Structural Design Engineer with 8 years experience


Key Skills: SACS,STAAD.Offshore,STAAD.Pro & PDMS

Brief Profile
Work Experience:
8 Year(s) 0 Month(s)
Current Employer (Designation):
L&T Valdel [Senior Stuctural Engineer]
Annual Salary
: (INR) 10.0 Lac(s)
Functional Area (Role):
Engineering Design / R&D [Sr. Design Engineer]
Industry:
Oil and Gas/Power/Infrastructure/Energy
Highest Degree:
M.Tech [Civil]
Current :
Chennai
Date of Birth (Gender):
05 Jul 1982 [Male]

Summary of Skills and Experience


Summary
A Structural Engineer with 8 years of experience in Design & Detailed Engineering, Pre-bid Engineering of upstream
and downstream oil & Gas structures.
1. Detailed engineering of fixed jacket structures (four legged) for Wellhead platform.
2. Design, analysis and detailed engineering of topsides for FPSO's.
3. Pre-bid engineering of well head platforms.
4. Design, analysis and detailed engineering of Modular structures (PAU"s, PAR"s and Modules).

Work Experience
Duration
: Oct 2011 - Till Date

/ / 2014-09-29 15:26:12

Company
: L&T Valdel
Designation
: Senior Stuctural Engineer
Job Profile
: PROJECTS INVOLVED:
B-127 CLUSTER WELL HEAD PLATFORM PROJECT, BOMBAY HIGH, INDIA
The Client was ONGC (Oil and Natural gas corporation)
Analysis and design of B-55-5 well head platform. Preparing mark-ups for Detail Structural, drawings and PDMS
model generation.
OSX -3 FPSO, BRAZIL
The Client was MODEC
Analysis and design of FWKO & produced water skid module. Preparing mark-ups for Detail Structural, fabrication
and transportation drawings
Duration
: Aug 2009 - Oct 2011
Company
: KBR Asiapacific Pte
Designation
: Senior Structural Engineer
Job Profile
: PROJECTS INVOLVED:
QUAD 204 PROJECT, SCHIEHALLION FIELD, UNITED KINGDOM
The Client was BP (British Petroleum)
Analysis and design of separation Topside Module. Preparing mark-ups for Detail Structural, fabrication and
transportation drawings.
GORGON LNG, BARROW ISLAND, AUSTRALIA
The Client was CTJV (Chevron, Total, Exxon Mobil Joint venture)
Analysis and design of Fractionation Module. Preparing mark-ups for Detail Structural, fabrication and transportation
drawings.
Duration
: May 2008 - Aug 2009
Company
: Petrofac Engineering services India Pvt Ltc
Designation
: Engineer
Job Profile
: PROJECTS INVOLVED:
KHARYAGA PHASE III DEVELOPMENT
The client was TOTAL EXPLORATION PRODUCTION, RUSSIA.
Analysis and design of pipe racks, cable racks, pipe bridges. Analysis and design of platforms for Diesel oil storage
tank, Closed drain drums and open drain tanks etc, preparing calculation reports for client approval, preparing markups for detail connection drawings and pile cap connection drawings, preparing mark-ups for Detail Structural
drawings, model clash check in PDS and Navis.
KHARYAGA PHASE III CPF AREA DE-BOTTLENECKING FEED

/ / 2014-09-29 15:26:12

The client was TOTAL EXPLORATION PRODUCTION, RUSSIA.


Analysis and design of pipe racks, pipe bridges. Analysis and design of equipment supporting structures, Shelters
etc, preparing mark-ups for Detail Structural drawings and checking,
KHURSANIYAH GAS PLANT PROJECT (KGP) - KARAN UTILITIES AND COGEN
The client was SAUDI ARABIA OIL COMPANY (SAUDI ARAMCO).
Analysis and Design of various Technological structures like Auxiliary Buildings, Chemical Shelter, Stand alone
platforms, Equipment supporting structures, cooling tower, Analysis and Design of Pipe racks, Electrical Cable racks,
Pipe Supporting Structure. Foundations for skid supporting equipment and horizontal vessels.

PROPOSAL FOR KHURSANIYAH GAS PLANT PROJECT (KGP) - MANIFA GAS FACILITIES
The client was SAUDI ARABIA OIL COMPANY (SAUDI ARAMCO).
Analysis and Design of various structures like cooling tower, SRU trains, Pipe Supporting Structures. Foundations for
skid supporting equipment and horizontal vessels, pump foundations, Preparation of Technical qualifications,
Technical write up and FEED verification, BOQ assumptions, Inclusions and exclusions, Interface matrix, estimation
of man hours and preparing Manpower Histogram. Preparing of Concrete and Steel BOQ"s.
Duration
: Jul 2006 - Apr 2008
Company
: Larsen & Toubro Limited
Designation
: Senior Design Engineer
Job Profile
: PROJECTS INVOLVED:
ASAHI INDIA GLASS PROJECT, ROORKEE, INDIA
Analysis and Design of DG House & Control room. Design was carried out using Indian standards.
GREEN SAND FOUNDRY PROJECT FOR THE DUNES, MUSCAT.
Analysis and design of Steel shed structure for the factory building.
RAS LAFFAN OLEFIN PROJECT, QATAR
Analysis and Design of Central Control room building, Substation and Security room. Blast resistant design was
carried out as per ASCE guide lines.
IISCO STEEL PLANT, WEST BENGAL
Analysis and Design of Sinter steel Structure. Dynamic Analysis (Response spectrum) was carried out. Design was
carried out as per Indian Standards.

Education
U.G. :
B.Tech/B.E. (Civil) from Bhartiyar University, Coimbatore in 2004
P.G. :
M.Tech (Civil) from National Institute of Technology (NIT), Tiruchirappalli in 2006

IT Skills and Projects


Skill Name

Version

Last Used

Experience

/ / 2014-09-29 15:26:12

SACS

5.3

STAAD offshore
STAAD.PRO

Affirmative Action
Category
: General
Physically Challenged
: No

Work Authorization
Countries authorized to work in
: India
Job Type
: Permanent / Temporary
Jobseeker Employment Status
: Full time

0000-00-00

V8i

2012

4 Year(s)

2011

2 Year(s)

2010

8 Year(s)

You might also like