Clause No.
Clarification Sought
No
.
1.
4.
of
is
proposed to be supported.........followed by
volumes
reworded as under:
2.24
m/s...............HRT
of
the
bidding
account.
excavation
documents
the
Specification, (page 4)
engineering
supported
by
additional
investigations as required.
scope
of
work
and
qualifying
7.
of Contractor.
clarify.
Please clarify.
methods.
b) Sub clause 3.5.1 (v) states that the
deformations of the excavated rock
perimeter are deemed to be included in
8.
9.
Construction
ground
stipulated
water
during
under
the
Section
construction
Drainage
as
has
been
found
in
the
bidding
and
underground
drill
bidding Documents.
conventional
and
blast,
mechanical,
manual
or
methods____________