Professional Documents
Culture Documents
Criteria
A 6s 2
6 7.82
1 Mark: C
365.04 cm
2 TB 2 210 GB
2048 GB
External hard drive 2048
4.096 4
Laptop hard drive
500
2 x 3x 4 x 2 x 3 x 4 x
1 Mark: D
1 Mark: D
24 x 3
h
( Af 4 Am Al )
3
50
(5 4 5.1 5.5)
3
515 m3
A
4
1 Mark: C
1 Mark: C
4 months with fewer guests than May Jul, Jun, Aug, Sep
1 Mark: A
1 Mark: C
$4.55
y mx b
y 2x 3
Gradient is 2.
y-intercept is 3
1 Mark: B
Alternatively check
the points (1,1) , (0,3)
and (1, 5) are on the line.
5Vt V 2
18 170
5 60 0.55 602
18
170
30.34313725... 30 m
d
9
10
1 Mark: C
1 Mark: A
1 Mark: D
12
1 Mark: B
3 y 1
72
2
3 y 1 14
3 y 15
y5
2
13
14
1 Mark: B
Number of arrangements 5 4 3 2 1
120
1 Mark: C
1 Mark: A
16
1 Mark: A
17
AB
13
o
sin 76 sin 63o
13sin 76o
AB
sin 63o
1 Mark: C
18
1 Mark: D
19
1 Mark: C
1 Mark: A
0.5
Percentage error
100
5327
0.00938614...
0.009%
21
Number of litres 55 40 38 7
140 L
7
Washing machine
100
140
5.0%
1 Mark: A
SA 2 r 2 2 rh
22
2 r 2 2 r 2r
1 Mark: A
6 r 2
23
24
2(3a 1) 2( a 5) 6a 2 2a 10
4a 8
1
1
2
$25 $10
$0
4
4
4
$11.25
Financial Exp
1 Mark: D
1 Mark: B
A P(1 r )n
25
24
0.06
$4800 1
12
$5410.37
Instalments = $5410.37 24
1 Mark: C
$225.43
Section II
Solution
26(a)
Criteria
5y 3 8
2 Marks: Correct
answer.
1 Mark: Completes
one correct step.
5 y 11
y
26(b)
(i)
11
2.2
5
132 x 2 52
x 2 132 52
144
x 12
26(b)
(ii)
1 Mark: Correct
answer.
Pythagoras theorem
37.4 m
2 Marks: Correct
answer.
1 Mark: Finds the
length of the
semicircle or makes
some progress.
26(c)
(i)
sin 35o
26(c)
(ii)
1 Mark: Correct
answer.
26(d)
(i)
1 Mark: Correct
answer.
26(d)
(ii)
2 Marks: Correct
answer.
1 Mark: Uses the
sine ratio with one
correct value.
AT
150
AT 150 sin 35o
86.03646545... 86 m
$17, 473.68
$3473.68 3
100
$14, 000
8.2706666... 8.27%
Interest rate
2 Marks: Correct
answer.
1 Mark: Finds the
total interest paid or
shows some
understanding.
26(e)
(i)
P (3)
26(e)
(ii)
P (4, 8 or 12)
26(f)
(i)
Number of calls
1 Mark: Correct
answer.
26(f)
(ii)
1 Mark: Correct
answer.
1
12
1 Mark: Correct
answer.
3 1
12 4
1 Mark: Correct
answer.
$750
($0.35 $0.85)
625
27(a)
600 200
p
800
200 p 48, 000
2 Marks: Correct
answer.
p 2400
1 Mark: Makes
some progress
a 2b3 16
2b3 a 16
a 16
b3
2
a 16
b 3
2
1 Mark: Correct
answer.
27(c)
(i)
Distance
27(c)
(ii)
1 Mark: Correct
answer.
27(d)
200 m 1 mm
1
50 m mm
4
7
350 m mm 1.75 mm
4
2 Marks: Correct
answer.
1 Mark: Shows
some
understanding.
27(e)
(i)
2 Marks: Correct
answer.
1 Mark: Uses the z
score of 2 and 2.
27(e)
(ii)
1 Mark: Correct
answer.
27(e)
(iii)
xx
s
x 50
2.5
3
x 50 7.5
x 57.5 h
Student with a z-score of 2.5 would have 57.5 hours sleep.
2 Marks: Correct
answer.
1 Mark: Uses the zscore formula with
one correct value or
shows some
understanding.
27(e)
(iv)
70
100 1400 km
5
1 Mark: Correct
answer.
15.85%
27(f)
Drip rate
1.5 1000
187.5 mL/h
8
2 Marks: Correct
answer.
1 Mark: Finds the zscore of 53 or 59.
1 Mark: Correct
answer.
28 (a)
(i)
2 Marks: Correct
answer.
1 Mark: Plotted at
least one correct
value or shows
some
understanding.
28 (a)
(ii)
5
Run 5
(negative sign given in the formula)
2 Marks: Correct
answer.
1 Mark: Finds d or
c.
1 Mark: Correct
answer.
5 1.5 25
17.5 litres
28(b)
(i)
k
N
k
21.25
16
k 21.25 16 340
2 Marks: Correct
answer.
1 Mark: Uses an
equation in the form
k
y
x
28(b)
(ii)
340
N
340
13.6
N
340
N
25 vibrations
13.6
1 Mark: Correct
answer.
b y mx
65 0.6 50
35
1 Mark: Correct
answer.
28(c)
28(d)
(i)
2 Marks: Correct
answer.
1 Mark: Uses the
product rule to find
the probability of
one outcome.
0.18
28(d)
(ii)
0.99
Alternatively, not CC .
28(e)
(i)
P( E ) 1 0.1 0.1
0.99
V r 2h
12 r 2 1.8
12
1.8
r 1.456731241...
r2
V 12, 000 L 12 m 3
28(e)
(ii)
29 (a)
(i)
20 mL takes 1 minute
100 mL takes 5 minutes
1000 mL takes 50 minutes
8000 mL takes 400 minutes = 6 hours 40 minutes
AB 2 502 502 2 50 50 cos120o
7500
87 m
The length of AB is 87 metres.
1
A 50 50 sin120o
2
1082.531755...
1083 m 2
Area of triangle AOB is 1083 square metres.
29 (a)
(iii)
1 Mark: Correct
answer.
1.457 m
AB 86.60254038...
29 (a)
(ii)
2 Marks: Correct
answer.
1 Mark: Shows
some understanding
1 Mark: Correct
answer.
2 Marks: Correct
answer.
1 Mark: Substitutes
one correct value
into the cosine rule.
2 Marks: Correct
answer.
1 Mark: Substitutes
one correct value
into the area
formula.
1 Mark: Correct
answer.
29 (a)
(iv)
1 Mark: Correct
answer.
29(b)
29(c)
(i)
29(c)
(ii)
2 Marks: Correct
answer.
1 Mark: Correct
answer.
72
2 Marks: Correct
answer.
1 Mark: Uses the
formula for arc
length with one
correct value.
2 r
360
72
2 6400
360
8042.477193 8042 km
29(c)
(iii)
Local times are the same as they both have the same
longitude.
Plane landed in Perth at 6.30 pm + 11 hours or
5.30 am on Wednesday.
29(c)
(iv)
29(d)
29(e)
30(a)
(ii)
30(a)
(iii)
30(a)
(iv)
1 Mark: Correct
answer.
1 Mark: Correct
answer.
(10 N 7.5 H )
5.5M
(10 4 7.5 2.5)
5.5 48
0.080492424...
BACFemale
1 Mark: Correct
answer.
x 3ab 2
1 Mark: Correct
answer.
3 7 3.82
303.24
30(a)
(i)
1 Mark: Shows
some understanding
of the problem.
1 Mark: Correct
answer.
$557 525.00
0.05
$557,525 1
$2800 $557, 048.02
12
1 Mark: Correct
answer.
0.05
$2321.03
12
1 Mark: Correct
answer.
1 Mark: Correct
answer.
$557, 048.02
30(b)
5 x 2 y 16 (1)
x y 1 (2)
2 Marks: Correct
answer.
1 Mark: Finds x or
y. Alternatively the
candidate shows
some understanding
of the process.
x2
Substitute x 2 into equation (2)
2 y 1
y3
Check using equation (1) 5 2 2 3 16 True
Solution is x 2 and y 3
30(c)
(i)
30 sentences
1 Mark: Correct
answer.
30(c)
(ii)
1 Mark: Correct
answer.
1 Mark: Correct
answer.
30(c)
(iii)
30(c)
(iv)
2 Marks: Correct
answer.
1 Mark: Constructs
appropriate scales
and titles for the
horizontal and
vertical axes.
30(d)
(i)
PV 2.49 7500
$18, 675
30(d)
(ii)
1 Mark: Correct
answer.
2 Marks: Correct
answer.
1 Mark: Finds the
intersection value.
10