PBBR/UBL/OPM: B-11005
Operating & Maintenance Manual
Project Code: B-11005
Page 2 of 11
PBBR/UBL/OPM: B-11005
Operating & Maintenance Manual
Project Code: B-11005
Connect Swing bend from Yeast propagator bottom nozzle to wort supply on flow plate and open
manual valves.
2.
3.
4.
Drain hot water and sterilize the line with hot water.
5.
6.
7.
Fill the complete wort line with De-aerated water / chilled water.
8.
9.
10.
Start wort cooling pump (From Whirlpool to Unitank).Drain the water in the pipeline through the Tee
connection (drain valve) provided below the Yeast Propagator.
11.
12.
13.
14.
Close valve below yeast propagator bottom wort inlet and open drain valve on tee connection.
15.
16.
Fill the complete wort line with De-aerated water / chilled water.
17.
18.
19.
20.
Page 3 of 11
PBBR/UBL/OPM: B-11005
Operating & Maintenance Manual
Project Code: B-11005
STEP NAME: WORT STERILIZATION
STEP DESCRIPTION: WORT STERILIZATION
WORT STERILIZATION
1.
After filling of wort in yeast propagator I, apply heating to boil the wort for sterilization. (From
80C to 980C).For sterilization open valve on yeast propagator tank top line on flow plate.
2.
Open valve on steam inlet & condensate outlet on cone jacket of yeast propagator.
3.
4.
5.
6.
7.
8.
9.
Close valve on steam supply on cone jacket & header to yeast section.
10.
11.
Start cooling with propylene glycol (33 % w/w) from 980C to 80C.
12.
13.
Open glycol inlet & outlet valve on shell jacket of yeast propagator.
14.
15.
16.
17.
18.
Pass the yeast from Carlsberg flask to yeast propagator with sterile air.
19.
Set pressure on bunging device 0.5 kg/cm2 (g) and open bunging device outlet valves.
20.
Connect swing bend on sterile air supply to yeast propagator tank top line and open manual
valve.
21.
Page 4 of 11
PBBR/UBL/OPM: B-11005
Operating & Maintenance Manual
Project Code: B-11005
22.
23.
Set temp as per brewers requirement in temperature control loop. Open manual valve on
glycol inlet & outlet on shell jacket.
24.
25.
Once the yeast propagation is complete in yeast propagator I, take required quantity of wort in
yeast propagator II.
26.
27.
When required temperature is attained in yeast propagator II, transfer yeast from propagator I
to II.
28.
29.
Once the propagation is complete in yeast propagator II, take required quantity of wort in
yeast propagator III.
30.
31.
When required temperature is attained in yeast propagator III transfer yeast from propagator II
to III.
32.
33.
Page 5 of 11
PBBR/UBL/OPM: B-11005
Operating & Maintenance Manual
Project Code: B-11005
Connect swing bend for yeast transfer from yeast propagator outlet to yeast supply header to
yeast storage tank / pitching tank & open manual valve.
2.
Connect swing bend for yeast inlet on yeast storage / pitching tank on flow plate from yeast
supply header from yeast propagator & open manual valves.
3.
Connect hose pipe from hot water header to yeast propagator bottom nozzle on tee
connection below sight glass.
4.
Open drain valve on yeast storage / pitching tank on tee connection before sight glass.
5.
6.
Set pressure on bunging device & keep bunging device outlet valve open.
7.
Connect swing bend on the Flow Plate from sterile air supply to Yeast propagator tank top &
open manual valves.
8.
9.
Open valve on yeast transfer line from yeast propagator to yeast storage / pitching tank.
10.
Open valve below yeast propagator & transfer yeast from yeast propagator to yeast storage /
pitching tank.
11.
Drain water hold up from line through valve below yeast storage / pitching tank when yeast is
seen in sight glass open yeast inlet valve below yeast storage / pitching tank and close drain
valve on tee connection
12.
At the end of transfer, chase the transfer line with chilled water followed by hot water to
sterilize line.
13.
Page 6 of 11
PBBR/UBL/OPM: B-11005
Operating & Maintenance Manual
Project Code: B-11005
Ensure sufficient yeast is ready in Yeast Storage / pitching tank for transferring yeast to Wort line.
2.
3.
Connect swing bend on the Flow Plate from sterile air supply to yeast storage / pitching tank top
& open manual valves.
4.
Connect swing bend on flow plate to connect tank bottom outlet for yeast supply and open
manual valves on flow plate.
5.
6.
7.
8.
9.
10.
When the required quantity of yeast is pitched into Wort, stop yeast pitching pump.
11.
12.
13.
Depressurize the Yeast Storage Tank (Release the pressure slowly through Bunging device).
14.
Page 7 of 11
PBBR/UBL/OPM: B-11005
Operating & Maintenance Manual
Project Code: B-11005
2.
Connect swing bend from CO2 supply to Unitank Top and bunging device outlet to CO 2 collection
header on the Unitank flow plate & open manual valves.
3.
Connect hosepipe from Unitank bottom outlet to Yeast cropping Pump suction.
4.
Connect hosepipe from yeast cropping pump discharge to yeast transfer line in the Unitank
section.
5.
6.
Connect the Swing bend from Unitank Yeast supply header to yeast storage tank bottom yeast
inlet on flow plate, Open manual valves on flow plate & open drain valve on tee connection below
yeast storage tank.
7.
Connect the swing bend to the valves on the Hot CIP supply header & tee connection on Unitank.
8.
Connect a hosepipe from tee connection on yeast storage tank bottom & gutter in the yeast
section.
9.
10.
11.
12.
Drain chilled water through drain valve till the yeast is seen in the flow glass below the yeast
storage tank.
13.
Close drain valve on the tee connection below yeast storage tank (drain).
14.
15.
After completion of yeast collection (decided by the brewer by observing the sight glass of the
Unitank bottom),
16.
17.
18.
When water is seen in the sight glass below the yeast storage tank, open drain valve on the tee
connection below yeast storage tank (drain) and close valve on the yeast storage tank bottom
yeast inlet.
Page 8 of 11
PBBR/UBL/OPM: B-11005
Operating & Maintenance Manual
Project Code: B-11005
19.
20.
21.
2.
Ensure that the manual inlet & outlet valves on the Glycol header are open.
3.
4.
Ensure that air is vented out of the jacket and glycol line by opening the vent valve before glycol
circulation.
5.
6.
7.
8.
Start glycol supply. When the glycol comes out of the air vent, close vent valve on glycol return
line.
9.
10.
Page 9 of 11
PBBR/UBL/OPM: B-11005
Operating & Maintenance Manual
Project Code: B-11005
STEP DESCRIPTION: GLYCOL CIRCULATION IN YEAST TANK
2.
3.
During start up the air inside the jacket and pipelines to be vented out. Following steps to be
followed for venting the air.
4.
5.
6.
Open the glycol supply valve to the jackets and start glycol circulation.
7.
8.
When glycol starts coming out of vent valve, close vent valve and open glycol return valve.
9.
Vent valve should always remain closed once the air is vented out.
Page 10 of 11
PBBR/UBL/OPM: B-11005
Operating & Maintenance Manual
Project Code: B-11005
Page 11 of 11