CHECKLIST

REFERENCES:
ACI 318-95
AISC 9TH EDITION
ASTM A706
RA 9184

DRAWING NO.
FOOTINGS
CF-1

fps (kPa)

fps (psf)

fc' (Mpa)

fc' (psi)

COMPRESSION FACE (B
COMPRESSION FACE (B
TENSION FACE (BAR X
TENSION FACE (BAR Y)

96
96
96
96

2000
2000
2000
2000

27.6
27.6
27.6
27.6

4000
4000
4000
4000

COMPRESSION FACE (B
COMPRESSION FACE (B
TENSION FACE (BAR X
TENSION FACE (BAR Y)

96
96
96
96

2000
2000
2000
2000

27.6
27.6
27.6
27.6

4000
4000
4000
4000

LONGITUDINAL
TRANSVERSE

96
96

2000
2000

27.6
27.6

4000
4000

LONGITUDINAL
TRANSVERSE

96
96

2000
2000

27.6
27.6

4000
4000

F-3

WF-1

WF-2

COLUMNS
FDN to GF
C-1
main
ties
C-2
main
ties
C-3
main
ties
GF to 2F
C-1
main
ties
C-2
main
ties
C-3
main
ties

27.6
27.6

4000
4000

27.6
27.6

4000
4000

27.6
27.6

4000
4000

27.6
27.6

4000
4000

27.6
27.6

4000
4000

27.6
27.6

4000
4000

2F to 3F
C-1
main
ties
C-2
main
ties
C-3
main
ties

27.6
27.6

4000
4000

27.6
27.6

4000
4000

27.6
27.6

4000
4000

27.6
27.6

4000
4000

27.6
27.6

4000
4000

27.6
27.6

4000
4000

27.6
27.6

4000
4000

27.6
27.6

4000
4000

27.6
27.6

4000
4000

3F to 4F
C-1
main
ties
C-2
main
ties
C-3
main
ties
4F to RF
C-1
main
ties
C-2
main
ties
C-3
main
ties
SLABS
GF
short span
continuous
top
bottom
mid span
top
bottom
discontinuous
top
bottom
long span
continuous
top
bottom
mid span
top

96
96

2000
2000

27.6
27.6

4000
4000

96
96

2000
2000

27.6
27.6

4000
4000

96
96

2000
2000

27.6
27.6

4000
4000

96
96

2000
2000

27.6
27.6

4000
4000

96

2000

27.6

4000

bottom
discontinuous
top
bottom

96

2000

27.6

4000

96
96

2000
2000

27.6
27.6

4000
4000

96

2000

27.6
27.6

4000
4000

96
96

2000
2000

27.6
27.6

4000
4000

96
96

2000
2000

27.6
27.6

4000
4000

96
96

2000
2000

27.6
27.6

4000
4000

96
96

2000
2000

27.6
27.6

4000
4000

96
96

2000
2000

27.6
27.6

4000
4000

2F
short span
continuous
top
bottom
mid span
top
bottom
discontinuous
top
bottom
long span
continuous
top
bottom
mid span
top
bottom
discontinuous
top
bottom

BEAMS
GIRDERS
CONCRETE SLABS

fy (Mpa)

fy (ksi)

max aggregate (mm)

max slump (mm)

concrete cover (mm)

275
275
275
275

40
40
40
40

20
20
20
20

100
100
100
100

75
75
75
75

275
275
275
275

40
40
40
40

20
20
20
20

100
100
100
100

75
75
75
75

275
275

40
40

20
20

100
100

75
75

275
275

40
40

20
20

100
100

75
75

275
275

40
40

20
20

100
100

40
40

275
275

40
40

20
20

100
100

40
40

275
275

40
40

20
20

100
100

40
40

275
275

40
40

20
20

100
100

40
40

275
275

40
40

20
20

100
100

40
40

275
275

40
40

20
20

100
100

40
40

275
275

40
40

20
20

100
100

40
40

275
275

40
40

20
20

100
100

40
40

275
275

40
40

20
20

100
100

40
40

275
275

40
40

20
20

100
100

40
40

275
275

40
40

20
20

100
100

40
40

275
275

40
40

20
20

100
100

40
40

275
275

40
40

20
20

100
100

40
40

275
275

40
40

20
20

100
100

40
40

275
275

40
40

20
20

100
100

40
40

275
275

40
40

20
20

100
100

40
40

275
275

40
40

20
20

100
100

40
40

275
275

40
40

20
20

100
100

40
40

275
275

40
40

20
20

100
100

40
40

275

40

20

100

40

275

40

20

100

40

275
275

40
40

20
20

100
100

40
40

275
275

40
40

20
20

100
100

20
40

275
275

40
40

20
20

100
100

40
40

275
275

40
40

20
20

100
100

40
40

275
275

40
40

20
20

100
100

40
40

275
275

40
40

20
20

100
100

40
40

275
275

40
40

20
20

100
100

40
40

max pouring height (m)

min curing time (days)

min form stripping (days)

6
6
6
6

7
7
7
7

1
1
1
1

(24
(24
(24
(24

hrs)
hrs)
hrs)
hrs)

6
6
6
6

7
7
7
7

1
1
1
1

(24
(24
(24
(24

hrs)
hrs)
hrs)
hrs)

6
6

7
7

1 (24 hrs)
1 (24 hrs)

6
6

7
7

1 (24 hrs)
1 (24 hrs)

6
6

7
7

21
21

6
6

7
7

21
21

6
6

7
7

21
21

6
6

7
7

21
21

6
6

7
7

21
21

6
6

7
7

21
21

6
6

7
7

21
21

6
6

7
7

21
21

6
6

7
7

21
21

6
6

7
7

21
21

6
6

7
7

21
21

6
6

7
7

21
21

6
6

7
7

21
21

6
6

7
7

21
21

6
6

7
7

21
21

6
6

7
7

1 (24 hrs)
1 (24 hrs)

6
6

7
7

1 (24 hrs)
1 (24 hrs)

6
6

7
7

1 (24 hrs)
1 (24 hrs)

6
6

7
7

1 (24 hrs)
1 (24 hrs)

1 (24 hrs)

1 (24 hrs)

6
6

7
7

1 (24 hrs)
1 (24 hrs)

6
6

7
7

8
1 (24 hrs)

6
6

7
7

1 (24 hrs)
1 (24 hrs)

6
6

7
7

1 (24 hrs)
1 (24 hrs)

6
6

7
7

1 (24 hrs)
1 (24 hrs)

6
6

7
7

1 (24 hrs)
1 (24 hrs)

6
6

7
7

1 (24 hrs)
1 (24 hrs)

segregation

vibration

rebar diameter minimum rebar splice (mm)

NONE
NONE
NONE
NONE

REQUIRED
REQUIRED
REQUIRED
REQUIRED

16
16
20
20

400
400
500
500

NONE
NONE
NONE
NONE

REQUIRED
REQUIRED
REQUIRED
REQUIRED

16
16
20
20

400
400
500
500

NONE
NONE

REQUIRED
REQUIRED

12
12

300
300

NONE
NONE

REQUIRED
REQUIRED

12
12

300
300

NONE
NONE

REQUIRED
REQUIRED

25
12

625
-

NONE
NONE

REQUIRED
REQUIRED

25
12

625
-

NONE
NONE

REQUIRED
REQUIRED

25
12

625
-

NONE
NONE

REQUIRED
REQUIRED

25
12

625
-

NONE
NONE

REQUIRED
REQUIRED

25
12

625
-

NONE
NONE

REQUIRED
REQUIRED

25
12

625
-

NONE
NONE

REQUIRED
REQUIRED

20
12

500
-

NONE
NONE

REQUIRED
REQUIRED

25
12

625
-

NONE
NONE

REQUIRED
REQUIRED

25
12

625
-

NONE
NONE

REQUIRED
REQUIRED

20
12

500
-

NONE
NONE

REQUIRED
REQUIRED

25
12

625
-

NONE
NONE

REQUIRED
REQUIRED

25
12

625
-

NONE
NONE

REQUIRED
REQUIRED

20
12

500
-

NONE
NONE

REQUIRED
REQUIRED

25
12

625
-

NONE
NONE

REQUIRED
REQUIRED

25
12

625
-

NONE
NONE

REQUIRED
REQUIRED

10
10

300
300

NONE
NONE

REQUIRED
REQUIRED

10
10

300
300

NONE
NONE

REQUIRED
REQUIRED

10
10

300
300

NONE
NONE

REQUIRED
REQUIRED

10
10

300
300

NONE

REQUIRED

10

300

NONE

REQUIRED

10

300

NONE
NONE

REQUIRED
REQUIRED

10
10

300
300

NONE
NONE

REQUIRED
REQUIRED

10
10

300
300

NONE
NONE

REQUIRED
REQUIRED

10
10

300
300

NONE
NONE

REQUIRED
REQUIRED

10
10

300
300

NONE
NONE

REQUIRED
REQUIRED

10
10

300
300

NONE
NONE

REQUIRED
REQUIRED

10
10

300
300

NONE
NONE

REQUIRED
REQUIRED

10
10

300
300

minimum rebar anchorage (mm)

max rebar center to center spacing (mm)

250
250
300
300

(90
(90
(90
(90

deg)
deg)
deg)
deg)

100
150
100
150

250
250
300
300

(90
(90
(90
(90

deg)
deg)
deg)
deg)

150
150
150
150

65 (180 deg)
65 (180 deg)

150
150

65 (180 deg)
65 (180 deg)

150
150

450 (90 deg)


72 (135 deg)

102
100

450 (90 deg)


72 (135 deg)

161
100

450 (90 deg)


72 (135 deg)

152
100

450 (90 deg)


72 (135 deg)

92
100, 150

450 (90 deg)


72 (135 deg)

149
100, 150

450 (90 deg)


72 (135 deg)

141
100, 150

300 (90 deg)


72 (135 deg)

92
100, 150

450 (90 deg)


72 (135 deg)

141
100, 150

450 (90 deg)


72 (135 deg)

141
100, 150

300 (90 deg)


72 (135 deg)

92
100, 150

450 (90 deg)


72 (135 deg)

141
100, 150

450 (90 deg)


72 (135 deg)

141
100, 150

300 (90 deg)


72 (135 deg)

92
100, 150

450 (90 deg)


72 (135 deg)

107
100, 150

450 (90 deg)


72 (135 deg)

107
100, 150

150 (90 deg)


150 (90 deg)

350
350

150 (90 deg)


150 (90 deg)

350
350

150 (90 deg)


150 (90 deg)

350
350

150 (90 deg)


150 (90 deg)

350
350

150 (90 deg)

350

150 (90 deg)

350

150 (90 deg)


150 (90 deg)

350
350

150 (90 deg)


150 (90 deg)

350
350

150 (90 deg)


150 (90 deg)

350
350

150 (90 deg)


150 (90 deg)

350
350

150 (90 deg)


150 (90 deg)

350
350

150 (90 deg)


150 (90 deg)

350
350

150 (90 deg)


150 (90 deg)

350
350

FDN to GF
C-1

0
500
1500
-1.5
500

435

102

GF to 2F
C-1

3.2
500

533.33
3200

2133.33

3200

2133.33

533.33

500

92
400

2F to 3F

C-1

3.2

500

533.33

3200

2133.33

533.33

500

400

92

3F to 4F
C-1

3.2
500

533.33
3200

2133.33
533.33

0
500

400

92

4F to RF
C-1

3.2

500

533.33

3200

2133.33

533.33

500

92
400

FDN TO GF
1

435.00

250.00

450.00

15 pcs

C-2

12

100 mm spacing

610

GF to 2F
1

400.00

533.33

450.00

5 pcs

C-2

12

100 mm spacing

14 pcs

12

150 mm spacing

5 pcs

12

100 mm spacing

575

2F to 3F
1

400.00

533.33

450.00

5 pcs

C-2

12

100 mm spacing

14 pcs

12

150 mm spacing

5 pcs

12

100 mm spacing

550

3F to 4F
1

400.00

533.33

450.00

5 pcs

C-2

12

100 mm spacing

14 pcs

12

150 mm spacing

5 pcs

12

100 mm spacing

550

4F to RF
1

400.00

533.33

450.00

C-2

5 pcs

12

100 mm spacing

14 pcs

12

150 mm spacing

5 pcs

12

100 mm spacing

450

FDN TO GF

610.00

250.00

450.00

C-3

500
15 pcs

12

100 mm spacing

1500
-1.5
500

160.3333

GF to 2F

3.2

575.00

533.33

450.00

C-3

500

575.00

5 pcs

12

100 mm spacing

3200

2050.00

3200

2050.00

13 pcs

12

150 mm spacing

575.00

5 pcs
0

12

100 mm spacing
500

148.6667

2F to 3F

3.2

550.00

533.33

450.00

C-3

500

550.00

5 pcs

12

100 mm spacing

3200

2100.00

13 pcs

150 mm spacing

550.00

5 pcs
0

12

12

100 mm spacing
500

140.3333

3F to 4F

3.2

550.00

533.33

450.00

C-3

500

550.00

5 pcs

12

100 mm spacing

3200

2100.00

13 pcs

12

150 mm spacing

550.00

5 pcs
0

12

100 mm spacing
500

140.3333

4F to RF

3.2

450.00

533.33

450.00

C-3

500

533.33

5 pcs

12

100 mm spacing

3200

2133.33

14 pcs

150 mm spacing

533.33

5 pcs
0

12

100 mm spacing
500

107

12

585.00

250.00

450.00

500
15 pcs
100 mm spacing

1500
-1.5
500

585

152

3.2

550.00

533.33

450.00

500

550.00

5 pcs
100 mm spacing

3200

2100.00

3200

2100.00

13 pcs
150 mm spacing

550.00

5 pcs
0

100 mm spacing
500

550

140.3333

3.2

550.00

533.33

450.00

500

550.00

5 pcs
100 mm spacing

3200

2100.00

13 pcs
150 mm spacing

550.00

5 pcs
0

100 mm spacing
500

550

140.3333

3.2

550.00

533.33

450.00

500

550.00

5 pcs
100 mm spacing

3200

2100.00

13 pcs
150 mm spacing

550.00

5 pcs
0

100 mm spacing
500

550

140.3333

3.2

450.00

533.33

450.00

500

533.33

5 pcs
100 mm spacing

3200

2133.33
533.33

150 mm spacing

5 pcs
0

100 mm spacing
500

450

14 pcs

107

12

mm spacing

12

mm spacing

12

mm spacing

12

mm spacing

12

mm spacing

12

mm spacing

12

mm spacing

12

mm spacing

12

mm spacing

12

mm spacing

12

mm spacing

12

mm spacing

12

mm spacing

holdpoints
Reference ACI 318-95

1.2 Drawings and specifications


a Name and date of issue of code and supplement to which design conforms
b Live load and other loads used in design
c Specified compressive strength of concrete at stated ages or stages of construction for w
d Specified design or strength of reinforcement
e Size and location of all structural elements and reinforcement
f Provision for dimensional changes resulting from creep, shrinkage, and temperature
g Magnitude and location of prestressing forces
h Anchorage length of reinforcement and location and length of lap splices
i Type and location of welded splices and mechanical connections of reinforcement
1.3.2 Inspection
design drawings and specifications
a quality and proportions of concrete materials and strength of concrete
b construction and removal of forms and reshoring
c placing of reinforcement
d mixing, placing, and curing of concrete
e sequence of erection and connection of precast members
f tensioning of prestressing tendons
g any significant loadings on completed floors, members or walls
h general progress of work
temperature
> 40 deg. F
< 95 deg. F
all records be preserved for 2 years

3 Materials
3.2 Cement
(+,- 1% of mass)
a Specification for Portland Cement - ASTM C150
b Specification for Blended Hydraulic Cements (excluding Types S and SA) - ASTM C595
c Specification for Expanded Hydraulic Cement - ASTM C845
d ASTM C1157
3.3 Aggregates
(+,- 2% mass)
Specification for Concrete Aggregates (ASTM C33)
Specification for Lightweight Aggregates for Structural Concrete (ASTM C330)
Specification for Heavyweight Aggregate for Structural Concrete (ASTM C637)
Exception: approved aggregates
Max aggregate size:
a 1/5 narrowest dimension between sides of forms
b 1/3 depth of slabs
c 3/4 the minimum clear spacing between individu
Exception: if honeycombs and voids can be prevented
3.4 Water
(+,-1 % volume)
free from:
C109 and C191
oils

acids
alkalis
salts
organic materials
deleterious substances
chloride ion (for prestressed concret
3.5 Steel Reinforcement
Deformed reinforcement

AASHTO T26

D 512 and D 516

a Specification for Deformed Bars and Plain Billet-S


b Specification for Rail-Steel Deformed and Plain Ba
c Specification for Axle Steel Deformed and Plain B
d Specification for Low-Alloy Steel Deformed Bars f
Deformed bars with fy > 60 ksi will only be permitted if it corresponds to the fy in a stra
Bar mats
a Specification for Fabricated Deformed Bar Mats fo
Deformed wire
a Specification for Steel Wire, Deformed for Concre
Welded Plain Wire Fabric
a Specification for Steel Welded Wire Fabric, Plain f
Galvanized Reinforcing bars
a Specification for Zinc-Coated (Galvanized) Steel B
Epoxy coated wires and welded wire fabric
a Specification for Epoxy Coated Steel Wire and We
Plain reinforcement (for spirals)
a Specification for Deformed Bars and Plain Billet-S
b Specification for Rail-Steel Deformed and Plain Ba
c Specification for Axle Steel Deformed and Plain B
d Specification for Steel Wire, Plain for Concrete Re
Prestressing Tendons
a Specification for Uncoated Stress-Relieved Steel W
b Specification for Steel Strand, Uncoated Seven W
c Specification for Uncoated High Strength Steel Ba
Structural steel
a Specification for Structural Steel (A36)
b Specification for High Strength Low Alloy Structur
c Specification for High Strength Low Alloy Colomb
d Specification for High Strength Low Alloy Structur
Steel pipe or steel tubing
Specification for Pipe, Steel, Black and Hot Dippe
Specification for Cold Formed Welded and Seamle
Specification for Hot Formed Welded and Seamle
Welding shall conform to ANSI/AWS D1.4 (except for A706)
3.6 Admixtures
(+,- 3% of volume)
Do not use Chloride containing admixtures for (prestressed concrete, concrete with emb
Air entraining admixtures
a Specification for Air Entraining Admixtures for Co
Water Reducing, retarding and accelerating admixtures
a Specification for Chemical Admixtures for Concre

b Specification for Chemical Admixtures for Use in


Fly Ash or other Pozzolan

a Specification for Fly Ash and Raw or Calcinized N


Ground Granulated Blast Furnace Slag
a Specification for Ground Granulated Blast Furnac
ASTM C 845
Silica fume
a Specification for Silica Fume for Use in Hydraulic
4 Requirements for Special Exposure Conditions
w/c ratio

cement type

Concrete intended to have low


permeability when exposed to water

II, IP(MS),
IS(MS), P(MS),
I(PM)(MS),
0.5 I(SM)(MS)

Concrete exposed to deicing


chemicals

II, IP(MS),
IS(MS), P(MS),
I(PM)(MS),
0.5 I(SM)(MS)

Concrete exposed to freezing and


thawing in a moist condition or to
deicing chemicals (3/8 aggregate severe)

II, IP(MS),
IS(MS), P(MS),
I(PM)(MS),
0.45 I(SM)(MS)

Concrete exposed to freezing and


thawing in a moist condition or to
deicing chemicals (1/2 aggregate severe)

II, IP(MS),
IS(MS), P(MS),
I(PM)(MS),
0.45 I(SM)(MS)

Concrete exposed to freezing and


thawing in a moist condition or to
deicing chemicals (3/4 aggregate severe)

II, IP(MS),
IS(MS), P(MS),
I(PM)(MS),
0.45 I(SM)(MS)

Concrete exposed to freezing and


thawing in a moist condition or to
deicing chemicals (1 aggregate severe)

II, IP(MS),
IS(MS), P(MS),
I(PM)(MS),
0.45 I(SM)(MS)

Concrete exposed to freezing and


thawing in a moist condition or to
deicing chemicals (1 1/2 aggregate severe)

II, IP(MS),
IS(MS), P(MS),
I(PM)(MS),
0.45 I(SM)(MS)

Concrete exposed to freezing and


thawing in a moist condition or to
deicing chemicals (3/8 aggregate moderate)

II, IP(MS),
IS(MS), P(MS),
I(PM)(MS),
0.45 I(SM)(MS)

Concrete exposed to freezing and


thawing in a moist condition or to
deicing chemicals (1/2 aggregate moderate)

II, IP(MS),
IS(MS), P(MS),
I(PM)(MS),
0.45 I(SM)(MS)

Concrete exposed to freezing and


thawing in a moist condition or to
deicing chemicals (3/4 aggregate moderate)

II, IP(MS),
IS(MS), P(MS),
I(PM)(MS),
0.45 I(SM)(MS)

Concrete exposed to freezing and


thawing in a moist condition or to
deicing chemicals (1 aggregate moderate)

II, IP(MS),
IS(MS), P(MS),
I(PM)(MS),
0.45 I(SM)(MS)

Concrete exposed to freezing and


thawing in a moist condition or to
deicing chemicals (1 1/2 aggregate moderate)

II, IP(MS),
IS(MS), P(MS),
I(PM)(MS),
0.45 I(SM)(MS)

For corrosion protection of


reinforcement in concrete exposed to
chlorides from deicing chemicals, salt,
salt water, brackish water, seawater,
or spray from other sources

II, IP(MS),
IS(MS), P(MS),
I(PM)(MS),
0.4 I(SM)(MS)

For corrosion protection of


reinforcement in concrete exposed to
chlorides from deicing chemicals, salt,
salt water, brackish water, seawater,
or spray from other sources

II, IP(MS),
IS(MS), P(MS),
I(PM)(MS),
0.4 I(SM)(MS)

For corrosion protection of


reinforcement in concrete exposed to
chlorides from deicing chemicals, salt,
salt water, brackish water, seawater,
or spray from other sources

II, IP(MS),
IS(MS), P(MS),
I(PM)(MS),
0.4 I(SM)(MS)

For corrosion protection of


reinforcement in concrete exposed to
chlorides from deicing chemicals, salt,
salt water, brackish water, seawater,
or spray from other sources

II, IP(MS),
IS(MS), P(MS),
I(PM)(MS),
0.4 I(SM)(MS)

Concrete exposed to sulfate


containing solutions or soil (0.00 to
0.10 % in soil; 0-150 ppm in water)

II, IP(MS),
IS(MS), P(MS),
I(PM)(MS),
0.5 I(SM)(MS)

Concrete exposed to sulfate


containing solutions or soil (0.10 to
0.20 % in soil; 150-1500 ppm in
water)

II, IP(MS),
IS(MS), P(MS),
I(PM)(MS),
0.5 I(SM)(MS)

Concrete exposed to sulfate


containing solutions or soil (0.20 to
2.00 % in soil; 1500-10000 ppm in
water)

0.45 V

Concrete exposed to sulfate


containing solutions or soil (0.10 to
0.20 % in soil; 150-1500 ppm in
water)

V plus
approved
compatible
0.45 pozzolan

5.3 Proportioning of Concrete


if there are 30 test results available
if there are 15 to 29 test results

find S, average required strength is larger of (fc'+


find S and apply modification factor, average req

if there are 10 field test results (same


mixture)
take average, average required strength is (fc' +
if there are 10 field test results (two
mixtures, same condition)
if there are no data

based on other's experience

plot averages for each proportion then interpolat


perform 3 trial mix with different proportions (eit
a
b
c
can be used only for 4000 psi and lower

5.6 Evaluation and acceptance of concrete


1 set for
a
(at least 6 test cylinders)
b
c

once per day


once every 150 cu. Yd.
once every 5000 ft2

at least 5 sets
5.6.2.1
5.6.2.2

Sampling (ASTM C 172) (at 15% and 85% of load


Molding (ASTM C 470) and Curing (ASTM C 31, C

5.6.2.2

Testing (ASTM C 39), Yield (C 138), Air content (C

OK if

a Every average of any three consecutive strength


b No individual strength test result is below fc' - 50
improve handling and curing if

a strength test result falls below 85% of fc' at test a


5.6.4

In case of failed specimen

a Take three cores for each failed specimen on the


b If concrete will be dry during its service condition
c If concrete will be more than superficially wet dur
d Will be considered adequate if average of three c

5.7 Preparation before concreting


All equipment to be used should be clean
All debris and ice should be removed from spaces to be occupied by concrete
Forms shall be properly coated
Masonry filler units that will be in contact with concrete shall be well drenched
Reinforcement shall be clear of ice and deleterious substances
Water shall be removed from place of deposit before concrete is deposited unless tremie
All laitance or other unsound materials shall be removed before additional concrete is pl
5.8 Mixing
ASTM C94
ASTM C685
at least 1.5 minutes
Record:
number of batches produced
proportions of materials used
approximate locations of final deposit in structure
time and date of placing and mixing
5.11 Curing
temperature (50 to 95 F)
moist for at least 3 days if high early strength and 7 days if normal concrete
6.1 Design of formwork

1 Forms shall result in a final structure that conform


2 Forms shall be substantial and sufficiently tight to
3 Forms shall be properly braced or tied together to
4 Forms and their support shall be designed so as n
5 Design of formworks shall include consideration o
a

b
c
6 Forms of prestressed concrete members shall be

6.2 Removal of forms, shores and reshoring


1 Removal of forms
a
2 Removal of shores and reshoring
a
b
c
3 No construction loads exceeding the combination
4 Forms support for prestressed concrete shall not

6.3 Conduits and pipes embedded in concrete


1 Should not replace structurally the displaced con
2 Aluminum shall not be embedded unless effectiv
3 Shall not impair significantly the strength of cons
4 (If in column) shall not displace more than 4 perc
5
1
2
6 Will replace structurally displaced concrete
1
2
3
Shall be designed to resist the the effects of the
No pressure exceeding 50 psi or temperature exc
Piping (unless for radiant heating or snow melting
Concrete cover shall not be less than 1.5 in for co
Reinforcement with an area not less than 0.002 t
Shall be so fabricated and installed that cutting,
6.3 Construction joints
1 Surface of concrete construction joints shall be cl
Immediately before concrete is placed, all constr
Construction joints shall be so made and located
Construction joints in floors shall be located withi
Beams, girders, or slabs supported by columns a
Beams, girders, haunches, drop panels, and capit
6.4 Details of reinforcement
MAIN
Bar No.
2
3
4
5

Dia (mm)
6
10
12
16

180
64
64
64
64

6
7
8
9
10
11
14
18

20
22
25
28
32
36
42
56

80
88
100
112
128
144
168
224

All reinforcement shall be bent cold unless otherw


Reinforcement partially embedded in concrete sh

Shall be free from mud , oil, or other non-metallic


Shall be consd=idered satisfactory if dimensions
ACI 117
TOLERANCES
in
MAIN LENGTH OF REBARS
6 to 36 mm
L<12 ft. Or 3 m
L>12 ft. Or 3 m
larger than 36 mm
42 mm
56 mm

+,+,-

0.5
1

+,+,-

2.5
3.5

HOOKS AND BENDS OF REBARS


6 to 36 mm
larger than 36 mm

+,+,-

0.5
1

SPLICES ON REBARS
6 to 36 mm
larger than 36 mm

+,+,-

1
2

CLEARANCE TO FORMS / CONCRETE COVER


4 in. Dimension (100 mm)
+,12 in. Dimension (300 mm)
+,24 in. Dimension (600 mm)
+,over 600 mm dimension
+,SPACING OF REBARS
non-prestressed
prestressed
24 in. Or less
lateral
vertical
More than 24 in.
lateral
vertical

0.25
0.375
0.5
1

+,-

+,+,-

0.5
0.25

+,+,-

1
0.5

EMBEDDED ITEMS

+,-

SLUMP

+,-

1.5

FOUNDATIONS
Drilled piers
Vertical alignment
A. Normal (Unreinforced) +,B. Stiff soil (Unreinforced)+,C. Reinforced
+,Lateral alignment
+,Level alignment
+,Relative alignment
+,Cross-sectional dimension+,Footings
Lateral alignment
+,Level alignment
+,Relative alignment
+,Cross-sectional dimension+,CAST IN PLACE CONCRETE
Vertical alignment
100 ft (30 m)
lines, surfaces +,corners
+,More than 100 ft. (30 m)
lines, surfaces and arises
corners
Lateral alignment
Slabs
Other

0.5
1
0.5

1
0.5

+,+,-

0.5
1

+,+,-

0.5
0.75

Level alignment
Lintels, Sills, Parapets,
Horizontal Grooves
Other

1 ft
3 ft
more 3 ft

Cross sectional dimension


+,+,+,Relative alignment
Stairs

0.25
0.25
0.75

Risers
Treads

+,+,-

0.125
0.25

+,+,+,-

0.125
0.25
0.25

+,+,+,+,-

0.125
0.25
0.5
1

+,+,+,-

0.5
0.25
0.125

+,+,-

1
0.5

+,-

0.25

Grooves
2"
More than 2"
Surface Slope
Offset of formwork face
A
B
C
D
Surface Tolerance
A
B
C
Openings
Size
Location of Centerline
MASONRY

PRECAST CONCRETE (linear elements) - fabrication


Length
+,Cross sectional dimensions
6 in
+,18 in
+,36 in
+,greater than 36+,-

0.125
0.125
0.25
0.25
0.5

Lateral alignment
60 '
over 60 '

+,+,-

0.25
0.5

Camber variation
Prestressed
Non-prestressed

+,+,-

0.125
0.25

Surface Irregularities
with topping
without topping
steering surfaces

from a 10 ft straightedge
+,0.5
+,0.25
+,0.125

PRECAST CONCRETE (piles) - fabrication


Length
+,Cross sectional dimens+,Lateral alignment

+,-

2
0.25
0.125

Surface Irregularities from a 10 ft straightedge


pile head
+,0.125
other surfaces
+,0.25
PRECAST CONCRETE (planar) - fabrication
Length and width
20 +,40 +,for every 10 ft. Additional +,diagonals +,Cross sectional dimens+,Opening
+,Lateral alignment of embedded items
reglets for glazing gasket +,bolts
+,flashing reglets
+,flashing reglets at panel +,mepfs
+,weld plates
+,inserts
+,Bowing
+,Warping
+,-

0.125
0.25
0.0625
0.5
0.125
0.25
0.125
0.25
0.25
0.125
0.5
1
0.5
1
1

PRECAST CONCRETE - erection


Alignment
Building
+,Guideways and steering s+,-

0.0625

Offset of adjacent surfaces (top surface)


with topping
+,0.75
floor without topping
+,0.25
roof without topping
+,0.75
guideway elements and st+,0.0625
CAST IN PLACE CONCRETE (SLIPFORM)
Vertical alignment
100 ft (30 m)
lines, surfaces +,corners
+,More than 100 ft. (30 m)
lines, surfaces +,corners
+,Lateral alignment
Slabs
Other

+,+,-

2
1
8
4

1
2

Cross sectional dimens+,Relative alignment

0.5

+,-

0.25

MASS CONCRETE
Vertical alignment
Visible surfaces+,Concealed surfa+,Watertight struc+,-

1.25
2.5
0.25

Lateral alignment
Visible surfaces+,Concealed surfa+,Watertight struc+,-

1.25
2.5
0.25

Cross sectional dimensions


Visible surfaces+,Concealed surfa+,Watertight struc+,-

0.5
1
0.25

Relative alignment
Visible surfaces+,Concealed surfac
+,-

0.25
0.5

Visible surfaces+,Concealed surfac


+,-

0.5
1

CANAL LINING
Lateral alignment
Tangents
+,Curves
+,width at any he+,-

1.25
2.5

Cross sectional dimens+,-

10%

Level alignment
Profile grade
Invert
Side slope
Height

+,+,+,+,-

1
0.25
0.5

+,+,-

Cross sectional dimens+,-

10%

MONOLITHIC SIPHON
Lateral alignment
Centerline
Inner

Increase
Decrease

+
-

0.50
0.25

Level alignment
Profile grade
Invert
Side slope

+,+,+,-

1
0.25
0.5

CAST IN PLACE CONCRETE (BRIDGE)


Vertical alignment
Visible surfaces+,Concealed surfa+,-

0.75
1.5

Lateral alignment
Centerline

+,-

Level alignment
Profile grade +,Visible surfaces+,Concealed surfa+,Pavements
+,-

1
0.75
1.5
0.25

Cross sectional dimensions


Slabs
+,Columns, beams,
+,Openings
+,Relative alignment
Visible surface +,Concealed surf +,Other than pav +,Openings
+,PAVEMENTS AND SIDEWALKS
Lateral alignment
Dowels

0.125
0.25
0.5

0.5
1
0.25
0.5

+,-

Level alignment
Pavements
+,Other than pav +,-

0.125
0.25

CHIMNEYS AND COOLING TOWERS


Vertical alignment
Diameter
Outside
Wall thickness

+,-

+,-

10 in
+,greater than 10+,-

0.25
0.5

NON-REINFORCED CAST IN PLACE PIPE


Offset
42 in
+,72 in
+,greater than 72 in
+,-

0.5
0.75
1

Diameter
Inside

+,-

95%

Wall thickness

+,-

Surface Indentations

+,-

0.5

ch design conforms

es or stages of construction for which each part of structure is designed

shrinkage, and temperature

gth of lap splices


nections of reinforcement

gth of concrete

Types S and SA) - ASTM C595

Concrete (ASTM C330)


Concrete (ASTM C637)

mension between sides of forms

m clear spacing between individual reinforcing bars or wires, bundles of bars, or prestressing tendons or ducts

Deformed Bars and Plain Billet-Steel Bars for Concrete Reinforcement (ASTM A615)
Rail-Steel Deformed and Plain Bars for Concrete Reinforcement (ASTM A616 including S1)
Axle Steel Deformed and Plain Bars for Concrete Reinforcement (ASTM A617)
Low-Alloy Steel Deformed Bars for Concrete Reinforcement (ASTM A706)
it corresponds to the fy in a strain of 0.35

Fabricated Deformed Bar Mats for Concrete Reinforcement (ASTM A184)

Steel Wire, Deformed for Concrete Reinforcement (ASTM A496)

Steel Welded Wire Fabric, Plain for Concrete Reinforcement (ASTM A497)

Zinc-Coated (Galvanized) Steel Bars for Concrete Reinforcement (ASTM A934)

Epoxy Coated Steel Wire and Welded Wire Fabric for Concrete Reinforcement (ASTM A 884)

Deformed Bars and Plain Billet-Steel Bars for Concrete Reinforcement (ASTM A615)
Rail-Steel Deformed and Plain Bars for Concrete Reinforcement (ASTM A616 including S1)
Axle Steel Deformed and Plain Bars for Concrete Reinforcement (ASTM A617)
Steel Wire, Plain for Concrete Reinforcement (ASTM A82)

Uncoated Stress-Relieved Steel Wire for Prestressed Concrete (ASTM A421)


Steel Strand, Uncoated Seven Wire for Prestressed Concrete (ASTM A416)
Uncoated High Strength Steel Bar for Prestressed Concrete (ASTM A722)

Structural Steel (A36)


High Strength Low Alloy Structural Steel (ASTM A242)
High Strength Low Alloy Colombium-Vanadium Steels of Structural Quality (ASTM A572)
High Strength Low Alloy Structural Steel with 50 ksi (345 Mpa) Minimum Yield Point to 4 in. (100 mm) thick (

Pipe, Steel, Black and Hot Dipped, Zinc Coated Welded and Seamless (ASTM A53)
Cold Formed Welded and Seamless Carbon Steel Structural Tubing in Rounds and Shapes (ASTM A500)
Hot Formed Welded and Seamless Carbon Steel Structural Tubing (ASTM A501)

sed concrete, concrete with embedded aluminum, concrete cast againt stay in place galvanized steel forms)

Air Entraining Admixtures for Concrete (ASTM C260)

Chemical Admixtures for Concrete (ASTM C494)

Chemical Admixtures for Use in Producing Flowing Concrete (ASTM C1017)

Fly Ash and Raw or Calcinized Natural Pozzolan for Use as a Mineral Admixture in Portlan Cement Concrete (

Ground Granulated Blast Furnace Slag for Use in Concrete and Mortars (ASTM C989)

Silica Fume for Use in Hydraulic -Cement Concrete and Mortar (ASTM C1240)

min air content (%)

optimum air content (%)

5.5

5.5

7.5

5.5

4.5

4.5

5.5

4.5

5.5

3.5

4.5

4.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

equired strength is larger of (fc'+1.34S) and (fc'+2.33S-500)


modification factor, average required strength is larger of (fc'+1.34S') and (fc'+2.33S'-500)

erage required strength is (fc' + 1000) for less than 3000 psi; (fc' + 1200) for 3000 to 5000 psi; (fc' + 1400)

r each proportion then interpolate proportion for average required strength (fc' + 1000) for less than 3000 ps
mix with different proportions (either water to cement ratio or cementitious material proportion), plot average

y for 4000 psi and lower

every 150 cu. Yd.


every 5000 ft2

2
2
2

C 172) (at 15% and 85% of load) (max interval of 15 minutes) (1 ft3 per sample), Slump (C143) (+,- 1.5 in fo
470) and Curing (ASTM C 31, C 617 and C 511) (fill every layer based on ASTM C 31, tap sides with mallet 1

39), Yield (C 138), Air content (C 138, C 173 and C 231)

f any three consecutive strength test is equal to or greater than fc'


ength test result is below fc' - 500 psi

ult falls below 85% of fc' at test age

specimen

for each failed specimen on the representative area on the actual concrete poured
e dry during its service condition, cores will be air dried (temperature 60 to 80 F, relative humidity less than
e more than superficially wet during service condition, cores shall be immersed in water for at least 40 hrs. A
ed adequate if average of three cores is equal to or greater than 85% of fc' and if no single core is less than 7

occupied by concrete
shall be well drenched

ncrete is deposited unless tremie is used or otherwise approved by building official


d before additional concrete is placed against hardened concrete

ys if normal concrete

t in a final structure that conforms to shapes, lines, and dimensions of the members as required by the desig
ubstantial and sufficiently tight to prevent leakage of mortar
roperly braced or tied together to maintain position and shape
support shall be designed so as not to damage previously placed structure
orks shall include consideration of the following

ssed concrete members shall be desgined and constructed to permit movement of the member without dam

es and reshoring

oads exceeding the combination of superimposed dead load plus specified live load shall be supported on an
r prestressed concrete shall not be removed until sufficient prestressing has been applied to enable prestres

ce structurally the displaced concrete


not be embedded unless effectively coated or covered to prevent aluminum-concrete reaction or electrolytic
significantly the strength of construction
all not displace more than 4 percent of the area of the cross section

cturally displaced concrete

d to resist the the effects of the material, pressure and temperature to which they will be subjected
eeding 50 psi or temperature exceeding 90 F shall be placed in the pipes until concrete has achieved its desi
r radiant heating or snow melting, shall be placed between top and bottom reinforcement
hall not be less than 1.5 in for concrete exposed to earth or weather nor 0.75 in. For concrete not exposed to
ith an area not less than 0.002 times the area of concrete section shall be provided normal to piping
cated and installed that cutting, bending , or displacement of reinforcement from tis proper location will not b

ete construction joints shall be cleaned and laitance removed


ore concrete is placed, all construction joint shall be wetted and standing water removed
ts shall be so made and located as not to impair the strength of structure
ts in floors shall be located within the middle third of spans of slabs, beams, and girders. Joints in girders sha
or slabs supported by columns and walls shall not be cast or erected until concrete in the vertical support me
haunches, drop panels, and capitals shall be placed monolithically as part of a slab system, unless otherwise

MINIMUM HOOK
MAIN
90
72
120
144
192

TIES AND STIRRUPS


90
36
60
72
96

240
264
300
336
384
432
504
672

240
264
300
336
384
432
504
672

t shall be bent cold unless otherwise permitted by the engineer


artially embedded in concrete shall not be field bent unless otherwise permitted by the engineer

m mud , oil, or other non-metallic coatings. Epoxy coatings shall be permitted


dered satisfactory if dimensions and weight are still satisfactory except for prestressing tendons

mm

12
25
60
80

12
25

25
50

5 shall
10 shall
12 shall
25 shall

not
not
not
not

exceed
exceed
exceed
exceed

shall not exceed

12
5
25
12

25
40

0
0
0
0
25

0
12
25
12

25
12
not more than
not more than

12
25

12
20

5
5
20

3
5
3
5
5 in every 3m.
3
5
12
25
12
5
3

25
12
5 in every 3m.

3
3
5
5
12

5
12

3 per 3 m
5 per 3 m

aightedge
12
5
3

50
5
3

aightedge
3
5

3
5
1
12 but not greater than
3
5
3
5
5
3
12
25
12
25 but not greater than
25 but not greater than

same with cast in place


1

15
5
15
1

50
25
200
100

25
50

12
5

30
55
5

30
55
5

12
25
5

5
12
12
25

30
55
not greater than
10%

25
5
12
not greater than

25

10%

12.00 not greater than


5.00 not greater than

25
5
12

15
30

25

25
15
30
5 done with a 10 ft straightedge

3
5
12

5 in every 3 m
12 in every 3 m
3 in every 3 m
12

25

3
5 done with a 10 ft straightedge

25 in every 3 m; not greater than

5
12

12
15
25

95% not greater than


minimum wall thickness is 2 in.
must not be less than (1/2) inside diameter plus 1/2 in.
12

les of bars, or prestressing tendons or ducts

ment (ASTM A615)


ASTM A616 including S1)
ASTM A617)

(ASTM A934)

nforcement (ASTM A 884)

ment (ASTM A615)


ASTM A616 including S1)
ASTM A617)

STM A421)

al Quality (ASTM A572)


nimum Yield Point to 4 in. (100 mm) thick (ASTM A588)

less (ASTM A53)


g in Rounds and Shapes (ASTM A500)
(ASTM A501)

againt stay in place galvanized steel forms)

M C1017)

ral Admixture in Portlan Cement Concrete (ASTM C618)

ortars (ASTM C989)

STM C1240)

max % of total cementitious materia

max air content (%)

fly ash and other pozzolan

25

25

25

8.5

25

7.5

25

7.5

25

25

7.5

25

25

6.5

25

25

25

25

25

25

25

25

25

25

25

34S') and (fc'+2.33S'-500)


+ 1200) for 3000 to 5000 psi; (fc' + 1400) for over 5000 psi

d strength (fc' + 1000) for less than 3000 psi; (fc' + 1200) for 3000 to 5000 psi; (fc' + 1400) for over 5000 ps
entitious material proportion), plot averages for each proportion then interpolate for average required streng

for 7 days
for 14 days
for 28 days

ft3 per sample), Slump (C143) (+,- 1.5 in for slump 3 and below; +,- 2.5 in. For slump greater than 3) (take 1
ased on ASTM C 31, tap sides with mallet 10 to 15 times, roll tamping rod on the top of mold, mark molds to

l concrete poured
ture 60 to 80 F, relative humidity less than 60 %) then tested dry after 7 days of air drying
be immersed in water for at least 40 hrs. And be tested wet
5% of fc' and if no single core is less than 75% of fc'

by building official

ns of the members as required by the design drawings and specifications

mit movement of the member without damage during application of prestressing force

specified live load shall be supported on any unshored portion of the structure under construction, unless an
ressing has been applied to enable prestressed members to carry their dead load and anticipated constructi

aluminum-concrete reaction or electrolytic action between aluminum and steel

ure to which they will be subjected


e pipes until concrete has achieved its design strength
nd bottom reinforcement
her nor 0.75 in. For concrete not exposed to earth and weather
shall be provided normal to piping
forcement from tis proper location will not be required

tanding water removed

bs, beams, and girders. Joints in girders shall be offset a minimum distance of two times the width of interse
ted until concrete in the vertical support member is no longer plastic
y as part of a slab system, unless otherwise shown in design drawings or specifications.

MINIMUM BEND

ND STIRRUPS
135
36
60
72
96

36
60
72
96

120
132
150
168
192
216
252
336

120
132
150
224
256
288
420
560

wise permitted by the engineer

e permitted
except for prestressing tendons

mm

CC
0

mm

LEAST DIMENSION OF CROSS SECTION


0

2.5

60

SHAFT DIAMETER

SHAFT DIAMETER

30
0

150
200

LENGTH in meters
0

LENGTH in meters of diagonal


0
0

WIDTH
25

HEIGHT
25

DIMENSION
0
THICKNESS

0
0

0
DIAMETER
25

side diameter plus 1/2 in.

DIAMETER
25

max % of total cementitious material weight (cement plus the following materials)
slag
silica fume

50

10

50

10

50

10

50

10

50

10

50

10

50

10

50

10

50

10

50

10

50

10

50

10

50

10

50

10

50

10

50

10

50

10

50

10

50

10

50

10

0 to 5000 psi; (fc' + 1400) for over 5000 psi


hen interpolate for average required strength (fc' + 1000) for less than 3000 psi; (fc' + 1200) for 3000 to 50

+,- 2.5 in. For slump greater than 3) (take 1 ft3 sample, fill mold every one third layer, tamp 25 times every
ping rod on the top of mold, mark molds to easily identify them) (store at a level ground surface to 1/4 in pe

after 7 days of air drying

n of prestressing force

the structure under construction, unless analysis indicates adequate strength to support such additional loa
y their dead load and anticipated construction loads

num and steel

m distance of two times the width of intersecting beams

ings or specifications.

SPLICES

for formed soffits


5

SECTION

SHAFT LENGTH

HEIGHT
30000

g materials)
combination of the three types

chloride content

50

0.3

50

0.3

50

0.3

50

0.3

50

0.3

50

0.3

50

0.3

50

0.3

50

0.3

50

0.3

50

0.3

50

0.3

50

0.06

50

0.15

50

50

0.3

50

0.3

50

0.3

50

0.3

50

0.3

psi; (fc' + 1200) for 3000 to 5000 psi; (fc' + 1400) for over 5000 psi

rd layer, tamp 25 times every layer, last layer filled fully, roll rod on top surface of mold), Temperature (C 10
vel ground surface to 1/4 in per ft., from 60 to 80 F, initial curing for up to 48 hrs.) (after 8 hrs, transport mol

h to support such additional loads

mold), Temperature (C 1046) (55 to 90 F)


(after 8 hrs, transport molds to laboratory, transportation not exceeding 4 hrs.) (final curing at 73 F +,- 3 F)

uring at 73 F +,- 3 F)

12.77778
131

55

32.22222
194

90

10
122

50

35
203

95

INSPECTION AND
CONTRACT NO.

UNIT / AREA / LOCATION

DISCIPLINE

INSPECTION / TEST REQUIREMENTS


Activity #

Activity Description / Location


TEST OR INSPECTION PERFORM

1.00

Shop Drawing for all Construction Works

N/A

2.00

Method of Statement

N/A

3.00

Technical Submittal of Materials and Equipment

N/A

4.00

Checking of Survey and Layout

5.00

SITE PREPARATION

Clearing and Grubbing

Visual

Removal of Structures and Obstruction

Visual

Structure Excavation

Survey

Required Grade Level

Survey

6.00

LEAN CONCRETE

Survey

Penetrometer
Check soil bearing capacity

Check installation of micropiles

Monitor lean concreting

7.00

Visual + Material Test

Visual + Sampling

GRAVEL BEDDING

Penetrometer
Check soil bearing capacity

B
8.00

Check installation of gravel bedding

Visual + Material Test

FOOTINGS, BEAMS AND GIRDERS, COLUMNS, SLABS, RAMPS, STAIRS

Check installation of rebars

Embedded items (MEPFS, Anchor bolts, etc.)

Check enclosure of forms

Visual + Material Test

Visual + Level & Align + Material Test

Visual + Level & Align

Monitor concreting

Visual + Sampling

Curing of Concrete

Visual

Testing of Concrete Cylinder Samples

Check removal of forms & reshoring

9.00

Visual

MASONRY WORKS

Check installed concrete hollow blocks

Check plastering

10.00

Test

CEILING WORKS

Visual + Material Test

Visual

Check ceiling framing system

Check installation of ficem board

11.00

Visual + Level & Align + Material Test


Visual + Material Approval

PAINTING WORKS

Check Surface preparation / Application of neutralizer

Visual + Material Approval

Check Application of Primer

Visual + Material Approval

Check Application of Paint

Visual + Material Approval

12.00

TILING WORKS

Check initial layout of tiles

Check installed tiles

13.00

Visual + Material Approval


Visual

FIXTURES

Doors

Visual + Material Approval

Windows

Visual + Material Approval

Handrails

Visual + Material Approval

Other Fixtures (Plumbing, Electrical, Architectural etc.)

Visual + Material Approval

13.00

ROOF STRUCTURE (TRUSS, SAGRODS, CROSS BRACING, PURLINS, FLASHING SUPPORTS, ROOFING, FLASHING)

Check installation of baseplate

Check Grouting

Check Initial Setting of Roof Framing System (Tack Weld)

Check Final Setting of Roof Framing System (Full Weld)

Visual + Level & Align + Material Test


Visual + Material Test
Visual + Level & Align + Material Test

Visual

E
14.00

Check Installation of Roofing, Flashing and Ridgeroll


PLUMBING WORKS

Check installation of plumbing lines (water, sewer, drainage)

Commissioning

15.00

Visual + Level & Align + Material Test


Visual

ELECTRICAL WORKS

Check electrical wiring installation

Commisioning

16.00

Visual + Material Approval

Visual + Material Test

Visual

EMBANKMENT

Check backfilling and compaction works

Required Grade Level

Visual + Survey + Material Test + FDT

Survey

INSPECTION AND TEST PLAN


DATE:

DISCIPLINE

EQUIPMENT DESCRIPTION / TAG NUMBER, N/A

CTION / TEST REQUIREMENTS

METHOD OF VERIFICATION

REFERENCE DOCUMENTS

(see legends below)

STAGE / FREQUENCY

CODE, SPECS, ETC.

ACCEPTANCE CRITERIA

PHESCO

DPWH

OTHERS

N/A

IFC Drawing; As per contract


requirements

Approval by client

Prepared by
PHESCO

N/A

IFC Drawing; As per contract


requirements

Approval by client

Prepared by
PHESCO

N/A

IFC Drawing; As per contract


requirements

Approval by client

Prepared by
PHESCO

Staking Out/Control Point

IFC Drawing; As per contract


requirements

Approval by client

H+I

Prepared by
PHESCO

Per Area

IFC Drawing; As per contract


requirements

Approval by client

Contractor Crew

Per Location

IFC Drawing; As per contract


requirements

Approval by client

Contractor Crew

Per Location

IFC Drawing; As per contract


requirements

Approval by client

H+I

Contractor Crew
& PHESCO
Survey

Per Location

IFC Drawing; As per contract


requirements

IFC Drawings

H+I

Contractor Crew
& PHESCO
Survey

Per Location

IFC Drawing; General Notes; As


per contract requirements

IFC Drawing, General Notes,


greater than or equal to 96 kPa
(2000 psf)

H+I

PHESCO

Per Location

IFC Drawing; General Notes; As


per contract requirements

IFC Drawings

H+I

Contractor Crew

Per Location

IFC Drawing; General Notes; ACI


138-95 (general construction
requirements); As per contract
requirements

IFC Drawings; Cross sectional


dimensions +,- 5 mm, Temperature
15 to 32 degree Celsius, Slump +,60 mm

Contractor Crew

Per Location

IFC Drawing; General Notes; As


per contract requirements

IFC Drawing, General Notes,


greater than or equal to 96 kPa
(2000 psf)

H+I

PHESCO

Per Location

IFC Drawing; General Notes; As


per contract requirements

IFC Drawings

H+I

Contractor Crew

Per Location

IFC Drawing; General Notes; ACI


IFC Drawings; for 36mm and
138-95 (general construction
requirements); ACI 117
smaller +,- 12 mm, for bars larger
(tolerances); As per contract
than 36mm +,- 25 mm
requirements

H+I

Contractor Crew

Per Location

IFC Drawing; General Notes; ACI


138-95 (general construction
requirements); ACI 117
(tolerances); As per contract
requirements

IFC Drawings; Location of


centerline +,- 25 mm

H+I

Contractor Crew

Per Location

IFC Drawing; General Notes; ACI


138-95 (general construction
requirements); ACI 117
(tolerances); As per contract
requirements

IFC Drawings; for slabs +,- 5 mm,


for main columns, beams and
footings +,- 25 mm, for secondary
columns and beams +,- 12 mm

H+I

Contractor Crew

Per Location

IFC Drawing; General Notes; ACI


138-95 (general construction
requirements); ACI 117
(tolerances); As per contract
requirements

IFC Drawings; Cross sectional


dimensions +,- 5 mm, Temperature
15 to 32 degree Celsius, Slump +,60 mm

Contractor Crew

Per Location

IFC Drawing; General Notes; ACI


138-95 (general construction
requirements); ACI 117
(tolerances); As per contract
requirements

Approval by client

Contractor Crew

Per Location

IFC Drawing; General Notes; ACI


138-95 (general construction
requirements); ACI 117
(tolerances); As per contract
requirements

IFC Drawings; individual strength


test results shall not decrease
above 500 psi from the required
strength, average of 3 strength
tests results is not less than
required strength

Contractor Crew

Per Location

IFC Drawing; General Notes; ACI


138-95 (general construction
IFC Drawings; testing of concrete is
requirements); ACI 117
conducted and passed
(tolerances); As per contract
requirements

Contractor Crew

Per Location

IFC Drawing; General Notes; ACI


138-95 (general construction
IFC Drawings; +,- 5 mm for every 3
requirements); ACI 117
m
(tolerances); As per contract
requirements

H+I

Contractor Crew

Per Location

IFC Drawing; ACI 138-95 (general


construction requirements); ACI 117 IFC Drawings; +,- 5 mm for every 3
(tolerances); As per contract
m
requirements

H+I

Contractor Crew

Per Location

IFC Drawing; General Notes; As


per contract requirements

IFC Drawing, Approval by client

H+I

Contractor Crew

Per Location

IFC Drawing; As per contract


requirements

IFC Drawing, Approval by client

H+I

Contractor Crew

Per Location

As per contract requirements

Approval by client

H+I

Contractor Crew

Per Location

As per contract requirements

Approval by client

H+I

Contractor Crew

Per Location

IFC Drawing; As per contract


requirements

Approval by client

H+I

Contractor Crew

Per Location

As per contract requirements

Approval by client

H+I

Contractor Crew

Per Location

IFC Drawing; As per contract


requirements

IFC Drawings; +,- 5 mm for every 3


m

H+I

Contractor Crew

Per Location

IFC Drawing; As per contract


requirements

IFC Drawing, Approval by client

H+I

Contractor Crew

Per Location

IFC Drawing; As per contract


requirements

IFC Drawing, Approval by client

H+I

Contractor Crew

Per Location

IFC Drawing; As per contract


requirements

IFC Drawing, Approval by client

H+I

Contractor Crew

Per Location

IFC Drawing; As per contract


requirements

IFC Drawing, Approval by client

H+I

Contractor Crew

Per Location

IFC Drawing; General Notes; As


per contract requirements

IFC Drawing, Approval by client

H+I

Contractor Crew

Per Location

IFC Drawing; As per contract


requirements

IFC Drawing, Approval by client

H+I

Contractor Crew

Per Location

IFC Drawing; General Notes; As


per contract requirements

IFC Drawing, Approval by client

H+I

Contractor Crew

Per Location

IFC Drawing; General Notes; As


per contract requirements

IFC Drawing, Approval by client

H+I

Contractor Crew

G)

Per Location

IFC Drawing; As per contract


requirements

IFC Drawing, Approval by client

H+I

Contractor Crew

Per Location

IFC Drawing; As per contract


requirements

IFC Drawing, Approval by client

H+I

Contractor Crew

Per Location

IFC Drawing; As per contract


requirements

IFC Drawing, Approval by client

H+I

Contractor Crew

Per Location

IFC Drawing; General Notes;


Philippine Electrical Code; As per
contract requirements

IFC Drawing, Approval by client

H+I

Contractor Crew

Per Location

IFC Drawing; General Notes;


Philippine Electrical Code; As per
contract requirements

IFC Drawing, Approval by client

H+I

Contractor Crew

Per Location

IFC Drawing; As per contract


requirements

Approval by client

H+I

Third Party

Per Location

IFC Drawing; As per contract


requirements

Approval by client

H+I

Contractor Crew
& PHESCO
Survey

REPORT / CHECKLIST COMPLETED; RFI HOLD


POINT RELEASE, REFERENCE #

In-progress
In-progress
In-progress
DPWH HPR

DPWH HPR
DPWH HPR

DPWH HPR

DPWH HPR

DPWH HPR

DPWH HPR

DPWH HPR

DPWH HPR

DPWH HPR

DPWH HPR

DPWH HPR

DPWH HPR

DPWH HPR

DPWH HPR

DPWH HPR

DPWH HPR
DPWH HPR

DPWH HPR
DPWH HPR
DPWH HPR

DPWH HPR
DPWH HPR

DPWH HPR
DPWH HPR
DPWH HPR
DPWH HPR

DPWH HPR
DPWH HPR
DPWH HPR

DPWH HPR

DPWH HPR

DPWH HPR
DPWH HPR

DPWH HPR

DPWH HPR

DPWH HPR

DPWH HPR

INSPECTION AND
CONTRACT NO.

UNIT / AREA / LOCATION

DISCIPLINE

INSPECTION / TEST REQUIREMENTS


Activity #

Activity Description / Location


TEST OR INSPECTION PERFORM

1.00

Shop Drawing for all Construction Works

N/A

2.00

Method of Statement

N/A

3.00

Technical Submittal of Materials and Equipment

N/A

4.00

Checking of Survey and Layout

5.00

SITE PREPARATION

Clearing and Grubbing

Visual

Removal of Structures and Obstruction

Visual

Structure Excavation

Survey

Required Grade Level

Survey

6.00

LEAN CONCRETE

Survey

Penetrometer
Check soil bearing capacity

Check installation of micropiles

Monitor lean concreting

7.00

Visual + Material Test

Visual + Sampling

GRAVEL BEDDING

Penetrometer
Check soil bearing capacity

B
8.00

Check installation of gravel bedding

Visual + Material Test

FOOTINGS, BEAMS AND GIRDERS, COLUMNS, SLABS, RAMPS, STAIRS

Check installation of rebars

Embedded items (MEPFS, Anchor bolts, etc.)

Visual + Material Test

Visual + Level & Align + Material Test

Check enclosure of forms

Monitor concreting

Visual + Sampling

Curing of Concrete

Visual

Testing of Concrete Cylinder Samples

Check removal of forms & reshoring

9.00

MASONRY WORKS

Visual + Level & Align

Test

Visual

Check installed concrete hollow blocks

Check plastering

10.00

Visual

CEILING WORKS

Check ceiling framing system

Check installation of ficem board

11.00

Visual + Material Test

Visual + Level & Align + Material Test


Visual + Material Approval

PAINTING WORKS

Check Surface preparation / Application of neutralizer

Visual + Material Approval

Check Application of Primer

Visual + Material Approval

Check Application of Paint

Visual + Material Approval

12.00

TILING WORKS

Check initial layout of tiles

Check installed tiles

13.00

Visual + Material Approval


Visual

FIXTURES

Doors

Visual + Material Approval

Windows

Visual + Material Approval

Handrails

Visual + Material Approval

Other Fixtures (Plumbing, Electrical, Architectural etc.)

Visual + Material Approval

13.00

ROOF STRUCTURE (TRUSS, SAGRODS, CROSS BRACING, PURLINS, FLASHING SUPPORTS, ROOFING, FLASHING)

Check installation of baseplate

Check Grouting

Check Initial Setting of Roof Framing System (Tack Weld)

Check Final Setting of Roof Framing System (Full Weld)

Check Installation of Roofing, Flashing and Ridgeroll

14.00

Check installation of plumbing lines (water, sewer, drainage)

Commissioning

Visual + Level & Align + Material Test

Visual
Visual + Material Approval

Visual + Level & Align + Material Test


Visual

ELECTRICAL WORKS

Check electrical wiring installation

Commisioning

16.00

Visual + Material Test

PLUMBING WORKS

15.00

Visual + Level & Align + Material Test

Visual + Material Test

Visual

EMBANKMENT

Check backfilling and compaction works

Required Grade Level

Visual + Survey + Material Test + FDT

Survey

INSPECTION AND TEST PLAN


DATE:

DISCIPLINE

EQUIPMENT DESCRIPTION / TAG NUMBER, N/A

CTION / TEST REQUIREMENTS

METHOD OF VERIFICATION

REFERENCE DOCUMENTS

(see legends below)

STAGE / FREQUENCY

CODE, SPECS, ETC.

ACCEPTANCE CRITERIA

PHESCO

CLIENT

OTHERS

N/A

IFC Drawing; As per contract


requirements

Approval by client

Prepared by
PHESCO

N/A

IFC Drawing; As per contract


requirements

Approval by client

Prepared by
PHESCO

N/A

IFC Drawing; As per contract


requirements

Approval by client

Prepared by
PHESCO

Staking Out/Control Point

IFC Drawing; As per contract


requirements

Approval by client

H+I

Prepared by
PHESCO

Per Area

IFC Drawing; As per contract


requirements

Approval by client

Contractor Crew

Per Location

IFC Drawing; As per contract


requirements

Approval by client

Contractor Crew

Per Location

IFC Drawing; As per contract


requirements

Approval by client

H+I

Contractor Crew
& PHESCO
Survey

Per Location

IFC Drawing; As per contract


requirements

IFC Drawings

H+I

Contractor Crew
& PHESCO
Survey

Per Location

IFC Drawing; General Notes; As


per contract requirements

IFC Drawing, General Notes,


greater than or equal to required
soil bearing capacity

H+I

PHESCO

Per Location

IFC Drawing; General Notes; As


per contract requirements

IFC Drawings

H+I

Contractor Crew

Per Location

IFC Drawing; General Notes; ACI


138-95 (general construction
requirements); As per contract
requirements

IFC Drawings; Cross sectional


dimensions +,- 5 mm, Temperature
15 to 32 degree Celsius, Slump +,60 mm for slump greater than 3 in.
+,- 40 mm for slump 3 in and lower

Contractor Crew

Per Location

IFC Drawing; General Notes; As


per contract requirements

IFC Drawing, General Notes,


greater than or equal to required
soil bearing capacity

H+I

PHESCO

Per Location

IFC Drawing; General Notes; As


per contract requirements

IFC Drawings

H+I

Contractor Crew

Per Location

IFC Drawing; General Notes; ACI


IFC Drawings; for 36mm and
138-95 (general construction
requirements); ACI 117
smaller +,- 10 mm, for bars larger
(tolerances); As per contract
than 36mm +,- 25 mm
requirements

H+I

Contractor Crew

Per Location

IFC Drawing; General Notes; ACI


138-95 (general construction
requirements); ACI 117
(tolerances); As per contract
requirements

H+I

Contractor Crew

IFC Drawings; Location of


centerline +,- 25 mm

Per Location

IFC Drawing; General Notes; ACI


138-95 (general construction
requirements); ACI 117
(tolerances); As per contract
requirements

IFC Drawings; for dimensions=100


mm +,- 5 mm, for dimension=300
mm +,- 10 mm, for
dimensions=600mm +,- 25 mm

H+I

Contractor Crew

Per Location

IFC Drawing; General Notes; ACI


138-95 (general construction
requirements); ACI 117
(tolerances); As per contract
requirements

IFC Drawings; Cross sectional


dimensions +,- 5 mm, Temperature
15 to 32 degree Celsius, Slump +,60 mm for slump greater than 3 in.
+,- 40 mm for slump 3 in and lower

Contractor Crew

Per Location

IFC Drawing; General Notes; ACI


138-95 (general construction
requirements); ACI 117
(tolerances); As per contract
requirements

Approval by client

Contractor Crew

Per Location

IFC Drawing; General Notes; ACI


138-95 (general construction
requirements); ACI 117
(tolerances); As per contract
requirements

IFC Drawings; individual strength


test results shall not decrease
above 500 psi from the required
strength, average of 3 strength
tests results is not less than
required strength

Contractor Crew

Per Location

IFC Drawing; General Notes; ACI


138-95 (general construction
IFC Drawings; testing of concrete is
requirements); ACI 117
conducted and passed
(tolerances); As per contract
requirements

Contractor Crew

G)

Per Location

IFC Drawing; General Notes; ACI


138-95 (general construction
IFC Drawings; +,- 5 mm for every 3
requirements); ACI 117
m
(tolerances); As per contract
requirements

H+I

Contractor Crew

Per Location

IFC Drawing; ACI 138-95 (general


construction requirements); ACI 117 IFC Drawings; +,- 5 mm for every 3
(tolerances); As per contract
m
requirements

H+I

Contractor Crew

Per Location

IFC Drawing; General Notes; As


per contract requirements

IFC Drawing, Approval by client

H+I

Contractor Crew

Per Location

IFC Drawing; As per contract


requirements

IFC Drawing, Approval by client

H+I

Contractor Crew

Per Location

As per contract requirements

Approval by client

H+I

Contractor Crew

Per Location

As per contract requirements

Approval by client

H+I

Contractor Crew

Per Location

IFC Drawing; As per contract


requirements

Approval by client

H+I

Contractor Crew

Per Location

As per contract requirements

Approval by client

H+I

Contractor Crew

Per Location

IFC Drawing; As per contract


requirements

IFC Drawings; +,- 5 mm for every 3


m

H+I

Contractor Crew

Per Location

IFC Drawing; As per contract


requirements

IFC Drawing, Approval by client

H+I

Contractor Crew

Per Location

IFC Drawing; As per contract


requirements

IFC Drawing, Approval by client

H+I

Contractor Crew

Per Location

IFC Drawing; As per contract


requirements

IFC Drawing, Approval by client

H+I

Contractor Crew

Per Location

IFC Drawing; As per contract


requirements

IFC Drawing, Approval by client

H+I

Contractor Crew

Per Location

IFC Drawing; General Notes; As


per contract requirements

IFC Drawing, Approval by client

H+I

Contractor Crew

Per Location

IFC Drawing; As per contract


requirements

IFC Drawing, Approval by client

H+I

Contractor Crew

Per Location

IFC Drawing; General Notes; As


per contract requirements

IFC Drawing, Approval by client

H+I

Contractor Crew

Per Location

IFC Drawing; General Notes; As


per contract requirements

IFC Drawing, Approval by client

H+I

Contractor Crew

Per Location

IFC Drawing; As per contract


requirements

IFC Drawing, Approval by client

H+I

Contractor Crew

Per Location

IFC Drawing; As per contract


requirements

IFC Drawing, Approval by client

H+I

Contractor Crew

Per Location

IFC Drawing; As per contract


requirements

IFC Drawing, Approval by client

H+I

Contractor Crew

Per Location

IFC Drawing; General Notes;


Philippine Electrical Code; As per
contract requirements

IFC Drawing, Approval by client

H+I

Contractor Crew

Per Location

IFC Drawing; General Notes;


Philippine Electrical Code; As per
contract requirements

IFC Drawing, Approval by client

H+I

Contractor Crew

Per Location

IFC Drawing; As per contract


requirements

Approval by client

H+I

Third Party

Per Location

IFC Drawing; As per contract


requirements

Approval by client

H+I

Contractor Crew
& PHESCO
Survey

REPORT / CHECKLIST COMPLETED; RFI HOLD


POINT RELEASE, REFERENCE #

In-progress
In-progress
In-progress
CLIENT HPR

CLIENT HPR
CLIENT HPR

CLIENT HPR

CLIENT HPR

CLIENT HPR

CLIENT HPR

CLIENT HPR

CLIENT HPR

CLIENT HPR

CLIENT HPR

CLIENT HPR

CLIENT HPR

CLIENT HPR

CLIENT HPR

CLIENT HPR

CLIENT HPR
CLIENT HPR

CLIENT HPR
CLIENT HPR
CLIENT HPR

CLIENT HPR
CLIENT HPR

CLIENT HPR
CLIENT HPR
CLIENT HPR
CLIENT HPR

CLIENT HPR
CLIENT HPR
CLIENT HPR

CLIENT HPR
CLIENT HPR

CLIENT HPR
CLIENT HPR

CLIENT HPR

CLIENT HPR

CLIENT HPR

CLIENT HPR

You might also like