Manpower Optimization Study

Workload Details Sheet


Department

QA

Section
Workcentre

QA Lab

Designation

Dy. Manager

Sr. No.

Activity Description

Check daily quality reports & verify with standard specification.

Check the physical inspection of the final product & co-ordination with production dept. for the cle
production.

Give the quality clearance, for the material dispatch.

Discussion with production Head/QA head related to quality issues.

Check, RM/ additives testing reports & verify with specification as per Inspection plan & give the q
the use in production.

Co-ordination with R&D for additional required testing.

SAP data entries for Raw Material / In process samples / Finished product samples.

Monitoring SAP data entries for the QA lab.

Maintain Master data for the QM module in SAP.

10

If required, providing the COA to the marketing.

11

Customer complaint handling, investigation in coordination with production. Customer complaints

12

Arrange & monitor the internal Round robin testing with R&D & other plant lab.

13

Maintain the Internal calibration status of the Lab. instruments as per the calibration plan.

National Productivity Council, Gandhinagar

Manpower Optimization Study

Workload Details Sheet


Department

QA

Section
Workcentre

QA Lab

Designation

Dy. Manager

Sr. No.

Activity Description

14

Follow up for the AMC & external calibration of the lab. equipments with the vendors/external a

15

Co-ordination for Internal & external ISO audit.

16

Responsibility as Site MR for ISO 9001 compliance at Nandesari site.

17

Internal auditing of other Nandesari departments for compliance to ISO systems.

18

Responsible to monitoring of QA activities.

19

Leave & shift duty management. Effective work allocation, distribution & monitoring.

20

Safe working environment in QA.

21

Decision making for quality conformance of Final product, In process, Raw material, Auxi. Chemic
communication with all concern.

Basic Workload per Shift (in man-minutes)

Rest & Relaxation Allowances (%)

Standard Workload per Shift (in man-minutes) [A + B%]

Shift Available Time (minutes)

Present Utilization (%) [C / D]

Proposed Manpower per shift

Remarks & Guidance

National Productivity Council, Gandhinagar

Manpower Optimization Study

s Sheet

PRO / WLS / 03

Supervision Received from


Shifts

Crew Size

Frequency

Basic Time
(mins.)

1.0

15.0

1.0

15.0

1.0

15.0

1.0

20.0

1.0

15.0

1.0

15.0

1.0

30.0

1.0

30.0

1.0

30.0

0.3

30.0

uction. Customer complaints data entry in SAP.

1.0

30.0

plant lab.

1.0

15.0

1.0

15.0

Present Manpower
Proposed Manpower

on

h production dept. for the clearance of last 24 hrs.

r Inspection plan & give the quality clearance for

duct samples.

r the calibration plan.

National Productivity Council, Gandhinagar

Manpower Optimization Study

s Sheet

PRO / WLS / 03

Supervision Received from


Shifts

Crew Size

Frequency

Basic Time
(mins.)

1.0

4.0

1.0

5.0

1.0

10.0

1.0

5.0

1.0

5.0

1.0

15.0

1.0

15.0

1.0

20.0

Present Manpower
Proposed Manpower

on

with the vendors/external agencies.

SO systems.

on & monitoring.

, Raw material, Auxi. Chemicals & effective

National Productivity Council, Gandhinagar

Manpower Optimization Study

G
1
Total Time
(mins.)
15.0

15.0
15.0
20.0
15.0
15.0
30.0

30.0
30.0
8.6
30.0

15.0
15.0

National Productivity Council, Gandhinagar

Manpower Optimization Study

G
1
Total Time
(mins.)
4.0

5.0
10.0
5.0
5.0

15.0

15.0

20.0
332.57
13 %
375.81
410.00
92 %
0.9

National Productivity Council, Gandhinagar

Manpower Optimization Study

Workload Details Sheet


Department

QC

Section
Workcentre
Designation

Officer/Chemist

Sr. No.

Activity Description

Report preparation (Formulation, SAN receipt, Daily property, Rejection, RRT, In process)

Analysis of In-process samples.

Sampling & Analysis of Raw material (Styrene, Acrylonitrile, Auxi. chemicals & additives).

Online inspection of Finished good granules for Spikes, Mix pellets, Fines. Embedded etc. abnorma

Data entry of Finished product testing record in Log sheet.

SAP entry of In-process, Finished product & Raw material results.

Calibration of Lab. Instruments.(pH Meter, MFI tester -Temp. check).

Calibration of Lab. Instruments.( Izod Impact Tester, MFI tester- Die Dimension, Notch cutter, HDT

Calibration of Lab. Instruments. ( Surface Tensiometer, UV Spectrophotometer, Conductivity Mete

10

Analysis of styrene & Acrylonitrile Kandla storage samples, Party samples.

Basic Workload per Shift (in man-minutes)

Rest & Relaxation Allowances (%)

Standard Workload per Shift (in man-minutes) [A + B%]

Shift Available Time (minutes)

Present Utilization (%) [C / D]

Proposed Manpower per shift

Proposed Utilization (%) [F / D]

Remarks & Guidance

National Productivity Council, Gandhinagar

Manpower Optimization Study

tails Sheet

PRO / WLS / 06

Supervision Received from


Shifts

Crew Size

Frequency

Basic Time
(mins.)

1.0

15.0

44.0

7.2

1.0

20.0

2.0

20.0

8.0

4.0

3.0

5.0

0.1

15.0

imension, Notch cutter, HDT, Rockwell Hardness)

0.1

5.0

otometer, Conductivity Meter, Gas Chromatograph)

0.1

5.0

0.1

5.0

Present Manpower
Proposed Manpower

ription

on, RRT, In process)

emicals & additives).

nes. Embedded etc. abnormality visual inspection.

mples.

National Productivity Council, Gandhinagar

Manpower Optimization Study

G
1
Total Time
(mins.)
15.0
316.8
20.0
40.0
32.0
15.0
2.1
0.7
0.7
0.7
443.09
13 %
500.69
410.00
122 %
1.2
188 %

National Productivity Council, Gandhinagar

Manpower Optimization Study

Workload Details Sheet


Department

QC

Section

Molding

Workcentre
Designation

Operator

Sr. No.

Activity Description

Molding of Running Samples Colour plaque only.

Molding of R1 Samples ( Colour plaque+Impact).

Molding of Lot Samples ( Colour plaque+Impact+Film)

Molding of Full testing Sample ( Colour plaque+Impact+FS)

Molding of New color development/ color trial molding.

R1 Samples testing ( MFI+Impact+Film).

Lot Samples testing ( MFI+Impact+RH+Film).

RRT Sample testing ( MFI+Impact)

Record keeping of Molding.

10

Record keeping of contamination.

Basic Workload per Shift (in man-minutes)

Rest & Relaxation Allowances (%)

Standard Workload per Shift (in man-minutes) [A + B%]

Shift Available Time (minutes)

Present Utilization (%) [C / D]

Proposed Manpower per shift

Proposed Utilization (%) [F / D]

Remarks & Guidance

National Productivity Council, Gandhinagar

Manpower Optimization Study

Workload Details Sheet


Department
Section

QC
Molding

Workcentre
Designation
Sr. No.
Remarks & Guidance

Operator
Activity Description

National Productivity Council, Gandhinagar

Manpower Optimization Study

s Sheet

on

PRO / WLS / 04

Supervision Received from


Shifts

Present Manpower

Proposed Manpower

Crew Size

Frequency

Basic Time
(mins.)

8.0

10.0

3.0

10.0

4.0

10.0

12.0

10.0

5.0

10.0

3.0

10.0

4.0

10.0

1.0

10.0

1.0

5.0

1.0

5.0

National Productivity Council, Gandhinagar

Manpower Optimization Study

s Sheet

on

PRO / WLS / 04

Supervision Received from


Shifts

Present Manpower

Proposed Manpower

Crew Size

Frequency

National Productivity Council, Gandhinagar

Basic Time
(mins.)

Manpower Optimization Study

Total Time
(mins.)
80.0
30.0
40.0
120.0
50.0
30.0

40.0

10.0
5.0
5.0
410.00
13 %
463.30
410.00
113 %
1.1
188 %

National Productivity Council, Gandhinagar

Manpower Optimization Study

Total Time
(mins.)

National Productivity Council, Gandhinagar

Manpower Optimization Study

Workload Details Sheet


Department

Materials

Section

ETP

Workcentre
Designation

Chemist

Sr. No.

Activity Description

Analysis of unit wise waste water samples, treated water samples on shift basis. Stream wise ana
logbook as per ISO.

Coordination with plant operators for maintaining the Good ETP performance & smooth operation

Monitoring and Logging of various parameters in Logbook & PC. To maintain all records & logbook
14001.

Attending break down maintenance at ETP, Issuing the permits (Coordination with concerned serv
response.)

Bring in notice any bottlenecks in ETP.

Monitoring of Storm water management/ Work place monitoring of Hazardous process area.

To assist & coordinate with external Env Monitoring agency & auditor for their works. Taken count
keep record update.

To monitor performance of Waste Water Treatment Plant as per statutory requirement.

Assist for troubleshooting problem of ETP operation & coordinate with Operates & Contract labors

10

Preparation of all required chemicals at ETP Lab for different analysis & standardize it as per SOP.

11

Check & do calibration of each ETP lab instruments as per ISO records & keep records updated.

12

Preparation of the Haz. Waste Disposal Manifest manually (Landfill & Incineration) for the agency
internal incineration at moxi plant.

13

Supervise the Contract workers activities like SDB cleaning/ RVBF operation/ ETP Plant Housekeep

National Productivity Council, Gandhinagar

Manpower Optimization Study

Workload Details Sheet


Department

Materials

Section

ETP

Workcentre
Designation

Chemist

Sr. No.

Activity Description

14

Take lab trial & physic-Chemical treatability study for dosing of primary chemical & at the time of
problem at WWTP.

16

Scrutinizes & compilation of WWTP monthly report.

Basic Workload per Shift (in man-minutes)

Rest & Relaxation Allowances (%)

Standard Workload per Shift (in man-minutes) [A + B%]

Shift Available Time (minutes)

Present Utilization (%) [C / D]

Proposed Manpower per shift

Proposed Utilization (%) [F / D]

Remarks & Guidance

National Productivity Council, Gandhinagar

Manpower Optimization Study

ils Sheet

PRO / WLS / 01

Supervision Received from


Shifts

Crew Size

Frequency

Basic Time
(mins.)

1.0

200.0

1.0

30.0

1.0

30.0

1.0

20.0

1.0

10.0

0.2

30.0

0.0

240.0

tory requirement.

1.0

60.0

h Operates & Contract labors For resolve soon.

0.2

30.0

& standardize it as per SOP.

1.0

30.0

s & keep records updated.

0.2

30.0

1.0

10.0

1.0

30.0

Present Manpower
Proposed Manpower

ption
shift basis. Stream wise analysis work & Maintained

ormance & smooth operation & Maintenance work

aintain all records & logbooks up dated as per ISO

dination with concerned service department for quick

Hazardous process area.


for their works. Taken counter samples for analysis &

Incineration) for the agency like NECL & send waste for

eration/ ETP Plant Housekeeping & cleaning work.

National Productivity Council, Gandhinagar

Manpower Optimization Study

ils Sheet

PRO / WLS / 01

Supervision Received from


Shifts

Crew Size

Frequency

Basic Time
(mins.)

0.0

80.0

0.0

10.0

Present Manpower
Proposed Manpower

ption

ry chemical & at the time of any trouble shooting

National Productivity Council, Gandhinagar

Manpower Optimization Study

G
1
Total Time
(mins.)
200.0
30.0
30.0
20.0
10.0
5.0

9.6

60.0
5.0
30.0
5.0

10.0
30.0

National Productivity Council, Gandhinagar

Manpower Optimization Study

G
1
Total Time
(mins.)
3.2

0.4
448.20
13 %
506.47
410.00
124 %
1.2
101 %

National Productivity Council, Gandhinagar

Manpower Optimization Study

Workload Details Sheet


Department

EHS

Section

ETP

Workcentre
Designation
Sr. No.

Operator
Activity Description

Smooth operation & maintaining of WWTP each unit & trouble shutting monitoring as per statutor

Maintaining of Logbook filling & record keeping related to ETP operation & Maintenance work.

Attending break down maintenance activity at ETP (Coordination with concerned service departm
attend).

Day to day waste water sampling of each unit each shift for analysis at ETP lab.

Preparation of dosing chemicals as per the schedule in each shift for Primary/secondary treatmen

Assist to Casual labor for Sludge taken & RVBF operation at ETP.

Assist to Casual labor for top sludge removing manually from Primary & Secondary clarifier.

Assist to casual labor for cleaning & waste removing as & when required for regular activity.

Assist to casual labor for cleaning of Receiving pond & tiles pond as & when required.

10

To coordinate with external Env. monitoring agency for water sampling & monitoring activity

11

Maintain ETP chemical stock & record day to day used quantity in logbook.

12

Assist to ETP strom water drain management & empty out/Cleaning activity.

13

To maintain the record of day to day Haz. Waste generation & disposal as per category in log boo

National Productivity Council, Gandhinagar

Manpower Optimization Study

Workload Details Sheet


Department

EHS

Section

ETP

Workcentre
Designation

Operator

Sr. No.

Activity Description

14

To Coordinated with Contract agency for disposal of waste for maintain the status as per statutory
Supervise for internal waste transport movement to hazardous waste storage area timely.

16

Taken Meter reading from various plant flow meter

Basic Workload per Shift (in man-minutes)

Rest & Relaxation Allowances (%)

Standard Workload per Shift (in man-minutes) [A + B%]

Shift Available Time (minutes)

Present Utilization (%) [C / D]

Proposed Manpower per shift

Proposed Utilization (%) [F / D]

Remarks & Guidance

National Productivity Council, Gandhinagar

Manpower Optimization Study

s Sheet

PRO / WLS / 05

Supervision Received from


Shifts

Crew Size

Frequency

Basic Time
(mins.)

ng monitoring as per statutory requirement.

1.0

20.0

ion & Maintenance work.

1.0

20.0

1.0

20.0

at ETP lab.

3.0

10.0

Primary/secondary treatment.

2.0

20.0

2.0

5.0

y & Secondary clarifier.

2.0

5.0

red for regular activity.

2.0

5.0

& when required.

0.1

80.0

ng & monitoring activity

0.0

30.0

gbook.

2.0

5.0

activity.

0.0

25.0

al as per category in log book.

1.0

10.0

Present Manpower
Proposed Manpower

on

h concerned service department/ issuing permit to

National Productivity Council, Gandhinagar

Manpower Optimization Study

s Sheet

PRO / WLS / 05

Supervision Received from


Shifts

Crew Size

Frequency

Basic Time
(mins.)

1.0

20.0

5.0

5.0

Present Manpower
Proposed Manpower

on

in the status as per statutory requirement &


e storage area timely.

National Productivity Council, Gandhinagar

Manpower Optimization Study

G
1
Total Time
(mins.)
20.0
20.0
20.0
30.0
40.0
10.0

10.0

10.0
11.4
1.2
10.0

0.8
10.0

National Productivity Council, Gandhinagar

Manpower Optimization Study

G
1
Total Time
(mins.)
20.0

25.0
238.46
13 %
269.46
410.00
66 %
0.7
188 %

National Productivity Council, Gandhinagar

Manpower Optimization Study

Workload Details Sheet


Department

Materials

Section

Stores

Workcentre
Designation

Dy. Manager

Sr. No.

Activity Description
Indents/Purchase Requisitions

Overall responsibilities for smooth operation of stores in bound logistic

Develop, prepared and ensure to follow up work instructions and procedures.

Update and maintained ISO records / Statutory records

Co-ordinate for internal audit / customer audit and compliance of audit recommendations.

Daily work planning for day by day activities.

Coordination with planning, operation & material procurement to maintain store inventory.

Coordinate with finance department for goods receipt issues.

Coordinate with transporters to receipt & booking of material from transporter ware house.

Coordinate with service provider for inter plant material transfer.

10

Follow up with all concern departments for pending returnable gate pass.

11

Ensure to maintain housekeeping & safety standard in store area.

National Productivity Council, Gandhinagar

Manpower Optimization Study

Workload Details Sheet


Department

Materials

Section

Stores

Workcentre
Designation

Dy. Manager

Sr. No.

Activity Description

12

Prepared and circulate various reports


Inventory report of intermediates & Chemicals
Material rejection report
Nonmoving inventory report
Acetic Anhydride consumption report
Raw Material inventory report

13

Verify inventory - chemicals and consumable spare - SAP Vs Physical stock.

14

Planning for lot preparation as per requirement of production department.

15

Coordinate for Styrolution other site store activity, as and when required.

16

Ensure and maintain chemical inventory stack as per chemical compatibility

17

Give training to staff as required like Safety requirement, SAP, MSDS, and if any required.

18

Monitor and coordination of Forklift activities with third party vendor and forklift operators.

19

To ensure SAP entry is going perfect and various MIS reports prepare form SAP. Coordination for

Basic Workload per Shift (in man-minutes)

Rest & Relaxation Allowances (%)

Standard Workload per Shift (in man-minutes) [A + B%]

Shift Available Time (minutes)

Present Utilization (%) [C / D]

Proposed Manpower per shift

National Productivity Council, Gandhinagar

Manpower Optimization Study

Workload Details Sheet


Department

Materials

Section

Stores

Workcentre
Designation

Dy. Manager

Sr. No.
G

Activity Description
Proposed Utilization (%) [F / D]

Remarks & Guidance

National Productivity Council, Gandhinagar

Manpower Optimization Study

s Sheet

PRO / WLS / 07

Supervision Received from


Shifts

Crew Size

Frequency

Basic Time
(mins.)

stic

1.0

40.0

cedures.

1.0

20.0

1.0

20.0

1.0

10.0

1.0

20.0

1.0

30.0

1.0

20.0

1.0

30.0

1.0

20.0

1.0

20.0

1.0

20.0

Present Manpower
Proposed Manpower

on

uisitions

dit recommendations.

intain store inventory.

ansporter ware house.

pass.

National Productivity Council, Gandhinagar

Manpower Optimization Study

s Sheet

PRO / WLS / 07

Supervision Received from


Shifts

Crew Size

Frequency

Basic Time
(mins.)

1.0

40.0

al stock.

1.0

10.0

ment.

1.0

10.0

red.

1.0

15.0

atibility

1.0

15.0

and if any required.

1.0

10.0

and forklift operators.

1.0

15.0

form SAP. Coordination for MM modules of SAP.

1.0

10.0

Present Manpower
Proposed Manpower

on

National Productivity Council, Gandhinagar

Manpower Optimization Study

s Sheet

on

PRO / WLS / 07

Supervision Received from


Shifts

Crew Size

Frequency

Basic Time
(mins.)

Present Manpower
Proposed Manpower

National Productivity Council, Gandhinagar

Manpower Optimization Study

G
1
Total Time
(mins.)

40.0
20.0
20.0
10.0
20.0
30.0

20.0

30.0
20.0
20.0
20.0

National Productivity Council, Gandhinagar

Manpower Optimization Study

G
1
Total Time
(mins.)

40.0

10.0

10.0

15.0
15.0
10.0
15.0
10.0
375.00
13 %
423.75
410.00
103 %
1.0

National Productivity Council, Gandhinagar

Manpower Optimization Study

G
1
Total Time
(mins.)
188 %

National Productivity Council, Gandhinagar

Manpower Optimization Study

Workload Details Sheet


Department

Stores

Section
Workcentre
Designation

Officer

Sr. No.

Activity Description

Weighment of chemical store related vehicles.

Arrangement for unloading of material other than chemical in Chemical Store Godown through co

Confirm the quantity of Raw Material, Colours & Pigments as mentioned on Challan with actual re
receipt stamp on challan. Then the challan is given to Security department for Gate Entry inward.

Segregating, Stacking and tagging on every incoming material stored in Chemical Store Godown.
under inspection and after QC clearance, green Tag and Red Tag for rejected material with full det
Colours and pigments with quantity date of receipt and batch number.

To send the original invoice to Finance department and Duplicate for Transporter copy to Excise d
Butadiene, no extra copy is received, so we have to take one zerox copy to keep for our record.

For transfer of raw material, colour and pigments to Moxi, check the stock, confirm with User depa
NRGP and arrangement of vehicle for transfer of material from Nandesari to Moxi.

A copy of MSDS is tagged on every chemical, colours and pigments rack in chemical store godown

For Issue of Chemicals / raw materials, Reservation is issued by Production department is advance
Reservation received, chemical set is prepared in separate packing and arrangement for deliverin
production department to be made by Chemical Store through Contract Labours. FIFO (First In Firs
followed strictly for issue of chemical to production department.

Arrangement for issue Raw Material, SAN, Colours & Pigment to Finishing Section through Contrac
of issue received from User Department. FIFO (First In First Out) system is followed strictly for issu
Finishing Section.

10

Physical stock counting of all Raw Materials, Colours, Pigments and SAN on daily, weekly & mont

11

Arrangement to ensure timely issue of material to all User departments through contract labours.

12

Keeping advance cash for making payment to transporters / couriers for the delivery of materials
Engineering Stores and preparing Cash vouchers. Once in a week on Thursday, the account is set
department Cashier. Keeping account of advance cash.

13

Housekeeping of Chemical Store & Godown.

National Productivity Council, Gandhinagar

Manpower Optimization Study

Workload Details Sheet


Department

Stores

Section
Workcentre
Designation

Officer

Sr. No.

Activity Description

14

Proper filing of documents / records of Chemical Store.

15

Supervision of work done by Contract Labours.

16

Any additional work as directed by Seniors.


Other Works

Daily FR, PB and Graft section wise chemical sets Preparation with help of contract worker.

To make Tag for various chemical batch type sets and put on each packet properly.

To ensure that chemical sets load plant wise on pallet and make sure to reach at designated plan

Administrative work i.e. Local Post office work, GIDC Office, ECP Office, GIDC & ETP office to hand
bills, deliver letters etc miscellaneous work.

Basic Workload per Shift (in man-minutes)

Rest & Relaxation Allowances (%)

Standard Workload per Shift (in man-minutes) [A + B%]

Shift Available Time (minutes)

Present Utilization (%) [C / D]

Proposed Manpower per shift

Proposed Utilization (%) [F / D]

Remarks & Guidance

National Productivity Council, Gandhinagar

Manpower Optimization Study

s Sheet

PRO / WLS / 08

Supervision Received from

Present Manpower
Proposed Manpower
Crew Size

Frequency

Basic Time
(mins.)

1.0

10.0

cal Store Godown through contract labours / forklift.

1.0

15.0

ned on Challan with actual receipt and affix the store


tment for Gate Entry inward.

1.0

15.0

d in Chemical Store Godown. Yellow Tag for material


ejected material with full details of chemical,
r.

1.0

15.0

Transporter copy to Excise department. In case of


opy to keep for our record.

1.0

15.0

stock, confirm with User department, and prepare


esari to Moxi.

1.0

10.0

ack in chemical store godown.

1.0

15.0

1.0

15.0

hing Section through Contract Labours on the basis


em is followed strictly for issue of chemical to

1.0

10.0

SAN on daily, weekly & monthly basis.

1.0

15.0

nts through contract labours.

1.0

15.0

1.0

10.0

1.0

15.0

on

uction department is advance. On the basis of


nd arrangement for delivering the chemical set to
act Labours. FIFO (First In First Out) system is

for the delivery of materials for Chemical as well as


Thursday, the account is settled with Finance

National Productivity Council, Gandhinagar

Manpower Optimization Study

s Sheet

PRO / WLS / 08

Supervision Received from

Present Manpower
Proposed Manpower
Crew Size

Frequency

Basic Time
(mins.)

1.0

15.0

1.0

15.0

1.0

10.0

elp of contract worker.

1.0

60.0

acket properly.

1.0

10.0

e to reach at designated plant location timely.

1.0

15.0

1.0

70.0

on

e, GIDC & ETP office to hand over cheque, collect

National Productivity Council, Gandhinagar

Manpower Optimization Study

Total Time
(mins.)
10.0
15.0
15.0
15.0
15.0
10.0
15.0

15.0

10.0
15.0
15.0

10.0

15.0

National Productivity Council, Gandhinagar

Manpower Optimization Study

Total Time
(mins.)
15.0
15.0
10.0

60.0
10.0
15.0
70.0
370.00
13 %
418.10
410.00
102 %
1.0
188 %

National Productivity Council, Gandhinagar

Manpower Optimization Study

Workload Details Sheet Sunil patel


Department

Materials

Supervision Received from

Section

Shifts

Workcentre

Present Manpower

Designation
Sr. No.

Permanent

Proposed Manpower

Activity Description
Indents/Purchase Requisitions

Create Purchase Requisitions for Store and other User departments, who do not have SAP System facility like P&A
Department, Safety Department and Environment Department.

Intimation to User Department and Materials department regarding generation of PR. If the requirement is urgent,
intimation to Materials Department to generate Purchase Order.

Engineering Material unloading & item wise verification as per Challan & Purchase Order.

If there is any discrepancy in receipt of material or its documents, intimation to concerned person of Materials
department.

Intimation to User department regarding receipt of material.

Co-ordination with Security department for material receipt gate entry.

Goods Receipt SAP Entry of Material Receipt and information of GR Number to User department and Materials
department through E-mail.

Original Copy of Invoice to be sent to Materials department and Duplicate for Transporter Copy to be sent to Excise
department.

National Productivity Council, Gandhinagar

Manpower Optimization Study

Workload Details Sheet Sunil patel


Department

Materials

Supervision Received from

Section

Shifts

Workcentre

Present Manpower

Designation
Sr. No.
9

Permanent

Proposed Manpower

Activity Description
To maintain list of pending entry for the material already received & circulate to User department and Materials
department.

10

Co-ordination / follow up with Materials Department for pending Purchase Requisitions, Purchase Orders and problems /
error in SAP Entry.

11

To prepare Returnable Gate Pass for the material to be sent outside for repairing / other purpose or other location of the
Company.

12

When the material sent on Returnable Gate Pass is received back, co-ordination with Security department for closing of
Returnable Gate Pass.

13

To prepare Non-returnable gate pass for return of rejected engineering material to the supplier.

14

To collect the issue from respective User department for the material issued.

15

Follow up for getting issue from User department.

16

Issue of Material from Chemical Store during Shift hours (Except 9:00 to 17:00 hours) and on Sundays & Holidays.

National Productivity Council, Gandhinagar

Manpower Optimization Study

Workload Details Sheet Sunil patel


Department

Materials

Supervision Received from

Section

Shifts

Workcentre

Present Manpower

Designation
Sr. No.

Permanent

Proposed Manpower

Activity Description

17

Issue of Personal Protective Equipment to all the employees and Contract Labours as & when required.

18

Ensure timely issue of material to User department

19

To verify critical items stock regularly & inform to concerned User department for further necessary action.

20

Supervision for Physical stock counting daily, monthly, quarterly and yearly

21

To circulate Daily Material Receipt reports to User department and Materials Department

22

Co-ordination with IT Department, Vadodara for refilling of Cartridge of all the printers located at Nandesari Plant.

23

Weightment of all Raw Material Tankers and SAN Tankers during shift hours (Except 9:00 Hours to 17:00 Hours) and on
Sundays and Holidays.

24

Follow up with transporters for delivery of the material and arrangement of vehicle to collect the material.

25

Housekeeping of Engineering Store

National Productivity Council, Gandhinagar

Manpower Optimization Study

Workload Details Sheet Sunil patel


Department

Materials

Supervision Received from

Section

Shifts

Workcentre

Present Manpower

Designation

Permanent

Sr. No.

Proposed Manpower

Activity Description

26

To segregating, stacking and tagging every incoming material.

27

To maintain stock of material belongs to Safety & Personnel department, which is not in stock and comes against cost
center.

28

Proper filing of Engineering Store documents.

29

Printing of stationery for store department and its stock.

30

All correspondence of Engineering Store on E-mail.

31

Supervision of work done by Contract Labour in Engineering Store.

32

To help in periodical various stores audit

National Productivity Council, Gandhinagar

Manpower Optimization Study

Workload Details Sheet Sunil patel


Department

Materials

Supervision Received from

Section

Shifts

Workcentre

Present Manpower

Designation

Permanent

Sr. No.

Proposed Manpower

Activity Description
Basic Workload per Shift (in man-minutes)

Rest & Relaxation Allowances (%)

Standard Workload per Shift (in man-minutes) [A + B%]

Shift Available Time (minutes)

Present Utilization (%) [C / D]

Proposed Manpower per shift

Proposed Utilization (%) [F / D]

Remarks & Guidance

National Productivity Council, Gandhinagar

Manpower Optimization Study

PRO / WLS / 02

G
1

Crew Size

Frequency

Basic Time
(mins.)

Total Time
(mins.)

1.0

15.0

15.0

1.0

5.0

5.0

1.0

12.0

12.0

1.0

15.0

15.0

1.0

10.0

10.0

1.0

15.0

15.0

1.0

10.0

10.0

1.0

5.0

5.0

National Productivity Council, Gandhinagar

Manpower Optimization Study

PRO / WLS / 02

G
1

Crew Size

Frequency

Basic Time
(mins.)

Total Time
(mins.)

1.0

15.0

15.0

1.0

20.0

20.0

1.0

15.0

15.0

1.0

20.0

20.0

1.0

15.0

15.0

1.0

15.0

15.0

1.0

15.0

15.0

1.0

20.0

20.0

National Productivity Council, Gandhinagar

Manpower Optimization Study

PRO / WLS / 02

G
1

Crew Size

Frequency

Basic Time
(mins.)

Total Time
(mins.)

1.0

20.0

20.0

1.0

10.0

10.0

1.0

5.0

5.0

1.0

20.0

20.0

1.0

10.0

10.0

1.0

15.0

15.0

1.0

15.0

15.0

1.0

10.0

10.0

1.0

10.0

10.0

National Productivity Council, Gandhinagar

Manpower Optimization Study

PRO / WLS / 02

G
1

Crew Size

Frequency

Basic Time
(mins.)

Total Time
(mins.)

1.0

15.0

15.0

1.0

10.0

10.0

1.0

5.0

5.0

1.0

5.0

5.0

1.0

5.0

5.0

1.0

5.0

5.0

1.0

2.0

2.0

National Productivity Council, Gandhinagar

Manpower Optimization Study

PRO / WLS / 02

G
1

Crew Size

Frequency

Basic Time
(mins.)

Total Time
(mins.)
384.00
13 %
433.92
410.00
106 %
1.1
188 %

National Productivity Council, Gandhinagar

Workload Details Sheet


Department

Outbound

Section
Workcentre

DEVEN VAIDYA

Designation
Sr. No.

Officer
Activity Description

DESPATCH Activity like preparation & signing of Invoice+form 402+Gate pass+ sales tax on lin

PREPARATION OF CENVAT CREDIT REGISTER

PREPARATION OF FINANCE DEPT STATEMENTS

CENVAT CREDIT TO BE TANKEN OF ALL RM(SAP)

PREPARATION OF POWDER TANKER INVOICE

MONITORING OF TANKER RUNNING MOVEMENT

To monitor warehousing & stocking of FG

Supervision on labour contractors for timely loading, unloading & dispatch

Checking of vehicle after loading complet, Trapoline with use of fall protection system & send

10

To followed ISO / Safety & Environmental Aspects & Compliances.

11

Daily Post & courier work

12

PREPARATION OF MIS REPORTS

13

Preparation of Rg-1 Daily Stock Register as per Excise Rules

14

Monitoring of Aging Report

15

Keeping & Maintaining of all Records of (Capital goods ) as per Stores receipts- for Excise Rule

16

Insurance matters of all the co's Tankers - 6 Nos

17

Payment of freight to the transporters. ( M/S Jupiter Trpt. )

18

Payment/Communication of Maintenance Bills of Tankers

19

Monthly Stock Statement of Finished Goods


Monthly Production Statement
Monthly Cenvet Statements of RM & Capital Goods

20

Statement of BOE of Imported Goods ( Balance Statement )

21

Reconciliation of Cenvat Modvat in SAP

22

Preperation
Preperation
Preperation
Preperation
Preperation

23

Monthly Production Returns Under Industry Act-1951 - tobe sent to Dehli

24

Visit to Consultants / Excise Range / Division for all Excise related Works

25

Coordination with Excise Departments ( Range & Division ) for all Excise related issues & liozin

26

To keep track records of SCN received from the Excise Departments ( All Plants )

27

To
To
To
To

28

RTO Passing ( yearly ) for all the Co's Tankers ( 6 Tankers including KTL Tankers )

Basic Workload per Shift (in man-minutes)

Rest & Relaxation Allowances (%)

Standard Workload per Shift (in man-minutes) [A + B%]

Shift Available Time (minutes)

Present Utilization (%) [C / D]

Proposed Manpower per shift

Proposed Utilization (%) [F / D]

attend
attend
attend
attend

&
&
&
&
&

filling
filling
filling
filling
filling

of
of
of
of
of

ER-1
ER-4
ER-5
ER-6
ER-7

Return
Return
Return
Return
Return

Internal Excise Audit


External Excise Audit
Excise Department Excise Audit
AG Audit -Excise

Remarks & Guidance

Details Sheet

PRO / WLS / 06

Supervision Received from


Shifts

Crew Size

Frequency

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

0.1

0.1

0.0

0.0

0.0

Present Manpower
Proposed Manpower

escription

2+Gate pass+ sales tax on line

dispatch

all protection system & send it for final weighment.

tores receipts- for Excise Rules-qty based-II

0.0

0.0

0.0

0.0

to Dehli

0.0

Works

0.0

Excise related issues & liozing work

0.0

0.0

0.0

0.0

nts ( All Plants )

ding KTL Tankers )

PRO / WLS / 06

G
1

Basic Time
(mins.)

Total Time
(mins.)

80.0

80.0

20.0

20.0

20.0

20.0

20.0

20.0

25.0

25.0

30.0

30.0

15.0

15.0

15.0

15.0

60.0

60.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0

10.0

1.4

15.0

2.1

120.0

4.0

80.0

2.7

30.0

1.0

120.0

4.0

60.0

2.0

60.0

2.0

80.0

2.7

60.0

2.0

120.0

4.0

60.0

2.0

60.0

2.0

120.0

4.0

120.0

4.0
384.90
13 %
434.94
410.00
106 %
1.1
169 %

Workload Details Sheet


Department

Outbound

Section
Workcentre

VA PRAIKH

Designation
Sr. No.

Officer
Activity Description

PREPARATION OF CENVAT CREDIT REGISTER PART II

PREPARATION OF FINANCE DEPT STATEMENTS

CENVAT CREDIT TO BE TANKEN OF ALL RM(SAP)

PREPARATION OF POWDER TANKER INVOICE

To monitor warehousing & stocking of FG.

Maintaing of Bill of Entry Status & Daily Posting of All Bill of Entry.

Preperation of Rg-1 Daily Stock Register as per Excise Rules

Daily Post & courier work

PREPARATION OF MIS REPORTS

10
11

Keeping & Maintaining of all Records of (Capital goods ) as per Stores receipts- for Excise Rule
Monthly Stock Statement of Finished Goods
Monthly Production Statement
Monthly Cenvet Statements of RM & Capital Goods
Statement of BOE of Imported Goods ( Balance Statement )

12
13

Monthly Production Returns Under Industry Act-1951 - tobe sent to Dehli

14

Visit to Consultants/Excise office for Document Movement

15

Preparation of Scrap Invoice/documentations

16

Preparation of Aging Report

Basic Workload per Shift (in man-minutes)

Rest & Relaxation Allowances (%)

Standard Workload per Shift (in man-minutes) [A + B%]

Shift Available Time (minutes)

Present Utilization (%) [C / D]

Proposed Manpower per shift

Proposed Utilization (%) [F / D]

Remarks & Guidance

Details Sheet

PRO / WLS / 06

Supervision Received from


Shifts

Crew Size

Frequency

1.0

1.0

1.0

0.5

1.0

1.0

0.5

0.2

0.0

1.0

0.0

0.0

0.0

0.0

0.1

0.1

Present Manpower
Proposed Manpower

escription

tores receipts- for Excise Rules-qty based-II

to Dehli

PRO / WLS / 06

G
1

Basic Time
(mins.)

Total Time
(mins.)

20.0

20.0

60.0

60.0

30.0

30.0

20.0

10.0

40.0

40.0

40.0

40.0

60.0

30.0

40.0

8.0

120.0

2.0

15.0

15.0

60.0

2.0

60.0

2.0

80.0

2.7

120.0

4.0

60.0

8.6

80.0

11.4
285.67
13 %

322.80
410.00
79 %
0.8
179 %

Manpower Optimization Study

Workload Details Sheet


Department

Excise

Section
Workcentre
Designation

Assistant Officer

Sr. No.

Activity Description

Verification of All Production with Grades/Qty/Colours of last 24hours.

Preparation of Process Stock Position Report & Verification with Compounding Dept.

After Transfer given from Comp Dept., Re Verification of duly Transfer FG as per Production Report
Bags condition, stitching, Batch No, Grade Name, printing etc.

Grade and color wise stacking of finished goods in go- down.

Weighment of Empty/Loaded Truck of FG & Powder.

Material loading sheet given to Godown keeper as per PDA.

Checking of Vehicle Condition like Tarpoline, Floor, Inside Wall etc.

Arranging Material for Loading in to Vehicle.

After compilation of Despatch, Day to Day updation of Stock in Godown

10

Helping hands to other activity like co ordination & communication with other dept.

11

On Sunday one godown keeper attend duty even if there is no despatch on Sunday, for procurem

National Productivity Council, Gandhinagar

Manpower Optimization Study

Workload Details Sheet


Department

Excise

Section
Workcentre
Designation

Assistant Officer

Sr. No.

Activity Description

12

Stock Verification on Monthly Basis.

Basic Workload per Shift (in man-minutes)

Rest & Relaxation Allowances (%)

Standard Workload per Shift (in man-minutes) [A + B%]

Shift Available Time (minutes)

Present Utilization (%) [C / D]

Proposed Manpower per shift

Proposed Utilization (%) [F / D]

Remarks & Guidance

National Productivity Council, Gandhinagar

Manpower Optimization Study

s Sheet

PRO / WLS / 08

Supervision Received from


Shifts

Crew Size

Frequency

Basic Time
(mins.)

1.0

30.0

1.0

20.0

1.0

25.0

1.0

20.0

1.0

20.0

1.0

20.0

1.0

10.0

1.0

70.0

wn

1.0

15.0

ith other dept.

1.0

10.0

tch on Sunday, for procurement of FG.

0.1

30.0

Present Manpower
Proposed Manpower

on

pounding Dept.
FG as per Production Report & also checking of

National Productivity Council, Gandhinagar

Manpower Optimization Study

s Sheet

on

PRO / WLS / 08

Supervision Received from


Shifts

Crew Size

Frequency

Basic Time
(mins.)

0.0

40.0

Present Manpower
Proposed Manpower

National Productivity Council, Gandhinagar

Manpower Optimization Study

G
1
Total Time
(mins.)

30.0
20.0

25.0

20.0

20.0

20.0

10.0

70.0

15.0
10.0

4.3

National Productivity Council, Gandhinagar

Manpower Optimization Study

G
1
Total Time
(mins.)
1.3

245.62
13 %
277.55
410.00
68 %
0.7
188 %

National Productivity Council, Gandhinagar

Workload Details Sheet


Department
Section

RM STORES
HRG

Workcentre
Designation
Sr. No.

OPERATORS
Activity Description

Read previous shift report & field round.

If chilling process is running, monitor parameters frequently & start or stop the chilling circu

If Butadiene transferring is continue, monitor parameters frequently & start or stop the oper

If any maintenance job arises, to write work permit and get the job done, with watch for safety

BD Tanker receive, observe parking on point & note temp, pr.& roro gauge, write work permit
note details in register, disconnect and isolate. ( two tankers a day)

ST Tanker receive, observe parking on point & write work permit for connection, sampling, line
register, disconnect and isolate. ( two tankers a day)

ACN Tanker receive, observe parking on point & write work permit for connection, sampling, li
register, disconnect and isolate. ( one tanker per alternate day)

H2So4 / KOH Tanker receive, observe parking on point & write work permit for connection, sam
details in register, disconnect and isolate. ( total 5 tanker per month)

Acetic Anhydride Tanker receive, observe parking on point & write work permit for connection
note details in register, disconnect and isolate. ( one tanker per alternate month)

10

Maintain high level of safety in storage area.

Basic Workload per Shift (in man-minutes)

Rest & Relaxation Allowances (%)

Standard Workload per Shift (in man-minutes) [A + B%]

Shift Available Time (minutes)

Present Utilization (%) [C / D]

Proposed Manpower per shift

Proposed Utilization (%) [F / D]

Remarks & Guidance

Details Sheet

PRO / WLS / 06

Supervision Received from


Shifts

Crew Size

Frequency

1.0

tart or stop the chilling circulation.

1.0

ently & start or stop the operation.

1.0

ob done, with watch for safety.

0.5

1.0

1.0

0.5

rk permit for connection, sampling, lineup & unloading, note


nth)

0.2

e work permit for connection, sampling, lineup & unloading,


lternate month)

0.0

1.0

Present Manpower
Proposed Manpower

escription

ro gauge, write work permit for connection, lineup & unloading,


y)

or connection, sampling, lineup & unloading, note details in

t for connection, sampling, lineup & unloading, note details in

PRO / WLS / 06

G
1

Basic Time
(mins.)

Total Time
(mins.)

20.0

20.0

60.0

60.0

40.0

40.0

30.0

15.0

40.0

40.0

40.0

40.0

60.0

30.0

40.0

8.0

120.0

2.0

15.0

15.0
270.00
13 %
305.10
410.00
74 %
0.7
188 %

240

Manpower Optimization Study

Workload Details Sheet


Department
Section

Stores
Raw Material & Project
Transportation

Workcentre
Designation

Officer (savita patel)

Sr. No.

Activity Description

Arrangement for unloading of material other than chemical in Chemical Store Godown through co

Confirm the quantity of Raw Material, Colours & Pigments as mentioned on Challan with actual re
receipt stamp on challan. Then the challan is given to Security department for Gate Entry inward.

After Gate Entry SAP Entry Good Receipt Note (GRN) for all Chemicals, Colours and Pigments is pr

After GR entry, intimation to QC Lab for testing for all Chemicals, Colours & Pigments with batch n
receipt.

Segregating, Stacking and tagging on every incoming material stored in Chemical Store Godown.
under inspection and after QC clearance, green Tag and Red Tag for rejected material with full det
Colours and pigments with quantity date of receipt and batch number.

To send the original invoice to Finance department and Duplicate for Transporter copy to Excise d
Butadiene, no extra copy is received, so we have to take one zerox copy to keep for our record.

Non-returnable gate pass for inter-plant transfer of Styrene Tankers to Katol Plant and Raw Materi
and for rejected material to be returned.

For transfer of tankers Gate entry, SAP entry and QC Passing procedure is to be followed. Then NR
handover to Excise department. On the basis of NRGP, invoice is prepared by Excise department
documents to Chemical Store. The documents are handed over to the tanker Driver.

For transfer of raw material, colour and pigments to Moxi, check the stock, confirm with User depa
NRGP and arrangement of vehicle for transfer of material from Nandesari to Moxi.

10

To transfer of raw material, Colours and pigments from Moxi to Nandesari, E-mail is sent to Moxi. O
availability of material, Stock Transfer Order (STO) is created in SAP System. Moxi Plant prepares
STO and when the material is received from Moxi, segregation, proper stacking and tagging is don
godown.

11

A copy of MSDS is tagged on every chemical, colours and pigments rack in chemical store godown

12

For Issue of Chemicals / raw materials, Reservation is issued by Production department in advanc
Reservation received, chemical set is prepared in separate packing and arrangement for deliverin
production department to be made by Chemical Store through Contract Labours. FIFO (First In Firs
followed strictly for issue of chemical to production department.

National Productivity Council, Gandhinagar

Manpower Optimization Study

Workload Details Sheet


Department

Stores
Raw Material & Project
Transportation

Section
Workcentre
Designation

Officer (savita patel)

Sr. No.

Activity Description

13

Same procedure is followed for issue Raw Material, SAN, Colours & Pigment to Finishing Section a
Utility Department and Environment Department (ETP Lab) through Contract Labours on the basis
User Department. FIFO (First In First Out) system is followed strictly for issue of chemical to Finish

14

Physical stock counting of all Raw Materials, Colours, Pigments and SAN on daily, weekly & mont

15

Arrangement to ensure timely issue of material to all User departments through contract labours.

16

To verify critical items stock regularly & inform to concern User department and Materials departm
necessary action.

17

Follow up with transporters for delivery of all incoming material and arrangement of vehicle to co
transporter.

18

Keeping advance cash for making payment to transporters / couriers for the delivery of materials
Engineering Stores and preparing Cash vouchers. Once in a week on Thursday, the account is set
department Cashier. Keeping account of advance cash.

19

Daily Report of Acetic Anhydride hard copy and soft copy. Hard copy to be signed by GM (Operatio

20

Daily report of Moxi Receipt & Issue.

21

Raw Materials Tanker Receipt Report on daily basis.

22

Customer Return Report on daily basis.

23

Chemical Store Inventory Report on daily basis.

24

Intimation to QA Department Report for receipt of all Chemicals, Colours & Pigments on daily basi

25

Acetic Anhydride issue follow-up.

26

Raw Material Tankers Monthly Report.

27

Opening Balance, Receipt, Issue & closing balance of all Raw Material, Colours & Pigments month

28

SAP Stock V/s Physical Stock monthly report.

29

Customer Return Monthly report.

30

Moxi Receipt & Issue monthly report.

31

Monthly issue of all Chemical, Colours & Pigments.

32

Housekeeping of Chemical Store & Godown.

National Productivity Council, Gandhinagar

Manpower Optimization Study

Workload Details Sheet


Department

Stores
Raw Material & Project
Transportation

Section
Workcentre
Designation

Officer (savita patel)

Sr. No.

Activity Description

33

Proper filing of documents / records of Chemical Store.

34

Printing of Stationery for chemical store & maintain its stock.

35

Correspondence of Chemical Store through E-mail.

36

Supervision of work done by Contract Labours.

37

To help in Periodical various Stores Audit.

38

Any additional work as directed by Seniors.

Basic Workload per Shift (in man-minutes)

Rest & Relaxation Allowances (%)

Standard Workload per Shift (in man-minutes) [A + B%]

Shift Available Time (minutes)

Present Utilization (%) [C / D]

Proposed Manpower per shift

Proposed Utilization (%) [F / D]

Remarks & Guidance

National Productivity Council, Gandhinagar

Manpower Optimization Study

s Sheet

PRO / WLS / 09

Supervision Received from


Shifts

Crew Size

Frequency

Basic Time
(mins.)

cal Store Godown through contract labours / forklift

1.0

10.0

ned on Challan with actual receipt and affix the store


tment for Gate Entry inward.

1.0

15.0

s, Colours and Pigments is prepared.

1.0

15.0

1.0

10.0

d in Chemical Store Godown. Yellow Tag for material


ejected material with full details of chemical,
r.

1.0

15.0

Transporter copy to Excise department. In case of


opy to keep for our record.

1.0

5.0

1.0

10.0

ure is to be followed. Then NRGP to be prepared and


pared by Excise department and returns the
e tanker Driver.

1.0

10.0

stock, confirm with User department, and prepare


esari to Moxi.

1.0

15.0

1.0

15.0

1.0

5.0

1.0

15.0

Present Manpower
Proposed Manpower

on

ours & Pigments with batch number and date of

o Katol Plant and Raw Material to be sent to Moxi

esari, E-mail is sent to Moxi. On confirmation of


System. Moxi Plant prepares invoice on the basis of
er stacking and tagging is done at chemical store

ack in chemical store godown.

uction department in advance. On the basis of


nd arrangement for delivering the chemical set to
act Labours. FIFO (First In First Out) system is

National Productivity Council, Gandhinagar

Manpower Optimization Study

s Sheet

PRO / WLS / 09

Supervision Received from


Shifts

Crew Size

Frequency

Basic Time
(mins.)

gment to Finishing Section and other Chemical to


Contract Labours on the basis of issue received from
or issue of chemical to Finishing Section.

1.0

10.0

SAN on daily, weekly & monthly basis.

1.0

10.0

nts through contract labours.

1.0

10.0

1.0

5.0

1.0

10.0

for the delivery of materials for Chemical as well as


Thursday, the account is settled with Finance

1.0

10.0

to be signed by GM (Operations).

1.0

10.0

1.0

10.0

1.0

10.0

1.0

10.0

1.0

10.0

1.0

5.0

1.0

5.0

1.0

5.0

1.0

5.0

1.0

5.0

1.0

5.0

1.0

10.0

1.0

10.0

1.0

10.0

Present Manpower
Proposed Manpower

on

rtment and Materials department for further

arrangement of vehicle to collect the material from

ours & Pigments on daily basis.

l, Colours & Pigments monthly report.

National Productivity Council, Gandhinagar

Manpower Optimization Study

s Sheet

on

PRO / WLS / 09

Supervision Received from


Shifts

Crew Size

Frequency

Basic Time
(mins.)

1.0

10.0

1.0

5.0

1.0

10.0

1.0

10.0

1.0

5.0

1.0

5.0

Present Manpower
Proposed Manpower

National Productivity Council, Gandhinagar

Manpower Optimization Study

G
1
Total Time
(mins.)
10.0
15.0

15.0
10.0

15.0

5.0
10.0
10.0
15.0

15.0

5.0

15.0

National Productivity Council, Gandhinagar

Manpower Optimization Study

G
1
Total Time
(mins.)

10.0
10.0
10.0
5.0
10.0

10.0
10.0
10.0
10.0
10.0
10.0
5.0
5.0
5.0
5.0
5.0
5.0
10.0
10.0
10.0

National Productivity Council, Gandhinagar

Manpower Optimization Study

G
1
Total Time
(mins.)
10.0
5.0
10.0
10.0
5.0
5.0
350.00
13 %
395.50
410.00
96 %
1.0
188 %

National Productivity Council, Gandhinagar

Department:- Inbound Logistics


Particulars

Number of Indents/Purchase Requisitions assigned


Number of Line Items in Indent/Purchase Requisition
Number of Invoices handed over to excise dept
Number of offers collected from non authorized
suppliers/dealers/vendors/distributors
Number of times reverting back to
suppliers/dealers/vendors/distributors for detailed discussiong through
mails for any query or incomplete details/specifications (20% of Total
Offers collected)
Number of times sending reminders for offers to suppliers /vendors
and do follow up if required (20% of Total RFQs sent)
Number of times reviewing and discussing pending indents (10% of
Line Items)
Number of Purchase orders prepared and posted in system
Number of Purchase orders in which
amendments/modifications/cancellations have been made
Number of times co-ordinating with users and suppliers for drawing
approval, sample approval and inspection of material (10% of Line
Items)
Number of times reviewing, discussing pending orders, generating
report of pending orders and mailing to concerned authorities (10% of
Purchase Orders)
Number of times coordinating with
suppliers/dealers/vendors/distributors for sending reminders for timely
delivery of material, timely receipt of invoices, LR & Test certificates,
original invoice/challan, packing slip,etc. (25% of Purchase Orders)
Number of times coordination with accounts for payment details,
payment transfer/RTGS, issuing 'C' forms,etc. (equal to Purchase
Orders)
Number of times coordinating with vendors for material quality,
specifications, shortage, missing of warranty/guarantee/test
certificate (10% of Purchase Orders)
Number of times coordinating with vendors for closing pending orders
due to invoices, due to shortage and damage, missing
warranty/guarantee/test certificates, tax structures, discount, etc.
(10% of Purchase Orders)
Number of Invoices received from suppliers
Number of new Vendors developed

Chemical Stores
Average per month

Number of times searching & developing new vendors/authorized


distributors,raising enquiries checking accreditations, authorization,
certificates, business history of vendors, co-ordinating meeting with
new vendors for vendor profile, authorization/dealership, type of
material supply/specification, industrial reference of vendor for
supplied items, POs, etc. (5 times of Vendors developed)
Number of times follow-up with Vendors through Phone/Mail
Number of times clarification with Users/Suppliers
Number of approvals for POs/ QCs

ound Logistics

Chemical Stores
Average per day

Engineering Stores
Average per month

Average per day

S.no

Raw Material

Capcity/truck Trucks/year Trucks/month

Butadiene

18 Tonnes

450

37.50

ACN

23 Tonnes

85

7.08

Styrene

20 Tonnes

360

30.00

HCL

12 Tonnes

15

1.25

Sulphuric Acid

17 Tonnes

20

1.67

KOH

16 Tonnes

35

2.92

Actetic Anhydride

16 Tonnes

0.58

Ammonia

58 m3

24

2.00