Professional Documents
Culture Documents
Lutz Bcheler
Purchasing Manager,
Onshore Civil Works and Mechanical Installation,
Dept. BPPO
MAN Diesel & Turbo
Stadtbachstr. 1
86153 Augsburg, Germany
Lutz.Buecheler@man.eu
Page 1 of 8
Table of content
1.
2.
Price breakdown............................................................................................................. 3
3.
4.
5.
6.
7.
Signature of bidder......................................................................................................... 8
Page 2 of 8
2. Price breakdown
Price breakdown as follows
(Included in the above total. These items do not necessarily represent all of the Subcontract Work
specified in this tender):
Description
Amount [USD]
1-1.20
75,000
50,000
Page 3 of 8
1-2.10
2,432,250
2,557,250
Hourly rate
[USD/ hour]
STAFF:
Site Manager
11.33
8.50
QA/ QC Manager
8.50
HSE Manager
7.50
Head Mason
Foreman
8.00
SKILLED WORKER:
Machine Operator
5.50
Concrete Worker
3.50
Underground worker
3.00
Erection Supervisor
4.00
Electrician
4.50
Helper
2.50
Page 4 of 8
Till 10 p.m.:
+100%
After 10 p.m.:
+100%
Saturday:
Sunday:
Shifts:
NA
+100%
Double shift: NA
Night shift:
NA
ERECTION EQUIPMENT:
Daily rate
[USD/ day]
Weekly rate
[USD/ week]
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
Forklift 5 t
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
Wheel loader
NA
NA
NA
NA
Daily rate
[USD/ day]
Weekly rate
[USD/ week]
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
Page 5 of 8
Daily rate
[USD/ day]
Weekly rate
[USD/ week]
75
525
Labour-container (6x3)m
35
245
Sanitary-container (6x3)m
35
245
Toilet-cabines (2x2)m
15
105
Tool-container (12x3)m
50
350
Material-container (12x3)m
50
350
Unit
[pcs.]
NA
[pcs.]
NA
[pcs.]
NA
Cost
[USD/ week]
5,000
5,000
The Subcontractor has in that case to prove to MAN Diesel & Turbo SE that the staff, tools, equipment
and material etc. could not be appointed to any other work. The Subcontractor has to execute every
just and reasonable action to prevent MAN Diesel & Turbo SE from costs arising out of that
suspension, extension of time, idleness and interruption.
Page 6 of 8
NAME OF SUBSUBCONTRACTOR
SteelReinforcement
17%
AghaSteelIndustries
ConcreteReadyMix
25%
DREADYMIXCONCRETE(PVT)LTD
We acknowledge that we have investigated the above sub-subcontractors and suppliers and confirm
that they are reliable and competent to carry out the work satisfactorily. It is agreed that there will be
no substitution of, or any addition of, sub-subcontractors without the prior written approval of the
Contractor.
6. Name of surety
I (we) hereby propose
Page 7 of 8
Bidder:
NATIONAL BORING PIONEER CO.
9/21-22,Commercial Area Main Road,Bus Stop No.10
Liaquatabad, Karachi.
Project:
MP.-Nr:
10
DESCRIPTION OF WORK
QTY
UNIT
UNIT PRICE
USD
AMOUNT
USD
GENERAL
In the works the following shall be included as a minimum scope, but
not limited:
- preparing of a well bearing gravel layer for placment and working plane of
the drilling machinery for the drilling areas
- drilling of piles for all existing soil types at site as discribed in soil
investigation report
- disposal of drilled earth material, if this can not be used at site for filling
- supply and built-in of reinforcing steel for piles, bar reinforcement, Steel
grade 60 (fy = 4,200 kg/cm2) acc. ASTM A-615 or equal, including up to 0.8
m bar lapping into ground slab
- supply and pooring of concrete (fc cube > 35 MPa = 5250 psi) for drilled
piles
- cutting of weak concrete at top of pile (at least 0.30 m have to be cutted)
- length of pile will be measured for billing from top of concrete to bottom of
pile
10-010
1.00
pcs
75,000.00 USD
10-020
1.00
pcs
50,000.00 USD
20
Piling works
20-001
55.00
962,500.00 USD
20-002
Supply of Concrete (fc cube > 35 MPa = 5250 psi) for piles acording to the
technical terms and consotions incl. All needed test and documentation
8,000.00
105.00
840,000.00 USD
20-003
Supply of reinforcing steel cage for all piles, bar reinforcement, Steel grade 60
(fy = 4,200 kg/cm2) acc. ASTM A-615 or equal
625.00
950.00
593,750.00 USD
20-004
3.00
pcs
12,000.00
36,000.00 USD
11,200.00
5,350.00
7,400.00
m
m
m
4.500
5.000
5.500
Unit Price
Unit Price
Unit Price
7,400.00
4.500
Unit Price
7,400.00
3.750
Unit Price
7,400.00
21.250
Unit Rates
30
Earth Works