You are on page 1of 23

Cooperation between operators on renewable

projects and local municipalities.

JOAN FAGES
Managing Partner

Group CXC ENERGIA RENOVABLE


November 4th,2016

Engineer from the High Technical School of Industrial Engineers of Barcelona since
1966.
Studies on MBA at ESADE.
Developed his professional activity in the field of renewable energies since 1981.
Developed projects in Spain, Portugal, Cape Verde and France.
Founder in 1986 of Spanish Association of Small Producers and Electricity
Generators with Renewable Energy Sources (APPA) and member of the Board until
today.
Founder in 1989 of European Small Hydropower Association (ESHA) and member
of the Board until 1994.
Founder in 1999 of European Renewable Energies Federation (EREF) and President
until 2004.

FLAGSHIP PROJECTS
Rec dels 4 Pobles, Catalan Pyrenees. Spain Power installed: 1.88 MW
Rehabilitation of the irrigation canal and construction of a new small hydropower plant.
Agricultural income:
Improvement of spray irrigation
Improvement of production.
Possibility of increasing spray irrigation in 52 Ha.
Energy results:
Generation of 14.4 GWH/year of renewable energy.
Financial results:
Reduction of water consumption through the process of irrigation.
Power generation economically remunerated.
Social outcomes:
Involvement of local farmers in the management of the project.
Improvement of farmer's competitiveness.
Environmental outcomes:
75% of savings in irrigation water.
Green landscape maintenance.
Reduction of 5000 T/year of the CO2 emissions to the atmosphere.

WIND FARMS in Spain


EL PERELL

Wind farms in Spain:


- 17 General Electric wind turbines of 750 Kw.
Commissioned in July 2001.
- 54 Gamesa wind turbines of 660 Kw. Commissioned in
April 1999 and July 2000.
- 1 Alstom prototype wind turbine of 3,000 kw.
Commissioned in 2008.
TOTAL POWER INSTALLED: 51.39 MW

Control center

WIND FARMS in FRANCE

Wind farms in operation: 13.8 MW


Wind farms under construction: 36.8 MW. Commissioned
expected in April 2017
Wind farms currently on development: 60 MW.
New project to build 100 MW of wind farms and
photovoltaic projects to be in place in 3-4 years.

Example of a local cooperation with the municipality of El


Perell:
El Perell is a municipality with 3,000 inhabitants, located near
the Mediterranean sea in Catalonia.
The cooperation with El Perell was based on the following
points:

A. Economic contribution.
Voluntary contribution of 3% of yearly turnover plus
official taxes amounting to about 3.8 M in 15 years.

B. Local employment .
Working in Operation and Maintenance of the wind
farms

C. Visitors
farms Centre.
Guiding visitors, since 2000 about 83,000 visitors,
approx. 6,000 people per year to the Wind Farms.

And also including visitors from Japan


2009
2010
2012
2014
2016
2016

Kyushu Electric Power Co. Fukuoka


The Tokyo Electric Power Workers
The Kyoto Chamber of Commerce and Industries
National Federation of Agricultural Cooperative Ass. (ZEN-NOH)
National Federation of Electric Workers Association
The Aomori Prefectural Assembly

D.Cooperation in local celebrations


(Festa Major, local orchestra, choir, carnivals,
parades, Christmas cards, Handball local team)
Choir,
Orchestra

Christmas Cards
Carnivals

Year 2015 Electricity Generation Mix in Spain

Fuente: APPA annual report 2015

The importance of the compensation systems and the


stability in regulatory frame
Evolution:
-

From 1981 up to year 2000, our selling price was the same fixed for the power
bought for industries connected at 30 kV.
From 2001 up to year 2007 pool price + premium.
From 2007 up to year 2013 pool price + premium but with a cap and floor .
Since 2013, new regulation applicable :
1. Existing Wind Farms commissioned before 2004, pool price without premium
2. Existing Wind Farms commissioned after 2004, pool price plus fixed amount per
MW installed
3. New Wind Farms to be installed, auction system

Evoluci del preu del kWh Parc Elic Les Colladetes 2000-2016
0,14
0,13
0,12
0,11
0,10

0,09
0,08
0,07
0,06
0,05
0,04
0,03
0,02
0,01

0,00

mensual

Lmit superior CAP segons RD 661

Lmit inferior FLOOR segons RD 661

mesual sense forats de tensi

Preu Pool (/kWh)

661 Tarifa

Evolution of the installed wind power capacity every year in Spain (in MW)

THANK YOU

You might also like