Professional Documents
Culture Documents
Description
Perak
Pahang
MT
60
del
217.00
219.00
224.00
230.00
217.00
230.00
MT
60
ex
18.00
17.67
20.67
22.00
20.67
21.00
MT
30
ex
12.17
16.33
16.50
8.00
7.33
6.67
MT
30
ex
15.67
22.00
23.33
18.00
10.67
9.00
MT
30
ex
12.00
15.67
16.50
13.00
7.33
13.00
MT
30
ex
14.00
23.33
23.33
18.00
9.33
17.00
MT
14
del
2,415.00
2,415.00
2,415.00
2,415.00
2,415.00
2,415.00
MT
14
del
2,366.00
2,366.00
2,366.00
2,366.00
2,366.00
2,366.00
MT
14
del
2,275.00
2,275.00
2,275.00
2,275.00
2,275.00
2,275.00
10
MT
14
del
2,275.00
2,275.00
2,275.00
2,275.00
2,275.00
2,275.00
11
MT
14
del
2,275.00
2,275.00
2,275.00
2,275.00
2,275.00
2,275.00
12
MT
14
del
2,275.00
2,275.00
2,275.00
2,275.00
2,275.00
2,275.00
13
MT
14
del
2,275.00
2,275.00
2,275.00
2,275.00
2,275.00
2,275.00
14
MT
14
del
2,469.00
2,469.00
2,469.00
2,469.00
2,469.00
2,469.00
15
MT
14
del
2,415.00
2,415.00
2,415.00
2,328.00
2,415.00
2,415.00
16
MT
14
del
2,328.00
2,328.00
2,328.00
2,328.00
2,328.00
2,328.00
17
MT
14
del
2,328.00
2,328.00
2,328.00
2,328.00
2,328.00
2,328.00
18
MT
14
del
2,328.00
2,328.00
2,328.00
2,328.00
2,328.00
2,328.00
Source of Data: This average price is compiled from data supplied by BMDAM
MT = Metric Ton or Tonne, m = Square Metre, m = Cubic Metre, Del = Delivered, Ex = Ex-Factory, Ex-Quarry, Ex-Sand Pit
Table 1. Average Price of Building Materials for Peninsular Malaysia (BMDAM) (Continue...)
Description
Unit
Credit Del or Ex
January 2008 (RM)
Pulau
Selangor
Johor
Kelantan
Term
Pinang
(Days)
No.
Perak
Pahang
19
MT
14
del
2,328.00
2,328.00
2,328.00
2,328.00
2,328.00
2,328.00
20
30
del
5.70
5.70
5.70
5.70
5.70
5.70
21
30
del
7.98
7.98
7.98
7.98
7.98
7.98
22
30
del
10.19
10.19
10.19
10.19
10.19
10.19
23
30
del
13.23
13.23
13.23
13.23
13.23
13.23
24
30
del
16.70
16.70
16.70
16.70
16.70
16.70
25
30
del
144.33
136.00
140.67
132.33
116.00
134.33
26
30
del
150.33
141.00
146.00
139.33
121.00
138.67
27
30
del
155.00
145.67
151.00
146.00
126.00
144.00
28
30
del
161.33
153.00
156.67
153.00
133.00
151.00
29
30
del
170.00
160.67
163.33
160.33
141.00
159.67
30
30
del
179.00
170.00
170.00
176.00
150.00
168.00
31
30
del
188.67
179.67
180.33
183.00
160.33
178.00
32
piece
30
del
0.26
0.25
0.25
0.28
0.26
0.26
33
piece
30
del
0.73
0.69
0.72
0.75
0.76
0.76
34
piece
60
del
0.17
0.16
0.18
0.17
0.18
0.17
35
piece
60
del
1.72
1.60
1.72
1.72
1.65
1.72
Source of Data: This average price is compiled from data supplied by BMDAM
MT = Metric Ton or Tonne, m = Square Metre, m = Cubic Metre, Del = Delivered, Ex = Ex-Factory, Ex-Quarry, Ex-Sand Pit
No.
Table 1. Average Price of Building Materials for Peninsular Malaysia (BMDAM) (Continue...)
January 2008 (RM)
Description
Unit
Credit Del or Ex
Pulau
Selangor
Johor
Kelantan
Term
Pinang
(Days)
Perak
Pahang
36
sheet
30
del
25.67
25.67
25.67
25.67
25.67
25.67
37
sheet
30
del
39.83
38.67
39.83
39.83
39.07
39.53
38
sheet
60
del
22.33
22.33
22.33
22.33
22.33
22.33
39
piece
60
del
1.51
1.47
1.50
1.53
1.48
1.48
40
60
del
57.17
57.17
58.67
58.89
58.00
57.67
41
60
del
51.53
51.53
53.37
53.88
53.03
52.37
42
60
del
47.13
47.46
50.46
49.93
50.13
47.46
43
60
del
42.20
41.87
42.20
42.20
42.20
42.20
44
60
del
47.90
47.57
47.90
47.90
47.90
47.90
45
60
del
55.27
54.93
55.27
55.27
55.27
55.27
46
60
del
48.10
47.77
48.10
48.10
48.10
48.10
47
60
del
55.17
54.83
55.17
55.17
55.17
55.17
Source of Data: This average price is compiled from data supplied by BMDAM
MT = Metric Ton or Tonne, m = Square Metre, m = Cubic Metre, Del = Delivered, Ex = Ex-Factory, Ex-Quarry, Ex-Sand Pit
No.
Table 1. Average Price of Building Materials for Peninsular Malaysia (BMDAM) (Continue...)
January 2008 (RM)
Description
Unit
Credit Del or Ex
Pulau
Selangor
Johor
Kelantan
Term
Pinang
(Days)
Perak
Pahang
48
60
del
58.67
58.33
58.67
58.67
58.67
58.67
49
piece
60
del
0.74
0.73
0.74
0.74
0.74
0.74
50
piece
60
del
1.52
1.51
1.52
1.52
1.55
1.52
51
piece
60
del
1.05
1.05
1.09
1.09
1.09
1.09
52
piece
60
del
2.03
2.03
2.03
2.05
2.07
2.07
53
piece
60
del
18.00
18.00
17.67
18.00
18.00
18.00
54
piece
60
del
18.00
18.00
17.67
18.00
18.00
18.00
55
piece
60
del
18.00
18.00
17.67
18.00
18.00
18.00
56
piece
60
del
25.00
25.00
24.00
25.00
25.00
25.00
57
piece
60
del
3.50
3.50
3.30
3.50
3.50
3.50
58
piece
60
del
3.13
3.13
3.03
3.13
3.13
3.13
59
piece
60
del
3.13
3.13
3.07
3.13
3.13
3.13
Source of Data: This average price is compiled from data supplied by BMDAM
MT = Metric Ton or Tonne, m = Square Metre, m = Cubic Metre, Del = Delivered, Ex = Ex-Factory, Ex-Quarry, Ex-Sand Pit
No.
Table 1. Average Price of Building Materials for Peninsular Malaysia (BMDAM) (Continue...)
January 2008 (RM)
Description
Unit
Credit Del or Ex
Pulau
Selangor
Johor
Kelantan
Term
Pinang
(Days)
Perak
Pahang
60
piece
60
del
12.71
12.38
12.38
12.71
12.71
12.71
61
piece
60
del
12.71
12.38
12.38
12.71
12.71
12.71
62
piece
60
del
0.69
0.71
0.76
0.72
0.74
0.74
63
piece
60
del
0.83
0.83
0.83
0.83
0.83
0.83
64
sheet
60
del
3.65
3.65
3.65
3.65
3.65
3.65
65
sheet
60
del
6.33
6.33
6.33
6.33
6.33
6.33
66
sheet
60
del
7.30
7.28
7.30
7.30
7.30
7.30
67
sheet
60
del
12.67
12.67
12.67
12.67
12.67
12.67
68
sheet
60
del
5.00
5.00
5.00
5.00
5.00
5.00
69
sheet
60
del
9.83
9.87
9.83
9.83
9.83
9.83
70
sheet
60
del
4.53
4.53
4.53
4.53
4.53
4.53
71
6m run
60
del
27.17
27.17
27.17
27.03
27.03
27.03
Source of Data: This average price is compiled from data supplied by BMDAM
MT = Metric Ton or Tonne, m = Square Metre, m = Cubic Metre, Del = Delivered, Ex = Ex-Factory, Ex-Quarry, Ex-Sand Pit
No.
Table 1. Average Price of Building Materials for Peninsular Malaysia (BMDAM) (Continue...)
January 2008 (RM)
Description
Unit
Credit Del or Ex
Pulau
Selangor
Johor
Kelantan
Term
Pinang
(Days)
Perak
Pahang
72
6m run
60
del
40.53
40.53
40.53
39.20
39.20
39.20
73
6m run
60
del
55.83
55.83
55.83
55.37
55.37
55.37
74
6m run
60
del
33.73
33.73
33.73
33.57
33.57
33.57
75
6m run
60
del
43.67
43.67
43.67
43.43
43.43
43.43
76
6m run
60
del
63.50
63.50
63.50
63.47
63.47
63.47
77
6m run
60
del
40.07
40.07
40.07
39.80
39.80
39.80
78
6m run
60
del
51.60
51.60
51.60
51.33
51.33
51.33
79
6m run
60
del
79.77
79.77
79.77
79.60
79.60
79.60
80
4m run
60
del
21.42
21.42
21.42
21.42
21.42
21.42
81
6m run
60
del
32.67
32.33
32.67
32.67
32.67
32.67
82
6m run
60
del
45.37
45.37
45.37
45.37
45.37
45.37
83
6m run
60
del
64.90
63.13
64.90
64.90
64.90
64.90
Source of Data: This average price is compiled from data supplied by BMDAM
MT = Metric Ton or Tonne, m = Square Metre, m = Cubic Metre, Del = Delivered, Ex = Ex-Factory, Ex-Quarry, Ex-Sand Pit
No.
Table 1. Average Price of Building Materials for Peninsular Malaysia (BMDAM) (Continue...)
January 2008 (RM)
Description
Unit
Credit Del or Ex
Pulau
Selangor
Johor
Kelantan
Term
Pinang
(Days)
Perak
Pahang
84
4m run
60
del
7.10
7.10
7.10
7.10
7.10
7.10
85
4m run
60
del
10.17
10.17
10.17
10.17
10.17
10.17
86
6m run
60
del
9.80
9.80
9.80
9.80
9.80
9.80
87
6m run
60
del
29.27
29.27
29.27
29.27
29.27
29.27
88
4m run
60
del
8.78
8.64
8.78
8.78
8.78
8.78
89
4m run
60
del
25.93
26.80
26.13
26.13
26.13
26.13
90
6m run
60
del
56.30
56.30
56.30
56.30
56.30
56.30
91
6m run
60
del
78.93
78.93
78.93
78.93
78.93
78.93
92
4m run
60
del
8.55
8.35
8.35
8.35
8.35
8.55
93
4m run
60
del
12.25
12.25
12.25
12.25
12.25
12.25
94
4m run
60
del
10.80
10.80
10.73
10.73
10.73
10.73
95
4m run
60
del
15.58
15.58
15.20
15.20
15.20
15.58
Source of Data: This average price is compiled from data supplied by BMDAM
MT = Metric Ton or Tonne, m = Square Metre, m = Cubic Metre, Del = Delivered, Ex = Ex-Factory, Ex-Quarry, Ex-Sand Pit
No.
Table 1. Average Price of Building Materials for Peninsular Malaysia (BMDAM) (Continue...)
January 2008 (RM)
Description
Unit
Credit Del or Ex
Pulau
Selangor
Johor
Kelantan
Term
Pinang
(Days)
Perak
Pahang
96
4m run
60
del
21.13
21.13
21.13
21.13
21.13
21.13
97
4m run
60
del
35.08
35.08
35.08
35.08
35.08
31.75
98
100m roll
60
del
424.33
424.33
424.33
424.33
424.33
424.33
99
100m roll
60
del
136.00
136.00
136.00
136.00
136.00
136.00
100m roll
60
del
328.00
328.00
328.00
328.00
328.00
328.00
100m roll
60
del
533.00
533.00
533.00
533.00
533.00
533.00
100m roll
60
del
108.33
108.33
108.33
108.33
108.33
108.33
100m roll
60
del
156.00
156.00
156.00
156.00
156.00
156.00
100m roll
60
del
643.00
643.00
643.00
643.00
643.00
643.00
6m run
60
del
8.98
8.98
8.98
8.98
8.98
8.98
6m run
60
del
14.17
14.17
14.17
14.17
14.17
14.17
6m run
60
del
14.97
14.97
14.97
14.97
14.97
14.97
6m run
60
del
17.97
17.97
17.97
17.97
17.97
17.97
6m run
60
del
22.50
22.50
22.50
22.50
22.50
22.50
Source of Data: This average price is compiled from data supplied by BMDAM
MT = Metric Ton or Tonne, m = Square Metre, m = Cubic Metre, Del = Delivered, Ex = Ex-Factory, Ex-Quarry, Ex-Sand Pit
No.
Table 1. Average Price of Building Materials for Peninsular Malaysia (BMDAM) (Continue...)
January 2008 (RM)
Description
Unit
Credit Del or Ex
Pulau
Selangor
Johor
Kelantan
Term
Pinang
(Days)
Perak
Pahang
60
del
1,841.67
1,841.67
1,821.67
1,821.67
1,821.67
1,841.67
60
del
1,700.00
1,700.00
1,763.33
1,770.00
1,746.67
1,700.00
60
del
1,636.67
1,636.67
1,600.00
1,566.67
1,566.67
1,636.67
60
del
1,703.33
1,703.33
1,666.67
1,633.33
1,633.33
1,633.33
No.
60
del
97.23
96.13
97.23
97.23
97.23
97.23
No.
60
del
173.83
171.63
173.83
173.83
173.83
173.83
No.
60
del
101.67
101.67
101.67
101.67
101.67
101.67
No.
60
del
204.60
201.67
208.00
208.00
208.00
208.00
118 Wash Hand Basins - 560mm x 406mm, white colour Dotex WB 702, Globe
Set
60
del
53.73
53.73
53.73
53.73
53.73
53.73
119 Wash Hand Basins - 560mm x 406mm, white colour Jacqueline WB 142, Claytan
Set
60
del
58.50
58.50
59.50
59.50
59.50
58.50
Item
60
del
45.67
45.67
46.67
46.67
46.67
45.67
Item
60
del
464.00
464.00
464.00
464.00
464.00
464.00
Source of Data: This average price is compiled from data supplied by BMDAM
MT = Metric Ton or Tonne, m = Square Metre, m = Cubic Metre, Del = Delivered, Ex = Ex-Factory, Ex-Quarry, Ex-Sand Pit
No.
Table 1. Average Price of Building Materials for Peninsular Malaysia (BMDAM) (Continue...)
January 2008 (RM)
Description
Unit
Credit Del or Ex
Pulau
Selangor
Johor
Kelantan
Term
Pinang
(Days)
Perak
Pahang
Item
60
del
122.57
122.57
122.57
123.90
123.23
122.57
Set
60
del
461.73
461.73
461.73
461.73
461.73
461.73
Set
60
del
966.67
966.67
966.67
966.67
966.67
966.67
Item
60
del
89.20
89.20
90.20
90.20
86.53
89.20
Set
60
del
386.40
386.40
386.40
368.40
386.40
386.40
Item
60
del
132.40
132.40
132.40
132.40
132.40
132.40
128 Stainless Steel Sinks - Single Bowl Single Drainer Lay on type, 42" x 18"
Item
60
del
71.67
71.67
71.67
71.67
71.67
71.67
5 litres
60
del
112.00
112.00
112.00
112.00
112.00
112.00
5 litres
60
del
97.00
97.00
97.00
97.00
97.00
97.00
5 litres
60
del
84.00
84.00
84.00
84.00
84.00
84.00
5 litres
60
del
110.00
110.00
110.00
110.00
110.00
110.00
Source of Data: This average price is compiled from data supplied by BMDAM
MT = Metric Ton or Tonne, m = Square Metre, m = Cubic Metre, Del = Delivered, Ex = Ex-Factory, Ex-Quarry, Ex-Sand Pit
No.
Table 1. Average Price of Building Materials for Peninsular Malaysia (BMDAM) (Continue...)
January 2008 (RM)
Description
Unit
Credit Del or Ex
Pulau
Selangor
Johor
Kelantan
Term
Pinang
(Days)
Perak
Pahang
5 litres
60
del
85.00
85.00
85.00
85.00
85.00
85.00
5 litres
60
del
87.00
87.00
87.00
87.00
87.00
87.00
5 litres
60
del
84.00
84.00
84.00
84.00
84.00
84.00
5 litres
60
del
79.33
79.33
79.33
79.33
79.33
79.33
7 litres
60
del
27.67
27.67
27.67
27.67
27.67
27.67
60
del
85.00
85.00
85.00
85.00
85.00
85.00
5 litres
60
del
72.40
72.40
72.40
72.40
72.40
72.40
5 litres
60
del
55.33
55.33
55.33
55.33
55.33
55.33
5 litres
60
del
90.00
90.00
90.00
90.00
90.00
90.00
5 litres
60
del
82.00
82.00
82.00
82.00
82.00
82.00
5 litres
60
del
70.00
70.00
70.00
70.00
70.00
70.00
5 litres
60
del
85.00
85.00
85.00
85.00
85.00
85.00
Source of Data: This average price is compiled from data supplied by BMDAM
MT = Metric Ton or Tonne, m = Square Metre, m = Cubic Metre, Del = Delivered, Ex = Ex-Factory, Ex-Quarry, Ex-Sand Pit
No.
Table 1. Average Price of Building Materials for Peninsular Malaysia (BMDAM) (Continue...)
January 2008 (RM)
Description
Unit
Credit Del or Ex
Pulau
Selangor
Johor
Kelantan
Term
Pinang
(Days)
Perak
Pahang
5 litres
60
del
80.00
80.00
80.00
80.00
80.00
80.00
5 litres
60
del
60.00
60.00
60.00
60.00
60.00
60.00
5 litres
60
del
81.67
81.67
81.67
81.67
81.67
81.67
5 litres
60
del
71.00
71.00
71.00
71.00
71.00
71.00
No.
60
del
66.67
66.67
66.67
66.67
66.67
66.67
No.
60
del
81.67
81.67
81.67
81.67
81.67
81.67
No.
60
del
79.00
79.00
79.00
79.00
79.00
79.00
No.
60
del
41.00
41.00
41.00
41.00
41.00
41.00
Set
60
del
8.13
8.03
7.87
7.97
7.90
8.13
6m
length
60
del
109.60
109.60
109.60
106.80
109.60
109.60
6m
length
60
del
6.77
6.77
6.77
6.52
6.77
6.77
MT
60
del
4,013.33
4,013.33
3,800.00
3,800.00
3,800.00
4,013.33
Source of Data: This average price is compiled from data supplied by BMDAM
MT = Metric Ton or Tonne, m = Square Metre, m = Cubic Metre, Del = Delivered, Ex = Ex-Factory, Ex-Quarry, Ex-Sand Pit
No.
Table 1. Average Price of Building Materials for Peninsular Malaysia (BMDAM) (Continue...)
January 2008 (RM)
Description
Unit
Credit Del or Ex
Pulau
Selangor
Johor
Kelantan
Term
Pinang
(Days)
Perak
Pahang
MT
60
del
3,344.67
3,344.67
3,194.33
3,159.33
3,159.33
3,344.67
MT
60
del
3,954.00
3,954.00
3,784.00
3,756.00
3,756.00
3,954.00
MT
60
del
3,361.33
3,361.33
3,197.33
3,176.00
3,176.00
3,361.33
MT
60
del
3,920.33
3,920.33
3,735.00
3,728.00
3,728.00
3,920.33
MT
60
del
3,920.33
3,920.33
3,735.00
3,728.00
3,728.00
3,920.33
MT
60
del
3,838.67
3,838.67
3,666.67
3,631.67
3,631.67
3,838.67
MT
60
del
3,808.67
3,808.67
3,636.67
3,601.67
3,601.67
3,808.67
MT
60
del
4,230.00
4,230.00
4,016.67
4,000.00
4,000.00
4,230.00
MT
60
del
4,036.67
4,036.67
3,830.00
3,820.00
3,820.00
4,036.67
MT
60
del
3,820.67
3,820.67
3,643.33
3,626.67
3,626.67
3,820.67
MT
60
del
3,752.67
3,752.67
3,580.00
3,570.00
3,570.00
3,752.67
MT
60
del
2,846.00
2,846.00
2,707.00
2,705.00
2,705.00
2,846.00
Source of Data: This average price is compiled from data supplied by BMDAM
MT = Metric Ton or Tonne, m = Square Metre, m = Cubic Metre, Del = Delivered, Ex = Ex-Factory, Ex-Quarry, Ex-Sand Pit
No.
Table 1. Average Price of Building Materials for Peninsular Malaysia (BMDAM) (Continue...)
January 2008 (RM)
Description
Unit
Credit Del or Ex
Pulau
Selangor
Johor
Kelantan
Term
Pinang
(Days)
Perak
Pahang
MT
60
del
2,842.00
2,842.00
2,707.00
2,701.67
2,701.67
2,842.00
MT
60
del
2,850.33
2,850.33
2,751.67
2,712.00
2,712.00
2,850.33
MT
60
del
3,125.33
3,125.33
2,980.00
2,980.00
2,980.00
3,125.33
MT
60
del
3,247.67
3,247.67
3,085.67
3,087.67
3,087.67
3,247.67
MT
60
del
3,228.00
3,228.00
3,228.00
3,076.67
3,076.67
3,228.00
MT
60
del
3,343.67
3,343.67
3,084.00
3,085.67
3,085.67
3,343.67
MT
60
del
3,700.00
3,700.00
3,700.00
3,516.67
3,516.67
3,700.00
piece
60
del
4,354.67
4,354.67
4,354.67
4,143.33
4,143.33
4,354.67
piece
60
del
3,671.00
3,671.00
3,471.67
3,468.33
3,468.33
3,671.00
piece
60
del
3,600.00
3,600.00
3,407.00
3,403.33
3,403.33
3,600.00
piece
60
del
3,601.33
3,601.33
3,413.33
3,406.67
3,406.67
3,601.33
piece
60
del
189.00
187.33
187.33
187.33
184.00
190.67
piece
60
del
333.67
332.00
332.00
335.33
332.00
335.33
piece
60
del
72.73
74.40
74.40
74.40
72.73
74.40
Source of Data: This average price is compiled from data supplied by BMDAM
MT = Metric Ton or Tonne, m = Square Metre, m = Cubic Metre, Del = Delivered, Ex = Ex-Factory, Ex-Quarry, Ex-Sand Pit
No.
Table 1. Average Price of Building Materials for Peninsular Malaysia (BMDAM) (Continue...)
January 2008 (RM)
Description
Unit
Credit Del or Ex
Pulau
Selangor
Johor
Kelantan
Term
Pinang
(Days)
Perak
Pahang
piece
60
del
86.00
91.00
91.00
91.00
89.33
91.00
piece
60
ex
526.67
526.67
526.67
513.33
513.33
513.33
piece
60
ex
1,030.00
1,030.00
1,030.00
1,016.67
1,016.67
1,016.67
piece
60
del
49.67
49.67
49.67
49.67
50.00
49.00
piece
60
del
1,168.00
1,141.67
1,172.00
1,183.33
1,160.67
1,179.67
piece
60
del
118.13
114.80
115.13
115.13
114.80
122.47
piece
60
del
186.33
180.33
181.33
181.33
181.33
194.33
piece
60
del
81.50
80.50
80.17
84.83
78.83
82.17
piece
60
del
89.83
88.83
88.50
92.83
87.17
90.17
piece
60
del
151.33
148.00
146.33
160.33
143.00
160.33
piece
60
del
163.17
160.83
158.83
173.50
160.17
170.83
piece
60
del
271.07
271.07
271.07
271.07
271.07
271.07
Source of Data: This average price is compiled from data supplied by BMDAM
MT = Metric Ton or Tonne, m = Square Metre, m = Cubic Metre, Del = Delivered, Ex = Ex-Factory, Ex-Quarry, Ex-Sand Pit
No.
Table 1. Average Price of Building Materials for Peninsular Malaysia (BMDAM) (Continue...)
January 2008 (RM)
Description
Unit
Credit Del or Ex
Pulau
Selangor
Johor
Kelantan
Term
Pinang
(Days)
Perak
Pahang
piece
60
del
400.43
400.43
400.43
400.43
400.43
400.43
piece
60
del
9,283.33
9,283.33
8,866.67
8,866.67
8,863.33
9,283.33
piece
60
del
11,849.33
11,849.33
11,312.67
11,312.67
11,309.33
11,849.33
piece
60
del
15,758.67
15,758.67
15,038.67
15,038.67
15,038.67
15,758.67
piece
60
del
756.53
756.53
718.33
726.67
713.50
764.87
piece
60
del
1,255.99
1,255.99
1,186.00
1,201.00
1,183.77
1,270.99
MT
60
del
792.12
792.12
748.33
756.67
747.60
800.45
MT
60
del
1,320.20
1,320.20
1,248.33
1,263.33
1,246.00
1,335.20
MT
60
del
843.25
843.25
801.67
810.00
795.77
851.59
MT
60
del
1,402.25
1,402.25
1,326.67
1,343.33
1,324.10
1,418.92
MT
60
del
3,983.33
3,983.33
3,983.33
3,983.33
3,966.67
3,983.33
Source of Data: This average price is compiled from data supplied by BMDAM
MT = Metric Ton or Tonne, m = Square Metre, m = Cubic Metre, Del = Delivered, Ex = Ex-Factory, Ex-Quarry, Ex-Sand Pit
No.
Table 1. Average Price of Building Materials for Peninsular Malaysia (BMDAM) (Continue...)
January 2008 (RM)
Description
Unit
Credit Del or Ex
Pulau
Selangor
Johor
Kelantan
Term
Pinang
(Days)
Perak
Pahang
MT
60
del
3,756.67
3,756.67
3,756.67
3,756.67
3,750.00
3,756.67
MT
60
del
3,770.00
3,770.00
3,770.00
3,770.00
3,766.67
3,770.00
MT
60
del
3,983.33
3,983.33
3,983.33
3,983.33
3,966.67
3,983.33
MT
60
del
3,806.67
3,806.67
3,806.67
3,806.67
3,800.00
3,806.67
MT
60
del
3,806.67
3,806.67
3,806.67
3,806.67
3,800.00
3,806.67
piece
60
del
114.47
114.47
114.47
114.47
110.47
114.47
piece
60
del
175.00
175.00
175.00
175.00
174.33
175.00
Source of Data: This average price is compiled from data supplied by BMDAM
MT = Metric Ton or Tonne, m = Square Metre, m = Cubic Metre, Del = Delivered, Ex = Ex-Factory, Ex-Quarry, Ex-Sand Pit
Description
Unit
January 2008
(RM)
ton
272.11
sheet
9.08
26.13
19.92
33.83
38.39
77.30
kg
14.97
kg
15.01
10
ton
1,133.00
Source of Data : This average price is compiled from data supplied by Department of Statistics, Malaysia (DOS)
m2 = Square Metre
Description
Unit (m)
Unit (MT)
4,440.00
6,287.00
2,500.00
3,540.00
1,520.00
2,152.00
2,550.00
3,611.00
1,030.00
1,458.00
4,450.00
6,301.00
2,850.00
4,036.00
1,290.00
1,827.00
2,450.00
3,469.00
10
980.00
1,388.00
11
1,320.00
1,869.00
12
1,350.00
1,912.00
13
1,180.00
1,671.00
14
1,180.00
1,671.00
15
850.00
1,204.00
16
880.00
1,246.00
17
1,290.00
1,827.00
18
1,250.00
1,770.00
Source of Data : This average price is compiled from data supplied by Malaysian Timber Industry Board (MTIB)
m3 = Cubic Metre, MT = Metric Ton or Tonne
Description
Unit (m)
Unit (MT)
19
1,310.00
1,855.00
20
1,260.00
1,784.00
21
1,000.00
1,416.00
22
950.00
1,345.00
23
1,730.00
2,450.00
24
1,360.00
1,926.00
25
1,670.00
2,365.00
26
960.00
1,359.00
27
980.00
1,388.00
28
1,180.00
1,671.00
29
1,460.00
2,067.00
30
1,010.00
1,430.00
31
1,270.00
1,798.00
32
3,200.00
4,531.00
33
850.00
1,204.00
34
1,850.00
2,620.00
35
1,470.00
2,082.00
36
1,450.00
2,053.00
Source of Data : This average price is compiled from data supplied by Malaysian Timber Industry Board (MTIB)
m3 = Cubic Metre, MT = Metric Ton or Tonne
Description
Unit (m)
Unit (MT)
37
1,350.00
1,912.00
38
1,050.00
1,487.00
39
1,420.00
2,011.00
40
1,540.00
2,181.00
41
930.00
1,317.00
42
1,100.00
1,558.00
43
3,250.00
4,602.00
44
900.00
1,274.00
Source of Data : This average price is compiled from data supplied by Malaysian Timber Industry Board (MTIB)
m3 = Cubic Metre, MT = Metric Ton or Tonne