Professional Documents
Culture Documents
INDEX
Railway Board References (Traction Rolling Stock)
S. No.
letter No.
Date
Subject
Page No.
1.
2008/Eiect.(TRS)/440/10 3
Ph./Misc.
11.02.2011
2.
97 /Eiect(TRS)/113/4 Pt. ll
15.03.2011
2-10
3.
2008/Eiect.(TRS)/113/5 Pt.
19.04.2011
11
4.
2008/Eiect.(TRS)/440/23
13.05.2011
12
5.
C-D&D/T/09
10.08.2011
13-16
6.
2004/Eiect.(TRS)/412/6 Pt.
12.08.2011
Updation of inspection
electric locos in FOIS
7.
2008/Eiect.(TRS)/440/4 Misc.
29.08.2011
18-19
8.
2007/Eiect.(TRS)/225/10 Misc.
07.10.2011
20-22
9.
2009/Eiect.(TRS)/113/2
11.11.2011
23 ..
10.
2008/Eiect.(TRS)/440/6/3
Ph./FA Vol. Ill
22.11.2011
Performance reports
sheds/workshops
24
11.
2011/Eiect.(TRS)/225/13 Misc.
15.12.2011
12.
EL/3.1.35/2 (3-Ph)
06.01.2012
13.
2007/Eiect(TRS)/113/7
19.61.2012
14.
19.01.2012
schedules
being
sent
of
by
17
25
26-27
28
29-39
2008/Eiect(TRS)/440/23
24.01.2012
40
16.
2011/Eiect(TRS)/138/9
10.02.2012
41
17.
EL/3.1.35/4
26.03.2012
42-43
S.No.
Letter No.
Date
Subject
Page No.
18.
El/3.6.1
28.03.2012
44
19.
2005/Eiect(TRS)/440/23
04.04.2012
46-47
20.
2011/Efect.(TRS)/113/4
. 24.04.2012
48-49
21.
2012/Eiect(TRS)113/7
Timely communication
unusual occurrence
02.05.2012
2002/Eiect.(TRS)/113/1 dt.
12.11.2007
of accidents
50-52
22.
2012/Eiect(TRS)/113/4
31.05.2012
23.
2012/Eiect.(TRS)/113/2
18.06.2012
55
24.
2007/Eiect.(TRS)/440/8
04.07.2012
56-57
25.
2009/Eiect.(TRS)/113/2
28.08.2012
58-59
26.
2002/Tele/WCM/6/Geni/Pt.
28.08.2012
60-63
2002/Tele/WCM/6/Genl/Pt.
dt. 17.10.2007
5354
27.
2003/Eiect.(TRS)/440/17 Pt.
29.10.2012
64
28.
2002/Eiect(TRS)/122/2
07.11.2012
65-66
2.9.
2012/Eiect(TRS}/225/13 Misc.
Pt. I
07.12.2012
67
30.
2003/Elect.(TRS)/441/3 Viol. I
Pt. I
13.12.2012
68
31.
H/3.6.4/02
14.12.2012
69-102
32.
2011/Eiect.(TRS)/225/13 Misc.
19.12.2012
33.
2010/Tele/2(1)/1/Pt.
27.12.2012
***
103
104-106
'+f"R(f.
(m m
RAILWAY BOARD}
SUB
Three phase locos are provided with shunting mode feature to limit
speed to 15 kmph during shunting.
Zonal Railways are advised to issue suitable instructions to field units to
ensure that locomotives are put in shunting mode while in sheds I outpits so
as to avoid any mishap during shunting these locos.
This shall be treated as URGENT.
\~~
(Mohit Chandra)
Dir. Elect. Engg. (RS)
Railway Board
e-mail: deers@rb.railnet.gov.in
Fb '!l
No. 97/Elect(TRS)/113/4 Pt II
Ref:
1.
Pursuant to the change of authority of vendor development of ROSO for certain Items,
issued vide letter under ref. (i), the revised distribution of responsibilities for preparation of
drawing I specification, capacity I capability assessment, approval of sources for
developmental I regular orders, placement of developmental orders and prototype clearance
amongst CLW, RDSO and Zonal Railways for various items pertaining to electric loco shall be
as under:
Electric: locomotive iConventional}
s.
Description of Item
Preparation
No.
C;~pacity,
capability
of dr.IINing/
assessment &
specification
approval of sources
Placement of
developmental
orders
Prototype
clearance
for developmental
2.
Metalised
carbon
strip
for
RDSO/CLW
(Cleared by
RDSO)
CLW
CLW/ZR
ROSO
RDSO
RDSO
CLW/lR
ROSO
Prepared by
CI,Wand
CLW
CLW/ZR
RDSOwith
Pantograph
3.
assistance
from CLW
~---------
s.
----
--- ----- ..
Des(riptlon of item
Preparation
of drawing/
No.
specification
4.
Vacuum
Bottle}
5.
6.
7.
Circuit
Breaker
(Single
Prepared by
CLWand
cleared by
RDSO
RDSO
RDSO
Prepared by
CLW and
Capacity, Capability
assessment &
approval of sources
for developmental
and regular orders
RDSO
Placement of
developmental
orders
Prototype
clearance
CLW
RDSOwlth
assistance
fromCLW
RDSO
RDSO
RDSO
CLW
CLW
CLW
RDSO
ROSO
RDSOwith
assistance
from CLW
RDSO
RDSO
RDSO
ClW/ZR
CLW
ZR
RDSO
RDSO
RPSO
CLW
CLW/ZR
RDSOwith
assistance
fromCLW
CLW
CLW/ZR
Cl.W
ClW
CLW/ZR
CLW
cleared by
RDSO
11.
Transformer oil
Tapr;hanger
Spares for Tap Changers including
RGR
Rectifier Block complete
12.
13.
8.
9.
10.
ROSO
RDSO
RDSO
Prepared by
CLWand
cleared by
RDSO
Prepared by
CLWand
cleared by
RDSO.
Prepared by
CLWand
cleared by
RDSO
RDSO
CLW
CLW/ZR
RDSO
Prepared by
CLW*and
cleared by
RDSO
ROSO
CLW
RDSOwith
assistance
fromCLW
Prepared by
CLW*and
cleafed by
RDSO
Prepared by
CLW *and
cleared by
RDSO
RDSO
RDSO
RDSO
CLW
RDSOwith
assistance
from CLW
RDSO
CLW
RDSOwith
assistance
fromCLW
RDSO
RDSO
CLW/ZR
CLW/ZR
RDSO
RDSO
RDSO
RDSO
ClW/ZR
RDSO
RDSO
CR
ZR
RD$0
Shunt SJ
15.
15.
17.
Traction
Motor
HS15250A
Complete
with
earth
brush
assembly(wittlout axle suspension
unit, pinion, gear & gear case
assembly)
Insulation scheme
for all class of
TMs
and
commutator.
TM
18.
19.
20.
21.
--
s.
Deseriptfon of item
No.
22.
23.
Preparation
of drawing/
spedflcatfon
RDSO
capacity, Capability
assessment &
approval of sources
for developmental
and regular orders
RDSO
Placement of
developmental
orders
Prototype
clearance
CLW
RDSOwith
assistance
fromClW
CR
ZR
RDSO
RDSO
CR
ZR
RDSO
RDSO
RDSO
CR
CR
ZR
ZR
RDSO
RDSO
RDSO
CR
ZR
RDSO
RDSO
CR
ZR
RDSO
RDSO
CR
ZR
RDSO
RDSO
RDSO
RDSO
RDSO
CR
CR
CLW
RDSO
ZR
ZR
CLW
CLW/ZR
RDSO
RDSO
RDSO
RDSO
RDSO
CR
ZR
RDSO
RDSO
ECoR
ZR
RDSO
RDSO
RDSO
CLW/ZR
RDSO
CR
CLW
RDSO
RDSO
CLW
RDSO
ZR
CLW/ZR
ZR
ZR
CLW
CLW/ZR
RDSO
RDSO
RDSO
RDSO
RDSO
ClW
CLW
RDSOwith
24.
25.
26.
27.
28.
29.
30.
31.
32.
33.
34.
35.
36.
37.
--
RDSO
CLW
RDSO
RDSO
RDSO
RDSO
Prepared by
CLWand
cleared by
RDSO
CLW
assistance
from CLW
s.
Description of item
Preparation
of drawing/
specification
No.
45.
46.
47.
48.
49.
50.
52.
53.
54.
Batteries
Battery Charger
51.
55.
61.
62.
DBR
56.
57.
5&.
59.
60.
RDSO/ClW
(Cleared by
RDSO)
Prepared by
CLWand
cleared by
RDSO
RDSO/CLW
(Cleared by
RDSO)
RDSO
RDSO
RDSO
RDSO
Placement of
developmental
orders
Prototype
clearance
CLW/ZR
RDSO
CLW
CLW/ZR
RDSO
CLW
CLW/ZR
RDSO
RDSO
RDSO
RDSO
CLW
ZR
CLW/ZR
CLW/ZR
ZR
RDSO
RDSO
RDSO
RDSO
Capacity, Capablllty
assessment &
approvalofsources
for developmental
and regular orders
CLW
Prepared by
CLWand
cleared by
RDSO
RDSO
Prepared by
CLW and
cleared by
RDSO
RDSO
CLW,
CLW/ZR
RDSO
RDSO
CLW
CLW/ZR
CLW/ZR
RDSO
RDSOwfth
assistance
from ClW
CLW
CLW
ROSO
RDSO
RDSO
RDSO
RDSO
CLW
CLW
RDSO
RDSO
CLW
CLW
CLW
CLW
RDSO
RDSO
RDSO
RDSO
RDSO
RDSO
CLW
RDSO
RDSO
Prepared by
CLWand
RDSO
CLW
CLW/ZP.
CLW/ZR
RD$0
RDSOwlth
assista!'lce
from CLW
CLW
CLW/ZR
RDSO
CLW
CLW/ZR
RDSO
cleared by
63.
64.
Resistance
Punched Grid Type
(RS/RPS/R118)
RDSO
Prepared by
CLW and
cleared by
RDSO
Prepared by
CLWand
cleared by
RDSO
s.
Description of item
Preparation
of drawing/
No.
specification
65.
66.
67.
Prepared by
CLW and
cleared by
RDSO
RDSO
ROSO
Prototype
clearance
capacity, Capability
Placement of
assessment &
approval of sources
for developmental
and regular orders
developmental
orders
CLW
Ct.W/ZR
RDSOwith
assistance
from CLW
CLW
RDSO
CLW
CLW
R.DSO
RDSOwith
assistance
68.
Main Compressors
69.
70.
Auxiliary compressor
71.
72.
Air Drier
Pressure switch, magnet valve &
spares for ACP indication assly.
Suspension Tube and its assembly
components {To be procure in
complete sets for all type of TM)
Wear' Plates (between axle box and
bogie frame)
Gear in two halves
73.
74.
75.
76.
77.
Prepared by
CLWand
cleared by
RDSO
Prepared by
CLWand
cleared by
RDSO
Prepared by
CLWand
cleared by
RDSO
RDSO
RDSO
RDSO
CLW
from CLW
RDSOwith
assistance
fromCLW
RDSO
ClW
RDSO with
assistance
from CLW
CLW
CLW
CLW
RDSO
RDSO
CLW/ZR
CLW/ZR
RDSO
RDSO
CLW
CLW
CLW
CLW/ZR
RDSOwith
assistance
fromCLW
CLW
Prepared by
RDSO
ZR
RDSO
CLWand
cleared by
RDSO
ROSO
RDSO
RDSO
RDSO
ZR
ZR
RDSO
RDSO
CLW
ROSO
CR
RDSO
ZR
CLW/ZR
RDSO
RDSO
RDSO
CLW
CLW
ROSO
RDSO
CLW
CLW
CLW/ZR
CLW/ZR
CLW/ZR
CLW/ZR
CLW
CLW
CLW/ZR
CLW
RDSO
RDSO
ZR
RDSO
RDSO
-~-
RDSO
RDSO
RDSO
RD$0
CLW
CLW
s.
Description of item
Preparation
of drawing/
specification
No.
86.
87.
88.
89.
TBU Assly
forWAG7
Traction motor Gear case and
mounting bolts for conventional
locos
Lubricants
Look out glass including gasket
Capacity, capability
RDSO
RDSO
assessment &
approval of sources
for developmental
and regular orders
RDSO
RDSO
RDSO
CLW
Placement of
developmental
Prototype
dearance
orders
CLW/ZR
CLW/ZR
RDSO
RDSO
RDSO
RB
CLW
CLW/ZR
RDSO
CLW
s.
Description of item
No.
1.
2.
3.
Metalised
Pantograph
4.
Cables
5.
6.
7.
carbon
strip
for
{Single
Major equipments:
Traction
Motor,
Transformer,
Power/ Aux; Converter and control
Electronics
8.
Sub
assemblies
of
Control
Electronics
9.
Preparation
of drawing
/speclflcation
RDSO
RDSO/CLW
(Cleared ~y
RDSO)
RDSO
RDSO
RDSO
Prepared by
CLWand
cleared by
RDSO
Prepared by
CLW** and
cleared by
RDSO
Prepared by
CLWand
cleared by
RDSO
Prepared by
ClWand
cleared by
Prototype
clearance
approval of sources
Placement of
developmental
orders
for developmental
and regular orders
RDSO
NA
RDSO
CLW
CLW/ZR
RDSO
RDSO
CLW/ZR
RDSO
RDSO
RDSO
CLW
CLW/ZR
CLW
RDSO
ROSO
RDSOwith
assistance
from CLW
CLW
CLW/ZR
RDSO jointly
capacity, capability
assessment &
RDSO
wlth CLW
ROSO
CLW/ZR
RDSO
Rosa
CLW/ZR
RDSO
RDSO
-6
s.
Description of Item
Preparation
of drawing
/specificatfon
No.
10.
Prepared by
CLWand
. cleared by
RDSO
Capacity, Capabll!ty
Placement of
developmental
assessment &
approval of sources
orders
for developmental
and regular orders
..
CLW/ZR,
RDSO
Prototype
clearance
RDSO
'
etc.
11.
:.
12.
13.
14.
15.
16.
17.
18.
19.
20.
22.
25.
26.
27.
28.
29.
30.
Prepared by
. CLWand
cleare.d by
RDSO
. Cl.W '
Radiator
3-Phase locomotive Traction motor
RDSO
Bearing for TM type 6FRA6068 and
6FXA7059
RDSO .
Traction Motor Repairs Rotor
Traction Motor Repairs Stator
RDSO:
Assembly components of Traction Prepared by
Motors of Three Phase Electric , .CLW and
locomotives
cle~redby
.RD$0
leather' Bellows
RDSO
.
OCB motor
RDSO
OCB Impeller
RDSO
All
auxtllaries
motor except Prepared by
compressor motor, OCB motor &
CLWand
impeller.
cleared by
21.
23.
24.
Transformer
locomotives.
Converter
and
WAG9/
RDSO
Prepared by
CLWand
cleared by
RDSO
Prepared by
CLWand
cleared by
RDSO
RDSO
RDSO
RDSO
RDSO
RDSO/CLW
RDSO
ClW
RDSO
CLW
CLW/ZR
CLW
ROSO
..
CLW
RDSO.
RDSO
RDSO
RDSO with
assistance
fromct,w
RDSO
RDSO
RDSO
ZR
ZR
CLW
CLW
RDSO
RDSO
CLW
CLW
ClW
CLW
ClW
RDSO
RDSO.
RDSO
RDSO jointly
withCLW
CLW
ClW
RDSO jointly
wlthCLW
CLW
CLW
RDSO jointly
'
with CLW
CLW
RDSO
RDSO
RDSO
RDSO
ZR
CLW/ZR
CLW/ZR
ZR
CLW/ZR
RDSO
RDSO
RDSO
RDSO
ROSO
Prepared by
CLWand
cleared by
RDSO
RDSO
RDSO
CLW/ZR
RDSO
RDSO
CLW/ZR
RDSO
RDSO
RDSO
CLW/ZR
RDSO
s.
Description of item
No.
Preparation
of drawing
/specification
31.
32.
33.
Brake system
Lubricants for 3;.:phase locos
Capacity, capability
assessment &
approval of sources
for developmen1al
and regular orders
RDSO
RDSO
RDSO
RDSO
RDSO
RDSO
...
... CLW/ZR
.
RDSO
RDSO.
RDSO
.....
CLW/1.R
(CLW
.. RDSO
RDSO
RDSO
RDSO
RDSO
RDSO jointly
witllCLW.
CLW/ZR
QLW/ZR
.
RDSO
ROSO
..
' ..
RDSO
RDSO .
GLW/ZR
ROSO
RDSO
RDSO
GLW/ZR
RDSO
1--
. .
CLW
ROSO'
RDSO
RDSOwith.
assistance
.
42.
..
'
CLW/ZR
RDSO
RDSO
RDSO
RDSO
Prototype
clearance
orders
:cLW
RB/ClW/ZR
..
RDSO
.. RDSO
RDSO
Placement of
developmental
Prepared by
CLWand
cleared by
RDSO
CLW/ZR
CLW
fromCLW
CLW
**Any change in components of 3-Phase Traction Motors and Transformers wil/ bt'! incorPQrated by CLW In
consultation with RDSO and, with prior approval of Railway Board.
2.
In respect of items, which are not listed above, CLW or Zonal Railways {ZR), as the.case
may be are vested with the responsibility of preparation of specification /drawing, capacity I
capability assessment, placement of orders. Prototype clearance etc.
3.
No new source needs to be developed for certain itern.s like TA0-.659 Traction Motors
including compqn~nts, plain suspension bearings, HETT~3900Transform~rs, Arno Converters
and Vacuum Exhaustr;lrs which are being phased out.
Zonal Railways will follow the list approved by RDSO/CLW}CR/ECoR for Items
mentioned in the above list. and their own list as applicable for procurement of
ltems/equipments, formaintenance of electric lotomotives.
4.
5.
Whenever Zona( Railways feel the need for repeating type test on a particular
-----~--
..
__ ___
,.
6.
If a particular source I firms approved by Zonal Railway and not approved by another,
in such cases, RDSO will inspect the firm and give decision which will be final for all Railways.
7.
RDSO/CLW and Zonal railways must ensure that specifications for electric loco
equlpments I items have provision for embossing I writing/ punching month and year of
manufacturing and manufacturers name on the items I equipment, which must form part of
inspection.
8.
Purchase Order on new sources I developing sources should be clearly mentioned as
"Developmental Order" and workshops f electric loco sheds advise the fitment particulars of
such items for proper monitoring of their performance. All electric loco sheds should develop
system to monitor performance. Performance reports to RDSO/CLW/other Z.onal Railways in
respect in developmental items should signed by SAG officers in Headquarters.
RDSO, all Railways and Production Units should acknowledge the receipt of these
instructions and ensure compliance.
\2~
(Mohlt Chandra)
Dir. Elect. Engg. {RS)
Railway Board
e-mail: deers@rb.railnet.gov.in
(~ ~
Np. 2008/Eiect(TRS}/113/5 Pt
.
RAILWAY BOARD)
. __....;:;,;-
No. 2008/Eiect(TRS)/440/23
Eastern Railway,.Kolkata
East Coast Railwayi Bhubaneswar
SUB : Recordings
of
I outpits
e~
(~)
Dir. Elect. Engg. (RS)
Railway Board
e-mail : deers@rb.railnet.gov.in
-~
."/'
INDIAN RAILWAYS
CEfiTRE FOR DESIGN & DEVELOPMENT
CHITTA.RANJAN LocoMOTIVE WoRKS
PO: Chittaranjan, West Bengal. PIN: J133'31
. F:ax: (:t-91) 341-2526153, Ph: (+91) 341"2525550
No. C-D&D/T/09
040-27825~43l2782265712783f179
022-22620667
07752-4146271415533
0761-267773012627629
033-24391566
Sub: Loggin9 _of VQO i!'l 3qPh~se locomotives with additional feat~r~ of ct~~Y of .
~.on the diagnostic .terminal.
.
.
.
3-Phase. locomotives have been equipped with Vigilance Control D~vice (VCD). whiyh gives an
audible alarm in case Loco Pilot or Assistant Loco Pilot fails to reset vigilance cycle and
emergency brakes are applied in :fi1e loco if no action is taken in further. 08 Seconds. As per the
present configuration in 1he.loeomotive, the VCD can be rrianually.isolated through rotafy switch
No. 237.1. However, while.doing so, there is no logging of any DDS or display of any driver display
message indicating isolated conditiOn of VCD.
'
It has been report~ by Railways th~t in some case$ loco Piiots have isolated the VCO through
Rotary Switch thus eliminating the basic. objective of safety provided by VCD. As.no.DDS is stored,
it was not possible to find details r:elated to VCO isolation. The Issue was raised by different
Railways as it pertains to safe operation of locomotive.
In order to solve this problem,. it was necessary to make an additional hardware connection from
the rotary switch to the VCU. For this a cable No. 300011 has been laid from the rotary switch to
.0~ _,,,1_ the 'J'.slot in the VCU. Necessary software modification was done in the STB-1 processor card to
monitor the ON/OFF condition of the rotary switch. As soon as the VCO is. isolated through the
~r q rotary SWitch the concerned signal becomes high and DDS is generated and stored in DlA card. To
I display. the message on the diagnostic terminal necessary modifications have been done in ODA-1
& DDA-2. In earlier modification the feature of display of message on diagnostic tenninal. was not
"-tUlP"'.J;
incorpo~ted.
f.sck.
. DA: Annexu,re.
;C\
~ ~ClM
1... ..
~
~ \ '-l
f ~1-:n _,11
i. ;:.tf.~i'-/C~. N
1~;.x.r,:-t ::.rr.~o.
"' J 1
u'-r
c.u11
!),..,.,...._,.,__ ,,_...._...
'0\
(Suresh Kumar)
Dy:C.EE.(Con)!fU-11
_
Mobile. 09163~0312
Email: suresh.kr21@gmgd.com
For Chief Electrical Engineer
Copy
.:'.'
:- .
... :
...........
.:-'.
Annexure-!
Processor Cards effected:
STSl, DDAl & DDA2
1;.
,,;,
.... .
";
Newi;fownloadt.oder
: ~ :
1.
RecOi"dirigoH$QJ~tion
of Vco in DDS:
.::=~ .'
Whenever the VCD is isolated through rotary switch, ODS _is generated and stored in DIA card
. . ai'Q~ith' th~ time sta:mp: Simultaneo~~JY_<!_ mess_!lze'is displayE!(t on ttie-9iagnps~!c termi~aL _
wiring sclleme per the Ann~xilr'Hll'o bt:(f(iiloWed~
-- - . - -
The
- 2.
as
--.Display
olVe~lon/t>at:chin
the .. Piagnostic Terminal
-:
.
:-
- ...
.
.. ..
''
loc0
Variant - I Mai~~e~~~~s~;
.J Patch No...
- _Remarks
--. WAP~5 _ .
- uoo. - -STB:l.:_;....:.;;:.l=.;.l"'-Ol-_-4---"--~.::.......;~~:..:.;:..:_;_c.;..;;___ _~.;.;...:...-__.,
WAP-7
2100
STB1- 2101
In the :Oiagnostic Terminal,the:Patth No.
,_-----------+----------~
WAG-9
3100
.STBl ~ 3101
will be shown in the Version Screen..
~~~~~~~--~~----~~----~--__.,
::.-
-- WA ~~9H
._ 4100
. 'STBl-...:.'4101
--:
,'
.
.
~r
... -- .
. .....:. -.
:._.::.,.
,
,:.
....; . ~-.
'
:.
..
. ,..._
~ ~~ I
,~~J
-.,
&
I .
'I' .
~.
" . . ..
: .:
; :
"'
.
\
~...._
....
l
...
~
...
ll
~06{)/l
II
l.5Sq.mm ~!able.
DESCRlPTION
Modified wlrlng diagram for
VCD circuit
l
0
.. 31)
I XF-22F-93(S~~t)
__,..--
I'
411-JD-10.
306011
----~----
---------
o.!Sq; ui.S.Phle
wA.
_G -9.1 w.AP- stWA.P.-7
3 Pltui.\DrlveLoeometivos
(
JCP,.
: f=:=
~ ht.jiijie
--~ -~:;~-
.J CHITT-i\RAN
. WM
: _._ JANBOGAL.
tocowrm:
H .
,._...... ....
bA~proved
VV""'l'\
1 .
. proJeetton . J".CD/CC'N/Tt..
AJmDr.g,.no.3$BitS.bv-t
CLW.DrJ..o.Nn,.
~.
. .
C~.P0R
c'::..~---- --- .
~~~-y----
J"--t'\1
V'11~
J.;,:::: /
. CixOIII
--------~;,.._,
-~ -~
-~----
----
--..--.,
.....
$p.!od. . PS:V!4ilm:;
'Vilillii.<;i\~ielbt
. .
:<i~: '.c~
.llidbtimio.,...w-.1_ Vli11 ~
..
-~
'
,,
..
Q:'o;,_""1
.ViaJI.l!Moiil
. .. . . . (D4~Jo~
_~~1!'
~.,.....;
,
I
~
,
tt
~-
f.
I'f j.' ::
~
._J
<
"' !
!
,;
;'
Mo
--.:...
- :-
c''~--;_--
- ~ --
_:
~-
BV'lJ(:..,.ol ,
r
- } t:t, t
1
':;-~
l' ''
.1!
{;
,
:
:.
( ],
I I
,
OM
--
11
~1
~.
'
Xl .
_. . lil.j/1
ra.nurrr
..
L~.,..
@Jfili
. l
I.
....J
'~
t,.;. _ _
;.,n,
-~1
'
,_ _
I!
f
---1
..f..
----,
-1
-~-_-1
12.01 .
Blooli:inll Oi"""
-. .
UU B~nc:!Jlodo lllunil.,.li<io\1'.,.!
l!lS- Chcll'Yil\nJb)'~Bl.;.
23S .Sprlna loo<l<oil fooL.wildi vljlihlll!.-..
236 P1llh butt "risiJ~cc coottol !tl'V<i
l)7 v~~~quipmoa~
.
lf>C
l.blUU
.2~11
213
72
-.ciao)
4J~.L0Conrw:ctor
ltil
412.0JCoot"""""'
411 .DJ(:oonoc:tu
:'.~ii
'.Yt
1:
;!II
:!37
lx_
~--
_J
~f'D.$
'
!5I
f{ f(:.;.l.!!::!~-:f
__ ..,
ssE!o&D
-~
11>/.lj
.l
1 _, .
:h
r.r
9)1
!A
c....
-~~~1
@=;:}
t$lll:l
,.
J.U.IJIII:tr
II!I'VIci-4
1,.
tu
l ~!;~-~-. -':ct~iFOlt~=l~N~f;r.V1jjfi~f.:NTn
fl__. .
1~""'$-v1
~~
'-----..,.;
.~ '
i\P'
,_,-.,.D--~!IWI
o-
==(
~lllO
_Dy.CEf'JCOlWTIJ-11
;:
l "/ r.
--lJ/!
S ltCD
.1!1
24].1/1
ki
&li
ii,
. M
M~fledsc.,etn@!IS:.f9t.~l'i!'_!l.t'L<;.!!!'~!:~.-*~!'r..
r--
. tf ..
~~Or7)
- _ -_
f~.,~-~
il:-; ....... .
'~~
I'll
'f
u_ _
.i
.l.
.,,
"-i
!O
r--
~ -. OJ f..
t-----,
. . 1
1 11111!2
:a~ ~ :&Y-:
!~v,.oa
i
,..
;):, ~ ,f I . 1 '# 'f
:I. ~
t
.... I
~.:: 1L!!J
.
.1
.
. .
,;
~;
;~LsP.
HlBIIl ..
a _ .. _
!'J
4%3~
"J1~~ !
,:u~
."fl1M.j
..
il
:;:!;
!:I
I . @r
L_
. _.
':t
!.:
[ ""
r.
~
.-~. 1-'
llllfl
l . ,
l
l
i
!!
-1S------~-- !:.-----'----------------~
'IL .
L------- v---~c--1
.'
lj
rs
. 14
'
13 llM!
~I \l~. _ J
I1. ~.'
. ' .
(
o'. n.,.,
,'
P.!n.IY'llll
~l
,..
1-4
.:;;
II
:
~.
ii
. .. . .
.,.
IL.--,,;,l~JI...----v;~~
-!,I .
'1;:1.
r .r t
_:
.
lullwr
~
li
~..,psn l,~n.M
:J'J
l ' ~..I
i
~-
.J~_?m
. ~J.MJJJ_UlOfRt
;
''
_!.:' . -- _.J"-. . .
r ..
rl)-.$
~~
lI :~IIUB2
'
'"
. ---->;
ifiiA'io ;
I'
g
l!Ii
~~, --'.1"-12
. m.ru. ' ~...o
... .
'I
I>
16
<:,':
~l)('rl
-~"
..
ll
.:5;,
~-.
()-
til
. -~ .
il
! ..
!----~-- ::~~'1~-1 :~;
..
l~!ffi ,
s;!. '
.I'Jot\l:tioo Dc111:nption
-~~~J
,
'4 .
. 00
< .
Potltl1>n
'
......_-,... ___
. .
A~K.Il'!iarllla.SsEI~&o,
___
.
i~
l;
_...,___;'
~ ~ RAILWAYBOARD)
Chairman, Railway Board has commented that excessive number of electric locos
are appearing as overdue for Inspection schedule on different Zonal Railways on FOIS.
On checking with Zonal Railways, it is found that the Inspection dates in FOIS are not
being updated properly.
It is, therefore, advised that the date of schedule inspections of electric locos
should be updated in FOIS regularly in coordination with concerned officials of FOIS of
Traffic department for necessary action.
..
'
Chief Electric Loco Engineer of the Zonal Railways should also monitor
correctness of the data periodically.
~l7---(J -I I
~\'l_..,,-:i('
~;/'
~Z-Lt.A./~L,
t~,&~
JJ)i
[~
5un'll)l0
L DC
I i5J
J ~, ,,
C'j)L9
__
.. _.
....
GOVERNMENT OF INDIA
MINISTRY OF RAILWAYS
(RAILWAY BOARD)
29.08.2011
A summary of important instructions issued by RDSO vide letter under ref. for
maintaining safety in the recent past is enclosed.
Zonal Railways are requested to ensure that the these safety related guidelines
issued are implemented/adhered to and also submit status/compliance of the same to
RDSO under advise to this office at the earliest.
DA/As above
~~01
(M":e: Rastogi)
Jt. Dir. Elect. Engg. {TRS)
Railway Board
Copy to:
Sr.EDSE/RDSO, Luck now : For information.
.. ~
S.No.j
Reference letter/document
Subject
2.
3.
4.
no.
5.
letter
no.
6.
RDSO's
letter
nQ.
I
_t
7.
'
8.
9.
letter
10.
11.
12.
no.
--
I
I
I
1.
2.
RDSO's
Technical
Circular
No.RDSO/
2010/EL/TC/0103 issued vide letter No.EL/3.1.3
dated 13.10.2010
RDSO's Report No.ELRS/PR/0113 (Rev.'O') of . Report- on prevention of Fire on electric
Aug., 2006
locomotives
RDSO's SMI No.RDSO/ELRS/SMI/ 0327 Re.v'O' Transposition of power cables froml
issued vide letter No. EL/2.2.4 dated 20.01.06
transformer to RSJ block
I
3.
4.
-t3~
1fN(f
sub : Modified procedure for manual isolation of bogie without switching 'OFF'
the electronics in three phase locos
Ref : RDSO's letter no. El/3.1.35/2 Electrical dated 10.06.2011 (copy enclosed)
RDSO, vide letter under reference 1 had informed of modification in softwatre done
in processor FLG-1 & FLG-2 & software patch released by CLW to facilitate manual
isolation of bogie without switching OFF the electronics and issued modified instruction
for loco Pilots for manual isolation of bogie without switching 'OFF 1 the electronics in
three phase locos.
Zonal Railways are advised to take following actions:
{i)
Loco Pilots should be intimated about the modified instruction through Driver
notice books/techanical bulletins.
{ii}
. {iii)
QA
Three phase locos having modified software should be pasted a sticker In both
the cabs for identification of loco Pilots.
as bove.
{Sum1t 13hatnagar)
Dir. Elect. Engg. (RS)
Railway Board
e-mail: deers@rb.railnet.gov.in
fl
y
J
Fax
: (Q522)-24525Bl
Telephone: (0522H:!450374
Telegram : 'AAILMANAK', KO
Emaii:dsetpl @gmail.com
:mxlfR'V
EU3.1.35/2 Electrical
Date: 10.06.2011
Vlde ietter reference above, a modification in software has been done in processor F!..G1
& FLG2 and software patch has been released by CLW. to facilitate manJJal isolation of bogi&
.vHhout switching OFF the electronics. After down loading that sofuvare patch it becomes
nec-essary to modify instructions fer dlive.rs for manual isolation of bogie in 3-phase
locomotive$.
2.
"
"
traction.
/
'
...:
3.
It is requested that drivers in the Railways may be counselled/trained accordingly once this
software patch is dovm!oaded in the locomotives.
~~oG\1\
(Sandeep
Encl: Nil.
s-riva"Stava}
Copy to:
Secretary (Eiectrical/RS),
Railway Soard. RailBhavan, New Delhl-110001
,.~
~
0 1}~\lt
(Sandeep Sriva
Encl: NiL
va)
,..
.....4:qt 5
---
.r
GOVERNMEri{OF:iNOIA
MINISTRY OF RAILWAYS
(RAILWAY BOARD)
NEW DELHI
No. 2009/Eiect(TRS}/113/2
__..:.-(P.K. Srivastava)
I ( { 11/l!
Advisor, Elect. (RS)
Railway Board
(ILL
/~t\
, lt ~~ 111
L- De
jt~ic)(9
......_.: ....-
.L~'"'"P.,
. ,...~
. . . ,.,:-::-.
' T"
. ."~-~~ ::~ .'',': :::'i;";~"~:~f.I!'Vfi~''~'''~f.J.>ii:-..e"'.:'":'' :-:<
l,.,_ _ _ _ _ _
;
..,'
-~
.: .:",,.,.
:"
. $fj
~ ~
GOVERNMENT OF INDIA
~~MINISTRY OF RAILWAYS
(~~ RAILWAYBOARD)
~~
(P.K. Srivastava)
j ;::: .
~t'tf
.
..
-- -'
.. - ..,_
i
....... ,:::.:. _.
:I
.2.2-fll} 11
No.201l/Elect(TRS)/225/13 Misc.
~~\-v---
(SurmtBhatnagar)
Director Elect. Engg.(RS}
Railway Board
e-mail: dir.rsrb@gmail.com
<;J(l
!6/o~;,,
l- D
c./EJ2 C/1-()
Nm. 1ll.doc
,,
'i I i
~.
Fax
: 91-0522-2465754
Telephone : 2465754
Railway
:42226
e-mail
: dse4cs@gmail.com
1ffiff ~ -- Xc;r ~
~w a,,~ Jih: 1=!RCP ~
('j '!Sl"\l:h 225 01i
Government oi India- Ministry of Railways
Research, Designs & Standards Organization,
LUCKNOVV- 226 01 i
No.EL/3.1.35/2(3 ph)
Date 06/0'1/2012
(?
/<jfl[\1-',.
/ .)
-~~r
',;:>-'
,_.---~-
{S.K. Gupta)
for m-ector General/Electrical
Encl: As above
.'
.--....... ''
.............., ,..... .
--~,.. "~
,_,... :-.-.!.
'<
'*':
No.SV.WAP7
Date: 05/01/2012
Sub:
Ref:
1.
As per RDSO's lt')struction Bulletin No.MP.IB.BD.02.16.01 (Rev.01) dated
31.12.2009 on Wheel Wear and Application Management, the service limits for root and
flange wear of WAP7 locomotive wheel having new wheel tread profile( IRS thick) as per
RDSO drawing no. CSL-3040 (Alt2) have been recommended as 4 mm and 2.5 mm
respectively.
2.
RDSO has conducted oscillation trial of WAP7 locomotive to increase the service
limits of worn whee! profile maintaining rdot and flange wear as 6 mm and 3
respectively, on track maintained to C&M-1, Vol-l standard on HWH-DGR section of
Eastern Railway up to a maximum test speed of 1.43 kmph. The results of this oscillation
trial have been found to be satisfactory.
mm
Thus, on the basis of oscillation trial results given in trial report mentioned under
reference above, the servir.e limits of root and flange wear for WAP7 locomotive fitted
with thlck profiie as per RDSO Drawing No.CSL-3040 (Alt.-2) are being revised as 6 mm
root wear and 3 mm flange wear respectively. It is also advised that the performance of
the locos permitted in service beyond the earlier wear limits may be monitored
meticulously by the respective Loco Sheds for a period of at least 6 months and feedback
given to RDSO every month.
'i_J~
(Anll Kumar)
I'
GOVERNMENT OF INDIA
MINISTRY OF RAILWAYS
(RAILWAY BOARD)
No. 2007/Eiect(TRS)/113/7
(i)
(ii)
(iii)
(iv)
{v}
It is desired that a 15 days special drive be launched to cover all the instructions issued
from Board, RDSO and standard procedures laid down by Zonal Railways, deputing RS I RSO
officers and supervisors covering all electric loco running staff. Also ensure the following on electric
locos, owned as well as operated in their Railways:
{i)
(il}
~~
----:--:--
- - - --
lt1 / 1 /, 2
--------------
GOVERNMENT OF INDIA
MINISTRY OF RAILWAYS
(RAILWAY BOARD)
No. 2005/Sig.I!PWS/1
(DU~AGC)
Vol.ll Pt.
'
Commerciaf s~rvice trials of T'PWS ori Delhi-Agra section are in progress since July,
2010. lnftially, only 3 trains were covered to gain experience and to take corrective action
wherever necessary. Based on experience gained,. following directions are iss wed to monitor the
performance, training of shed and running staff and n1aintenance of. on board. equipment on a
regular basis.
As on 31 61 Dec., 2011, following trains have been nominated with defined lfnl<s to make
use of TPWS equipped locomotives for commercial trial runs.
3
4
5
6
7
12155/12156
12189/12190
12279112280
12447/12448
12779/12780'
12823/12824
14211/14212
Shane-e-Bhjo~al
I!
f.
i:.
~~
'~
l:
-1--'--Frequeney-
-S.f.Hi)= f-~+r-a~A-M-.----~-~"Ffaffi~oome
i
2
....
.. Dally
Daily
Daily
6 Days weekly
Daily
Daily
Daf!y
1. Monitoring :
(a) Sr. DEE(RSO) and TLCs should ensure that these trains are worked by deploying only .
TPWS equipped locomotives. A list of TPWS equipped locos is enclosed as
An nexu re-I.
I
(b) The loco pilots should be advised to record all defects of TPWS noticed enroute in the
log book and also in the Defect Register at the time of 'Signing Off' in the lobby.
(c) Daily performance report of each incident shall be sent to concerned GEEs, CSTEs
and Signal & Electrical Otes. of the Board jointly signed by TLC and SE/Signa! control.
This positron shall be analysed by CSTE/IRPMU with the technfcat support from OEM
and RDSO and regular weekly reports shall be submitted jointly by Elect. and S&T
directorates in the format, which has already been circulated ~Ide Board's letter No.
2005/Sig/TPWS/1 (DLl-Agra) dt. 9.9.2010 and 19.11.2010. The format is appended as
Annexure-fA
. I
2. Training:
(a) Separate training shall be organized by !RPMU wlth the assistance of OEM and
RDSO for the maintenance staff in the foco s'heds and running staff including Us of
NR, NCR & WCR in the next fortnight.
'
for
tr.akdng
of
(c) Training material including s.oftware: an(j power poin(pr~sentatioll COs shall be made
:availablefo t~e lraininfi Centres, where running staff shaH be trained in TPWS. A set
of such training c;os. be also given to the crew booking lobbies, whi.ch should contain
FAQs TPWS tn KBC forni.ai...
.
.
on
(d) All lotos with TPWS should be provided with a s.tickeT bringing out clearly in brief
actioh to be taken by Loco Pilots for working on TPWS.
. 3. Maintenance:
(a) The loco trip shed should ensure that locomotive is turned out with TPWS equipment
.in_w.or:kJng,...or-d-$r-..--'P:te-sf::te6k-Hs-t-ef-someritemr,whit:l'rare re"qOirecr f6 "be ensured
before the loco is turned out for traffic is attached at> Armexure~!l.
(b) The system provided on the locomotives i.e the BTM, antenna, on board computer,
BMI, Driver Machine Interface, Tacho Meter/speed sensor, inter sub system wiring
and conduits, track interface and circuit breakers, should be clearly identified at the
time of carrying out the wor.k 'by suitably marking them in a specific colour. Shed staff
needs to be sensitized to ensure intactnets of the TPWS equipment
l.
I
\:
. .. --. -- .. --
'
(c) The locos should be turned out duly tested for TPWS at. appropriate level.
(d) For analysis and corrective actiof'l on the dBfeots noticed during the run, the event log
data along with location/time stamping should be down loaded immediately at the next
trip/loco shed using portable maintenance terminal designed for this purpose. The
locations for each train is given In Annexure-IlL Sr. DSTE should organize a system of
down ioading and evaluation by !RPMU-and RDSO and forwarding the copy to the
Board.
(e) The mainter1ance schedule for U1e syst~m should be made available by IRPMU in
consultation with RDSO after obtaining requiremE;nts from OEM and finalised.
I'
,,
I'
'"
p
!''1
t;;
ii'
I:
'i
l!!l
I~
d
!
..
-: 3 :(f) List of recommended spare modules required for maintenanc~ of TPWS in Shed
. should be :finalized by IRPMU in consultation with OEM. These should be made
available for a period of 1 year.
,.
. .
. ._ . .. . ..
". - .. ..
..:
.
..
___ .Please. acknowledge rece.iptand report compH~mce.
---~::::::-
_, _
'-~~
-::.~
...-.....-... /'
'. .,
~-
:~.
. ., ..
~: ~.-
,~-
.:
~~
(Rajeev Sharma)
Executiv~ Director (Signal Dev.)
.Railway board
'
,.
(SumJt Bhatnagar )
Director Elect.Engg.(RS)
Railway Board
Copy to:
1. DireCtor Generai/RDSO, Manak Nagar, Lucknow
.
.
.. ___ _
2: SL. ED!Sigf!al, RDSO, Mana_k N?g~r, ~uck.now for info(m.~tJon and necessary action.
3. CAO, IRPMU, IRCOT complex, Shivaji Bridge 1 New Delhi.
~"''
..
Elect Loco
EMU
Cost(Rs in
Crore)
179.96
Route
326.
25
30,.81
67
170.60
250
188
. 62
183.74
500
40
20
179.49
414
80
20
878.37
1557
333
202
Cost (fu in
Crorc)
Route
Km
rake a tt100
SR
SER
(250rkm)
WR Mumbai Central-Virar-Vadodara Ahemdabad: TPWS (500 rkm)
-..___:______
,______....._ ....
NCR
S.No Railw
ay
ER
NR
NR
SR
SR
136.37
133.02
of
Kill
327
----
enipmen
t .
168
II
I
118
293
90
j'
424
140.83
40
--
:\:
I
150
112,32
275
.
60
42.63
L
'
!
'60
1:
!r
I
112.46
110
286
40
48.52
78
100
--
!l
h;
~!
:;
~;
'
i
138.43
351
125
80.68
t25
1.75
lO
78.18
97
175
1:
~
fi
'
'
"\
I'
II
I
1023.43
'
1840
1469
35&
3397
1802
56(}
2362
'
.,
....
............ .
. '
S.No. Railwa
Area Covered
Route
Elect Loco
Km
EMtJ
raice~h.
CR
Pune~Lonavala~Kaj.rat
78
100
ER
Sealdah-Howrah~Khana,
Suburban
Area (SDAH-Dumdurri-Dankuni, Bellur- Bandel, SheoraphuliTarkeshwar, Bandel- Shaktigarh, SDAH-Ranaghat, DumDumBa;casat-Ba.shirhat, Ballygaunge-Baruipur-Diamond Harbor,
Ballygunge-Budge E!udge, Baruipur- Jaynagar Majilpur, RauaghatShantipur, Ranaghat-K.NJ, Ranaghat-Bangaon-Barasat; NaihatiBandel, Sonarpur-Canning)
653
25
268
NR
Delhl-Narela-Panipat-Ambala-Ludhiana-Jalandb.arOmtt-Amritsar,
Suburban Area (Delhi-New Delhi-Sahibabad-Delhi Shahadata..
Delhi, Anand Vihar-Sahibabad-Ghaziabad, Tilak BridgeNizamudin, Nizamudin-Patelnagar-Dayabasti, Delhi-Shakurbasti)
542
333
90
SR
277
275
/ 60
110
286
40
347
500
355
890
380
62
20
20
3397
1794
560
7
8
SER
,.,
..,
40
SHED
30
CR
BSL
AQ
KYN (AC+DC)
HWH
91
MGS
GMO
GZB
46
ER
ECR
NR
NCR
SR
WAP4
WAP5
WAP7
WAG9
95
45
77
8
31
52
39
43
66
40
10
94
23
47
60
11
TATA
SECR
WR
Total
Grand Total
75
4
BNDM
SRC
BIA
70
BRC
57
75
170
23
2
TKD
WCR
79
JHS
CNB
AJJ
LGD
83
96
RPM
SER
WAG7
LDH
ED
SCR
WAP1
35
ET
NKJ
28
39
74
. 64
626
69
45
::::
315
710
- 1829
on 010112
RAILWAY
CR
SHED
WAG5
AlB
BSL
104
ECoR
60
ASN
36
..
WAT.
.
.
>
23
68
29
.23
110
'._,
101
ANGL
'.
NR
NCR
'
45
LDH
CNB
139
1"17
JHS
-~
-~
91
AJJ
SR
WAG7
AQ
KYN
ER
WAG5
HAfHB
ED
71
RPM
BZA
53
96
42
SCR
113
KZJ
TATA
SER
SECR
BNDM
BKSC
46
BIA
14
BRC
55
17
113
36
WR
BL
54
':
TKO
94
ET
89
-"-
WCR
NKJ
Tot~.tl
Grand TTL
69
638
524
756
1918
.,
.-
_J I
GOVERNMENT OF INDIA
MINISTRY OF RAilWAYS
{RAilWAY BOARD}
New Delhi, dated 03.10.2011
No. 2004/Eiect{TRS)/440/19
:i
SUB
: Train Protection and Warning System {TPWS) on New Delhi- Agra Cantt.
section - Nomination of Electrlc Locomotives
i:
i\
;
'
1-
TPWS equipment
f--f._LS--'/,_G_Z_B"-/N
___R-'--+----W_A_P7_ _ _ _ _ _ _ _17
ELS/LGD/SCR
ELS/AQ}CR
_ WAP]__t=
WAP7
L_~~~~--L-~-------
14
4
-----------------~
Concerned Railways are advised to nominate WAP7 locos for fitment of TPWS
equipn'lent and deploy them on coaching links of trains being run on New Delhi - Agra
sections for service trials.
Central and South Central Railways are advised to avail necessary technical and other
relevant Inputs from RDSO and Northern Railway.
(
\-
!r
~
,,."'
f'
I\ :...
.
.,,
it \KJm"
~:~:~; Bo~;d .,
Rallwav Board
II dee"@ rb .rail net.gov. in
. .o\1\~ . . jt
'
'
.'
,. ~ ~ ..
-
,J
__n
-v~rJfl~J
\_
Q'\1\l,..t
~?~-:-
GOVERNMENT OF INDIA
---~].STRY Q!f_~L:W~X.~..... .
(Ra;~lw.ay -Boa~d)
~~p'
., ..,:
.No.2005/S1GITPWSJDLI-AGCNol-li
~orth
Centrnl Rail:way,
1./ .::5Ubedarganj,
Alla.Iiabad.
Eastern Rail'l\'ay,
'.
'
~-
)eStern Railway,
Chucbgate, Mumbai
Manak Nagar
Luck.Uow
Sub: - Strategy and time schedule for completion of '~Trafu Protection.& Warning
System" (TPWS) works sanctioned during 2010-11.
.
.
Ref: - Pink book (2010-11) item nos.- 438 (NCR), 468 (ER\ 355 (SER), 378 (WR)
the
~~:;~,
. . .
.
'\"""
~,' . \ :.~"E. o'CS~posit , tender docmnf:Jnt as p~r technic~ speci~cations,. with separ~te
cs\M
. . ;r-
sci;\edule
\J\ .
~~;
pe~ing .to"'ti>Ws On Board Equ!pments & in!Jtall~~on' shall be
executed by the CEE of the Railwa.y:"or-au.:tho.rit-:notninated by h1m. Schedule
'\
.,.......--
c.
pertaining to 'TPWS Track sicie Equipments & installations including Supply &
instaUation of all reCjuired ~~gn~lling equipments inclu~fing relays, c~bles etc,'
shall. be executed by the CSli
of the Railway or. authority nominated by him.
!
.
.
D&G c1;larges .. ~hall be apportioned according to ratio of costs of. ~TPWS On
Board ;Eqhipments & instl2J.llation', 'TPWS Track side Equipments & installations
including Supply &'-installation of all required Signalling equipments including
relays/~ables etc.' betWeen C.EE and CSTE respectively.
~'v
..
/l
.....
i'
I'
[:
I'
.,f<
',,
1:
/:
j:
li
!I
/:
/!
II
w.:c:z:
......... -
d.
e.
f.
::E2~~
tl..~. t~
. .: ., ..::
.... .
. . :
. ;'
..._. .
~~
~
.
~
'
...
'
.,.
-t"
.,
'
...
'.
.. .. ..
~
.'
.~ .
'
..
...
..
-~- ~~~;
.- ..
,'
-:~<-'\?J~'f!f:~~;:~~~r.~~:.gi.;~:~~:.,~: ._
. i
..;.. -
...
_; ~'
:.::.
GZB/NR
Status
LGD/SCR
Status
AQ/CR
30207
Fitted
30239
Fitted
30296
Fitted
30210
Fitted
30276
Fitted
30302
Fitted
30211
Fitted
30240
Fitted
30268
Fitted
30215
Fitted
30272
Fitted
30267
Fitted
30216
Fitted
30238
Fitted
30243
Fitted
30289"
Fitted
30254
Fitted
30253
Fitted
30255
Fitted
30261
Fitted
30256
Fitted
30275
Fitted
10
30257
Fitted
30273
Fitted
Fitted
30237
Fitted
Status
<
11
3Q220
. .
12
30217"
Fitted
30259
Fitted
13
30234
Fitted
30312
Fitted
14
30242
Fitted
30260
Fitted
. '
15
30235
Fitted
16
30249 .
Fitted
30209
Fitted
17
"'-
Total fitted= 17
GZB
LGD
Total fitted=14
17
14
AQ
Total
35
Total fitted=4
GOVERNMENT OF INDIA
MINISTRY OF RAILWAYS
(RAilWAY BOARD)
No.2008/Eiect.(TRS)/440/23
In. this regard, the following instruction, should strictly be adhered by all Zonal
Railways to maintain the discipline.
(f)
Coaching locos are to be deployed only as per approved links, any deviation
should be recorded in control office and only with the approval of CELE of the
Zonal Railway.
(ii)
(iii)
(iv)
(v)
Zonal Railways are advised to strictly follow the above instructions and send
compliance to this office.
1\;s~
.
,
--~-
. .. . ...
'
'
....
--
2-Lf/t{ ('1..-
\ ~.,....
~
GOVERNMENT OF INDiA
MINISTRY OF RAILWAYS
(RAILWAY BOARD)
It has been reported to Railway Board that the e\ectr"tc locomotives are being sent to
POH workshops in dead condition for overhaullng. Similarly newly turned out eleotdc loco5
ex. CLW ,..e sometime sent to th nominated Railway/Shed In. dead/defective conditiOn
This practice must be stopped immed\ate\y.
Instructions were already issued in this regard, along with deliberations during every
POH coordination meetings. The following instructions are once again reiterated:
(i)
New Electric locos turned out from CLW should be sent to their nominated RaHway/Shed
in working condition. In case of failure en route, it i5 the respon>ibil ity of ClW to rectify
the problem. CLW to ensure.
zonal Railways to ensure that Electdc locos are send to POH workshops in working
(i\)
condition.
All POH workshops should ensure that all electric locomotives after POH/MTR are
(iii)
Zonal railways and CLW are advised to comply the above instructions religiously, any
deviation required, if any, should b done wlth the approval of Board only. pOH shops and
Railways shall inform Board in case of any deviations.
,;
~;
Dir. Elect. E.ngg. {RS)
Railway Soard
e-mail: deers@rb.ra\\net.gov.in
~
cS,.-~
//~{'t
l ~ ~/11-
------------------~---------------~
-'""""e.:--<:=-:::;:.:.::::.....
--.:::.:.~
.. - ....
.,. - -""""""'~- -
------
Fax
: (0522)-2452581
Telephone: (0522)-2465715
Telegram: 'RAILMANAK', Lucknow.
Email
: dsetplgroup@gmail.com
'l'JT'<c!mc!>R-~~
226011
No. EU3.1.14
Dated: 26.3.12
4.
Sub: Use of existing pressure switches for sensing A9, SA9 and BP drop in
Vigilance Control Device application for tap changer locomotives.
1. Vide this office letter under reference (i) above, it was advised to use existing
pressure switches P1, P2 and SWC in place of providing separate pressure switches
for VCD application.
2. Sr.DEE/TRS/JHS vide letter under reference at (iii) has informed that there may be
problems in using the existing pressure switches. Further RDSO vide this office letter
under reference at (ii) sought comments from zonal Railways on the issues raised by
Sr.DEE/TRS/JHS and on circuit modification for SWC proposed by RDSO.
3. Regarding the proposed modification of .swc circulated vide this office letter even
no. dated1'7-11-11, Railways reported that if SWC is disconnected from wire no. 914
and directly connected to wire no. 700, relay Q50 will not de-energise and LSB will
not glow if C145 is welded or jammed mechanically while going from Braking mode
to Traction mode and crew will not be able to monitor correct operation of reverser,
CTF or C-145, which is unsafe.
4. Based on the comments received from Zonal Railways it has been further decided
that:
.> Existing P-1 & P-2 pressure switches can be used in place of providing separate
pressure switches for sensing A9 application and BP drop. It is not recommended to
lose the CCLSA fuse by drivers from the safety point of view hence the supply of P1
and P2 pressure switches shall be through CCLSA fuse only.
~
Keeping in view the problems stated in para 3.0 above, the proposed modification of
SWC circulated vide this office letter even no. dated17-11-11 is not considered fit for
issue and separate pressure switch for sensing SA-9 application to be provided by
Railways.
Page 1 of 2
,/ i'-
Enci:Nu
.Copy to:
Secretary(Eiectrical/RS),
Railway Board,
RaiiBhawan
New Delhi-11 0001
Encl: Nil
(Sandeep Srivastava)
for Director General (Elect.)
~h\IL-.
(Sandeep Sriva;tava)
for Director General (Elect.)
Page 2 of2
---
~--~-
Fnx
: 9 l-05:22-2-45258 1
~ ~ :Mi~ Tfi"'T<li
-n~_;,<i&
El/3.6.1/1
"ftrrOol
'.1<.4"10, - 22GO 11
Sub:
Revision of AOH periodicity of WAP4 class of electric locos equipped with Hitachi TMs
dt 20/03/2012(copy enclosed)
of 18 months 10 days on all WAP4 class of locomotives on trial basis for a period of two years. The
performance of these locos should be monitored critically by Rlys/sheds. Each & every case of
failure/UUOs/arisings and performance summary should be recorded by homing sheds, for which
necessary formats are enclosed at Annexure-I for guidance.
The performance feedback of locos undertaken AOH at 18 months interval may be submitted to
RDSO every 6 months in above mentioned format followed by consolidated performance feedback after
completion of 2 years trial along with recommendations for regular implementation for study and
submitting final recommendations by RDSO to Board.
DA: As above.
(Ishaq K mn
For Director General Std/Eiect
Copy to:
Secretary (Electrical), Railway Board 1 Rail Bhawan, New Oelhi-01
(Kind Attention to Sri Sumit Bhatnagar, DEE/RS): For kind information please.
I
~::!#!~
(Ishaq Kha;;)t/
For Director General Std/Eiect
'i!J (~
I
Annexure-I
1.
.
'
2. Perforrnafor sun1tnarizedverlhrn1ance .
. . Nature offailure/aii$ing
::
. .
, ...
~ 'fl'(ct>l~ GOVERNMENT OF
INDIA
~ +i;;fl~ll MINISTRY Of RAILWAYS
~ ~ RAILWAY BOARD}
__
No. 2005/Eiect(TRS}/440/23
(i)
(ii)
(iii)
(Jv)
Check transformer oil and traction converter oil in gauge glass between
minimum and maximum level.
(v)
If one auxiliary converter is isolated, then as per TSD, switching OFF & ON
electronics is advised once for normalizing the working of auxiliary
Besides above, following instructions are also to be followed by Loco Pilots while
working on three phase electric locos to curb the loco failures on line:
(i)
loss of time.
{ii)
::'--
1/
f . r'
{iii}
Pressure drop may also occur due to VCD getting activated due to being
defective. Isolate the VCD and look for reasons for malfunctioning at the
neXt stop station to avoid further detention in the block section. VCD
isolation cari be done using switch 237.1
(iv)
{v)
(vi)
(vii)
(viii)
Timely attention to Pll battery messages so that loco does not shut down
with PI message later on: Tripping ofbattery charger MCB 100 invariably
leads to Pll battery messages. Switching ON MCB 100 has to be done
with DJ in OFF condition.
(ix)
(x)
(xi)
MCB are available for ABB and MG make MCB's whlch should be clearly
understood. Restoring the MCB does not require switching OFF/ON of
the electronics system.
{xii)
PI message have to. be immediately acted upon & course of action Is also
in. DDS. Pll message need not be acted Immediately except for
battery voltage low I MCB 100 tdpped. PI message come with a red
flashing of LSFI in addition to BPFA.
availa~le
(xiii}
Zonal Railways are also advised to update the respective TSOs' of 3~Phase locos
adopted by Zonal Railways based on RDSO's latest Instructions issued vide letter no.
El/3.1.35/2 Electrical dated 04.04.12 and counsel all running staff in lobbies, training
schools, on line etc. accordingly.
C]?l~
(Su~atnagar)
" ...
GOVERNMENT OF INDIA
MINISTRY OF RAILWAYS
(RAILWAY BOARD)
No. 2011/Eiect{TRS)/113/4
The cases of SPAD I accidents on the Zonal Railway including cases of other Zona
Railways should be discussed in the training centr~s for mass awareness. Details o
all accident cases can be obtained from website http://sims.railnet.gov.inL
It should be made as a part of training module for all courses.
(ii)
Pamphlets should be issued, in lines of safety bulletin, narrating accident cases an1
action to be taken by Crew to avoid such occurances.
(iii}
{iv}
Close monitoring of duty hours and periodical rests must be ensured. CM5
wherever provided should be fully utilized. Increased interaction with famil
members of crew for bringing about an awareness of the need for proper rest at thr
home station. The working of Welfare Inspectors deputed for each lobby to br
closely monitored.
(v)
Proper learning road of the crew in all section of their jurisdiction must be ensurec
Also ensure that running staff are booked on all the routes so that their LR does no
become overdue.
(vi)
- r---48-
GO\ir:.f,_i\.t't~Of INDIA
''
...:...,
MINISTRY OF RAILWAYS
(RAILWAY BOARD)
No. 2002/Eiect.{TRS)/113/1
1
2. Derailment of an electric hauled passenger train.
3. (a) Abnormal conditions such as goods train derailments, OHE failures likely to
affect Main I branch lines for more than 4 hours.
(b) Electric loco/EMU/OHE/Traln lighting cases involving delays beyond
4 hours.
(c) Grid failures likely to disrupt traffic for over 4 hours.
I
;
CELE -for all accident related matters, Loco break downs & any general disorder
on the system
CEDE - for OHE I Grid failure incidences
CESE; - for all Coaching I EMU I MEMU I Metro incidences
In the event of any of the functional HODs as above not being available/
CEEs shall instruct other functional HOD or Deputy to ensure that information is
communicated timely.
1
~
..
2
Officers to whom
required information is
to be communicated
Rly.
Tele~hone
Office
DOT Telephone
Mobile
Resi.
Offict'!
Resi.
44651
23387736
9810487325
44649
23383343
9810487326
...
1.
2.
Director, Electrical
Engineering (Rolling
Stock)
Adviser Electrical (Rolling
Stock) in absence of.(l)
above.
3.
4.
5.
6.
7.
8.
9.
10.
Director Electrical
44652
77563
Enqineerino (General)
..
Adviser Electrical
(General) in absence of
4464$
l3) above.
Pertaininq to General Power SU(!R_I
Director Electrical
48377
Engineering (Power
44650
Supply)
Executive Director
(Electrical Energy
.
44660
Management) in absence
of(S).above.
.
Pertaining to Grid & Traction Distribution
Director Electrical
44668
54011
Engineering (Rai!w<,ty
Electrification)
Executive Director
.
44665
(Railway Electrification) in
absence of m above.
AM(L) may be Informed if
44645
above officers are not
available.
ML may be informed by
Head of the Department
.
44710
of respective Zones if
these officers are not
awiilable,
23387045
23922250
9910487447
23381869
9910487329
23389112
24675277
9910487331
23387221
9910487337
.....
23383313
24673507
991048338
~ ~
991048330
23381227
9818798383
23385100
23782549
.
~~~
Nov '07
.,_
'lfffif m<5R
GOVERNMENT OF INDIA
"W~ MINISTRYOFRAILWAYS
(~ i!Rf RAILWAY BOARD)
No.2012./Eiect.(TRS)/113/4
General Managers
.
reiterated below:
(i) ..
(ii)
Close monitoring of duty hours and periodical rests must be ensured. CMS,
wherever provided should be fully utilized.
(iii)
Increased interactioA with family members of the crew for bringing about
awareness on the need for proper rest at the home station. 10 hour rule
should be strictly adhered. Identify the bad sections which should be
monitored closely.
{iv)
(v)
Fitment of VCD on all locos and its proper functioning should be ensured by
all Zonal Railways.
{vi}
Ensure that the cases of SPAD I accidents on the Railways including cases
of other Zonal Railways should be discussed in the training centres for mass
awareness. ltshould,preferably be made a part of training module for all
courses.
(vii)
(viii)
valve quickly in case they find lack of alertness on the part of LocCf'PIIot
while approaching signals.
... 2/-
-.... ~
: 2 : -
(ix)
Proper learning road (LR) of the crew in all section of their jurisdiction must
be ensured. Also ensure. that running staff are booked on all the routes by
rotation so that their LR does not become overdue.
(x)
(xi)
(xii)
(xiii)
Officers should check the knowledge of the Inspectors & Trainers and their
regular training must be ensured for being conversant with latest
modifications, new equipments etc.,
(xiv)
All Loco Sheds should ensure that all safety items are being checked and
same are in working order as per the instructions issued by CLW/RDSO.
Working of all Safety equipment should be ensured before dispatching the
locos for traffic service.
(xv)
(xvi)
A report should be submitted to the Board within a month's time showing the action
taken on the above aspects.
~f'Y)~
GOVERNMENT OF INDIA
MINISTRY OF RAILWAYS
(RAILWAY BOARD)
SUB : Side collision between train no. 18006 On I<RPU-HWH Express ~nd Goods train
E/BRN/TATA at km. 513/15 of JSG Station yard on JSG-ROU Section of CKP
Division of SERiy at about 0200 hrs of 23.11.2011.
REF
9.2.5
During 'Road learning' of crew, special emphasis must be given for accfimatization with
signals located in 'Right Hand Side'. Railways must also issue the fist of signals located in.
'Right Hand Side'~ section wise, for ready and regular reference by the crew.
Zonal Railways are advised to take necessary action accordingly.
~~~
(S~Bnatnagar)
14.~~ v~~~
I
1-~kd~;:~~~j
j ,;,:: ~':
~ '" ::"~
,//~~~
'rP
t.- f)
)4 IP---
e-l ~j ""Lq
L
---~ ........
'
Line failures on account of 180 KVA SIV are still taking place wherein crew fails to
troubleshoot or takes excessive time. It is also observed that even Ll's & TLC's fail to correctly guide
the crew in case of line failures. ln this regard following instructions issued by RDSO time to time are
reiterated for strict compliance by all Rlys.
(a) Loco pilots put HBA 'OFF' position and then in 'ON' position for resetting of SJV in case of
intermittent tripping and after putting HBA OFF/ON, some time fault gets eliminated and SIV
is re-energized. This generally takes 05-15 minutes because by keeping HBA 'OFF' position,
not only lowers the pantograph but it also de-energies !P magnet valve provided iii brake
panel for DBR/ VCD thereby resulting in application of emergency brakes through E-3
emergency valve and loss of BP & MR pressure.
(b) For resetting of SIV, a separate push button type SIV reset switch has already been provided
on the SIV panel by all the manufacturers as per RDSO's standardization scheme in all the
units (except older version TCD, Kit-2 & Kit-3, which are less than 10% of total population).
It is advised that all crew should be counseled to first press SIV reset switch provided on the
panel for resetting of SIV instead of HBA "OFF/ON'. If fault does not get cleared by pressing SJV reset
switch then only HBA 'OFF/ON' should be resorted to after closing isolating cock of IP magnet valve
provided on brake panel to prevent BP & MR air pressure loss and position of cock should be
normalized after putting HBA 'ON'.
I"
.,
'i
'~
.,i
Indication
Red
LED
indication
of
"internal
Fault"
comes ON
!f (S!V trips} unsuccessful, turn OFF & ON the battery for few seconds (after closing
isolating cock of !P magnet valve) and energize the locomotive and if successful, work
the train.
If over temperature fault is displayed, driver should reset SIV once, then close DJ after
10 minutes. If SIV picks up normally, driver can work further and clear the block
section after reporting to TLC.
Action should be taken in the following seq'uence:
1. Isolate the cab he~ter and cab fans. Restart the SIV. lf successful, work the train.
2. If oot successful, switch OFF BLCP and BLVMT. Restart the SIV. if SIV trips isolate the
faulty motor from MVSis, MVSls and MPH. Follow existing troubleshooting directory
and work the train.
3.
If (SIV trips) unsuccessful, switch ON BLVMT. Restart the SIV. If SlV trips, isolate the
faulty MVMT or MVRH. Follow existing troubleshooting directory and work the train.
4.
If (SfV trips} unsuccessful, switch ON BLCP. Restart the SIV. If SIV trips, isolate the
faulty MCP. Follow existing troubleshooting directory and work the train.
5. If not successful in identifying the fault, isolate all loads connected at the output of S!V.
6. Advise TLC accordingly and work the train or ask for assistance except in case of earth
fault.
Red
LED
indication
of
uExternaf
Fault"
comes ON
If SIV trips through earth fault, the fault is inside the SlV or in the cables. Activate
Earth fault by pass mode, ensure that, the bypass mode lamp is glowing and work up
to a max of 45 minutes to clear section to avoid mid-section failure.
3.
(a) RDSO has finalized a scheme to take care of earth fault reported in the cab heater, TFVT or
in the auxiliary circuit external to the SIV (such as MCP, MVMT, MVRH, MVSI, MVSL or MPH)
vide Modification Sheet no. RDS0/2008/MS/0353 (Rev i) of July 2008.
(b) ff it is not possible to identify & isolate the faulty circuit, LP shall be instructed to resort to
Earth fault bypass mode to work the train upto next section, after which he shall consult the
TLC for further guidance.
(c) Process for activation of Earth fault bypass mode is as under:
Press earth fault bypass button on the panel of SIV ( It will set 45 minutes counter & glow
red indication lamp for earth fault bypass mode)
The position of the HSIV switch shall be restored to '1', after rectification of the fault and entry
must be made in the logbook by driver and/or maintenance staff.
It is advised to counsel concerned running staff including Ll's, TLC's & Instructors by issuing
suitable simplified instructions in local/vernacular language.
v'
No. 2009/Eiect(TRS)/113/2
General Manager {Elect)
Sub : Periodical meeting of Sr.DEE(TRO)s to discuss Safety, Crew and interRailway Operational issues
''
.S
Incidences of Signal Passing At Danger (SPAD} by loco pilots are increasing in IR,
which is a serious cause of concern. Further, analysis of punctuality performance
indicates rising trend of detentions due to operational failures at crew changing point,
terminal
stations,
improper
communication
with
Traction
Loco
Control
organizations etc.
In view of the above, it has been decided to hold joint meetings of Sr.DEE(TRO)s
of adjoining Railways at nominated locations as per following schedules:
Organizing Railway
Railways to participate
in meeting
CR
SCR
NCR
SER
r-
---
--
Details of all accident cases in recent past on account of Loco Running Staff
and action taken.
(ii)
(iii)
(iv)
(v)
Issues related to receiving & dispatching of electric locos with defect from &
to adjoining Railways.
.. .. 2/~
} '
2:(vi}
Issues of rest, LRDs & long duty hours related with extended run of goods
trains.
(vii)
~~~
(Ved Pal)
Exec. Dir. Elect. Engg. {RS)
Railway Board
oj
;c
~milO!'! I.\
------
m~ MINISTRYOFRAILWAYS
(~ ~)
(RAILWAY B()l\RD)
.~ ~' ~:28/08/2012
<ff.2002/Tele/WCM/6/Genl./Pt.
no.
Railways.
c--... .-
(x~~~
. ' [Y)~!l14>/ct~.~htt\!
~: lH1"2338S504, 030~44613
t&"c:Rf:011~23304690, 030-4469{)
t~:dtele@rb.railnet~gov.in
.. x:.2002/Tele/W CM/6/Genl./Pt~
Copy to:
(i)
(ii)
Copy to:
(1)
(ii)
(iii)
'''
~!
'~ ~. t
\~~J " ~
./"_, '
-~~).
' .. '.
;,p~-:-.
,Rr~<:.-sr~Iix;:l>
. 'Uiit-lt\
( lilVCI11fltCrit 0 f lndt<l..
.. .
. . ,. :,
.....
., .. .
..'
..:::::
.'
.. :..
:S3ndmr B.ilr.rvab.,2.1).Asbbka::l{trad,
. .. . : N~1{Pd.hi 1fo- om
N ~
st;l
Pnted ti1c
.. '(}ff?ICE..:~tr:f\'lORANDUJli
,
... ,
'
..
:.. .
. :.. The
,
.
'
j v.P /, .
.
l
~-. ~ " ....
7. (t
' :.
. ..
cr K :V~rat.ht Krishnmi)
..
, . t.;
oi' Indi::~.
-',..
GOVERNMENT OF INDIA
MINISTRY OF RAILWAYS
( RAILWAY BOARD)
***'
New Delbi.dt. 17.10.2007
No.2002/Tele/WCM/6/Genl.!Pt
The General Manager(S&T)
Northern Railway,
Bar~da House,
New Delhi-110001.
***
..-.<"!"'~, ...........:..-.....- .. -
. i
,.
;;y
U..
.t r
&;~........
~ <:)~'*""'
/'__-.;::
'
{'
"li
~\.. '
-.:"'
'',
,. :..:
,; .
_. -~'~
. ..
\'
Spoctf~~
d~rlng
y~~r
.' d'iHu~11
;. <. :' .p<\;i~;o
:.
.
":' lt004~05
..
;;
...
:'.
::.
:-
'..
:..
.-
._...
.'
,.
:'
: .
. ; .-~: _:
.:, .
.
. ,,,
..-
. ..
',
-:
.
-..:
...,
GOVERNMENT OF INDIA
MINISTRY OF RAILWAYS
(RAILWAY BOARD)
. o. 2003/Eiect.(TRS)/440/17 Pt.
SUB: Formation of JPO for Freight train operation on stalling prone sectionsModifications to WTI
Instructions have been issued to Zonal Railways for preparation of Joint Procedure Orders (JPO)
on working of freight trains in stalling prone areas and subsequently its incorporation in Working Time
Tables {WTT), it is observed from the latest WTTs of the most of the Railways are not addressing to all
aspects of right powering and stalling.
After examination of WTT issued by different Railways following aspects are identified which
should ideally be mentioned in it.
(i)
Identification of stalling prone critical locations I sections on both UP and ..DN directions;
including yards entry/exit. special types of crossovers etc. if any.
(ii)
Sections permitted for running of trains of enhanced loading like CC+6+2, CC+8+2 etc. and
permissible speed.
(iii) All type of loads to be coverd with maximum permissible number of wagons.
(iv)
Provision
(v)
(vi)
(vii) load table for all goods Electric locos (WAGS, WAG7, WAG9, WAG9H, AC/DC locos) in Single
and Multiple Unit formations on all available gradients of the set ions.
{viii) Maximum current to be fed to traction motors.
{ix)
(x)
(xi}
Locations in divisions where good quality dry sand shall be made available in-rainy weather.
Zonal Railways are advised first to formulate JPO covering all the above aspects alongwith the
local requirement of the sections, if any and subsequently incorporate the same in WTT.
>it'
....
'
~ ~Nif51'l
GOVERNMENT OF INDIA
No. 2002/E'lect(TRS}/122/2
General Manager,
Central Railway, Mumbal,
East Central Railway, Hajipur
Northern Railway, New Delhi
Southern Railway, Chennai
South Eastern Railway, Kolkata
Western Railway, Mumbai
(ii)
(iii)
,.
...
~
: 2 : .
(iv)
{v.).
CELEs. oLthe_oper.ating. Railway .shall coor::dlnate for repair and .dispatcb_af-the- -..
locomotive for rectification and liaison with the owning railway.
{vi)
The dead loco movement shall be permitted only with the personal approval
of CELE ofthe concerned Railway.
~,.,,....
(Ved Pal)
Exe. Dir. Elect. Engg. {RS)
Railway Board
Copy to:
Chief Electrical Engineers & Chief Operation Managers
CR, ER, ECR, ECoR, NR, NCR, SR, SCR, SER, SECR, SWR, WR and WCR
~~~
7~
+-( II}JL~rvv~fivh'lll}
Sub : Web based facility for Unusual Occurrence Report (UOR) of Electric
locomotives on Railnet
Railway Board has developed a data driven web facility on Railnet for recording of
Unusual Occurrence Report (UOR) of Electric locomotives with password protection
(same passwords a.s being used in 'eLocoS' website). The UOR website is available on
Railnet address htt[2:[L10.1.10.21/elocouor/login.htm and can also be accessed through
'eLocoS' website under the maintenance head.
It is advised that all electrified Railways should immediately start entering
Unusual Occurrence data related to electric locomotives on real time basis (as far as
possible} preferably at division level. The data shall also be monitored at Railway Board
level for judging the performance of electric locos.
UOR web site has facility for inserting data of Unusual Occurrence on electric loco
by the Railways and subsequently all Railways can view such data in the categprized form
of Ownership and IR territory basis. 'Export to Excel' facility has also been incorporated
in the site for downloading data in excel format for further analysis and necessary report
generation. This website would help Railways to reduce burden of manual registration of
UOR and telephonic conversation in this regard.
Zonal Railways are advised to take advantage of this website by using features
available on UOR website and send suggestions to make this website more useful.
~~~IY
(Ved Pal)
Exe. Dir. Elect. Engg. (RS)
Railway Board
t"c-r
V'
On 10.12.2012, freight train no. N/BRS hauled by MU electric loco 23910 + 23133
(BZA/SCR) passed Home signal of Bhanwar Tonk (BHTK) station of BSP - PND section
(BSP division of SECR) at "ON" position at 04.21 hrs and stopped in front of station
building after bursting point no. 16. Primary investigation revealed that VCD of the
leading locomotive was in isolated condition at that time. It is primarily understood that
it may be a case of lack in alertness of crew in 'Vee' hrs and this incidence of SPAD could
have been avoided if VCD was in working condition. Moreover, reports of recent safety
drive, received from Zonal Railways, indicates that large no. of locos are running with
VCD in isolated con-dition.
Since, isolation of VCD is a serious lapse in safety and hazardous for train
operation, this is to be viewed seriously & corrected on first opportunity.
In view ofthe above, Zonal Railways are advised the following:
(i)
All electric locos fitted with VCD to be turned out from homing shed with
VCO in working condition. Efforts are to be made for attending VCDs in
isolated condition for minor defects even at trip sheds.
(ii}
Whenever loco fitted with VCD touches shed its event data to be
downloaded to check periods of its isolation for few latest trips & report
to be sent to concerned Sr.DEE(TRO)s for identification of isolation cases
of VCD on freight as well as passenger locos by running staff.
(iii)
Running staff to be counseled not to isolate VCD without any valid reason
and reason should be recorded in log book properly.
(iv)
~~~tV
(Ved Pal)
Exe. Dir. Elect. Engg. {RS)
Railway Board
e-mail : edse.roso@gmail.com
'l'J'ffif ~ -~
<t:lTWT
Railways
Research, Designs & Standards
Organization, LUCKN.OW- 226011
Dated; 14.12.2012
No. EL/3.6.4/02
"'
0
e
f>
"'
e
e
e
~~>
..
,.,
1.1
1.2
At present, the provision of Machinery & Plants(M&P), Tools & Plants(T&P) and
other maintenru1.ce infrastructure required for main.tenruace of eonventional electric
locomotives is governed by RDSO's Technical Circular (TC) No.32 (Rev. 01) which is
valid for sheds havmg a holding of 120 locomotives ..Existing shed layout issued
vide RDSO's dra;,v:ing No. SKEL-1720 also gives the plan for 120 cop.ventional
electric locos. Similarly, the scale of requirement for Machinery and Plants, Tools &
Plants for holding & maintain:ing 50 nos. 3--phase electric locomotives in a shed is
governed by Railwa;y Board's letter No.2003/E1ect/Devj440f18/13 dated
6.12.2005.
.
With the increa.<:J.e in production of electric locos for meeting the traffic d.em.a11.d> the
locomotive holding of the electric loco sheds
Indian Railways has been
increasing steadily. Considering the non-availability o.f fixed bench marking of
infrastructrual facilities required in sheds for holdit1g these locomotives, Railway
on
Page 1 of5
RDS0'/2012/EL/RM/0158(Rev'O') submitted
by:th~ ahpve Committee t<> Railway Board vide .RDSO's letter .No. EL/3.6.4/02 dt.
(i) ..... TS:king into account cons~derable :i:n,preaS~ in .:int'(ke of three-phase locos in
. i'M:n,:;ting years, all new upcoming locos sheds should haVe facilities of homing
200. three-phase locq:m.Otives, hence .all ri;:quirement of T&P, M&P should be
". acqrdingly planned:
(ii) . . F~r planning shed augmentation w;qrl,{s upto 200 locos req1,1irernent of T&P
:; 'a:t1d M&P should be considered for a.,(l~~t::)OO three-phase locos.
1.4 In
with the above approvfl.i. ~SO has suitably modified t_h.e
infr.'g!iltrll~tural details required for ho:rn.ing .200 electric locomotives in a shed
sugg'~stecl by . the above Corru:pittee and,. as approved by the .RailW?-Y Board.
R~Wft.Yl'> are, therefore, advised to follow t~e fo~owing guidelines on the matter:
iccqtdance
2.0
. .
:_ ,.;J_""". :':
n_e;,tv/ upcoming
all
locos sheds ~/h.ich shoJjd h<:{ye facilities of homing :~;wo threeph,&$~; ol,-ocomotives, require:p:1ent of infr:as~uctural facilities to home , 200
con'\lfb:ti,Onal/three -phas~ eLectric locomotives in a new_shed a:re appeP,ded below;
2.1
iri
the
s,b.,~d layout at Anuexure :n~ with salient features being highlighted as under:
. .
.
.
:
i)
d~~~
uispg~i!i:on bays instead of having the e:ii$ting'-system of inspection pits. The .main
a.dv~~?ges
~ Staff cern do. the ir,tspection of bogie itern~ like axle box, break gear,.wheeJ. etc .
...iii a better manner . due to easy accessibility whlle sitting on stool or
, . . . standing.
~: This
page 2 of5
"'
. :c
.,
;L:fx}~Pi;Jft~i9i1.: of both side track entry of locomotives in Heavy Lifting (I-IL) Bays should
.~.: :<
'. ..~-
:p~j:ti,':i(:l.~
to facilitate access for locos from both sides. Location of HL bay should be
,riei{'i5t<) service building on .inspection side so that bogie and dismantling sedion
. . $1::'~'he:lirmachine and Wheel shop.
" iii)'']:'he ~ of loco pits should be of 25 m length and 1.4 m depth in inspection bay
.' ,.,,~-i{l,:o \~r pits.
~. Xill.)fir~\7;7 ~~lied construction should be ISO 14000 compliant as well as Green Building
<;:<J,'bQ.~(EGBC/ GRIHA) compliant. Energy efficiency measures considered while
cortsl:;r:S~ting new sheds are suggested as under:
.
.
)'!', Provision of a Grid connect solar Photo Voltaic generating system of KWp
rating (without bahery).
Grid connect wind turbine at locations rich in 'itrind energy.
Use of day light pipes for illumination and transparent roof tops/
corntgated sheets.
'-'i '
Page3 of5
,.--
.. :
--/(r-
2.2
The scale of .common T&P, M&P and testing facilitiesrequired in different sections
for maintaining 200 conventional/three-phase electric locomotives in a shed is
given in Annexure IliA.
A computerized networked database system of maintenance of locomotive and
equipment and failure analysis sho'\,:fld be used. I:ri this regard, a minimum basic
infrastructure needed in a shed is enclosed
List 11 of Anne:X.ure UIA. The. basic
software developed should be able to monitor the m.aintenance activities of a shed
wit)1 all sections and ofiices being lnJ,<.ed through LAN. Further, a uniform software
for Locomotive Maintenance & Management System should be got developed
through a certified agency like CRIS etc. for implementation and use by sheds,
Railways, RDSO & Railway Board at Central level
in
Additional facilities other than common facilities mentioned at Para 2.2 to 2.4
above for homing 200 three phase electric locomotives in .a shed in the form of
M&P,T&P, training, testing and maintenance of electronic cards/models etc. for 3phase electric locomotives as indicated in Annexure IIIB (list for :400 3 phase
locomotive~ to be followed) should be planned for newfupco:nllng sheds. This list
can be expanded in future depending on the experience gained v.rith additional
types of cards/electronic components ru1.d equipments being maintained in sheds.
3 .. ()
.,
.3.)
,.
depending on the location/ space C01o1Straints
augmentation/ extension/ expansion sanctioned etc.
the
shed,
value
of
3.2
The scale of common T&P, M&P and other maintenance facilities required for
maintaining 200 conventional/three phase electric locomotives in a shed includlng
additional facilities for homing at least 100 three phase electric locomotives in the
form of M&P,T&P, trainin.g, testing and maintenance of electronic cardsjmodels
etc. as given in An:nexu.res III A & m B {list for ioo 3 phase locomotives to be
followed) respectively should be planned for augmentation/ expansion of existing
sheds.
4.0
Specifications of major M&P /T&P items like EOT crar1e, Pit Wheel Lathe etc. as
prepared by COFMOW should be used while procuring the same. For small
M&P fT&P items, standard specifications being used in the market may be used
while procuring tb.e items. As far as the specification of Automated and Remote
Dignostic Equipments are concerned, they shall be used based on the available
technical literature on the subject.
5.0
This Technical Circular supercedes the provisions contained u1. RDSO's Technical
Circular no. 32 (Rev 0 1) issued for conventional electric locomotives arid guidelines
contained in Railway Board's letter no. 2003/Elect./Dev/440/18/ 13 dt
06.05.2012 for homing 50 3-phase electric locomotives.
~~v
(Sanjiv SwKrup)
for Director General (Elect.}
I----1
Page 1 of 3
ANNEXURE I
Photographs of Cat walk structure provided for locomotive inspection in
Electric Loco Shed, Angul
[~age
3 of 3
Page 1
of~O
ANNEXURE-III A
.
.M:A.er:ax~E8L
.
..
.
. .
~~,c
.,
.~
:1\{achine Shop
'
Shed Holding
._.,
Lathe
tsb mm swing x 1000 mm between centers
... ' ... .......
10
-2
:.,_
11 Marking table
12
13
14
16
Watchmaker's lathe
~----
'Page 2 of 20
3
~
~-
5
2
Smith Hearth
12
12
60
60
10
Pneum~tic
impact wrenches%"
Batte:ry charger
'Page3 of20
10
'
10
11
13
Ionizing blowers
14
1 set
16
Contactless thermometer
17
18
Q meter
19
20
21
22
23
Magnifying scale
24
10
A-
2.
3.
1 .
4.
Hack's burners
5.
'Page 4 of20
6.
7.
8.
:,
9.
'
15. VTLMachine
17.
18.
19.
.:
20.
23.
AJTB lathe
26.
--~.
30.
5T forklift
'PageS of20
31.
Pinion extractor
SA
sc
2
1
3.
10
11
15
16
Testing Panels
1.
2.
2
,.
Page 6 of 20
...
3.
4,
5.
6.
7.':
8.
..,_.
9.
..
12~
15~
<
:.
18.
21.
22.
Hydraulic puller of capacity - 15 ton with spread 280mm, reach - 229mm stroke- 82mm.
24. TFP
test Bench.
Page 7 of20
30. Thermal
imagin~
equipment
As per requirement
lB Megger 1000 V
10
Megger 500 V
Universal multimeter
8
10
4 Portable voltmeter de
Portable voltmeter ac
Portable ammeter de
Portable ammeter ac
10
Millivoltmeter 0-75 mV
11
12
13
14
15
16
17
18
oq
19
B
20
.o
,.
,/" ~
y<< ""~()
,Page 8 o20
21
22
23
24
25
26 Spring tester
ammeter
28 Recording voltm~ter
29 Aneomometer
30
Manometer
31
Vibration meter
32
33
27
34
Re~ording
35
Revolution counters
36
38
Electric timer
39
40
41
Stop watch
42
Illumination meter
43
44
45 Stroboscopef8Tachorneter
46
47
48
49
50
51
52
'Page 9 of20
53
55
2
1
-.
1
1
60
61
62
63
64
65
73 Thermovision camera
High speed camera (for taking photo of equipme.nt
74
frulures)
75 Ultrasonic air leakage detector
69
77
page 10. of 20
A-
15 tonne
1
2
5
6
2
4
~OT
crane
Lifting tackles for tn;msformer, traction motor,
armature loco underframe, roof sections, bogie,
wheel set, loco body etc.
..
7
8
10
11
B.
Transport Facilities
.r-----.---------------------------------------~----------------~
_.
1
1A
r-----+----------------------------------------+----------------~
..
b;.
4A
.\+.~!b< '
'Itonneha,nd.pkHi troiiey . . /}.
~- ;~:"
2 ..5 tonneliycttaulj.~-:P:~1~Ett()lley ~:('' . :.\\ . ,,. ,
. . : ': ;. . .
s<J:. . . _
:g
. .
6'
...
..
J(\
2'
2
7.
Jeepwithtt~t~:r
Departmert.tat~ag6ri.L. ; . .. :,;/'~;:
_, .:'\ t, .>
. . : ..:
Material hahd1~SYa.1:l: fitted"\Yi'th ct~~ .:.
Breakdo'Wrlv~~H~ :.''. '. .' :\'.
.o?/\ : ;.... ,{' ...
. :
.i;(,,
,: .. -;.
'!.
;<
,Y
;;
<:;.
1-
" ..
......
.. ;;
:..~ .. :..
:'.
: . ... ':".".(.
>.:'.
..,
;J,;. ,,. . . .
.,
,
<
..
':_
~'
'
..
.
:.
. :-.
'Page 11 of20
12
c.
Annexure~IIIA
Weighing Machine/Scales
1
2B
2C
Fax machine
As per requirement
40
Adequate nos
FOIS/COIS -terminal
10
CUG connections
100
As per requirement
Floor scrubber
{.
'Page 12 of 20
10
10
Stores
1A
almirahs,
filing
racks,
cabinets,
Printers,
7
duplicator, dr~vying office and ferro pringting
equipment.
,.
10
11
"
Stool with 8" back support for micro:-processorI
electronic equipments repair for staff
Pa,ge 13 of 20
Items
Staff Canteen
Digital Camera
Micro processor based training module for
conventional I 3 phase loco
- 1
1
1
2
3
4
5
6
7
8
9
10
11
Items
Water Harvesting arrangement
Fire fighting arrangement
General electrification with provision of all
electrical fitting light & power socket point.
Heavy Duty Digital copier machine
Audio conferencing system for :r;neeting room.
...
Provision of CCTV , ........ _:>:
Borewell with pump
: _:_; ... .::.-:: : :.'. '
Provision of motorized points to expedite shunting
and avoid the need for points men
Provision of ESD free lab
Provision of effluent treatment plant
.:.':.
:;,_;
.-.
...~,.
, ..
1
1
1
1
As per requirement
As per requirement
Page 14 of 20
a)
b)
c)
d)
e)
f)
2)
3)
4)
5)
6)
7)
8)
9)
10)
<,.
-1
No.
qPage 15 of 20
Other Facilities:
1)
2)
Fuming G9-sg;hamber
.
02 Desktop cpmputers with UPS and Laser Printer
1. Computer Roqni
2. Split AC
. .
3. Computer Table
..4. Computer Chairs
5. PCs
6. Server
7. Printer
2 No.
4 Nos.
50 Nos .
50 Nos.
50 Nos.
05 Nos.
25 Nos.
"Page 16 of 20
SN
1
DescripH9:n ',
..... :; ::.R.emarks
C(Jntact The thickness or abnormal wear of
PfllltogrE!:ph
. ,..
measuring system
pantograph contacts are measured by
the ultrasonic method and image
processing method.
M(Jnitoring system for loco Still picture of the pantographs and AC
rooftops
devices and the moving images of the
entire roof top condition are recorded.
WheeL profile measuring Dimensions of different sections of a
system
wheel are measured by laser and
camera.
Brake wear measurement Dimensions of the brake shoe and brake
unit
lining are measured by a camera and
their replacement periods are estimated.
Wheel flat detection device Flats on the wheel' treads are detected by
acoustic sensors and camera images,
Flaws in axles are automatically detected
Axle flaw. auto detector
by ultrasonic echo analysis
Higher pressure water jet shall be used
Paint peeler
to peel off the paint , instead of solvent
which has higher environmental impact
Loco
body
dirt
auto The degree of dirt accumulated on the
det~ctor
. surface of loco body and inside loco is
judged by image processing technique
for improved efficiency of the following
chemical cleaning process
Blowe:r, for under frame Air blowing of under frame devices is
automatically performed.
equipment ,'
Simulator for malfunction Procedures for counter measures taken
by Railway man in the event of problems
recovery' training
during train operation are outlined on a
PC.
'
5
6
9
10
'Page 18 of 20
14
15
16
17
18
'Page 17 of 20
11
12
13
20
E-70/CCB
Brake
equipment (full simulation)
test and diagnostic console
Automated
Vertical
Storage
and
Retrieval
System(AVSRS)
Note: The above list is indicative & in exhaustive and the same can be expanded
depending on the development and availability of more automated tools to
assist maintenance of locomotives aiJ.d its equipment.
B. Real-time preventive maintenance support system for Electric rolling
stock:
1. Introduction
~Page
20 of 20
The base station will contain one or more large data servers, loaded with
various application programs to analyse the raw data received from various
rolling all over India. It will have access to registered users. The system itself
will make alerts to the custodians about the failure trend, expected time for
preventive check, replacement of a components etc.
2.3 Data Network
The most important aspect for success of this scheme is to have a seamless
coverage of a wireless data network in the entire Indian Railways electrified
section. Even though private operators like Reliance & Airtel as well as state
owned BSNL provide wireless coverage in many parts of the country, these are
mainly for voice applications and for public use. These networks will not
provide facility for huge data transfer, and even if it is available in future with
3G spectrum, such operators would not be able to guarantee uninterrupted
data transfer and foot print across the electrified track. Hence, as part of this
project, it would be needed to set up a pan India (covering electrified tracks to
begin with) broad band wireless network like WiMax. Alternatively, some
network operators who would be getting the 3G spectrum and WiMax in future
can be asked to provide this facility with an exclusive arrangement.
, Page 1 of6
Annexure~III
ANNEXU~
III B
Shed Holding
For 100
locos
For200
locos
11
12
13
14
15
16
17
18
19
20
2
3
4
5
6
7
8
9
10
8.
16
12
3
3 .
3
2
4
6
3
2
4
3
2
3
8
6
2
Page 2 of6
Annexure~III
21
22
23
Asper
Requirement
As per
Requirement
24
Universal Programmer
25
Inverter
26
UPS
27
28
Towing Equipment as per RDSO Drawing No. SKVL215, 216, 217 & 218 for WAG9locomotive.
1 set
2 sets
29
30
31
32
35
36
37
, Page 3 of6
38
39
40
Transient recorder
41
--
42
--
'
s.
Description
No.
100 locos
200 locos
2*
3*
30
60
4*
30
60
5*
12
12
7*
12
8*
6*
10
11
2
4
13
12
, Page 4 of6
16
17
18
Pressure Calibrator
19
20
3.
21
22
23
24
25
26
27
28
29
30
31
1
.
32
33
34
35
36
Function generator
37
1 set
1 set
38
39
Current signature
analyzer
for TM
& Aux. motors
. . .
.
.
.. .
. ..
Surge compai'is6n tester for conditiqn monitoring
of TM & Aux. motor
40
(po~able}
Page 5 of6
Note; *marked items are common to conventional and 3 phase electric locomotives.
Therefore, their actual requirement in a shed should be worked out depending on the
types and numbers of locomotives available in the shed.
Requirement for Electronic Testing Lab (As per CLW specification No.
ES/3/534):
1. Functional Tests of the cards to determine Whether the card is faulty and
identification of suspect component list
2. In circuit diagnostic test of the PCB cards up to Component level
3. Through Hole and Surface Mounted Device (SMD)PCB Remote stations
4. Conformal coating Removal Equipment
5. Video Microscope Based PCB Remote Inspection System
6. ESD Work Tables
7. Software Requirement for 1 and 2 above 8. Power Supply Requirement 230 V, 1 phase, with Max count of 64A
9. ESD Flooring
B.
Test set ups for testing of locos with GTO based convertors
1. RDSO's SMI 252
2. RDSO's SMI 256
3. RDSO's SMI 260
4. RDSO's SMI 261
5. RDSO's SMI 265
C.
Other Requirements
1. Reed Relay test jig for URB 512 DIS & URB 177D15 card
2. GG Module pulse transformer jig
3. FDU Testing jig
4. Multi channel oscillograph (Portable)
5. Function Generator
D.
Page 6 of6
3)
4)
5)
6)
7)
8)
9)
tc;r
~ MINISTRY OF RAILWAYS
(~wr ~RAILWAY BOARD)
,,/
\./'
Vigilance Dte. while examining various vigilance cases has observed that instructions
laid down with regard to system improvements from time to time are not being followed
and has suggested the following:
(i) Para 1315 Chapter XIII of the Engineering Code states that at least 20% check by
Asstt. Elect. Engineer/Divisional Elect. Engineer is necessary. It has been observed
by the Vigilance that the locations where the JS/SS officers have conducted 20%
test check are not mentioned. It is therefore reiterated that while executing the
work, officers should strictly specify the locations/specific item, where they have
conducted 20% test check of the items including hidden work such as cable laying,
concealed wiring etc.
{ii) Material register containing detail of material against contract received from and
issued to the contractor, materials released while executing the work etc. should
be properly maintained.
It is advised that implementation of the above be ensured in your Railway.
61~
{Su~tnagar)
Dir. Elect. Engg. (RS)
Railway Board
e-mail: dir.rsrb.gmail.com
~"~
~ f)-~-1:-Jc~
... 1
~ ~ 1\fiNISTRY OF RAU...WAYS
(~ ~)
(RAILWAY BOARD)
x:i. 2010/Tele/2(1)/1/Pt.
TELECOM CIRCULAR NO. 14/2012
The General Manger,
All Indian Railways ..
Including Konkan Railway
Sub: Joint Procedure Order(JPO) for use of CUG/Personal Mobile
Telephones by Loco Pilots/Assistant Loco Pilots/Motormen and
Guards.
Ref: Railway Board letter no. 2006/Safety(A&R)/19/8 dated 11.05.2007.
***
Instances of accidents have come to light that have been caused because of
. Loco pilot/Assistant Loco PilotfMotorma:h/Guard using mobile phones during trains
run. Board has considered the issue of use of CUG/Persona! mobile phones by Loco
Pilots/Asst. Loco Pilot/Motorman/Guards during train nm and a revised guidelines
in the form of JPO has been approved by Board (CRB, ML, MM & MT).
2.
3.
DA: As above.
.~ 11.- S ~
~~~
t['flv
1\:
/
(m6mm)
~mc:B'/<i'Hi T.t 1\!
~:
011-23388504,030-44613
~: 011-23304690, 030-44690
~ ~: dtele@rb.railnet.gov.in
Copy forwarded for information and necessary action to:1. The Chief Operations l'y[anagers, All Indian Railways.
2. The Principal Chief Engineers, All Indian Railways.
3. The Chief Mechanical Engineer, All Indian Railways.
4. The Chief Electrical Engineer, All Indian Railways.
5. The Chief Signal & Telecom Engineers, Alllndian Rail
6. The Chief Safety Officer, All Indian Railways.
7. The Chief Commissioner of Railways Safety/Lucknow.
8. All Commissioners ofRailway Safety.
9. The Director General, RDSO, Lucknow.
::~r/
/
i' !
i '
-~
1.
While the train is on run, the Loco Pilot/Motormen will keep thelr
mobile phones (CUG & personal) in switched offcondition in their
bag/box.
3.
The Gtl.ards may use thei.T CUG mobile phones during train run in
exigencies only.
4.
Loco Pilots may use their CUG mobile phones during tram run only
in exigendes such as to call for assisttmce in the event of an
accident or failure. Howev~r, the reason necessitating use of mobile
phone during journey may be recorded at the end of their journey in
the register kept in the Loco Pilot lobby. Personal mobiles phones
shall not be used tmder any circumstances during the en~~\oumey
period.\ _. ~ ~
~- '3'11t.;b
\ Jy...\;J\~'""'-..:--~~~,__,
\"\
~~~ I
j;;,
I~. I,__..
\ g' \
t..
5.
6.
. ").
.i
! .
'
:~
i
I
8.
In case, the Assistant Loco Pilot has been provided with CUG
mobile phone or is carrying personal mobile phone,. the above
instructions shall also be applicable for Assistant Loco Pilots.
9.
1
!j
!
~r
!
~ ~"~
(VijaylaXllli Kaushik) (Ved 'Pal)
ED(Safety)
EDEE{RS)
-fo . ~'11L""
EDlYIE(Traction) .
1.