You are on page 1of 103

2013 Edition

CONTINUOUS
PROCESS Playbook
The bottom line on core automation issues
for the continuous processing industries

Control System Security and Access


Operator Interfaces and the Mobile Workforce
PLC vs DCS
Fieldbus, Ethernet & Wireless
Energy & Emissions Management
Safety: Lifecycle and Procedural Automation Approaches
Start-Ups, Upgrades & Migrations

CONTINUOUS PROCESS Playbook

CONTENTS
Sponsored by:

4 Contributors

7 Introduction

Tips for Successful Project Development

11 PLC vs. DCS: Which is Right for Your Operation?


14 PLC Lifecycle Management
17 Operator Interface Trends
20 How Reusable Code Streamlines Recipe Management
24 Are Intelligent Instruments The Right Choice?
28 Managing Emissions with Automation
31 How to Conduct an Energy Audit
36 Energy Management Best Practices
41 The Impact of Variable Speed Drives
44 Safety: The Lifecycle Approach
49 Procedural Automation for Greater Safety and Productivity

2 / 103

CONTINUOUS PROCESS Playbook

CONTENTS

52 Four IT Standards You Should Understand


55 Fieldbus & Ethernet in Continuous Process Applications
59 Understanding the Differences Among Industrial Ethernet Protocols
66 Wireless Trends
69 Wireless Sensor Applications
71 Wireless Protocols for the Process Industries
73 How to Avoid Mistakes with Control System Remote Access
77 Control System Security Tips
80 Leveraging Analytics and Community for a Mobile Workforce
84 Automation as a Continuous Improvement Tool for Everyone
89 Combining OEE and Automation for Improved Performance
92 Four Considerations for Upgrades & Migrations
95 VENDOR SELECTION RESOURCE GUIDE

3 / 103

CONTINUOUS PROCESS Playbook

CONTRIBUTORS

4 / 103

The following experts


contributed to this playbook:

Brooke Robertson

John Rezabek

Project Manager Regional Control Specialist, EPCD


Momentive Specialty Chemicals Inc.

Process Control Specialist


Ashland Specialty Ingredients

Michael Thibodeaux

Joe Staples

Industrial Automated Systems Security Engineer


BASF

Head of Manufacturing Systems North America


Bayer CropScience

Dennis Brandl

Chris Wells

President
BR&L Consulting

Senior Staff Instrumentation Engineer


ExxonMobil Chemical Company

Steven Toteda

Steve Elwart, P.E.

Chairman of WINA
(Wireless Industrial Networking Alliance)

Director of Systems Engineering


Ergon Refining Inc.

Dave Woll

Bob Rochelle

Vice President
ARC Advisory Group Inc.

Food and Packaging Industry Specialist


Staubli Corporation

CONTINUOUS PROCESS Playbook

CONTRIBUTORS

5 / 103

The following experts


contributed to this playbook:

Cyle Nelson

Chris Bacon

Ariel Prez

Senior Software Architect


Adept Technology

Operations Productivity Analyst


ISS Productivity

Control Systems Group Leader


Bechtel

Ethernet Protocol Experts


Richard Harwell

Carl Henning

EtherNet/IP

Profinet

Scott Hibbard

Shaun Kneller

Sercos III

Ethernet Powerlink

Chuck Lukasik

Joey Stubbs

CC Link IE

EtherCAT

CONTINUOUS PROCESS Playbook

CONTRIBUTORS
Control System
Integrators Association
(CSIA)
Automation World worked with CSIA to
gain access to the expertise of its system integrator members to bring you
much of the content in this playbook.
To become a member of CSIA, a
control system integration firm must
demonstrate experience and commitment to the field. Members who
earn CSIA Certification have passed
an independent audit of 80 criteria
covering all aspects of business performance, including general management, financial management, project
management, quality management,
supporting systems, human resources
and more. To maintain their certification, CSIA Certified members must be
re-audited every three years.
For more information about CSIA and
its system integrator members, visit
http://www.controlsys.org

6 / 103

The following CSIA experts


contributed to this playbook:

Chetan Chothani

Bryan Curtis, P.E.

President
Adaptive Resources

Senior Consutant, Power/Facilities


Dept., Matrix Technologies

Alan E. Lyon, P.E.

Antonio Manalo

Lead Engineer
Avid Solutions

Automation Systems Integrator


Avid Solutions

Alex Palmer

Dario Rossi

Team Lead
Aseco Integrated Systems

Chief Engineer
Aseco Integrated Systems

Scott Saneholtz, P.E.

Robert Snow

Manager - Process Solutions Dept.


Matrix Technologies

Senior Process Control Engineer


Optimation

Ronald Studtmann, P.E.

Russel Treat

Associate Dept. Manager, Power/


Facilities Dept., Matrix Technologies

President-CEO
Enersys Corp

CONTINUOUS PROCESS Playbook

7 / 103

INTRODUCTION
By David Greenfield

Director of Media & Events


for Automation World

Automation may not be such a big word when it comes to letter count, but when it comes
to meaning and concept its a doozy. The term automation encompasses everything from
controls, sensors, networks and interfaces to motors, drives, actuators and software. When
youre deeply involved with the production operations typically conducted by facilities
dealing with chemicals, metals, mining, or oil & gas, all the potential automation applications
that must also be considered can boggle the mind.
Knowing how confusing all these technological options can be, Automation World has
developed this continuous processing-focused playbook to provide a resource on some of
the most basic automation issues encountered in the industry.
Using this playbook as a helpful resource, youll have a handy, quick-read reference on topics
ranging from fieldbus and industrial Ethernet basics, operator interface trends, and control
system security to project start-up concerns, system migration issues, and variable speed
drive considerations.
We hope youll find this continuous process playbook to be a useful source of information
now and in the years ahead as you plan for new projects or upgrade existing production
functions.

FORWARD PLAYBOOK

ADD COMMENT

RETURN TO CONTENTS

CONTINUOUS PROCESS Playbook

8 / 103

Tips for Successful


Project Development
By Marty Weil

contributing writer
Automation World
and

David Greenfield

Media and Events Director


Automation World

Project development is not an everyday occurrence at continuous process facilities. To help


ensure you are covering all the major issues involved in these infrequent work scenarios, here
are some tips and considerations to facilitate a successful project startup.

1. Clearly identify the project specifications. What do you want to do? What is
your existing process? Define operator involvement, quality control issues, interface points
with other systems, and the technological capability available in-house.

2. Conduct a job risk assessment (JRA). Performing a JRA before the start of work
highlights any hazards that could produce undesirable results to personnel or property. A
safety assessment must be completed to ensure that the scheduled work can be performed in
a safe manner and to address any hazards that are uncovered as a part of the review process.

3. Operator training is key. The operators must learn how to navigate and operate
their process in the new control system. The training must be performed just in time (about
two weeks before start-up) so that the information is fresh in their minds. During the
instruction, it is critical that the operators be trained using the operator interface graphics
they will encounter.

4. Emphasize communications. Communicating with the site maintenance and


FORWARD PLAYBOOK

ADD COMMENT

RETURN TO CONTENTS

CONTINUOUS PROCESS Playbook

continued

Tips for Successful


Project Development

9 / 103

operations departments is critical to the success of the project. Maintenance and Operations
need to schedule their duties with enough lead-time to support the installation and start-up
activities. With enough time, maintenance can even contract back-fill support for the duration
of the project start-up activities. For operations, the work and vacancy relief schedule will
have to be organized so that enough operators are available to cut-over and start-up the
plant. This is especially important if a hot cut-over is involved.

5. Have a detailed cut-over plan. Planning is crucial to any stage of an automation


project. By putting together a detailed cut-over plan, the personnel performing the work
will have a clear directive of the activities that need to be completed each day. The cutover plan will help keep the activities on task and allow the project manager to assess the
progress of the work, create workarounds for problematic situations, coordinate with the
plant operations, and drive the project to completion. A cut-over plan, at minimum, should
include the I/O to be cut-over and tested (including the order in which they are to be tested),
any water testing through the process to verify configuration on the live plant, and the actual
order of the first products to be run on the unit.

6. Devise a roles-and-responsibilities matrix. Defining the roles and


responsibilities of all personnel and contractors involved in the project is key to delivering
a successful project. By putting together this matrix and using it as a pre- and post-training
reference for all staff, everyone involved will understand their responsibilities and perform the
appropriate work.

7. Get management involved. Management at various levels, including upper


management, needs to understand what is involved in the start-up process and why it is

FORWARD PLAYBOOK

ADD COMMENT

RETURN TO CONTENTS

CONTINUOUS PROCESS Playbook

10 / 103

continued

Tips for Successful


Project Development
critical to delivering on managements expectations of the
continuous process facilitys operations. Communication
and internal buy-in throughout the organization are
very important aspects to a successful startup, and
managements visible support and connection to the
project is critical to these aspects.

8. Be thorough in examining outside


support. Be sure to determine if outside personnel, such
as systems integrators, have experience in your industry. Is
their knowledge transferable to the project? Evaluate their
background and capabilities. What is the range of services
they provide? Are there any commercial issues outstanding?
Check references. Consider cost, but understand that the
lowest bid is not always the best. A good resource for
companies looking to hire control system integrators is the
Control System Integrators Association, www.controlsys.org.
This organization not only validates industry expertise, but
also supports dependable business practices by its system
integrator members.

FORWARD PLAYBOOK

COMMENT

RETURN TO CONTENTS

CONTINUOUS PROCESS Playbook

11 / 103

PLC vs. DCS: Which is Right


for Your Operation?
By Jeanne Schweder
contributing writer
Automation World

Over the past decade, the functionality of different control systems has been merging.
Programmable logic controllers (PLCs) now have capabilities once found only in distributed
control systems (DCSs), while a DCS can handle many functions previously thought more
appropriate for PLCs. So whats the difference between the two control approaches, wheres
the dividing line and are there still reasons to choose one over the other?
PLCs grew up as replacements for multiple relays and are used primarily for controlling
discrete manufacturing processes and standalone equipment. If integration with other
equipment is required, the user or his system integrator typically has to do it, connecting
human-machine interfaces (HMIs) and other control devices as needed.
The DCS, on the other hand, was developed to replace PID controllers and is found most often
in batch and continuous production processes, especially those that require advanced control
measures. The vendor handles system integration, and HMIs are integral.
As users demanded more production information, PLCs gained processing power and
networking became common. PLC-based control systems began to function like a miniDCS. At the same time, the DCS hybridized to incorporate PLCs and PCs to control certain

FORWARD PLAYBOOK

ADD COMMENT

RETURN TO CONTENTS

CONTINUOUS PROCESS Playbook

continued

PLC vs. DCS: Which


is Right for Your
Operation?

12 / 103

functions and to provide reporting services. The DCS supervises the entire process, much like
the conductor in an orchestra. Protocols, like OPC, have eased interactions between the two
control systems.
Since PLCs are less expensive and can now perform much like a DCS, wouldnt it make sense
to convert everything to PLCs? The answer, like most things in the world of automation, is that
it depends on the needs of your application. Here are six key factors to consider:

1. Response time
PLCs are fast, no doubt about it. Response times of one-tenth of a second make the PLC an
ideal controller for near real-time actions such as a safety shutdown or firing control. A DCS
takes much longer to process data, so its not the right solution when response times are
critical. In fact, safety systems require a separate controller.

2. Scalability
A PLC can only handle a few thousand I/O points or less. Its just not as scalable as a DCS,
which can handle many thousands of I/O points and more easily accommodate new
equipment, process enhancements and data integration. If you require advanced process
control, and have a large facility or a process thats spread out over a wide geographic area
with thousands of I/O points, a DCS makes more sense.

3. Redundancy
Another problem with PLCs is redundancy. If you need power or fault tolerant I/O, dont try to
force those requirements into a PLC-based control system. Youll just end up raising the costs
to equal or exceed those of a DCS.

FORWARD PLAYBOOK

ADD COMMENT

RETURN TO CONTENTS

CONTINUOUS PROCESS Playbook

continued

PLC vs. DCS: Which


is Right for Your
Operation?

13 / 103

4. Complexity
The complex nature of many continuous production processes, such as oil and gas, water
treatment and chemical processing, continue to require the advanced process control
capabilities of the DCS. Others, such as pulp and paper, are trending toward PLC-based control.

5. Frequent process changes


PLCs are best applied to a dedicated process that doesnt change often. If your process is
complex and requires frequent adjustments or must aggregate and analyze a large amount
of data, a DCS is typically the better solution. Of course, the very flexibility of a DCS system
also makes it much more vulnerable to meddling by operators that can cause spurious
shutdowns.

6. Vendor support
DCS vendors typically require users to employ them to provide integration services and
implement process changes.
System integrators perform similar functions for PLC-based systems. It has also become
common for PLC vendors to offer support services through their network of system integrator
partners.
Process control has become increasing complex. Its difficult for any individual to know
everything about these sophisticated systems, increasing the need for vendor support.
Manufacturers also continue to reduce factory staff and a generation of experienced process
control personnel has begun to retire. As a result, the quality of support has become a critical
factor in vendor selection.

FORWARD PLAYBOOK

ADD COMMENT

RETURN TO CONTENTS

CONTINUOUS PROCESS Playbook

14 / 103

PLC Lifecycle Management


By David Greenfield

Media and Events Director


Automation World

Discussion of controllers in the continuous process industries typically centers on distributed


control systems (DCSs). However, programmable logic controllers (PLCs) play as important
a role in the process industries as they do in discrete manufacturing, particularly when it
comes to operations reliability and protection of personnel. Some of the more significant
applications for PLCs in the process industries include control of safety-instrumented systems
and control of major machinery.
Like many discrete manufacturing operations, most process operations use a variety of PLCs
from different vendors. As a result, your ability to effectively operate and manage these
disparate PLC versions has a direct impact on your plant reliability and safety.
Following is a list of the top three PLC lifecycle management concerns for the process
industries and how some of your peers are working with PLC suppliers to address those
issues, compiled from presentations delivered at The Automation Conference 2012.

1. Long plant maintenance shutdown intervals limit the opportunity to modify,


maintain and upgrade PLCs. Many process industry units, particularly in continuous process
operations, run eight years or more without shutting down. As a result, your opportunity to
do anything with the PLCs in that unit is very limited. Therefore you need to ensure that PLC
management is a key part of your unit maintenance focus.

FORWARD PLAYBOOK

ADD COMMENT

RETURN TO CONTENTS

CONTINUOUS PROCESS Playbook

15 / 103

continued

PLC Lifecycle Management


2. Standardization of PLCs is difficult, if not

a giant breakthrough
in small readers

impossible in a multi-plant operation, and leads to


challenges with spare parts management and training.
Because across-the-board standardization is unlikely due
to regional differences tied to support and availability, a
strategy for PLC support and training for each region should
be developed to ensure that these critical controllers are
maintained in a standardized fashion.

3. Integration with main control systems

Meet the DataMan 50L. The tiny barcode reader that brings
big performance to the food & beverage industry.
Dont let its size fool you. The DataMan 50L is huge in barcode reading performance.
Measuring just 23.5mm x 27mm x 43.5mm and featuring an IP65-rated housing, the
DataMan 50L is premium technology designed for 1-D-oriented barcode reading. The
DataMan 50L delivers read rates that can surpass 99% through Cognexs proprietary
Hotbars image-analysis technology.

Three aspects are critical to any plan involving the


integration of PLCs with DCSs. 1) The integration process
needs to be reliable and shareable with all other plants to
standardize the process for ease of maintenance;
2) the integration plan should be flexible for adaptability to
local requirements; and 3) it must address industrial control
system security. (See Control System Security Tips in this
playbook for more details on this topic.)

The new DataMan 50L is a powerful upgrade for applications that use small laser
barcode scanner systems. Visit us at www.cognex.com/50L.

To better manage your PLC lifecycle, following is a set of


three requests that many top process industry operations
Scan to Learn More

FORWARD PLAYBOOK

COMMENT

RETURN TO CONTENTS

CONTINUOUS PROCESS Playbook

continued

PLC Lifecycle
Management

16 / 103

are asking of their PLC vendors to help them better manage their PLC assets over the long,
continuous operation periods common to the process industries.

1. Life extension. Because of the long periods of time that typically pass between
maintenance shutdowns in process facilities, users need to be able to source and use
components for longer-than-expected lives. Many facilities in the continuous process
industries are still looking at 20 to 30 years as a life cycle for their equipment. Talk to your
vendor about their ability to support backwards compatibility with new components as they
become available over these long lifecycles. These new components should be able to be
integrated into your system without requiring a shutdown for upgrading.

2. Online upgrades. More vendors are coming around to this request of process
industry end users, as it is often the easiest way to upgrade a PLCs logic without shutting it
down or rewiring the I/O. One process industry end user told us: If you look at the total cost
of an upgrade, the cost of the hardware is dwarfed by the cost of labor to re-do things like I/O
rewiring and the cost of the unit shutdown. Therefore, online version upgrades that can be
installed while the PLC is running and that work with the existing I/O is ideal.

3. Increased flexibility in design to address standardization. More end


users in the process industries are looking for scalable PLC systems from vendors that use
the same hardware. Having the same hardware requirements across-the-board for your
PLCs enables you to better manage spare components, training, and configurable I/O
requirements.

FORWARD PLAYBOOK

ADD COMMENT

RETURN TO CONTENTS

CONTINUOUS PROCESS Playbook

17 / 103

Operator Interface Trends


By Marty Weil

contributing writer
Automation World
and

David Greenfield

Media and Events Director


Automation World

Operator interaction with production machinery is critical from both a standard operations
aspect as well as for analytical and safety reasons. Following are some of the most significant
recent developments in operator interface (OI)/human machine interface (HMI) technologies
for the process industries:

Better Decision-Making Intelligence for Operators

Improved graphics provide detailed context for machine data, enable faster analysis, and
facilitate better and more rapid understanding of information. Operators are presented the
right information, in the right format, at the right time. This empowers them to make timely,
informed decisions and to take immediate actions to reduce costs and operational incidents,
improving productivity across the total operation.

Training

The higher level of functionality and interaction embedded in todays HMI better reflects the
essential experience of a machine or process. This is ideal for training, and speeding time-tocompetency among operators. The value provided by HMI in the training arena is reflected
in ease-of-use, higher efficiency and productivity, reduced time to complete tasks, improved
user satisfaction, greater trust in systems, and fewer user errors.

Workforce Demographics

Over the next decade, process industries face the challenge of replacing an aging workforce
with an Internet-driven, computer-savvy, video-gaming generation of employees. Industries

FORWARD PLAYBOOK

ADD COMMENT

RETURN TO CONTENTS

CONTINUOUS PROCESS Playbook

continued

Operator Interface
Trends

18 / 103

must preserve, maintain, extend, and institutionalize their workforce knowledge efficiently
and effectively to sustain operational excellence. Improved HMI technology, including HMI
with virtual reality techniques, is helping in this critical effort, providing an effective means
to train the new workforce in ways that dovetail with their generational interests and native
skills.

Virtual Reality

Though virtual reality techniques are primarily being used for new user training applications
related to basic equipment operations, they can also be used to expose personnel to
simulated hazardous situations in a safe, highly visual, and personally interactive way.
Customized simulations of plant layouts, dynamic process operations, and comprehensive
virtual environments can be set up to allow users to move within the virtual plants, make
operational decisions, and investigate processes at a glance. Trainees see the consequences of
correct and incorrect decisions immediately, providing the opportunity to directly learn from
their successes and mistakes.

Open Platform Architecture

As you explore available HMI technologies, ask yourself: Is it easy to exchange essential
information from this HMI with different systems or controllers? Is the application code
locked for customization of objects or functions? Will runtime software be able to operate on
different hardware platforms? These are the kinds of questions being discussed between HMI
vendors and their customers, and increasingly the right answers to these questions depends
on the HMIs use of open platform architectures. As HMI products evolve in their use of these
platforms, HMIs will be less proprietary and more open, offering greater freedom to the user
in terms of choice of runtime platforms.

FORWARD PLAYBOOK

ADD COMMENT

RETURN TO CONTENTS

CONTINUOUS PROCESS Playbook

19 / 103

continued

Think automation is
just another business cost?
Think automation is tactical
and not strategic?
Think no one has enough of the right
resources to execute your automation work?

Think again. Think MAVERICK.

Operator Interface Trends

Emerging Issues Drive Innovation

Among the issues facing HMI developers are userconstrained environments, collaborative work functions,
and facilities for individuals with restricted mobility. These
challenges have led to a number of HMI innovations,
including:

Gestural interface technology to support

communication to a system without contact through


a keyboard or touch screen;

Automated generation of HMI code based on an

abstract specification of required user interactions


independent of operation modes or device
implementations;

Advanced speech recognition to allow operation


Call MAVERICK: 888.917.9109
or visit us online at mavtechglobal.com

in noisy environments without the use of special


training or requiring a specific speech recognition
start trigger.

FORWARD PLAYBOOK

COMMENT

RETURN TO CONTENTS

CONTINUOUS PROCESS Playbook

20 / 103

How Reusable Code Streamlines


Recipe Management
By Jeanne Schweder
contributing writer
Automation World

Looking for a way to implement a flexible production strategy without breaking your budget
or spending weeks or months writing new software code? The answer can be found in ANSI/
ISA-88.00.03-2003, a control industry standard that establishes best practices for automating
batch manufacturing plants and batch control.
Although originally designed for batch manufacturing processes, the ISA-88 standard is also
helping users save time and money in automating continuous production processes.

Common Process Control Language


ISA-88 accomplishes this by defining a common language for process control to improve
communication between the various players involved in controlling plants and production
processes. It also creates a structure with consistent concepts and models for batch processes
that provides a map for how developers should organize their software code.
The standard sets forth a set of building blocks for process control at all levels: enterprise,
site, area, process cell, unit, equipment module and control module. The three highest levels
explain how the standards language can interface with the business systems of the area,
plant site and business enterprise as a whole.

FORWARD PLAYBOOK

ADD COMMENT

RETURN TO CONTENTS

CONTINUOUS PROCESS Playbook

continued

How Reusable Code


Streamlines Recipe
Management

21 / 103

The next two levels, process cell and unit, are the building blocks of the production process.
One or more units are contained in each process cell. Each unit is a collection of controlled
equipment.
Within the unit are the equipment and control modules. An equipment module defines a
small group of equipment with a process function and can contain control modules and
subsidiary equipment modules. The control module contains the equipment and systems that
perform the actual process control.

Universal Structure
The standard can be applied to either simple or complex processes, so that one programming
system can be used for all production processes in a plant. Using this methodology, users and
programmers can:

Identify the structure and format for recipes and procedures;


Define levels of recipes and procedures;
Recognize product-specific recipes and procedures that are separate from processoriented equipment and its direct control;

Identify a hierarchy of manufacturing equipment and its dedicated control;

FORWARD PLAYBOOK

ADD COMMENT

RETURN TO CONTENTS

CONTINUOUS PROCESS Playbook

continued

How Reusable Code


Streamlines Recipe
Management

22 / 103

Recognize equipment capabilities used during recipe and procedure driven


production; and

Recognize the need for modular and re-usable control functionality.


Re-usable software code blocks are central to the ISA-88 standard and are programmed using
IEC 61131-3-compliant software, which is available from all major automation vendors. Code
can be programmed in ladder diagram as well as structured text, function block diagram,
instruction list or sequential function chart languages.
Each vendor includes libraries of reusable control modules and algorithms that define
common machine functions and recipe steps in their software. Once the initial process or
recipe has been programmed, modular code blocks can be reused for the same functions
with minimal modifications. This eliminates the need to reinvent the wheel for different
recipes, and allows future changes to be made almost dynamically.
According to industry experts, users typically achieve a 30 percent savings in programming
time and costs for the first project, and as much as 70 percent savings on subsequent projects.

Broad Applicability
Industry experts say an estimated 50 percent of all U.S. manufacturing is now accomplished
using techniques and technologies consistent with the ISA-88 standard, which has been
proven in thousands of applications and can be applied in either DCS or PLC control
environments.

FORWARD PLAYBOOK

ADD COMMENT

RETURN TO CONTENTS

CONTINUOUS PROCESS Playbook

23 / 103

continued

Stop Programming Batch Tasks.


Start Configuring
S88 Builder is the first process control
system that is configured rather than
programmed. Configuration requires two
steps, define the devices that make up the
physical system and define specific tasks,
such as mixing, flow control, heating, etc.,
that the devices team up to accomplish.
Configuration is easier, more accurate and
faster than programming.

for new products;

Enable vendors to supply appropriate tools for

implementing batch control;

Enable users to better identify their needs;


Make recipe development straightforward enough

to be accomplished without the services of a control


systems engineer;

S88 Builder lowers the total cost of


ownership for a batch control system by:
Reducing time-to-market for new products
Reducing waste and downtime

The ISA-88 standard can be so widely applied because its


central objectives are to:

Reduce a user's time to reach full production levels

By configuring instead of programming


batch control tasks, S88 Builder speeds
project development by up to 90%.

Lowering initial development costs

How Reusable Code Streamlines


Recipe Management

Learn More About


the Many Cost-Saving
Benefits offered by
S88 Builder
www.S88Builder.com
CustomerSupport@ecssolutions.com
(800) 471-3273

CONTROL AND INFORMATION SOLUTIONS FOR INDUSTRY

Reduce the cost of automating batch processes; and


Reduce life-cycle engineering efforts.

FORWARD PLAYBOOK

COMMENT

RETURN TO CONTENTS

CONTINUOUS PROCESS Playbook

24 / 103

Are Intelligent Instruments


The Right Choice?
By Jeanne Schweder
contributing writer
Automation World

The process industries are increasing use of intelligent instruments that provide operators
and plant managers with a broader range of operational information than their analog
predecessors. Now that these instruments have been available for years, its apparent that
the difference in application success with them often hinges on whether or not the company
using them is prepared to take advantage of the benefits they offer.

Intelligent Instruments Defined


A control device is considered intelligent when it provides more than just raw engineering
values, such as whether a valve is open or shut. A flow meter that also measures density,
temperature and other properties of the flow is an example of an intelligent instrument.
Having this kind of multidimensional data simplifies diagnostics and provides a context for
smarter decision-making.
Industry efforts to improve quality and productivity, as well as regulatory requirements and
liability risks, are the key factors behind the increased use of intelligent instruments. Makers
of many consumer products, such as pharmaceuticals, food, and even tires need to capture
detailed process information that allows them to trace and track product defects to the
source.

FORWARD PLAYBOOK

ADD COMMENT

RETURN TO CONTENTS

CONTINUOUS PROCESS Playbook

continued

Are Intelligent
Instruments The
Right Choice?

25 / 103

Intelligent instrument capabilities and vendor offerings vary widely. As a result, one of the
biggest challenges to gaining all the benefits offered by intelligent instruments has been the
lack of uniform methods for accessing information. To overcome this, the control industry has
begun setting standards such as Field Device Tool, or FDT, making it easier to communicate
with and configure different devices from multiple vendors.

Core Benefits

Intelligent instruments control processes at the device level, so information is usually


more accurate and reaction times faster, enabling tighter process control.

Ethernet networks make it easy to calibrate, configure and adjust process parameters
remotely, similar to how a printer driver works on a computer.

Smart devices can self-address and self-report their status, simplifying remote
troubleshooting and reducing maintenance costs and manpower.

Smart instruments with multiple capabilities reduce the number of devices required,

as well as the cost of programming, wiring and installation, lowering the total cost of
ownership.

Process data that lets you anticipate failures can improve predictive maintenance,
increasing uptime and reducing waste.

Getting better information faster, can help you improve process efficiency, increase
productivity and actually reduce the cost of innovation.

FORWARD PLAYBOOK

ADD COMMENT

RETURN TO CONTENTS

CONTINUOUS PROCESS Playbook

continued

Are Intelligent
Instruments The
Right Choice?

26 / 103

Drawbacks
Intelligent instruments are not plug-and-play. While more information can be gathered more
accurately, enabling you to adjust processes more quickly, an intelligent control system can
also be more complex to manage and maintain.
Theres a steep learning curve for intelligent instruments. You have to be realistic. If your
control engineering staff isnt willing to move away from centralized decision-making or
your maintenance staff has a break-fix mentality, its unlikely theyll be willing to learn how to
manage and support the new systems.
Intelligent instruments also need to be properly installed. Follow vendor guidelines, install
devices correctly, validate your networks and update your cyber security methods. Otherwise,
youll be wasting your investment.
If this is your first attempt to use intelligent instruments, its best to select the vendor with
the broadest offering of applicable devices. Once your team has learned how to manage one
vendors instruments, it will be easier to learn anothers.

Justifying the Investment


It isnt enough to claim that intelligent instruments will improve production processes.
You need to understand how an investment can return money to the business. That means
focusing on the most important processes with the biggest potential returns.

FORWARD PLAYBOOK

ADD COMMENT

RETURN TO CONTENTS

CONTINUOUS PROCESS Playbook

continued

Are Intelligent
Instruments The
Right Choice?

27 / 103

In one recent installation, a company invested $5 million in intelligent systems and was able
to save $27 million in expensive raw materials used in its production process. Those are the
kind of numbers that can attract the attention of the people who control the budgets.

What It Takes To Be Successful


As a first step in evaluating whether intelligent instruments can add value to your business,
ask a few questions:

What information is most important to gather for effective decision-making? Too much

information is just noise and can actually be a barrier to making process improvements.

Do you have industrial networks capable of handling the information flow to and from
smart devices?

Does your plant follow a proactive program of preventive maintenance?


Do the people who manage your control, IT and energy systems talk to each other?

Intelligent control systems cross multiple domains and require integration of people as
well as devices.

If your companys production processes are spread out over large areas or involve multiple
facilities with similar processes, the benefits from intelligent instruments can be even more
significant. Being able to remotely diagnose and fix devices, or replicate process improvements
multiple times in multiple locations can deliver big benefits to the bottom line.

FORWARD PLAYBOOK

ADD COMMENT

RETURN TO CONTENTS

CONTINUOUS PROCESS Playbook

28 / 103

Managing Emissions
with Automation
By Jeanne Schweder
contributing writer
Automation World

Industries where emissions control is critical include electric utilities, oil and gas, chemical
processing, iron and steel, paper, food, mining, metals and cement. But emission control
concerns are not limited to these industries. Systems to control and reduce emissions are
required for any industrial process that produces sulphur and nitrogen dioxides (popularly
referred to as SOx and NOx), the major causes of acid rain, as well as airborne particulates and
volatile organic compounds (VOCs).
On the horizon are new regulations designed to limit mercury emissions in flue gas. These
rules will also apply to industrial facilities, including trash burners and industrial boilers, even
if they only generate process steam. More stringent controls on particulates will also require
new investments in emissions technologies.

NOx and SOx Reduction


The U.S. Clean Air Act, the Clean Water Act, the pending Casper regulations and proposed
Environmental Protection Agency (EPA) limits on greenhouse gases are driving the
development of improved emissions control technologies. Casper regulations will further
reduce NOx and SOx emissions limits in the Northeast and in certain Midwestern states
such as Texas and Illinois. In addition to these government measures, green initiatives by
corporations also emphasize emission reductions.

FORWARD PLAYBOOK

ADD COMMENT

RETURN TO CONTENTS

CONTINUOUS PROCESS Playbook

continued

Managing Emissions
with Automation

29 / 103

The list that follows touches upon the primary emission reduction methods used in industry:

Optimized process control is central to reducing NOx emissions from coal-fired power

plants. Oxygen is injected into the boiler to improve combustion and prevent pockets
of NOx from being created. A secondary technology, selective non-catalytic reduction,
or SNCR, injects urea or ammonia into the boilers, further reducing NOx emissions by
up to 20 percent. New low-NOx burners have also been introduced that allow a cooler,
more complete burn.

The most successful NOx reduction technologyat 90 percenthas been selective

catalytic reduction, or SCR. This capital-intensive technology, which is viable only for
large coal-fired plants, involves very large reactors and again injects ammonia into the
flow. Automated systems measure NOx levels before and after the reduction process,
enabling operators to fine-tune the process.

Distributed control systems manage the complex processes involved in balancing

boilers, injecting air and adjusting dampers to optimize combustion, measure


emissions and control heat levels within the boiler to prevent the build-up of slag. By
tightening process controls, operators can decrease the amount of raw materials and
energy used while reducing waste.

Scrubbers, using either dry or wet processes, use automated systems that regulate

water flows, monitor pH levels and spray lime or apply a slurry of limestone to remove
95 percent or more of sulphur dioxide. A by-product of the scrubber process is calcium
sulphate, which is then used to make wallboard.

FORWARD PLAYBOOK

ADD COMMENT

RETURN TO CONTENTS

CONTINUOUS PROCESS Playbook

continued

Managing Emissions
with Automation

30 / 103

At the stack, the air from the process is passed over a rack of sensors that measure
oxygen, carbon dioxide and carbon monoxide levels, as well as sulphur dioxide,
sulphur trioxide and nitrogen oxide content.

Most air pollution control devices (APCDs) come as pre-built OEM packages that

include PLC-based automation systems that tend to operate independently of the


central DCS system. As new regulations drive greater investment in these APCDs, these
systems will need to work together in a more holistic fashion. Achieving this goal will
likely require additional automation integration.

Alternative Fuel Strategies


Although coal has traditionally made up 50 percent of the fuel source for American electric
utility plants, many operators have begun building natural gas-fired plants that do not
produce nitrogen or sulphur dioxide. Others are using flexible fuel processes, replacing up
to 25 percent of their coal fuel with natural gas. Still others are blending coal from different
regions, mixing high-sulphur but lower cost Appalachian coal with low-sulphur but higher
cost Western coal to reduce the amount of sulphur dioxide their processes have to remove.
Each of these alternative fuel strategies, however, can complicate process control and require
additional steps and systems to optimize combustion and reduce emissions. Blending highand low-sulphur coal, for example, can create a slag layer in boilers that requires installing a
soot-blowing system to break up and remove it.

FORWARD PLAYBOOK

ADD COMMENT

RETURN TO CONTENTS

CONTINUOUS PROCESS Playbook

31 / 103

How to Conduct an Energy Audit


By Jeanne Schweder
contributing writer
Automation World

Whether your plant is processing food or chemicals, wastewater or steel, the process used
to audit your energy usage and find ways to use or waste less of it is much the same. Before
beginning your energy audit process, it is important to realize that, though there are
many energy saving steps that result in short-term payback, the average payback time for
investments to increase energy efficiency is five years. The older the facility and its equipment,
the greater the probability that the energy savings potentialand your return on investment
from corrective actionswill be significant.

Where Are You Using Energy?


Theres no better way to start the audit process than by walking the floor and identifying
where and how the facility is using energy. Its not just about electricity. Any equipment
powered by water, air, gas, electricity or steam (a group of power sources often referred to as
WAGES), should be the core focus of an energy audit.
It often helps to have an outsiders eyes, such as a system integrator or a vendor, on this
walkthrough. Theyve typically been involved in many similar projects and will know what to
look for. They also bring a different perspective to the task than a maintenance person, who
has different priorities.

Identify the Low-Hanging Fruit


Considering that the average ROI time on energy savings investments is five years, it helps to
get some early wins from the audit process that can be achieved with minimal investment.

FORWARD PLAYBOOK

ADD COMMENT

RETURN TO CONTENTS

CONTINUOUS PROCESS Playbook

continued

How to Conduct
an Energy Audit

32 / 103

Look for steam or compressed air leaks. Are there improperly working natural gas regulators?
Does the plant have programmable thermostats? How energy-efficient are the lighting
fixtures? Do infrared scans detect any hot spots on the electrical equipment?
Also consider the energy efficiency value to be found in straightforward upgrades of existing
equipment. For example, have variable frequency drives been installed on motors serving
high-energy-consuming equipment, such as cooling towers? Older cooling towers, for
example, tend to have motors that run either slow or fast, with none of the gradients that
drives can provide to match energy consumption to different operating conditions.
Go beyond direct asset-related energy use and ask questions like: Is there lighting thats on
when no one is working in a room? Where are the large motor loads, and how and when are
they being operated? Are start times being staggered to avoid electrical peak power demand
surcharges? Is the plant subjected to extreme seasonal temperature fluctuations between
summer and winter?

Understand the Electric Utility Contract


Its essential to get a working knowledge of the electric utility contract and the billing history
for the facility to understand how youre being billed and what penalties are being charged
for over-consumption. Different utilities use different ways to calculate rates and to penalize
high consumption.
Determining which of the WAGES energy types are used most in your facility is important for
prioritizing corrective actions. Different industries use different types of energy more than
others.

FORWARD PLAYBOOK

ADD COMMENT

RETURN TO CONTENTS

CONTINUOUS PROCESS Playbook

continued

How to Conduct
an Energy Audit

33 / 103

Steel plants, for example, are the largest consumers of electrical energy and also incur the
most frequent energy spikes because of their use of arc furnaces. The chemical and refining
industries, on the other hand, make greater use of compressed air and steam.

Draft a Pre-Plan
Once you have the initial findings from the walkthrough, draw up a pre-plan to address the
obvious areas of waste and identify the processes that consume the most energy. Most older
plants are poorly metered. If the only meter in the facility is the one measuring the main utility
feed, then it will be impossible to determine which machines or processes are contributing
the most to your utility bill.
The pre-plan should identify where meters are to be located to divide and measure energy
use among different processes. The information gathered from these sub-meters can then be
used to justify capital expenditures and enable you to develop a longer-term plan based on
where the best savings are for the least amount of investment.
Most importantly, make sure this plan focuses on the processes used to create the products
that contribute the most to the companys productivity and profitability. It should also define
a program of preventive maintenance to maintain energy-efficient production processes and
allow you to continue to innovate in the future.

FORWARD PLAYBOOK

ADD COMMENT

RETURN TO CONTENTS

CONTINUOUS PROCESS Playbook

continued

How to Conduct
an Energy Audit

34 / 103

Corrective Actions
Companies are taking many corrective steps to increase their energy efficiency. Among the
most common:

Install variable speed drives to match power output with process requirements.
Take advantage of the software controlling motors to regulate equipment start-up
times and prevent unscheduled starts.

Install the most energy-efficient light bulbs and other lighting fixtures.
Apply automatic lighting controls that turn off lights when rooms are unoccupied.
Use programmable thermostats to match temperatures within the plant to operating
requirements.

Eliminate leaks in compressed air and steam systems.


Update capacitor banks to maintain correct power factors when new equipment is
installed.

Install Ethernet-based power management systems. These create an open database


of the information collected from your processes that can be used to write custom
reports and new applications to address the unique requirements of your facility.

FORWARD PLAYBOOK

ADD COMMENT

RETURN TO CONTENTS

CONTINUOUS PROCESS Playbook

continued

How to Conduct
an Energy Audit

35 / 103

Make preventive maintenance a priority for maintenance staff by incorporating it into


their job descriptions or creating reward programs for meeting PM objectives.

Changing our attitudes about energy consumption can change our behaviors and lead
to energy savings.

There are also more significant capital investments that can be made depending on
conditions at your facility.
With electricity rates high and natural gas rates currently low, it may make sense to invest in
gas-powered turbines. Justifying that kind of investment, however, requires an analysis of the
predictability of rates going forward. Further efficiency can be captured with a co-generation
system to produce steam as well as electricity, or even tri-generation if your processes require
hot water.
Another possibility is heat recovery. Investment in piping and heat exchange equipment can
allow energy to be passed from one process stream to another, reducing the load on utility
sources such as steam and cooling water.
How much you can expect to reduce your energy costs will vary from industry to industry and
plant to plant. No matter the savings potential at your facility, an energy audit is the first step
toward achieving your energy efficiency goals.

FORWARD PLAYBOOK

ADD COMMENT

RETURN TO CONTENTS

CONTINUOUS PROCESS Playbook

36 / 103

Energy Management Best Practices


By Jeanne Schweder
contributing writer
Automation World

The path to achieving energy efficiency is shaped as much by attitudes and organizational
skills as by the physical aspects of reducing energy demands. But its goals can never be
achieved without the automation technologies that make it possible to mine information and
control the operation of machines.
A 2009 study by the Aberdeen Group, a research and consulting firm, found that industry
leaders seeking to reduce energy consumption at their facilities viewed energy management
as strategic to their business success. The primary tools they applied in their endeavors
included advanced visualization, information collection and consumption monitoring.
Among the best practices adopted by industry leaders in reducing energy consumption and
costs, according to the study, are:

Making energy usage data available to decision-makers in real time. The faster changes
can be made to equipment operations, the greater the energy savings.

Taking energy costs into account when scheduling production. Peak demand charges
can account for as much as 60 percent of a companys energy bills.

Establishing metrics to quantify the benefits of energy management programs. If you


dont measure it, the activity cant be valued.

FORWARD PLAYBOOK

ADD COMMENT

RETURN TO CONTENTS

CONTINUOUS PROCESS Playbook

continued

Energy Management
Best Practices

37 / 103

Tying operational metrics to financial metrics. Its essential to understand how the costs
of energy for production and facilities affect the companys bottom line.

Investing in technology to automate how energy data is collected and monitored. If


you cant see it, you cant measure it or change it.

Since energy can constitute as much as 25 percent of a manufacturers operating costs, even
small improvements can have a dramatic impact on the bottom line.

Understand Consumption
From a practical perspective, any energy management initiative must start by gaining an
understanding of consumption patterns and cost sources from production processes and
facilities. Heres a go-to short list to kick off your initiative:

Analyze energy utility contracts and penalties;


Conduct an audit of all equipment and their energy sourceswater, air, gas, electricity
and steam (WAGES);

Acquire and analyze energy consumption and cost data;


Establish a consumption baseline; and
Identify potential savings.
FORWARD PLAYBOOK

ADD COMMENT

RETURN TO CONTENTS

CONTINUOUS PROCESS Playbook

continued

Energy Management
Best Practices

38 / 103

Prioritize Opportunities
By first attacking the low-hanging fruit, such as leaks in compressed air and steam systems,
lack of energy-efficient lighting and utility penalties for peak demand and reactive power,
youll gain some early wins at minimal cost. A next step can include installing sub-meters to
identify which production activities contribute the most to your energy bills.
Ultimately, prioritization means that you must first establish goals, and then phase in a
planned program of corrective actions. Heres an outline to follow as you establish your
priorities and ensuing goals:

Fix the basics;


Focus on processes and assets that are high consumers of energy;
Decide where and what to meter; and
Develop a phased corrective plan.
Automate
The bulleted list below highlights the predominant users of energy in an industrial facility for
which automated solutions exist.
 otors. Whether they power production equipment, cooling towers or pumps and
M

fans in HVAC systems, motors are the biggest sources of industrial energy usage, as
well as waste. Adding variable speed drives will better match energy use to operational
requirements.

FORWARD PLAYBOOK

ADD COMMENT

RETURN TO CONTENTS

CONTINUOUS PROCESS Playbook

continued

Energy Management
Best Practices

39 / 103

L oads. Staggered start-times and software to prevent unscheduled equipment

starts will help avoid peak demand penalties. Utility incentives for demand response
programs can be substantial. Automated controls ensure essential loads keep working
while minimizing costs.

L ighting accounts for as much as 35 percent of energy bills. Programmable

lighting controls turn off lights when rooms or production areas are not in use. Match
illumination levels to task needs. Install energy-efficient bulbs and lighting fixtures.

H VAC systems. Drives, automated air dampers and programmable thermostats


can help limit energy usage correlated to operational needs.

P ower quality. If your plant is experiencing unexplained power outages and motor
failures, or paying penalties for reactive power, low power factor and harmonics may
be the cause. Upgrade capacitor banks or electrical equipment where necessary and
install corrective filters to extend equipment life.

E nergy management. Using software to track power quality, meter energy use,
and control remote monitoring systems will help you access energy information in
an organized fashion that speeds decision-making and lets you know where to take
corrective action.

FORWARD PLAYBOOK

ADD COMMENT

RETURN TO CONTENTS

CONTINUOUS PROCESS Playbook

continued

Energy Management
Best Practices

40 / 103

Measure ROI
Energy management is not a one-time event. To achieve sustained savings requires a
proactive program of measurement, monitoring and preventive maintenance to make sure
that equipment and systems are working in optimal fashion. Periodically measuring the
progress achieved in reducing energy consumption and associated costs savings will build
support for continuing improvements. As you go about measuring your progress, keep the
following in mind:

Always compare actual consumption to baseline;


Measure and report all savings;
Update plans and priorities based on what you learn from measurements;
Incorporate preventive maintenance as part of the process to reduce downtime and
increase savings potential.

The core takeaway of these tips is to realize that having a greater awareness of the cost
of energy is the first step in changing attitudes about energy consumption and related
behaviors in your facility. Following the best practices described above that have been
developed and implemented by other processing companies can favorably impact your
companys bottom line.

FORWARD PLAYBOOK

ADD COMMENT

RETURN TO CONTENTS

CONTINUOUS PROCESS Playbook

41 / 103

The Impact of
Variable Speed Drives
By Marty Weil

contributing writer
Automation World
and

David Greenfield

Media and Events Director


Automation World

Continuous processing facilities are finding increasing utilization for variable speed drives/
variable frequency drives (VSD/VFD) to control the motors on pumps, fans, conveyors,
etc. This is due to the reliability and low cost of an AC induction motor, as well as the high
performance of AC drives. Even though the up-front cost of an AC drive control unit is greater
than that of a DC drive, many factors quickly make up the difference. Conservative data
indicate a 17 percent savings as a percentage of total system and installation cost using AC
drives. Some end users have experienced up to 30 percent savings.
While energy usage savings are the primary factor for VSD utilization as utility costs continue
to increase, these savings are further supported by increased flexibility in selection of
product feed rates, improved accuracy for dispensing of materials, and an increase in access
to secondary process performance due to greater access to VSD parameters via control
networks.
Maintenance can become an issue if there is minimal to no in-house experience with VSDs,
however. But most of these concerns can be eliminated with comprehensive training of the
maintenance staff prior to project implementation, and reinforced by using the maintenance
staff during commissioning.

FORWARD PLAYBOOK

ADD COMMENT

RETURN TO CONTENTS

CONTINUOUS PROCESS Playbook

continued

The Impact of
Variable Speed Drives

42 / 103

Considerations in Applying VSDs


A variable speed drive is the most cost effective choice if the duty cycle is more evenly
distributed over the entire range of flow rates. Relative energy savings improve if the
performance and system resistance curves are steep. Many potentially good VSD applications
are passed over because benefits other than energy savings are overlooked. Frequently,
process control and reliability far outweigh efficiency-related benefits to the user. By using
only the average cost of energy in savings analyses, the savings can be understated for VSD
applications. Instead, both the energy and demand charges of the local utilitys rate schedule
should be used in the analysis.
For variable torque loads, the VSD savings can be significantly greater since the horsepower
varies proportionally to the cube of the speed. For horsepower applications above 25 hp,
installation costs are usually comparable to the total capital cost for the drive. Below 25 hp,
installation costs may be more than the cost of the drive.

VSD Best Practices


With a VSD, a tachometer or inferential speed feedback signal should be sent to the process
controller in the control system that is sending the signal to the drive. The speed feedback
should be used in a similar way to the position feedback from a digital positioner to prevent
the process controller output from changing faster than the VSD can respond. The use

FORWARD PLAYBOOK

ADD COMMENT

RETURN TO CONTENTS

CONTINUOUS PROCESS Playbook

continued

The Impact of
Variable Speed Drives

43 / 103

of the dynamic reset limit option for the loops in the control system can automatically
prevent the process controller from outrunning the response of any type of final element.
For best performance, users should consider the following during the specification and
implementation of variable speed drive systems:

High-resolution input cards;


Pump head well above static head on-off valves for isolation;
XPLE (cross-linked polyethylene) jacketed foil/braided or armored shielded cables;
Separate trays for instrumentation and VSD cables;
Inverter chokes and isolation transformers;
Pulse width modulated inverters;
Properly set deadband and velocity limiting in the drive electronics;
Drive control strategy to meet range/speed regulation requirements; and
Dynamic reset limiting using inferential speed or tachometer feedback.

FORWARD PLAYBOOK

ADD COMMENT

RETURN TO CONTENTS

CONTINUOUS PROCESS Playbook

44 / 103

Safety: The Lifecycle Approach


By James R. Koelsch
contributing writer
Automation World
and

Dave Woll

Vice President
ARC Advisory Group
and

David Greenfield

Media and Events Director


Automation World

Production safety is generally thought of as a series of steps necessary to ensure safe


interaction with industrial equipment. The process of identifying, agreeing upon and
delineating those steps is where things tend to get complicated. Thats why international
standards groups play such a significant role, as they set the guidelines for all of industry to
follow.
For the process industries, IEC 61511 is probably the most widely used safety standard, as it
applies to those industries that base their safety systems upon instrumentation. The goal of
safety-system design in IEC 61511 is for the process, whatever it may be, to go to a safe state
whenever a process parameter exceeds preset limits.

A New Way of Approaching Safety


Understanding IEC 61511 means that you must know a thing or two about IEC 61508
a functional safety standard that provides the framework for building industry-specific
functional standards. IEC 61511 was created from the guidelines established by IEC 61508.
The key point to understand about IEC 610508 is that it is designed to establish an
engineering discipline that will generate safer designs and build safer processes. The uniform
procedures built on these disciplines are contingent upon appropriate experts within a
company contributing to projects. In addition, the standard also makes it easy for outside
auditors and governmental agencies to follow the process.

FORWARD PLAYBOOK

ADD COMMENT

RETURN TO CONTENTS

CONTINUOUS PROCESS Playbook

continued

Safety: The Lifecycle


Approach

45 / 103

IEC 61508 can seem confusing at first, because its underlying philosophy is new for
safety standards. Older, more conventional safety standards, stipulated specific rules and
specifications for making processes safe. IEC 61508 and its derivative standards, such as IEC
61511, departed from this approach by being more functional, or performance-based.
A principal aspect of this new approach to safety standards is that it leverages two
fundamental principles: safety lifecycles and probabilistic failure analysis. Unlike previous
standards that claimed to cover the entire lifecycle of a project, IEC 61508 and its offshoots
actually dofrom project conception to maintenance to decommissioning.
In essence, the standards specify safety lifecycle activities that need to be followed over
the entire life of a production system. Safety lifecycle management provides a method or
procedure that enables companies to specify, design, implement and maintain safety systems
to achieve overall safety in a documented and verified manner.

Four Phases of The Safety Lifecycle


The IEC 61511 standard promulgated by the International Electrotechnical Commission
specifies twelve steps in the safety lifecycle. These are segmented into four phases: analysis,
realization, maintenance and ongoing functions.

FORWARD PLAYBOOK

ADD COMMENT

RETURN TO CONTENTS

CONTINUOUS PROCESS Playbook

continued

Safety: The Lifecycle


Approach

46 / 103

Safety Lifecycle I: Analysis Phase


The analysis phase includes the initial planning, identification and specification of safety
functions required for the safe operation of a manufacturing process.
Specific activities include:

Perform hazard and risk analysis: Determine hazards and hazardous events, the

sequence of events leading to hazardous condition, the associated process risks, the
requirements of risk reduction and the safety functions required.

Allocate safety functions to protection layers: Check the available layers of


protection. Allocate safety functions to protection layers and safety systems.

Specify requirements for safety system: If tolerable risk is still out of limit, then
specify the requirements for each safety system and their safety integrity levels.

Safety Lifecycle II: Realization Phase


The realization phase not only includes design, installation and testing of safety systems,
but also the design, development and installation of other effective risk reduction methods.
Specific activities include:

Design and engineer a safety system: Design system to meet the safety
requirements.

FORWARD PLAYBOOK

ADD COMMENT

RETURN TO CONTENTS

CONTINUOUS PROCESS Playbook

continued

Safety: The Lifecycle


Approach

47 / 103

Design and develop other means of risk reduction: Means of protection other than
programmable safety systems include mechanical systems, process control systems
and manual systems.

Install, commission and validate the safety protections: Install and validate that the
safety system meets the all safety requirements to the required safety integrity levels.

Safety Lifecycle III: Maintenance Phase


The maintenance phase begins at the start-up of a process and continues until the safety
system is decommissioned or redeployed. Specific activities include:

Operate and maintain: Ensure that the safety system functions are maintained during
operation and maintenance.

Modify and update: Make corrections, enhancements and adaptations to the safety
system to ensure that the safety requirements are maintained.

Decommissioning: Conduct review and obtain required authorization before

decommissioning a safety system. Ensure that the required safety functions remain
operational during decommissioning.

FORWARD PLAYBOOK

ADD COMMENT

RETURN TO CONTENTS

CONTINUOUS PROCESS Playbook

continued

Safety: The Lifecycle


Approach

48 / 103

Safety Lifecycle IV: Ongoing Functions


Certain functions are ongoing. Examples include managing functional safety, planning and
structuring the safety lifecycle, and performing periodic safety system verification and safety
audits over the whole lifecycle. Specific activities include:

Manage functional safety, safety assessment, and safety audit: Identify the

management activities that are required to ensure that the functional safety objectives
are met.

Plan and structure safety lifecycle: Define safety lifecycle in terms of inputs, outputs
and verification activities.

Verify safety system: Demonstrate by review, analysis and/or testing that the required
outputs satisfy the defined requirements for each phase of the safety lifecycle.

Activities for Phases I to III are typically carried out consecutively, while Phase IV runs
concurrently with the other phases. However, like all models, the safety lifecycle is an
approximation.

Bottom Line: A Requirements Definition


Readers should note that the standards define requirements for safety management, rather
than system development. Not all safety lifecycle phases will be relevant to every application;
management must define which requirements are applicable in each case. The standards do
not prescribe exactly what should be done in any particular case, but guide management
toward decisions and offer advice.

FORWARD PLAYBOOK

ADD COMMENT

RETURN TO CONTENTS

CONTINUOUS PROCESS Playbook

49 / 103

Procedural Automation for


Greater Safety and Productivity
By Jeanne Schweder
contributing writer
Automation World

Continuous process environments tend to be stable until theyre not. When that happens,
the consequences can be catastrophic. Think Deepwater Horizon.
The very stability of a continuous production process often induces a false sense of security in
operators. Lack of experience with system failure or unexpected alarms can lead operators to
freeze when systems suddenly cascade out of control.
Procedural automation standards originally developed for batch processes and discrete
manufacturing hold promise for helping continuous process operators deal more effectively
with sudden emergencies, as well as the more routine changes in state that can occur.

Processings Most Vulnerable Areas


The fact is, every continuous process has non-continuous elements, such as start-up, ramp-up,
emptying and filling of tanks, shutdown, emergency shutdown and clean-in-place activities. A
continuous process is really just a batch process with a very long steady state in the middle.
The ISA-88 standard has established a common terminology and a framework for writing
software to control batch production processes and procedures. ISA-95 did the same for
enterprise to manufacturing data integration. ISA-95s common denominator data structure

FORWARD PLAYBOOK

ADD COMMENT

RETURN TO CONTENTS

CONTINUOUS PROCESS Playbook

50 / 103

continued

Procedural Automation for


Greater Safety and Productivity
facilitates communication between business and process
systems, so that operators and managers can make better
decisions.
The thinking behind both of these standards has important
implications in areas where continuous process control
is most vulnerableprocess variations and disruptions.
These can result in unanticipated shutdowns that plant
operators can be ill equipped to counter because theyre
not confronted with them frequently enough to hone their
skills.
Automating procedural steps can counteract variations
in operator skills and will become increasingly important
as the current generation of experienced process control
engineers retires. Defining common process procedures
can also provide additional support for employees who are
executing operations that can be more manual, such as is
typical in equipment and plant startups, shutdowns and
transitions.

FORWARD PLAYBOOK

COMMENT

RETURN TO CONTENTS

CONTINUOUS PROCESS Playbook

continued

Procedural
Automation for
Greater Safety and
Productivity

51 / 103

ISA-106 Defines Continuous Process Procedures


A new ISA committee is working to develop standard methods and terminology for
automating continuous process procedures. ISA-106, Procedural Automation for Continuous
Process Operations, will define repeatable procedural steps that can lower the chances of
accidents due to human error. The intent of the new standard is to reduce process variability,
reduce risk to facilities and increase operational productivity in continuous process industries.
The ISA-106 committee plans to issue series of documents to help users standardize designs
to handle operator errors in normal, critical, and abnormal situations.
As a first step, the ISA-106 committee, which includes representatives from the largest
companies in the petrochemical industry, is working on its first technical report targeted
at oil refineries, upstream offshore oil rigs and chemical plants. The report will give users
common definitions to describe the requirements in improvements, upgrades, and changes
in procedural automation to system integrators and automation suppliers.
The technical report will also include standards for modularizing procedural steps, exception
handling for abnormal situations, state mode procedural logic, process unit orientation and
current practices.

FORWARD PLAYBOOK

ADD COMMENT

RETURN TO CONTENTS

CONTINUOUS PROCESS Playbook

52 / 103

Four IT Standards
You Should Understand
By Dennis Brandl
Chief Consultant
BR&L Consulting Inc.

Imagine a world without electrical standards, such as 110V at 60hz, or 220 at 50Hz, or a
world where every phone had a different type of connection and required a different type
of switchboard. Just as these standards are critical to the basic functioning of electrical
equipment, there are also IT standards used daily to ensure optimal functioning of production
systems in the process industries.
There are four production-related IT standards of special interest to the processing industries:

The ANSI/ISA 88 standard on batch control;


The ANSI/ISA 95 standard for MES and ERP-to-MES communication;
The ANSI/ISA 99 technical reports in industrial cyber security; and
The new ANSI/ISA 106 technical report on procedure automation.
These standards and technical reports define the best practices for implementing automated
and manual control on the systems that reside above the PLC (programmable logic controller)
and DCS (distributed control system) level, and which perform the basic control that keep
production running. These four standards all share a common view of a production facility,

FORWARD PLAYBOOK

ADD COMMENT

RETURN TO CONTENTS

CONTINUOUS PROCESS Playbook

53 / 103

continued

Stop Programming Process Tasks.


Start Configuring
S88 Builder is the first process control
system that is configured rather than
programmed. Configuration requires two
steps, define the devices that make up the
physical system and define specific tasks,
such as mixing, flow control, heating, etc.,
that the devices team up to accomplish.
Configuration is easier, more accurate and
faster than programming.

Lowering initial development costs


Reducing time-to-market for new products
Reducing waste and downtime

providing a consistent terminology that makes it easier to


compare plants within a company and across companies.
The ANSI/ISA 88 standard defines the most common and
effective method for defining control systems for batch
operations or for continuous and discrete startups and
shutdowns.

By configuring instead of programming


process control tasks, S88 Builder speeds
project development by up to 90%.
S88 Builder lowers the total cost of
ownership for a process control
system by:

Four IT Standards
You Should Understand

Learn More About


the Many Cost-Saving
Benefits offered by
S88 Builder
www.S88Builder.com
CustomerSupport@ecssolutions.com
(800) 471-3273

CONTROL AND INFORMATION SOLUTIONS FOR INDUSTRY

The ANSI/ISA 95 standard defines the most commonly


used method for exchanging information between ERP
systems, such as SAP or Oracle, and the multitude of shop
floor systems. It has also become the de facto standard for
defining MES (manufacturing execution system) and MOM
(manufacturing operations management) specifications.
The ANSI/ISA 99 reports define structures and policies
for designing effective and secure networked production
facilities.

FORWARD PLAYBOOK

COMMENT

RETURN TO CONTENTS

CONTINUOUS PROCESS Playbook

54 / 103

continued

Four IT Standards
You Should Understand
The new ISA 106 reports define the procedural control
strategy for continuous production during upsets,
switchovers, and other types of process changes.
Because these standards establish a commonly accepted
terminology, functions and process models by which
technical professionals are trained, and upon which solution
providers develop applications used in batch and process
production operations (as well as discrete manufacturing),
they should be of particular interest to those who are
new to the field and those who seeking a refresher on the
fundamentals of industrial processes.

FORWARD PLAYBOOK

COMMENT

RETURN TO CONTENTS

CONTINUOUS PROCESS Playbook

55 / 103

Fieldbus and Ethernet in


Continuous Process Applications
By Marty Weil

contributing writer
Automation World
and

David Greenfield

Media and Events Director


Automation World

In most process industry facilities, the predominant means of communication between field
devices and control systems was, for many years, a 4-20 mA analog connection. Though this
connection method is highly dependable and still in use, the amount of wiring required is
substantial, as each device on the network must have its own separate connection to the
controller.
As digital technologies emerged on the industrial scene, the capability of fieldbus protocols
became a more attractive alternative to analog 4-20 mA communication because of the
reduced wiring requirements of fieldbus networks. Less wiring is required with fieldbus
because a fieldbus segment can carry both DC power and digital communication signals to
numerous separate devices over one fieldbus cable.
The predominant fieldbus protocols in the process industries are: Foundation Fieldbus, HART,
and Profibus.
As Ethernet more clearly becomes the network of choice, not just for the front office, but in
production areas as well, the move toward Ethernet-based communications in the process
industries is gathering a great deal of attention. Evidence of this can be seen in the increase
of end devices for process industry applications that now come standard with an Ethernet

FORWARD PLAYBOOK

ADD COMMENT

RETURN TO CONTENTS

CONTINUOUS PROCESS Playbook

56 / 103

continued

Fieldbus and Ethernet in


Continuous Process Applications
a giant breakthrough
in small readers

port. Most fieldbus protocols now offer Ethernet-based


versions of their protocol, thereby enabling ease of network
management and connection to enterprise systems.
With all the networking options now facing the process
industries, following are a few of the core facts you should
be aware of when it comes to assessing your fieldbus and
Ethernet options.

Meet the DataMan 50L. The tiny barcode reader that brings
big performance to the food & beverage industry.
Dont let its size fool you. The DataMan 50L is huge in barcode reading performance.
Measuring just 23.5mm x 27mm x 43.5mm and featuring an IP65-rated housing, the
DataMan 50L is premium technology designed for 1-D-oriented barcode reading. The
DataMan 50L delivers read rates that can surpass 99% through Cognexs proprietary
Hotbars image-analysis technology.
The new DataMan 50L is a powerful upgrade for applications that use small laser
barcode scanner systems. Visit us at www.cognex.com/50L.

The HART (Highway Addressable Remote Transducer)


protocol is considered by many to be the global standard
in the process industries for sending and receiving digital
information across analog wires between smart devices
and control or monitoring systems. HART is a bi-directional
communication protocol that provides data access between
intelligent field instruments and host systems. A host
can be any software application from technician's handheld device or laptop to a plant's process control, asset
management, safety or other system using any control
platform.

Scan to Learn More

FORWARD PLAYBOOK

COMMENT

RETURN TO CONTENTS

CONTINUOUS PROCESS Playbook

continued

Fieldbus and Ethernet


in Continuous
Process Applications

57 / 103

Originally intended as a replacement for the 4-20 mA standard, Foundation Fieldbus can
be found in many heavy process applications such as refining, petrochemicals, and power
generation.
Two forms of Foundation Fieldbus are available, each uses different physical media and
communication speeds:

H 1 works at 31.25 kbit/s and generally connects to field devices. It provides

communication and power over standard twisted-pair wiring. Conforming with IEC
61158-2 (as does Profibus, detailed below), power can be delivered over the bus to field
instruments, while limiting current flows so that explosive conditions are not created.

H SE (High-speed Ethernet) works at 100 Mbit/s and generally connects input/output

subsystems, host systems, linking devices, gateways, and field devices using standard
Ethernet cabling. It doesn't currently provide power over the cable, although work is
under way to include this feature.

Another significant process industry fieldbus protocol is Profibus PA (process automation),


which also operates at 31.25 kbits/s. This protocol is a standard for fieldbus communication
in automation technology, first promoted by the German department of education and
research (BMBF) and then adopted for use by Siemens. The protocol is commonly found in
petrochemical, food/beverage, water and waste treatment plants.
Profinet is the open Industrial Ethernet standard from the Profibus/Profinet International
group. Profinet uses TCP/IP and IT standards and operates at Ethernet speeds.

FORWARD PLAYBOOK

ADD COMMENT

RETURN TO CONTENTS

CONTINUOUS PROCESS Playbook

58 / 103

continued

Think automation is
just another business cost?
Think automation is tactical
and not strategic?
Think no one has enough of the right
resources to execute your automation work?

Think again. Think MAVERICK.

Fieldbus and Ethernet in


Continuous Process Applications
Continuous process companies using a fieldbus protocol
typically cite its use based on easier regulatory compliance
because it is a digital network. As a result, documentation is
more precise (e.g., it is time stamped). Foundation Fieldbus,
for example, has an integral mechanism to measure data
quality, communicating to users whether the data received
from devices is good, bad, or of uncertain quality.
In addition, nearly all continuous process applications
today rely to some degree on the precision and diagnostic
power of microprocessor-based field devices. Diagnostics
are most valued for abnormal situation avoidance. After
all, if instruments can an alert an engineer to a problem
before the safety valves lift and the flare starts roaring
due to a spurious upset, the savings are huge. Fieldbus
protocols provide a means of standardizing the integration
of microprocessor-based devices and modern distributed
control systems.

Call MAVERICK: 888.917.9109


or visit us online at mavtechglobal.com

FORWARD PLAYBOOK

COMMENT

RETURN TO CONTENTS

CONTINUOUS PROCESS Playbook

59 / 103

Understanding the Differences


Among Industrial Ethernet Protocols
By David Greenfield

Media and Events Director


Automation World

The rapid adoption of Ethernet on the plant floor over the past decade underscores the
need for more production information for better decision-making and the need to simplify
networks for easier access and maintenance. But just as there have been wars between
the varying fieldbus protocols over the years, a similar posturing over the capabilities of the
different protocols persists in the Ethernet arena.
To help you make sense of the main differences between six of the major industrial Ethernet
protocols, we turn a spotlight on CC-Link IE, EtherCAT, Ethernet/IP, Ethernet Powerlink,
Profinet, and Sercos III.

CC-Link IE

CC-Link IE is gigabit speed industrial Ethernet.


It is an inherently deterministic network that uses token passing as the mechanism to
guarantee deterministic performance.

No Ethernet switches are required in the basic topology.


The protocol is based on ISO model IEEE.802.3 Ethernet at the physical layer.
FORWARD PLAYBOOK

ADD COMMENT

RETURN TO CONTENTS

CONTINUOUS PROCESS Playbook

continued

Understanding the
Differences Among
Industrial Ethernet
Protocols

60 / 103

CC-Link IE protocol fits at the transport network layer. It is not a TCP/IP or UDP-based
network. This is one of the reasons that its a separate protocol in order to guarantee
deterministic operation out of the box.

Frame format of the data is the Ethernet frame. Within the Ethernet frame is a CC-Link
IE frame with header and data information.

CC-Link EE works with Mitsubishi Electrics MES Interface IT hardware appliance to


move shop floor data to enterprise level and avoid the need for gateway PCs.

EtherCAT

The master does not require a special card to run EtherCAT, and each slave device

or node on the network has an ASIC or FPGA chip inside that implements the entire
protocol. The slave doesnt need a micro-controller or random access memory, which
means frames can be read and written as data goes through the network at a line
speed of 100 Mb/s with no switches built in.

EtherCATs fieldbus memory management unit uses logical addressing so that each

slave device knows where to find its data in the frame, regardless of its physical
location. One read-write cycle is capable of talking to all the devices without a great
deal of CPU overhead on the controller side.

FORWARD PLAYBOOK

ADD COMMENT

RETURN TO CONTENTS

CONTINUOUS PROCESS Playbook

continued

Understanding the
Differences Among
Industrial Ethernet
Protocols

61 / 103

EtherCAT supports multiple scan rates and multiple acyclic data exchange rates on the
same network for use in multiple industrial automation processes including motion,
I/O, condition monitoring, and data acquisition.

There is no separate backplane and, therefore, no conversion needed from EtherCAT

to another protocol to the I/O level. This is due to use of LVDS (low voltage differential
signal) a third physical layer in addition to CAT 5 and fiber used to pass the EtherCAT
packets directly through all the I/O terminals so that each I/O terminal can be its own
independent node on the network.

EtherCAT can synchronize down to the nanosecond level on a standard PC with no


special fieldbus cards for timing.

EtherNet/IP

EtherNet/IP is a control network designed to address enterprise communication rather


than focusing on segments across a machine or line. This enterprise design reportedly
allows for easy integration with other devices, as well as network traffic from other
protocols and Web servers.

Safety aspects are addressed through CIP (common industrial protocol) Safety, which

allows safety devices to coexist with standard control devices on the same CIP network,
with or without a safety PLC. In this environment, safety sensors can operate alongside

FORWARD PLAYBOOK

ADD COMMENT

RETURN TO CONTENTS

CONTINUOUS PROCESS Playbook

continued

Understanding the
Differences Among
Industrial Ethernet
Protocols

62 / 103

variable speed drives, safety controllers with standard PLCs and proximity switches.
Regardless of the combination of devices used, the integrity of the safety control loop
cannot be affected by any of the standard control devices.

CIP Motion addresses synchronization in motion. CIP Motion, as part of EtherNet/IP,

combines the requirements of deterministic, real-time, closed loop motion control


with standard, unmodified Ethernet, and complies with Ethernet standards, including
IEEE 802.3 and TCP/IP. EtherNet/IP with CIP Motion technology enables multi-axis,
distributed motion control through application profiles designed to allow position,
speed and torque loops to be set within a drive.

Ethernet Powerlink

Ethernet Powerlink is a broadcast-based system, meaning that the network doesnt

have to transmit the packet through every single station. When the system transmits
back, every node transmits the packet back as a broadcast. This makes it possible
to multiplex nodes, which means the node doesnt have to transmit its information
back on every single scan, allowing for network optimization and high-speed
synchronization.

By using a slot protocol, where each node has a certain slot time on the network and

passes data back to the master in a slot manner, this illuminates any collisions on the
system. This gives Ethernet Powerlink fast and predictable cycle times and also allows
for the removal and reconnection of nodes to the network without interrupting the
cycle.

FORWARD PLAYBOOK

ADD COMMENT

RETURN TO CONTENTS

CONTINUOUS PROCESS Playbook

continued

Understanding the
Differences Among
Industrial Ethernet
Protocols

63 / 103

Redundancy is built in for ease of network recovery whether using a ring, star or daisy

chain topology. If any part of network is disconnected, the system will self recover and
report back that the network has gone down.

Ethernet Powerlink can be implemented via free download from Sourceforge.net. Its
based on C, so its transportable to controllers or PCs using a standard Ethernet port.
With that in place, any system can be connected to a Powerlink network and control
Powerlink nodes.

The synchronization is around 100 nanoseconds with a guarantee of minimal jitter.


Profinet

Profinet uses standard, unmodified Ethernet media, but does not use TCP/IP to

transmit real-time information. When real-time data is being sent, those two layers are
skipped. Diagnostic information, however, is accessed over TCP/IP.

Bumpless redundancy meaning that each node sends its message out in both

directions around the ring (when using a ring topology) to ensure at least one message
will always get through.

In depth diagnostics are available from the I/O rack level down to a module in that rack.
Profinet supports real time I/O for motion control as well as machine-to-machine,
controller-to-controller or peer-to-peer types of communication.

FORWARD PLAYBOOK

ADD COMMENT

RETURN TO CONTENTS

CONTINUOUS PROCESS Playbook

continued

Understanding the
Differences Among
Industrial Ethernet
Protocols

64 / 103

Profinet allows for integration of other buses (including Foundation Fieldbus, Interbus,
ASI, HART, DeviceNet, and others) via proxies, allowing for maintenance of legacy
nodes.

ProfiEnergy is a vendor- and device-neutral data interface based on Profinet that

permits a coordinated, centralized shutdown of devices during idle times. This means
that individual components or entire subsections of a plant can be switched off
automatically when not in use without the aid of external hardware.

Since there is no explosion-proof industrial Ethernet, Profinet leverages Profibus

PA (the process automation version of Profibus), which can be installed in such an


atmosphere and then brought in through a proxy to Profinet.

Sercos III

Sercos III uses a tightly controlled time synchronization signal emitted from a master

control in the system once for every update cycle, providing nanosecond determinism
across the network. The time base is a phase-lock loop for deterministic control,
allowing for the synchronization of serially connected servo drives, CNCs, and motion
controls.

Each message sent from the control contains a master sync telegram for hard real-time
function. This also places fewer burdens on the host processors, freeing them up for
tasks such as running control algorithms and machine programs.

FORWARD PLAYBOOK

ADD COMMENT

RETURN TO CONTENTS

CONTINUOUS PROCESS Playbook

continued

Understanding the
Differences Among
Industrial Ethernet
Protocols

65 / 103

The collective telegram approach underlying Sercos III means that each device places
its input data on common answer telegrams. During the remaining time in the cycle,
which for a typical application can be 80 percent or more of the available bandwidth,
any standard Ethernet protocol can be transmitted over the network.

Bumpless, single fault redundancy means that Sercos III nodes are specified to detect

broken links in less than 25 microseconds and immediately re-route telegrams back in
a double line configuration.

No telegram data is destroyed in a communication cycle over Sercos, thereby allowing
direct cross communication of data between slaves without the CPU burden or time
delay that a re-transmission of data by a master would impose.

Sercos III can be integrated with EtherNet/IP, allowing integrators to mix Sercos III,
EtherNet/IP and TCP/IP components within a single machine on a single cable.

FORWARD PLAYBOOK

ADD COMMENT

RETURN TO CONTENTS

CONTINUOUS PROCESS Playbook

66 / 103

Wireless Trends
By David Greenfield

The history of wireless networking in industry has largely been that of cable replacement. It
was simply a tool to deliver communications in places where you simply couldnt run cable
for a variety of reasons. Maybe it was too expensive. Or maybe the cable would be running
in a hazardous zone. Through these types of applications, wireless secured a foothold in the
process industries over the past two decades.

Media and Events Director


Automation World

Now we are beginning to see a shift in the types of wireless technologies used, as well as
different types of applications. This shift is coming from a user-needs perspective, rather than
from pure technological capabilities.

Rapid Pace of Wireless Adoption


Currently (2011) and in the future (2015) what percent of your field devices
do/will communicate using wireless technology?
<5%

10%

15%

20%

>30%

26
19
18

2015

2011
0%
Source: WINA

14

22
64

13

6
7
10%

20%

30%

40%

50%

60%

70%

According to the most recent survey from WINA (Wireless Industrial


Networking Alliance), the biggest use of wireless technology today is for
asset management and condition monitoring. Through the use of wireless
sensors that can be positioned nearly anywhere on a piece of equipment,
maintenance personnel can get a steady stream of data from that equipment
about the state of its condition.
The other use of wireless technology, coming in a close second, is
incremental process measurements the classic measurements of level,
temperature, pressure, and flow. Its not difficult to think of many different
places in, say, a refinery or water treatment facility, where it makes sense to
get incremental temperature readings from segments of the process where

FORWARD PLAYBOOK

ADD COMMENT

RETURN TO CONTENTS

CONTINUOUS PROCESS Playbook

67 / 103

you have not been able to collect that data before. Of course, this wouldnt make sense if you
had to dig a 1,000-yard trench and stop part of the plant for a couple of weeks while you did
Wireless Trends
that. But if you could easily put a wireless sensor in that part of the plant and do that very cost
effectively, thats effective incremental process measurement. Such small
Top Industry Applications For Wireless steps can certainly help you improve your efficiency and, when examined
from the aspect of a large process, like a refinery, there are huge overall
Asset Management / Condition Monitoring
58%
efficiency numbers involved in the end result.
continued

Incremental Process Measurements


Mobile Operator / HMI

Control

Wireless sensors are, perhaps, the biggest area for substantial capital
expenditure savings in the process industries, especially when you think
about the potential benefit of establishing pervasive sensor networks.
When you literally start to put hundreds and thousands of devices out in the
facility or a refinery, that's when you begin to see real cap-ex savings versus
hard wiring. And this has already been documented. For example, using
temperature sensors positioned directly on the roller can produce a small
percentage of improvement in the surface finish of sheet steel by precisely
achieving the proper manifold temperature; this small improvement in quality translates into
millions of dollars in savings over the course of the process run.

44%

Voice, Video, Data


Asset Tracking

57%

30%
26%

13%

Source: WINA Annual Survey of End Users - December 2011

Access Full Presentation


Click here to access the full
presentation made by WINA Chairman
Steven Toteda at The Automation
Conference.

The third most prevalent trend for wireless technology is supporting mobile operators.
And its easy to see why: Removing the step of having to connect via an Ethernet jack as
measurements are taken at each stop is a big improvement in process.

FORWARD PLAYBOOK

ADD COMMENT

RETURN TO CONTENTS

CONTINUOUS PROCESS Playbook

continued

Wireless Trends

68 / 103

Following mobile in the fourth and fifth spots are voice/video data communications and
asset tracking. These types of wireless applications have been around for years and continue
to be deployed due to their successful track record, so its not surprising to see them among
the top trends.
What is surprising is the application that came in at number six in the 2012 WINA survey
control. This is surprising because wireless control had never even ranked in the survey prior
to this year. Now, however, 13 percent of survey respondents considered control to be their
top application of wireless. In industries like mining, wireless pump control has been around
for years, because there is no other way to really do it. But this result indicates that people
across industry are beginning to experiment with closed-loop control using wireless.

FORWARD PLAYBOOK

ADD COMMENT

RETURN TO CONTENTS

CONTINUOUS PROCESS Playbook

69 / 103

Wireless Sensor Applications


By David Greenfield

Media and Events Director


Automation World

If youre working in a facility without a great dealor anywireless sensors in place, you
may be suspicious about the viability of wireless sensor networks. To help illustrate how
ubiquitous wireless sensors have become across industry, following are a few examples of
wireless sensor deployments that have become so common that they could be considered
textbook application examples.
 ireless limit switch networks are commonly used to prevent the
W

overflow of liquid storage tanks. Their operation is simple: As the tank fills

up, the fluid level forces a change in the position of the limit switch. The wireless limit
switch then sends a signal to the pump controller to start pumping out the tank to
lower the level. When the fluid level drops to a safe level, the switch then sends a signal
to the controller to turn off the pump.

T he safety and security of oil pipelines is largely handled by

wireless sensor networks, according to Steve Toteda, vice president and

general manager of the wireless business unit at Cooper Industries and chairman of the
Wireless Industrial Networking Alliance (WINA). We're doing a lot of work in Mexico
now to monitor and maintain oil pipelines, he says. In these applications, there is a
hierarchy of networking tools with sensor networks being used with instrumentation
on the pipeline itself to capture data and transmit it back to the control system

FORWARD PLAYBOOK

ADD COMMENT

RETURN TO CONTENTS

CONTINUOUS PROCESS Playbook

continued

Wireless Sensor
Applications

70 / 103

via high-speed backhaul. This combination of technologieswired, wireless and


cellularhas really brought wireless to the forefront because youre mixing multiple
technologies to monitor pipelines in 20-30 kilometer segments. As you do this
with several segments, youre effectively able to monitor hundreds of kilometers of
pipelines.

A major pharmaceutical manufacturer recently decided to

instrument all of its R&D equipment, such as incubators and cryofreezers,


and connect them to the companys control systems for 24/7/365 monitoring. Because
much of this equipment has casters, it was difficult to wire them, as they need to be
moved around. This project is still ongoing, but there are currently nearly 2,000 pieces
of equipment equipped with wireless sensors on the companys R&D campus, which
covers an area of about 1.5km.

FORWARD PLAYBOOK

ADD COMMENT

RETURN TO CONTENTS

CONTINUOUS PROCESS Playbook

71 / 103

Wireless Protocols
for the Process Industries
By Renee Robbins Bassett
Managing Editor
Automation World

Two similar wireless protocolsWirelessHART, promulgated by the HART Communication


Foundation (www.hartcomm.org) and ISA 100.11a, promulgated by the International
Society of Automation (www.isa.org)are competing for dominance as the enabler of smart
instrumentation in Europe and North America. Complicating the issue for end users is the fact
that these two standards dont work together. In addition, a third standard, WIA-PA, exists in
China and further complicates the task for those with Asian operations.
Most process facilities use a mix of wired networks along with their diverse array of
instrumentation, but the inability to integrate the two main wireless standards makes that
difficult in the wireless realm. Unlike with wired instrumentation, if you want to mix brands of
wireless field devices to get an optimum mix of measurements, you cant. You have to have
two separate host systems to talk to two different types of field devices. And they have to
come from different vendors.
In many ways, WirelessHART and ISA 100.11a are alike. They are designed to serve the same
market in the same way. At an application level, they perform the same function and have the
same benefits. Both ISA 100.11a and WirelessHART implement IEEE 802.15.4 radio hardware.
Both protocols use DDL and Device Description files. Both can eliminate a lot of PLC I/O
hardware, wiring and associated schematics.

FORWARD PLAYBOOK

ADD COMMENT

RETURN TO CONTENTS

CONTINUOUS PROCESS Playbook

continued

Wireless Protocols for


the Process Industries

72 / 103

The principal difference between the two protocols is in the specification of the protocols
application layer. WirelessHART, for example, specifies HART as the application layer while
ISA100.11a leaves that layer undefined. This means that data in the application layer of
ISA100.11a can be transferred using Foundation Fieldbus, Profibus, Modbus, HART or other
protocols. While this makes ISA100.11a highly flexible, the customer must decide which
protocol to use. WirelessHARTs decision to specify only HART in the application layer was
done to deliver simplicity via use of a single data communication specification through the
network, meaning that data communication on the network is well-defined and understood.
Considering the potential for integrated use of the two wireless protocols, the obstacles
preventing a convergence seem to be more commercial than technical. Though the two
protocols are similar, investments have been made, vendors and early adopters are lined up
on either side, and product certification processes have been established. The two protocols
have been developed into products for sale. Marketing programs designed to win over
additional customers and vendor partners are in high gear. Both sides believe their approach
is right and others should come over to their way of thinking.

FORWARD PLAYBOOK

ADD COMMENT

RETURN TO CONTENTS

CONTINUOUS PROCESS Playbook

73 / 103

How to Avoid Mistakes with


Control System Remote Access
By Marty Weil

contributing writer
Automation World
and

David Greenfield

Media and Events Director


Automation World

As more operations aspects are tied to Ethernet networks and, therefore, are open to Internetbased access, the potential for greater collaborative operation and a freer work environment
increases. But so do the potential for security problems. Following are some basic tips and
considerations for achieving secure and reliable remote access:

1. Map out your project from the start. When companies fail to map out their
projects thoroughly from the start, they often find themselves saddled with applications
and automation products that dont work cohesively as a single system. Once you start
implementing various silosbe they applications or productsthings get more complex.
This is typical of problems that occur when automation products are implemented hastily,
without doing proper research, planning, or analyzing current and future goals, or without
realizing that implementing remote access monitoring for a facility is just step one of many.

2. Anticipate network interactions. When people have installed devices on a


proprietary network then try to use something different (e.g., Wi-Fi or another protocol),
individual systems may conflict. Or they may just cancel each other out, so that there is
no communication whatsoever. More often you find yourself managing so many different
applications, protocols, and systems that you have more work and headaches than you
imagined possible. This issue can be avoided if you select a network that is open and allows
everything to work together.

FORWARD PLAYBOOK

ADD COMMENT

RETURN TO CONTENTS

CONTINUOUS PROCESS Playbook

continued

How to Avoid
Mistakes with Control
System Remote
Access

74 / 103

3. Understand users and roles. Understanding users and their roles can have
a significant impact on how the remote access strategy evolves. In most control systems
operations, the roles that may require remote access to control assets may include, but are
not limited to:

System operators and engineers for local systems;


System operators and engineers for remote systems;
Vendors;
System integrators;
System support specialists and maintenance engineers;
Field technicians;
Business/supply chain partners;
Reporting or regulatory entities; and
Managed service providers.
The roles of users that would require remote access to mission-critical operations can
be extensive and the assignment of specific access depending on those roles can be

FORWARD PLAYBOOK

ADD COMMENT

RETURN TO CONTENTS

CONTINUOUS PROCESS Playbook

continued

How to Avoid
Mistakes with Control
System Remote
Access

75 / 103

complicated. Map out and document all acceptable access policies and procedures related to
allowable network access and coordinate this with industrial control system security experts.
Any user access that goes beyond simple viewing of data and permits changes to system
parameters should be extremely limited.

4. Know your vulnerabilities. Beginning at the remote user and following the
connection to the data or service, remote access can be compromised at any of the following
points:

T he user or system can be impersonated to fool the target system.


T he attacker can use captured or guessed credentials to impersonate the user.
T he attacker can intimidate or coerce the user to provide valid credentials, or to
perform activities at the attackers demand.

T he users access device (laptop, PDA, etc.) can be attacked, compromised, and used to
access the control system network.

T he target system can be impersonated by an attacker to fool the user and thus gain
credentials or other information from the user system.

C ommunication can be listened to by third parties anywhere along the


communication chain.

FORWARD PLAYBOOK

ADD COMMENT

RETURN TO CONTENTS

CONTINUOUS PROCESS Playbook

continued

How to Avoid
Mistakes with Control
System Remote
Access

76 / 103

T he communication can be interrupted or jammed.


C ommunications can have data injected into them by an attacker.
C ommunication can be hijacked after it has been initiated (does not rely on

impersonation) or intercepted during initiation (impersonating both user and target,


also known as a man-in-the-middle attack).

P arts of a communication can be replayed to a target, even if the attacker cannot


decipher the content (also known as a replay attack).

T he target communication software listening for requests can be attacked and


potentially compromised.

A n attacker can impersonate a valid communications node and gain access to the
underlying communications medium.

A denial-of-service attack can happen to the authentication server


(e.g., radius server or RAS).

A denial-of-service attack can happen to the outward communication device


(e.g., an outside router for remote access).

FORWARD PLAYBOOK

ADD COMMENT

RETURN TO CONTENTS

CONTINUOUS PROCESS Playbook

77 / 103

Control System Security Tips


By Marty Weil

contributing writer
Automation World
and

David Greenfield

Media and Events Director


Automation World

Recognizing that the biggest security risk to your control system assets are the operators who
interface with the system on a daily basis is the most important step to successfully securing
your systems. For a thorough analysis of your risks and setup of reliable control system
security technologies and processes, consult an industrial control system security expert such
as scadahacker.com, byressecurity.com, or industrialdefender.com. Following are the ground
level security steps that a continuous process facility should implement at a bare minimum:

1. Assess your systems. Compile an accurate list of all the assets in your plant: make,
model, and serial number. Where are your computers? Where are your PLCs? Its difficult to
secure something when you dont know it exists. This should be a high-level assessment in
which you go through your plant and figure out what is high risk and what is low risk, which is
determined by two key factors: how likely is a problem to occur? How serious is the problem?
For example, if something happened to your chlorine tank, it would be really ugly. That chip
pile, not so ugly. Get a feel for the significant risks. Where do you have to focus your effort?
The answer is going to drive your decisions and your capital allocation.

2. Document your policies and procedures. No company operates in a


vacuum. Each company will have a series of policies and procedures for things like safety
and performance, reliability, and change management. Lay those out and understand how
they impact control systems and security, and then build on that to create a set of additional
security requirements.

FORWARD PLAYBOOK

ADD COMMENT

RETURN TO CONTENTS

CONTINUOUS PROCESS Playbook

continued

Control System
Security Tips

78 / 103

3. Start training. No one is going to follow policies unless they know about them and
understand why they are necessary. All levels of employees that interact with the control
system need to understand what an attack looks like and how to respond to one. You should
end up with a matrix of training for the various levels of users; it doesn't have to be onerous,
but it has to be done.

4. Understand your traffic flows. You need a diagram that shows all the things that
require intercommunication. Smart companies will have a comprehensive diagram showing
that the accounting department needs data out of this area, and maintenance needs data out
of this area, and so on.

5. Remember that SCADA security is used to control access. Access should


be segmented to specific network resources, hardware resources, and HMI. Effective security
practices should prevent access to all layers by unwanted external connections.

6. Leverage safety reports. Those responsible for safety, when they do reports and
analyses, have done a good deal of the work needed to understand the security risks.

7. Use separate networks. Though this step is becoming less and less practical, some
still advocate that the process control network be kept separate from business networks,
and also isolated from the Internet. For this approach, which may not be viable in the longer
term, utilize operating system (OS) implemented security, with active directory domain group
security as the preferred approach.

FORWARD PLAYBOOK

ADD COMMENT

RETURN TO CONTENTS

CONTINUOUS PROCESS Playbook

continued

Control System
Security Tips

79 / 103

8. Security in the operator interface should be considered broadly. With


advanced human-machine interface technologies, security can be implemented for individual
attributes. HMI should be the only accessible program, with user-specific exceptions,
connected to the control operating system at a dedicated user station. All other resources for
that particular terminal should be restricted.

9. Use unique user accounts and passwords. All users should have unique user
accounts and passwords to minimize the risk of unauthorized access.

10. Provide port security. With this approach, the Ethernet MAC address connected
to the switch port allows only that MAC address to communicate on that port. If any other
MAC address tries to communicate through the port, port security will disable it. Most of the
time, network administrators configure the switch to send an SNMP trap to their network
monitoring solution that the ports disabled for security reasons. When using port security,
you can prevent unwanted devices from accessing the network.

11. Administer antivirus protection. Use an antivirus solution that is compatible


with the installed SCADA software.

12. Open and facilitate communications between IT and process


control groups. Roles need to be defined and an understanding of what each group
needs must be accomplished so true collaboration can take place to begin and continue the
process of enabling a fully functional control system with adequate security protection.

FORWARD PLAYBOOK

ADD COMMENT

RETURN TO CONTENTS

CONTINUOUS PROCESS Playbook

80 / 103

Leveraging Analytics and


Community for a Mobile Workforce
By David Greenfield

Media and Events Director


Automation World

Most businesses in the processing industries have spent the past several years establishing
solid technology platforms and infrastructures to gather production data to improve
operations. The next step lies in intelligently using those technologies to foster better
decision-making, communication, and process improvement.
As an example of how this is actually occurring in industry, Joe Staples, head of
Manufacturing Systems North America for Bayer CropScience (Kansas City, MO), said that
Bayer CropScience has equipped its operators with Invensys Intellitrack mobile devices with
workflow software to direct them on how to safely perform the operations required of them.
During his presentation at The Automation Conference 2012, Staples said Bayer CropScience
is now looking to extend its use of mobile applications so that plant managers, engineers,
technicians, and maintenance can get the information they need at any time without have to
carry their laptops around or refer to a terminal or a PC.
Now the company is looking at extending its use of mobile applications so that plant
managers, engineers, technicians, and maintenance can get the information they need at any
time without have to carry their laptops around or refer to a terminal or a PC.

FORWARD PLAYBOOK

ADD COMMENT

RETURN TO CONTENTS

CONTINUOUS PROCESS Playbook

continued

Leveraging Analytics
and Community for a
Mobile Workforce

81 / 103

Core to this extension of the mobile workforce at Bayer CropScience is a push for greater
employee and operations connectedness through the use of analytics and communities.

Analytics for Operations, Training and Risk Evaluation


As part of a long-range goal to use all the data they are collecting in their various systems to
enable better safety through a more rapid identification of risks, Bayer CropScience is first
targeting its process control systems.
Having a set workflow process accessible via a mobile device, the interaction of operators
with the control systems can be better managed, said Staples. Standard operating procedures
can be kept up to date and automatically pushed to operators. All changes to the system are
instantly recorded and shared.
For operators that may not be fully trained in all production aspects, the operator at the
machine now has full access to the information needed to do the job. The same goes for
maintenance inspections; when coordinated through workflow on a mobile device, all
maintenance activities are captured and accessible for future reference.
What we ultimately want from this is to be able to have a better risk evaluation and faster
notification, said Staples.
For example, if an operator who hasnt been fully trained is interacting via a mobile unit with
a control system on which certain interlocks have been by-passed, managers could remotely

FORWARD PLAYBOOK

ADD COMMENT

RETURN TO CONTENTS

CONTINUOUS PROCESS Playbook

continued

Leveraging Analytics
and Community for a
Mobile Workforce

82 / 103

shut the system down or not let it go to the next step until a properly trained engineer or
plant manager is there to review and give the go-ahead to move forward.

Community
Bayer CropScience is actively looking at using social media to help in its operations.
One of the questions theyre asking is: Why cant the machine participate in a social network?
After all, since those devices are now connected, they can provide information via a Facebook
page about its health and what its doing. And someone in maintenance at the facility can
access that information just as an engineer in another part of the world can.
Beyond ubiquitous communication and connectedness, Bayer CropScience is looking to use
social networks as a means to leverage its widely scattered technical resources for better
collaboration across the globe.

Benefits
These are the benefits Bayer CropScience is already seeing and expects to see more of from its
deployment of mobile devices to take advantage of analytics and community:

R etention and sustainability of knowledge. The company is now

capturing the expertise of operators and dispersing it so that any operator can become
the best operator.

FORWARD PLAYBOOK

ADD COMMENT

RETURN TO CONTENTS

CONTINUOUS PROCESS Playbook

continued

Leveraging Analytics
and Community for a
Mobile Workforce

83 / 103

I mproved performance. In operations where mobile devices are in place, Bayer


CropScience is achieving higher and higher levels of consistency across the board.

H igh-velocity collaboration of experts. Communities enabled by mobile


devices are proving to be the best way to get people involved immediately in
understanding whats going on and being able to contribute quickly.

B etter, more rapid focus on issues. By giving operators the information they
need to have, Bayer CropScience is creating a collaborative work environment among
all workers no matter where they are located. We can now collaborate on a global
basis to deal with issues that arise anywhere, said Staples.

FORWARD PLAYBOOK

ADD COMMENT

RETURN TO CONTENTS

CONTINUOUS PROCESS Playbook

84 / 103

Automation as a Continuous
Improvement Tool for Everyone
By David Greenfield

Media and Events Director


Automation World

Access Full Presentation


Click here to access the full
presentation made by PBVs Chris
Bacon at The Automation Conference.

Whether the term used is continuous improvement, Lean, Six Sigma or kaizen, most
discussions around these terms focus on how large, world-class companies have achieved
these cultural and procedural changes to improve their businesses. Often missing from the
discussion is how smaller operations, with far fewer resources, can adopt these practices for
significant benefit.
Chris Bacon, production manager at Pepsi Bottling Ventures (PBV) in Nampa, ID, described
how this small facility (which processes just one-tenth the amount of cases produced at PBVs
largest facility), leveraged automation technologies with real-time monitoring controls to
bolster a culture of continuous improvement.
Though this example originates in the batch process sector, PBVs approach to overall
equipment effectiveness (OEE) has lessons for continuous process as well.

Connecting OEE and Continuous Improvement


Once Pepsi Bottling Ventures had established its three-step, OEE-centered process for
performance improvement (detailed in Combining OEE and Automation for Improved
Performance, also found in this playbook), the facility now had a system that reported and
archived all data from each production run, and calculated OEE while providing a real-time
visual representation for personnel to manage and validate their activities.

FORWARD PLAYBOOK

ADD COMMENT

RETURN TO CONTENTS

CONTINUOUS PROCESS Playbook

continued

Automation as
a Continuous
Improvement Tool
for Everyone

85 / 103

With these data now available, it was decided to disseminate select operational opportunities
to all employees and use improvement tools to support the overall goal of maintaining
high quality at the lowest cost. Armed with the new data and point-of-contact analysis, line
availability and final quality became areas for continuous improvement focus.

Line Availability
The original human machine interface (HMI) screens designed for the mix run filler were
cluttered and difficult to decipher. Without in-depth working knowledge of the system, it was
easy to lose track of the process flow. By remapping both machine centers in the HMI, the new
visuals more accurately captured the physical layout of the systems and improved real-time
process flow evaluation. To accomplish this, a simple color code scheme was mapped to relay
real-time processes. Green was used for gases, brown for syrup, and blue for water. This simple
redesign not only helped during the initial project, but has also allowed for expansion of the

HMI Designs
The new HMI visuals, using color-coded
schemes, more accurately capture
the physical layout of the systems
and improved real-time process flow
evaluation. Green is used for gases,
brown for syrup, and blue for water.

FORWARD PLAYBOOK

ADD COMMENT

RETURN TO CONTENTS

CONTINUOUS PROCESS Playbook

continued

Automation as
a Continuous
Improvement Tool
for Everyone

86 / 103

facilitys trained knowledge base for support growing from one person to eight members
of the operation staff across all departments.
Furthermore, using Active Factory trending, analysis and reporting software from
Wonderware to determine the root cause of a recurring stoppage at both the mixer and the
filler, all rinse sequences for the mixer were changed to act only as event triggers (rather
than being time- or event-based, as they were in the previous system). This change not only
streamlined the programming process, but it eliminated any chance for one trigger sequence
starting ahead or at the same time as another, causing the reset status.
Another issue was the distribution of water between the filler and mixer during a flavor
changeover. In the original programming for the system, the mixer had to complete its rinse
before water could be sent to the filler, making it a highly inefficient symbiotic system. With
revised programming, both systems perform their end of run functions and rinse sequences
simultaneously.
Because of these modifications, a reduction of product changeover time from an average of
65 minutes in 2008 to 23 minutes in 2009 was achieved, exceeding PBVs initial 50 percent
reduction goal.

Quality
Leveraging OEE calculations for final quality proved to be a major issue, particularly with
regard to delivering first-time-through start-ups within specification for the product.

FORWARD PLAYBOOK

ADD COMMENT

RETURN TO CONTENTS

CONTINUOUS PROCESS Playbook

continued

Automation as
a Continuous
Improvement Tool
for Everyone

87 / 103

To achieve this goal, it was necessary to establish a repeatable Brix:TA blend for products at
start-up. With scale timers being the most constant factor in the transfer of syrup from the
batch room to the mixer, using this measure proved the most logical approach. Once these
timers were established to ensure a match with proper product specification, the focus
moved to the actual blending of water and syrup within the mixer itself.
Because of multiple points in the piping that trapped water, offline testing determined that
it was necessary to enrich the syrup higher at start-up to compensate for the water that was
impossible to remove. Not wanting to waste more syrup than necessary, testing at multiple
points in the piping was performed to test Brix:TA to determine optimum enrichment ratios.

PBV Mixers
Mixers in use at Pepsi Bottling Venture
in Nampa, ID.

From this analysis, it was determined that exceeding OEM Brix set points by 9 percent for the
first 70 gallons of syrup, before allowing the recipe to default back to the original set point,
was the right approach.

FORWARD PLAYBOOK

ADD COMMENT

RETURN TO CONTENTS

CONTINUOUS PROCESS Playbook

continued

Automation as
a Continuous
Improvement Tool
for Everyone

88 / 103

This calculation was based on analysis and measurement derived from piping length and
water left in the system. With these testing methods and trend analysis, first-time-through
start-up quality improved nearly 99 percent for all SKUs.
Bottom line: This PBV facility went from throwing away as much as 1,800 pieces of production
per run to, in most cases, throwing away zero pieces.
With an original project start date in late 2008 to design an integrated system for collecting
production data, PBV paid for the original project with the yield gains over time reduction
based on improved performance by mid 2009; they were also able to produce additional
products based on increased line availability.

FORWARD PLAYBOOK

ADD COMMENT

RETURN TO CONTENTS

CONTINUOUS PROCESS Playbook

89 / 103

Combining OEE and Automation


for Improved Performance
By David Greenfield

Media and Events Director


Automation World

Access Full Presentation


Click here to access the full
presentation made by PBVs Chris
Bacon at The Automation Conference.

Overall Equipment Effectiveness (OEE) is a metric designed to evaluate how efficient a


production operation truly is based on the real-world availability of the equipment used.
Commonly used as a key performance indicator in Lean production efforts, the OEE concept
has been around nearly 50 years. It is now starting to gain a stronger foothold in facilities of all
sizes due to advances in automation software.
Chris Bacon, production manager at Pepsi Bottling Ventures (PBV) in Nampa, ID, described
how this small facility (which processes just one-tenth the amount of cases produced at PBVs
largest facility), combined the use of automation and OEE tracking as part of its improvement
efforts. The key for the Nampa facility was leveraging automation with real-time monitoring
controls.
Though this PBV example originates in the batch process sector, the approach to OEE and
continuous improvement has lessons for continuous process as well.
This project began as a way to improve the OEE (overall equipment effectiveness) on the
facilitys bottling line, but also became an important bridge towards improving problem
solving and developing a continuous improvement culture.

FORWARD PLAYBOOK

ADD COMMENT

RETURN TO CONTENTS

CONTINUOUS PROCESS Playbook

continued

Combining OEE
and Automation
for Improved
Performance
Color-coded HMI
Color combinations on the HMI
screens correlate to real-time activities
of the line.

90 / 103

Step 1: Tracking Performance


Faced with limited personnel resources and numerous low volume production runs, the
number one challenge was to develop a system to track the lines performance as a total
unit and by each machine center. Measuring and capturing relevant data would provide the
ability to evaluate the line at each machine center to formulate real-time impressions of the
opportunities, while the background data could be pulled from the system for point-in-time
analysis. Having this data, accurate downtime reason codes could be implemented for root
cause analysis.

Step 2: How, When and What to Measure


For the OEE calculation to be as accurate as possible, the production line must have a
standardized time. As fundamental as this sounds, many facilities do not have this, due to a
non-standardized approach to all primary and ancillary activities necessary
for quality control, maintenance, and production personnel.
To remedy this problem, a 7:00 a.m. start-up time became the new standard.
The tracking system was designed to start OEE calculation at 7:00 a.m. each
morning and capture every minute of non-production time based on release
of the bottle stop or filler. A specific reason code was automatically attached
to accurately reflect the root cause impeding production. These reason
codes were directly pulled from that machine centers PLC.

FORWARD PLAYBOOK

ADD COMMENT

RETURN TO CONTENTS

CONTINUOUS PROCESS Playbook

continued

Combining OEE
and Automation
for Improved
Performance
To read more about ongoing
discussions surrounding the perceived
effectiveness of OEE, click here

Read More About OEE

91 / 103

Step 3: Putting Data Into Action


Once the facility was finally measuring and capturing relevant data, the next priority was to
design a visual representation of the system so that each member of the team could discern
some useful information from it.
Opting for a very simple design that mirrored the facilitys machine center flow, color
combinations on the human machine interface screens would correlate to real-time activities
of the line in accurate fashion. Red meant a machine center was in stoppage mode with the
reason code available in the drop-down visual. Yellow meant a machine or machine centers
were idle, either through changeover mode or awaiting upstream or downstream machine
centers to be released from stoppage mode.

Results
Armed with this new production insight, one root cause for low performance at the PBV
facility was quickly identified the periodic jamming of a vacuum drum on the labeler. PBV
realized this problem because of the reason codes now built in to the downtime tracking
system.

To learn how Pepsi Bottling


Ventures used OEE data to
foster a culture of continuous
improvement, see Automation as
a Continuous Improvement Tool
also in this playbook.

With an OEM upgrade to the processor and a few creative internal modifications, PBV was
able to reduce downtime by 55 percent at this specific machine center. With this gain in
performance, the OEM upgrade was paid off in five months.
Long-term results with improved performance also exhibited a 43 percent decrease in labor
over time (from 2009 to 2011).

FORWARD PLAYBOOK

ADD COMMENT

RETURN TO CONTENTS

CONTINUOUS PROCESS Playbook

92 / 103

Four Considerations for


Upgrades and Migrations
By Marty Weil

contributing writer
Automation World
and

David Greenfield

Media and Events Director


Automation World

Regardless of whether you want to increase productivity or shorten time-to-market, attaining


success in these areas depends on the application of suitable automation technologies in a
continuous process operation. Following are the principal steps involved in assessing your
plants technology to gauge whether a technology upgrade or migration is in order:

1. Consider the full range of aspects that relate to your existing


systems, such as:

Risk of unplanned plant downtime and production stoppages;


Ability to expand production or introduce new products;
Ability to integrate with enterprise level business software and at what cost;
Ongoing maintenance costs;
Need for continuing support of the legacy system; and
Effect on the efficiency and productivity of plant personnel.
FORWARD PLAYBOOK

ADD COMMENT

RETURN TO CONTENTS

CONTINUOUS PROCESS Playbook

continued

Four Considerations
for Upgrades and
Migrations

93 / 103

2. In each case of upgrade or migration, return on investment plays a


crucial role. A huge investment in hardware and application software is associated with
the installed process control system, as well as the accumulated know-how of the operating,
engineering, and maintenance personnel. For this reason, the prime objective of any
migration strategy should be to modernize the installed base gradually without any system
discontinuity and, if possible, without any plant downtimes or loss of production that would
negatively affect the investment return.

3. Assess the long-term security of existing investments. This assessment


is important in order to maximize the return on assets (ROA). For this reason, every migration
should include a robust lifecycle support strategy for the new system that considers not only
the availability of the components, but also product warranties, on-site service, and ongoing
technical support.

4. Obsolescence. When deciding whether to upgrade or migrate to a new system,


there are two aspects of obsolescence to assess. In a migration, its important to understand
the history of the technologies supported by the company behind the product under
consideration. Does this company actively support the long-term lifecycles of products as
they are typically employed in a process operation? Do upgrades have significant backwards
compatibility? How often are upgrades typically released for this system and what is required

FORWARD PLAYBOOK

ADD COMMENT

RETURN TO CONTENTS

CONTINUOUS PROCESS Playbook

continued

Four Considerations
for Upgrades and
Migrations

94 / 103

for installation? For upgrades, its important to understand what the future outlook is for
the system under consideration. With the significant maintenance and security issues tied
to process control systems, you should always consider your risk of system obsolescence
and the associated costs incurred with such a scenario versus the costs of moving to a
better-supported system. The good news is that, in the process industries, most vendors
are very aware of the long-term use of their systems by end users and thus tend to support
their systems for multiple decades rather a single decade, as is more common with office
IT systems. As newer automation technologies become core components of process
control systems, be sure to talk with your supplier about their support plan for those newer
technologies.

FORWARD PLAYBOOK

ADD COMMENT

RETURN TO CONTENTS

CONTINUOUS PROCESS Playbook

95 / 103

Cognex

VENDOR SELECTION RESOURCE GUIDE

Discrete/Machine Control Strategies: Sensors


Cognex Corporation is the worlds leading provider of vision systems,
vision software, vision sensors, industrial ID readers and surface
inspection systems used in manufacturing automation.
Vision: Cognex vision helps companies improve product quality,
eliminate production errors, lower manufacturing costs, and exceed
consumer expectations for high quality products at an affordable
price. Typical applications for machine vision include detecting defects,
monitoring production lines, guiding assembly robots, and tracking,
sorting and identifying parts.
ID: Cognex offers the most advanced technology available for
1D barcode and for 2D Data Matrix code reading regardless of the
size, quality, printing method, or surface the codes are marked on.
Combined with the best performing hardware on the market, in both
handheld and fixed-mount reader formats, Cognex can successfully
read codes that other readers cannot. As a result, image-based readers
are rapidly replacing laser scanners in a wide range of manufacturing
and logistics applications.
COMPANY: Cognex

ADDRESS: One Vision Drive, Natick, MA, 01760

Phone: (508) 650-3000

FORWARD PLAYBOOK

WEB: www.cognex.com

ADD COMMENT

RETURN TO CONTENTS

CONTINUOUS PROCESS Playbook

96 / 103

Cognex

VENDOR SELECTION RESOURCE GUIDE


DataMan 300 Code Reader
A quantum leap in barcode reading performance, the DataMan
300 series of readers was developed to handle the most difficult-toread DPM (Direct Part Mark) codes as well as challenging 1-D linear
barcodes and 2-D Data Matrix codes and for indexed or high-speed
lines.
In-Sight 7000 Series
Small, tough and very smart, the In-Sight 7000 series of vision
systems features powerful vision tools, autofocus, faster image capture,
integrated lighting and lens and the capability to power and control
a range of external lightingall in a compact, industrial IP67 package
that makes the system ideal for more applications than ever before.

Integrated Lighting and Lens


Smarter Tools
Faster Image Capture
Lighting Power and Control
Unlike most vision systems, the In-Sight 7000 has the capability to
power and control specialized lighting directly which eliminates the
need for external power supplies.
COMPANY: Cognex

key company contact


phone: (508) 650-3000 location: Natick, MA
email: contactus@cognex.com

ADDRESS: One Vision Drive, Natick, MA, 01760

Phone: (508) 650-3000

FORWARD PLAYBOOK

WEB: www.cognex.com

ADD COMMENT

RETURN TO CONTENTS

CONTINUOUS PROCESS Playbook

97 / 103

ECS Solutions, Inc.

VENDOR SELECTION RESOURCE GUIDE

ECS Focused on Your Process Automation


Return-on-Investment
We are focused on increasing your process
automation return-on-investment. Sure,
we are control engineers, but we are
versed in business too. This is why we offer
assistance in:
Project Planning The first step in the
process is understanding your goals and
resources, as well as your future needs.
Flexibility We design-in flexibility for every system to ensure your
system will be ready for challenges without excessive upgrade costs.
Installation You can count on ECS to make sure your system is up
and running in record time to meet your time-to-market requirements.
Operation At the heart of an ECS system is ease of use. We
design the system with operators in mind to ensure maximum
operational productivity.
Maintainability Within an ECS system are standard products,
software and compliance to recognized standards such as ISA. It all
keeps downtime to a minimum.

COMPANY: ECS Solutions, Inc.


Phone: (812) 479-5170

Automation and Information Experience


with Capabilities That Industry Trusts
One source for all of your control and information systems needs.
Over the last 30 years, we have been delivering exceptional returnon-investment results through the
use of the latest technologies and
WEB RESOURCES
techniques.
Case History
Discrete and Process Control
Seventy Unit Batch
Systems Software, Hardware and
System Configured in
Just 11 Weeks.
Migrations
awgo.to/ecs3
Information Systems Including
S88 Builder
Network Architecture, Data Collection,
White Paper
Historians and Data Access
Provides best practices
for developing device
Engineered Systems Including
tasks within a process
Power Distribution, Energy
system.
awgo.to/ecs2
Management, Drives and Motors

S88 Builder
Demos

ADDRESS: 2616 Kotter Avenue, Evansville, Indiana 47715

| Toll Free: (800) 471-ECSE WEB: www.ecssolutions.com

FORWARD PLAYBOOK

ADD COMMENT

Watch as S88 Builder


goes through its paces.

awgo.to/ecs4

RETURN TO CONTENTS

CONTINUOUS PROCESS Playbook

ECS Solutions, Inc.

VENDOR SELECTION RESOURCE GUIDE


Over 30 Years of Industry
Experience We Speak Your
Language

98 / 103

Consulting Services
Electrical and Control
Design Services
Full Range of Project Delivery Services
Emergency and Contract Service

Chances are your industry is one


that the people of ECS Solutions are
well versed in. Industry knowledge
that results in a cost-effective, flexible
and productive return-on-investment.
Food, Pharmaceutical and Personal Care
Aluminum and Ferrous Metals
Power Generation
Water/Wastewater
Automotive
General Manufacturing
Common Manufacturing Solutions
Information Technology Solutions

New: S88 Builder: A new paradigm for


batch and continuous process control

S88 Builder is the first process control system


that is configured rather than programmed. It
lets users configure devices such as valves, pumps, or tanks then
configures the devices into specific tasks such as mixing, flow control,
heating, etc. Configuration is easier, more accurate and faster than
programming, especially in batch control.
www.s88builder.com

Our Team Can Be on Your Team to Fill Out Your Roster


Our individual services are available a`la carte to meet your specific
support needs. No matter which services you choose, expect first class
support.
COMPANY: ECS Solutions, Inc.
Phone: (812) 479-5170

key company contact


ECS Solutions, Inc.
phone: (812) 479-5170 | Toll Free: (800) 471-ECSE
location: Evansville, IN email: Info@ecssolutions.com

ADDRESS: 2616 Kotter Avenue, Evansville, Indiana 47715

| Toll Free: (800) 471-ECSE WEB: www.ecssolutions.com

FORWARD PLAYBOOK

ADD COMMENT

RETURN TO CONTENTS

CONTINUOUS PROCESS Playbook

99 / 103

MAVERICK Technologies

VENDOR SELECTION RESOURCE GUIDE

MAVERICK Technologies:
Continuous Process Optimization
No matter your industry, you can depend on MAVERICK Technologies for a range of services designed to
optimize your process. We work across all major platforms and deliver integrated process automation solutions
designed to meet your specific objectives and ensure future success. Our continuous process service areas include:
Strategic Manufacturing Solutions

Industrial Automation

Make strategic advances, reduce costs and


unlock value across your entire organization
DCS migration services through DCSNext
24/7/365 remote operations support
through PlantFloor24
Sustaining Services
Operational Consulting
Enterprise Integration

Collect and share the data


needed to make more
informed decisions
Data Historians

Improve quality, efficiency and


safety of your plant
Automation Solutions
I&C Field Services
Advanced Process Control

Inside DCS Next:


Straight Talk on
DCS Migration

WHITE PAPER

Maintenance Management
ERP for Manufacturing
Manufacturing Supply Chain
Strategic Engagements

ADDRESS: 265 Admiral Trost Drive; Columbia, IL 62236

Phone: (888) 917-9109

VIDEO

bit.ly/Maverick_5

Recipes & Batches


Quality Management
Manufacturing Execution
Manufacturing Intelligence

COMPANY: MAVERICK Technologies

WEB RESOURCES

WEB: www.mavtechglobal.com

FORWARD PLAYBOOK

ADD COMMENT

Remote Management
Best Practices: How to
Utilize New Automation
Strategies

bit.ly/Maverick_4
WHITE PAPER

Aligning Business and


Automaton Strategy
with Proven ROI Results

bit.ly/Maverick_3

RETURN TO CONTENTS

CONTINUOUS PROCESS Playbook

100 / 103

MAVERICK Technologies

VENDOR SELECTION RESOURCE GUIDE

About MAVERICK Technologies


Founded in 1999, MAVERICK Technologies is the largest

and overall profitability. The companys people, processes and

independent systems integrator in North America, and is a

technical capabilities ensure delivery of the right solution for every

global leader in industrial automation, enterprise integration and

project, using the most appropriate technology. Organizations around

strategic manufacturing solutions for clients across a wide range

the world depend on MAVERICKs responsiveness, results-driven

of manufacturing and process industries. Leveraging its unique

approach and dedication to their success. Over the years, MAVERICK

enterprise-wide perspective, MAVERICK identifies suboptimal

has completed more than 10,000 successful projects in 45 countries

operations and improves performance for greater safety, efficiency

across six continents.

key company contact

LEARN MORE ON THE MAVERICK IDEAS BLOG


Every day, MAVERICK employees connect with our customers
on continuous process projects across a broad spectrum of
industries. Now we're sharing our experiences with you through
this blog. It's written by engineers, for engineers, and we hope it
will help you take your operation to the next level.
http://www.mavtechglobal.com/ideas/?s=continuous+process
COMPANY: MAVERICK Technologies

Jim Bouler
phone: (850) 780-6477
EMAIL: james.bouler@mavtechglobal.com
LIVE CHAT: Click here to live chat with Jim!

ADDRESS: 265 Admiral Trost Drive; Columbia, IL 62236

Phone: (888) 917-9109

FORWARD PLAYBOOK

WEB: www.mavtechglobal.com

ADD COMMENT

RETURN TO CONTENTS

CONTINUOUS PROCESS Playbook

101 / 103

Winsted

VENDOR SELECTION RESOURCE GUIDE

Winsted
Winsted is a worldwide leader in control room console solutions. We
create attractive, ergonomic consoles that work with your operators
to improve comfort
and optimize
efficiency. We offer
stock, customized
and custom
consoles suitable
for any control
room application.
Whether you are
building a stateof-the-art control
room from the ground up, or simply need to upgrade your operations,
Winsted can provide the ideal solution. Our experts combine the
disciplines of industrial design, ergonomics and interior design to
create solutions that are both efficient and eye-catching. We give
special consideration to the ergonomic requirements of your operators
to build consoles that reduce fatigue, improve productivity and
COMPANY: Winsted

inspire. Our commitment to customer service


is second-to-none and your satisfaction is
guaranteed.
Since its inception in 1963, Winsted has
consistently been a pioneer in product design and development.
Product concepts and designs are driven by industry needs and
demands, with many product ideas
WEB RESOURCES
suggested by customers and developed
with their input. Our modular system
White Paper:
approach, developed for the early
Human Factors: Planning & Designing
a Control Room
broadcast industry, has become the
http://winsted.com/img/
industry standard for all markets, and
resources_literature/human_
factors.pdf
our experience developing specialized
custom products enables us to offer
Online Catalog:
console and furniture solutions for any
http://catalog2012.winsted.com/
t1.asp
application.
A dominant factor in U.S. markets
YouTube Channel:
for many years, Winsted expanded into
http://www.youtube.com/user/
winstedcorp
overseas markets in 1975, primarily

ADDRESS: 10901 Hampshire Ave. South, Minneapolis, MN 55438 USA


Phone: 800-447-2257

Products:

http://winsted.com/products.htm

WEB: winsted.com

FORWARD PLAYBOOK

ADD COMMENT

RETURN TO CONTENTS

CONTINUOUS PROCESS Playbook

Winsted

VENDOR SELECTION RESOURCE GUIDE


in England.
In 1976 the
company began
concentrated
efforts to establish
distribution in the
Far East. Winsteds
international
distribution was
firmly established
in 1984 with
the formation
of Winsted, Ltd. in England. Since then, Winsted, Ltd. has become
a successful marketing and manufacturing operation serving the
European, Middle Eastern and African markets. In 1986, distributor
agreements were established in Australia, Japan, Hong Kong, Taiwan
and Korea.
In 2002, Winsted acquired Technical Interiors, a Georgia-based
company with 25 years of experience designing and manufacturing
custom consoles of the highest standards for the nuclear power
industry. Technical Interiors was renamed Winsted Custom Division in
COMPANY: Winsted

102 / 103

2010 and solidifies our mission of providing


the highest quality console and furniture
solutions to mission critical facilities around
the world.
In 2011, Winsted further expanded its
custom capabilities with the launch of a new
division. Winsted Custom Wood will focus on manufacturing custom
cabinetry and millwork for control room installations. The Custom
Wood Division enables Winsted to further expand our custom control
room capabilities and fully realize our value proposition of offering
stock, customized and custom console solutions to our customers.
With the expansion, Winsted has added many skilled craftsmen who
bring years of custom woodworking experience, as well as a state-ofthe-art production facility.
Our family of companies, broad range of capabilities and an ongoing
commitment to Customers, Products and Service is why Winsted is
Preferred by Professionals Worldwide.

key company contact


phone: 800-447-2257 location: Minneapolis, MN
email: brentl@winsted.com

ADDRESS: 10901 Hampshire Ave. South, Minneapolis, MN 55438 USA


Phone: 800-447-2257

FORWARD PLAYBOOK

WEB: winsted.com

ADD COMMENT

RETURN TO CONTENTS

103 / 103

Thank you for downloading Automation World's


Continuous Process Playbook!
Now that you've had a chance to review it,
we'd love your feedback. Share your thoughts!
POST YOUR
COMMENT

You might also like