It is a very critical process governing the strength, space rigidity and
stability of structures. It is very labor consuming part of the erection process, accounting for 75-80% of the overall labor requirements for erecting floors slabs and wall panels.
Operations in grouting Welding Protection of cast in fitting against corrosion Filling joints with mortar or concrete mix