRO SEGN DISEO


V-1
V-2
V-3

14.00

CERRAJERIA
14.01 BISAGRA CAPUCHINA DE 4"X4"
P-1
P-2

UND

0.00
14.02 CERRADURA FORTE 3 GOLPES
P-1
P-2

UND

14.04 MANIJA DE BRONCE PARA PUERTAS


P-1

UND

ITEM

DESCRIPCIN

UNIDAD

P-2

15.00

16.00

VIDRIOS, CRISTALES Y SIMILARES


15.01 VIDRIOS SEMIDOBLES
V-1

PINTURA
16.01 PINTURAS EN MUROS INTERIORES AL LATEX, IMP- LATEX

16.02 PINTURA EN CIELORRASO AL LATEX


TRAMO 1-2-3 (A-B-C)

16.03 PINTURAS EN MUROS EXTERIORES AL LATEX

M
0.00

16.04 PINTURA EN COLUMNAS, VIGAS Y DERRAMES


COLUMNAS
C1
C2

VIGAS

ITEM

DESCRIPCIN

UNIDAD

V-102 (.30x.60)

16.06 PINTURAS BARNIZ EN CARPINTERIA DE MADERA


P-1
P-2
V-1

19.00

20.00

INSTALACIONES ELCTRICAS
19.01 SALIDA PARA CENTRO DE LUZ
AULA 01

PTO

19.02 SALIDA PARA TOMACORRIENTES DOBLE , PVC


AULA 01

PTO

19.03 SALLIDA PARA INTERRUPTOR DE ILUMINACION

PTO

ALIMENTADOR A TABLERO 1" PVC SAP #10AW


AULA 01

22.01 TABLERO GENERAL 2x15A, 2X20A, 2X30A


AULA 01
DIRECCION
23.00

ARTEFACTOS
23.01 ARTEFACTO PARA 02 FLUORECENTE, IMC. LAMPARAS

ML

UND

UND

ITEM

DESCRIPCIN

UNIDAD

AULAS
DIRECCION
23.02 EQUIPO DE FLUORECENTE CIRCULAR DE 32 W
VEREDA FRONTAL
VEREDA POSTERIOR

UND

DE OBRA
0789 DEL CASERIO DE ATUMPAMPA - DISTRITO DE INCAHUASI- PROVINCIA DE
ENTO DE LAMBAYEQUE"

TRADO

ERCER NIVEL
CANT

N
VECES

DIMENSIONES
LARGO

ANCHO

CANTIDAD
ALTO

PARCIAL

TOTAL

6.30
1.00

10.00

0.30

0.30

3.00

2.70

1.00

10.00

0.30

0.40

3.00

3.60

57.00
1.00

10.00

0.90

3.00

27.00

1.00

10.00

1.00

3.00

30.00

1,031.52

10.70
1

10.70

0.30

0.60

7.70

12.00

0.25

0.20

3.00

1.00

4.00

10.70

0.90

38.52

1.00

5.00

12.00

0.45

27.00

65.52

936.55

CANT

N
VECES

DIMENSIONES
LARGO

ANCHO

CANTIDAD
ALTO

PARCIAL

TOTAL

11.24
1

10.70

12.00

11.24

128.40
1

10.70

12.00

128.40

751.93
1,070
1

10.70

12.00

1,069.57

2.69
1.00

1.00

1.00

1.00

1.00

2.69

22.62
1.00

1.00

1.00

1.00

22.62

230.63

230.63

275.52
1.00
2.00
1.00
1.00
1
1
1

1.00
1.00
1.00
1.00
1
1
1

11.00
9.09
11.00
21.61
16.29
16.53
4.97

2.80
2.80
2.50
2.80
2.80
2.80
2.80

30.80
50.90
27.50
60.51
45.61
46.28
13.92

CANT

N
VECES

DIMENSIONES
LARGO

ANCHO

CANTIDAD
ALTO

PARCIAL

TOTAL

455.43
1.00
2.00
1.00
1.00
1.00
1.00
1.00

1.00
1.00
2.00
2.00
2.00
2.00
1.00

1.00

1.00

1.00

10.00

1.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

11.00
9.09
11.00
21.61
16.29
16.53
4.97

2.80
2.80
2.50
2.80
2.80
2.80
2.80

30.80
50.90
55.00
121.02
91.22
92.57
13.92

15.00

2.50

37.50

0.60

3.00

18.00

10.00

0.60

3.00

18.00

1.00
0.00

4.00
0.00

10.70
0.00

0.60
-0.40

25.68
0.00

1.00

5.00

12.00

0.15

9.00

2
1
4
2
2
1

1
1
1
1
1
1

37.50

36.00

34.68

32.56
2.10
2.10
3.58
3.58
1.20
2.38

4.20
2.10
14.32
7.16
2.40
2.38

CANT

N
VECES

DIMENSIONES
LARGO

ANCHO

CANTIDAD
ALTO

PARCIAL

TOTAL

150.00
1

15.00

10.00

150.00

138.55
1.00

1.00

10.04

13.80

138.55

138.55
1.00

1.00

10.04

13.80

138.55

26.88
6
6

0.90
0.70

2.80
2.80

15.12
11.76
0.00
20.61

3
3
1

1.25
1.1
0.8

1.5
0.8
0.8

5.63
2.64
0.64

5.85

11.70
12.00

1
1

6
6

6.00
6.00
6.00

6.00
0.00

6.00

CANT

N
VECES

DIMENSIONES
LARGO

ANCHO

CANTIDAD
ALTO

PARCIAL

TOTAL

0.00

221.50
3

20.61

10.75

221.50

2.80
2.80
2.50
2.80
2.80
2.80
2.80

30.80
50.90
55.00
121.02
91.22
92.57
13.92

455.43
1.00
2.00
1.00
1.00
1.00
1.00
1.00

1.00
1.00
2.00
2.00
2.00
2.00
1.00

11.00
9.09
11.00
21.61
16.29
16.53
4.97

150.00
1.00

1.00

15.00

10.00

1.00

1.00

0.00

15.00

150.00

37.50
2.50

37.50

70.68
1.00

10.00

0.60

3.00

18.00

1.00

10.00

0.60

3.00

18.00

CANT

N
VECES

DIMENSIONES
LARGO

ANCHO

CANTIDAD
ALTO

PARCIAL

1.00
0.00

4.00
0.00

10.70
0.00

0.60
-0.40

25.68
0.00

1.00

5.00

12.00

0.15

9.00

TOTAL

35.15
6.00
6.00
3.00
3.00
1.00

0.90
0.70
1.25
1.10
0.80

2.80
2.80
1.50
0.80
0.80

15.12
11.76
5.63
2.64
0.64

16
1

16

16.00

14
1

14

14.00

14

14.00

14

60.00
1

60

60.00

2
1

1.00
1.00

CANT

DIMENSIONES

VECES

LARGO

ANCHO

CANTIDAD
ALTO

PARCIAL

8.00
0.00

8.00
0.00

TOTAL

HOJA DE METRADOS DE OBRA


VIVIENDA - CONSTRUCCION DEL TERCER NIVEL - S
Proyecto:
Departamento:

Ubicacin:

LAMBAYEQUE

Provincia: LAMBAYEQUE Distrito: LAMBA

CONSTRUCCIN DEL TERCER NIVEL


MEDIDAS
ITEM

04.12

DESCRIPCIN

COLUMNAS, ACERO 4,200 KG/CM2


C-1

Kg
3/4"
5/8"
3/8"
3/8"
5/8"
3/8"
3/8"
3/8"
1/2"
3/8"

CANT.

N
VECES

LONGITUD

10.00
10

6
6

20

17.5

1.20

Estribos
VB1 (.15x.20)
Estribos

5/8"
1/2"
5/8"
3/8"
3/8"
3/8"

4
4
4
4
5
5

2
2
2
64
4
49

10.70
10.70
10.70
2.00
12.00
1.20

LOSA , ACERO FY=4200 KG/CM2


LOSA 1 - Vigetas
bastones eje 1 (A-B-C)
bastones eje 2 (A-B-C)

Kg
1/2"
1/2"
1/2"

1
1
1

25
100
100

15.00
1.00
1.20

Acero de temperatura

1/4"

60

10.70

Estribos
Estribos
C-2
Estribos
Estribos
C-3
Estribos
COLUMNETAS
EJE A (1-2-3-4-5-6)
Estribos
EJE C (1-2-3-4-5-6)
Estribos
04.15 VIGAS, ACERO 4,200 KG/CM2

V-103 (.30x.60)

04.18

3.50
3.50

3/8"
1/4"
3/8"
1/4"
Kg

LOSA 2 - Vigetas
bastones eje 3 (A-B-C)
bastones eje 4 (A-B-C)
bastones eje 5 (A-B-C)
Acero de temperatura

RADOS DE OBRA
ON DEL TERCER NIVEL - SRA CARMEN

AYEQUE Distrito: LAMBAYEQUE Localidad: LAMBAYEQUE


Aug-13

DEL TERCER NIVEL


ACERO
0.25

0.56

0.994

1.55

1/4"

3/8"

1/2"

5/8"

2.24

PARCIAL

TOTAL

3/4"

1,031.52
325.92
470.40

235.20

325.92
470.40

235.20

0.00

936.55

33.21
21.27
33.21
71.68
26.88
32.928

0.00
0.00
0.00
0.00
0.00
0.00
132.85
85.09
132.85
286.72
134.40
164.64

751.93
372.75
99.40
119.28
160.50

372.75
99.40
119.28
160.50