Operation and Maintenance Manual

U Blowout Preventer
13-5/8" 10,000 psi WP

TC1075

All the information contained in this manual is the exclusive property of Cooper
Cameron Corporation, Cameron Division. Any reproduction or use of the calculations, drawings, photographs, procedures or instructions, either expressed or implied, is forbidden without the written permission of Cameron or its authorized
agent.

Initial Release A1
December 1993
Rev B1
March 1998
Rev B2
January 2002

Copyright 2002 all rights reserved


by
Cooper Cameron Corporation
Cameron Division

TC1075

PREFACE
The procedures included in this book are to be performed in conjunction
with the requirements and recommendations outlined in API Specifications. Any repairs to the equipment covered by this book should be done
by an authorized Cameron service representative. Cameron will not be
responsible for loss or expense resulting from any failure of equipment or
any damage to any property or death to any person resulting in whole or
in part from repairs performed by other than authorized Cameron personnel. Such unauthorized repairs shall also serve to terminate any contractual or other warranty, if any, on the equipment and may also result
in equipment no longer meeting applicable requirements.
File copies of this manual are maintained. Revisions and/or additions will
be made as deemed necessary by Cameron. The drawings in this book are
not drawn to scale, but the dimensions shown are accurate.
This book covers Cameron products, which are products of Cooper
Cameron Corporation.
Cooper Cameron Corporation
Cameron Division
P.O. Box 1212
Houston, Texas 77251-1212
713-939-2211
http://www.coopercameron.com

TC1075

TC1075

Contents
I. Physical Data . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
II. Applicable Operating Characteristics . . . . . . . . . . . . . . . . . 8
III. Disassembly Procedure . . . . . . . . . . . . . . . . . . . . . . . . . 8
IV. Assembly Procedure . . . . . . . . . . . . . . . . . . . . . . . . . . 10
V. Operation and Installation Procedures . . . . . . . . . . . . . . . . 14
VI. Maintenance Procedures . . . . . . . . . . . . . . . . . . . . . . . . 15
VII. Testing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16
VIII. Storage . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
Illustrations and Bills of Material
Dimensional Drawings . . . . . . . . . . . . . . . . . . . . . . . . . . 20
13-5/8" - 10,000 psi WP U BOP . . . . . . . . . . . . . . . . . . . . . . 22
Blind Ram . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26
Casing, Pipe and Tubing Ram . . . . . . . . . . . . . . . . . . . . . . 27
DS Shearing Blind Ram . . . . . . . . . . . . . . . . . . . . . . . . . . 28

TC1075

13-5/8" 10,000 PSI WP U BLOWOUT PREVENTER


OPERATION AND MAINTENANCE (T-126 1-02)
I. PHYSICAL DATA
A. Lubricants
1. Ram lubricant, P/N 705725 (CHEMLOA #681 BOP oil) or a water resistant non petroleum base grease.
2. Thread lubricant - API-5A-Lub, Fel-Pro Paste #670, or SLECT-A-TORQ
Paste #503, (P/N 705444, 4 lb can)
3. Multi-purpose lubricant or grease.
4. Multi-purpose lubricant or grease for cold weather operation.
5. Hydraulic operating system:
a. Storage - P/N 718100 (Marston Bentley Preservation Fluid.)
b. Standard operation - Use a fresh water lubricant that forms a true
solution rather than an emulsion when mixed with water and/or
antifreeze.
6. Seals and sealing surfaces - Hydraulic Oil (10-15 wt) P/N 203497

B. Dimensional Drawings
1. SD-10852-99 13-5/8"-10,000 psi WP Single U BOP with flange side outlets.
2. SD-10848-99 13-5/8" - 10,000 psi WP flange Double U BOP.

C. Drawings with Bills of Material


1. SD-10847-99 13-5/8"-10,000 psi WP Double U BOP.
2. SD-8813 Blind rams
3. SD-8811 Pipe rams

D. Weights
1. Single 13-5/8" - 10,000 psi WP BOP with flange outlets, 6360 lb.
2. Bonnet Assembly 13-5/8" - 10,000 psi WP (Std): 1440 lb

TC1075

3. Average Ram Assembly: 170 lb


4. Double flange 11" - 10,000 psi WP U BOP 12,300 lb

E. Lifting and Handling


1. Lift BOP assemblies only with slings appropriately rated for the maximum weight of the BOP.
2. Lift ram assemblies by installing a lifting eye, P/N 011849, in the
threaded preparation in the ram.
3. Handle all other subassemblies using appropriately rated slings.

F. External Thread Connections


Description

Size

Location

Open Port

1" NPT

BOP body, right side

Close Port

1" NPT

BOP body, left side

G. Hydraulic Operating System Requirements


1. Use a fresh water lubricant in the hydraulic system that forms a true
solution rather than an emulsion when mixed with water and/or antifreeze.
2. Fluid Requirements
Rams
(One Set)

Open

Close

Bonnets
(One Set)

Open

Close

Rams

Close Open

Locking
Screw
Turns
(Each
End)

Gal Liters Gal Liters Gal Liters Gal Liters Ratio Ratio
5.4 20.44 5.8 21.96 7.7 29.15 6.6 24.99 7.0:1 2.3:1

TC1075

32

3. Normal pressure for the hydraulic operating system is 1500 psi.


4. Maximum pressure to shear drill pipe is 2800 psi.
5. The maximum hydraulic operating pressure limit is 3000 psi to operate
rams.

H. API 16A Drift Diameter


API drift for 13-5/8" 10,000 psi is 13.595"

II. APPLICABLE OPERATING CHARACTERISTICS


A. Subassemblies
1. Pipe ram operating characteristics.
a. Seals around drill pipe or casing.
b. 6-5/8", 5-1/2" and 5" pipe rams support 600,000 lb and seals both
low or high pressure.
2. Variable bore rams 4-1/2" to 7".
a. Seals and holds low or high pressure on either size of drill pipe.
b. Supports 190,000 lb of of 5" drill pipe, and seals both low or high
pressure.
3. Shear Rams
a. Shears up to 6-5/8" 27.6 ppf Grade S-135 drill pipe and maintains a
low pressure and high pressure seal.
4. Bonnet
a. Houses the BOP hydraulic operating system.
b. Provides access to the rams.
c. Provides mounting for the wedgelock assembly.

III. DISASSEMBLY PROCEDURE


A. Part Preparation Prior To Disassembly
The work area should be clean and well lighted.

TC1075

B. BOP Disassembly
Refer to the illustration on page 20.
1. Use an air wrench to break and unscrew the bonnet bolts (12) on both
sides of the BOP.
2. Apply hydraulic closing pressure to the rams CLOSE connection on the
BOP to open the bonnet assembly.
3. Screw the lifting eye (38) into the top of the ram.
4. Use a hoist to lift up on the ram to remove it from the operating piston rod.
5. Remove the seal (22) that resides in the seal bore of the BOP body.
6. With a spanner wrench and a hammer, break loose the locking screw
housing nuts (14).
7. Remove the nuts, the locking screw housing (7), and the locking screw
(8).
8. Remove the locking screw housing studs (13) with a small pipe
wrench.
9. On the top of the bonnet, remove:
a. the tubing gland (36) and blind plug (37).
b. the 1" NPT pipe plug (17).
c. the plastic packing screw (16) and packing (39).
10. Unscrew the plastic packing check valve (15).
11. Remove the O-ring (34) from each bonnet bolt and remove the bolts
from the bonnet assembly.
12. Insert the lifting eye (38) into the intermediate flange or into the bonnet.
13. Attach a hoisting cable to the lifting eye and apply tension to the cable to hold up the bonnet assembly.
14. Using a crescent wrench, loosen the ram change pistons (9) and (10)
on the flats provided.
15. Once the ram change pistons are completely loose, move the assembly
to the side away from the main body of the BOP.
TC1075

C. Bonnet Disassembly
1. Remove the ram guide pins (23) from the intermediate flange (2).
2. Remove the cap screws (35) to disassemble the intermediate flange
from the bonnet.
3. Separate the bonnet (3) from the intermediate flange (2).
4. Remove the ram change cylinder O-rings (31) and (32) from the cylinders, and remove the cylinders from the bonnet.
5. Remove the operating cylinder O-rings (24) from the operating cylinder,and remove the cylinder from the bonnet. These O-rings are for
standard bonnets only. The large bore shear bonnets do not have a
separate operating cylinder.
6. Remove the operating piston seal ring (26) and the operating piston
wear ring (42) from the operating piston, and remove the piston from
the bonnet.
7. Pull out the remaining seals in the bonnet bore, including the wiping
O-ring (28) and the lip seal for the tail rod (27).
8. Remove the following seals from the intermediate flange:
a. spirolox retaining ring (41)
b. lip seal retainer (40)
c. back-up ring (21)
d. lip seal (connecting rod) (20)
e. energizing ring (19)
f. plastic packing ring (18)
g. operating piston rod O-ring (25)

IV. ASSEMBLY PROCEDURE


A. Part Preparation Prior to Assembly
The work area should be clean and well lighted.

TC1075

10

1. Remove all dirt, grit, oil, and contaminants from the ram bore, ram
change piston holes, bonnet stud holes, all fluid passageways in the
body, and intermediate flange. Clean water and detergent should be
used for cleaning. High pressure air may also be used if it is dry air.
2. Clean all internal surfaces of bonnets using clean water and detergent. Lubricate internal sealing surfaces.
3. Clean pistons, cylinders, and intermediate flanges, using clean water
and detergent. Lubricate areas that will come in contact with other
parts.
4. Lubricate sealing surfaces behind the threads in the bonnet stud holes
in the BOP body after cleaning this area.
5. Sealed elastomer containers should not be opened until they are required for assembly. This is to prevent contamination and damage to
the seal.

B. Bonnet Assembly
Refer to the illustration on page 20.
1. Place each bonnet (3) on stands or pallets with the bore side up.
2. Install the tail rod lip seal (27) and the wiping O-ring (28) into the
bonnet (3).
3. Place the operating cylinder O-rings (24) on the operating cylinder (6).
These O-rings are for standard bonnets only. The large bore shear
bonnets do not have a separate operating cylinder.
4. Insert the operating cylinder (6) into the standard bonnet bore.
5. Install the ram change cylinders (11) into the bonnet.
6. Place ram change piston O-rings (33) and the ram change piston to
body O-rings (29) on both ram change pistons.
7. Insert the assembled ram change pistons (9) and (10) into the bonnet
so that the pistons with side holes are on the OPEN side, and the pistons with center holes are on the CLOSE side.
Caution: Ensure that the threaded end of the ram change piston does not contact
the floor.
8. Place the operating piston wear ring (42) and the seal ring (26) onto
the operating piston (5).

TC1075

11

9. Position the assembled operating piston into the bonnet.


10. Place the intermediate flange (2) on the assembly table with the
threaded holes for the guide pins (23) in the bottom position.
11. Place the operating piston rod O-ring (25) in the central bore.
12. Install the plastic packing ring (18) and energizing ring (19).
13. Install the connecting rod lip seal (20), lip seal retainer (40), the
back-up ring (21), and spirolox retaining ring (41).
14. Install the O-ring (30) onto the intermediate flange.
15. Install the cylinder O-rings (31) and (32) onto the ram change cylinder.
16. Apply a light coat of oil on the O-rings and inside the corresponding
seal bores in the bonnet (3) and the intermediate flange (2).
17. Install the assembled intermediate flange onto the assembled bonnet.
18. Install the cap screws (35) from the bottom side of the intermediate
flange and tighten them securely. Be sure that the plastic packing port
on the intermediate flange is on the same side of the assembly as the
lifting eye hole on the bonnet.
Caution:
a. Ensure that the tail rod seals are not damaged.
b. Ensure that the seals are not damaged during the bonnet seating process.
Important: The threaded holes for the lifting eyes in both the bonnet and the intermediate flange must be on the same side of the connecting rod.
19. Tighten the cap screws in a crisscross pattern so that the intermediate
flange pulls down straight and level with respect to the face of the
bonnet. Torque the cap screws between 3350 and 3670 ft-lb.
20. Screw the ram guide pins (23) into the intermediate flange. Tighten
the guide pins with a pipe wrench to a maximum of 500 ft-lb.
21. Install the lifting eye (38) into the intermediate flange or into the
bonnet.
22. Position the bonnet assembly next to the body and thread the ram
change pistons onto the body.
23. Tighten the rods securely against the body, using a crescent wrench
on the flats provided.
TC1075

12

Warning: Make sure that the open and close pistons are in the appropriate location with respect to the body.
24. Insert the bonnet bolts (12) through the bonnet and intermediate
flange.
25. Push the bonnet bolt O-rings (34) over the bonnet bolt threads onto
the undercut.
26. Screw the plastic packing check valve (15) all the way into the preparation in the intermediate flange.
27. Insert one stick of plastic packing (39) above the check valve and install the plastic packing screw (16). Do not apply any torque to the
plastic packing screw.
28. Install a 1" NPT pipe plug (17) to close the hole.
29. Install the bleeder gland (36) with the plug (37) into the bonnet.
30. Install the double ended locking screw studs (13) into the bonnet. The
short threaded ends screw into the bonnet. These studs can be tightened with a small pipe wrench used close to the bonnet.
31. Install the locking screw (8) into the locking screw housing (7).
32. Install the locking screw housing over the studs with the flats on the
housing flange vertical. Install and tighten the locking screw housing
nuts (14).
Note. All hydraulic lines must be in place. Install the seal carrier before the rams
are installed.
33. Lubricate the seal bores for the bonnet seal in both the BOP body (1)
and the intermediate flange (2).
34. Install the bonnet seal (22) that will reside in the seal bore of the intermediate flange.
35. Lubricate the seal with ram lubricant.
36. Close the bonnet assembly with 200 to 500 psi operating pressure,
trapping the seal carrier.
Caution: Keep hands out of the way during this operation.
37. Lubricate the seal with ram lubricant.

TC1075

13

38. Once the bonnet seals are securely installed, connect the hydraulic
lines to the OPEN and CLOSE ports on the sides of the preventer body.
39. With the bleed gland (36) loose, on the top of the bonnets, apply
200-300 psi OPEN and CLOSE operating pressure alternately to expel
air from the operating system.
40. After the air is bled from the system, tighten the bleed plugs (37).
41. Install the appropriate ram assemblies (4) onto the operating piston
rod.
42. After assembling both bonnets, apply 1500 psi hydraulic pressure to
the rams OPEN connection to close the bonnets.
43. Apply thread lubricant to the threads and below the head of the bolt.
44. Screw in and torque the bonnet bolts to 3300 ft-lb.

V. OPERATION AND INSTALLATION PROCEDURES


A. Preparation
Prior to the installation of the preventer, ensure that the following requirements are met:
1. The capacity and the pressure rating of the accumulators and the pressure pumps must comply with the API RP53 recommendations or appropriate regulatory agency requirements.
2. Ensure that the ring gaskets are correct for the preventer flange, the
hub size, and the pressure rating.

B. Installation
1. Install the preventer, ensuring that the preventer is right-side-up (outlets are below the center of the preventer).
2. Inspect the preventer, the ram subassemblies, and all rubber parts during installation.
3. Remove the external mechanical protectors.
4. Lift the BOP with slings installed around the body of the BOP.
5. Install the BOP on a test stump/fixture.
6. Drain the fluid from the operating system.

TC1075

14

7. Remove the 1" ball valves or pipe plugs from the inlet and outlet connections.
8. Connect the hydraulic control lines, and flush the operating system
with clean fluid.
9. Test for leaks in the operating system (refer to Part VII, TESTING.)
10. Install the rams in accordance with the assembly procedure described
in Part IV, ASSEMBLY.
11. While installing the rams, inspect the ram bore and bonnet.
a. Inspect the vertical bore for key seating.
b. Inspect the intersection between the vertical bore and the ram
bore. Grind out any raised metal surfaces. Do not remove any
metal below the original surface.

VI. MAINTENANCE PROCEDURES


A. Routine Maintenance
1. If more than 500 psi hydraulic pressure is required to operate the ram
subassemblies when there is no pressure in the well bore, determine
the cause and correct any irregularities.
Caution: To avoid damage to the packers, close pipe and variable bore rams only
when pipe is in the preventer.
2. Pressure test and operate the preventer once a week per API RP53
Periodic Field Testing or appropriate regulatory agency requirement.

B. Periodic Maintenance
1. Once a year, or every six months in cold weather conditions, completely disassemble the preventer.
Note: For a detailed description of disassembly, see Part III, DISASSEMBLY.
a. Clean all parts. Do not use a wire brush on sealing areas.
b. Replace all rubber seals, gaskets, and O-rings.
c. Replace ram packing according to its physical condition.
d. Repair or replace damaged metal parts.

TC1075

15

2. Reassemble the preventer.


Note: For a detailed description of assembly, see Part IV, ASSEMBLY.
a. After reassembling the preventer, test the rams and operating system. Refer to Part VII, TESTING for the correct procedure.

VII.TESTING
A. Hydraulic Operating System
1. Test the hydraulic operating system after installation.
a. Flush the hydraulic operating system with clean operating fluid.
b. Test for proper stroking of the rams and operating system.
1) Apply a maximum of 300 psi hydraulic pressure to the OPEN
port.
2) Ensure that the rams open.
3) Reduce hydraulic pressure to zero psi.
4) Apply a maximum of 300 psi hydraulic pressure to the CLOSE
port.
5) Ensure that the rams close.
6) Reduce hydraulic pressure to zero psi.
c. Test for leaks in the operating system.
1) Remove the hydraulic line from the OPEN port.
Note: If testing pipe, casing, flex packers, or variable bore rams, be sure that an appropriate size test mandrel is installed into the preventer. DO NOT close the
rams on an open hole unless closing pressure is less than 300 psi. Flex Packers
and VBRs should be tested with the largest pipe size for that packer.
2) Apply 300 psi hydraulic pressure to the CLOSE port, and observe
the OPEN port for leaks.
3) Increase the pressure to 3000 psi and observe the OPEN port for
leaks.
4) Inspect for leaks between the intermediate flange, the bonnet,
and the BOP body. Bleed all pressure from the BOP closing line.
5) Replace the hydraulic line to the OPEN port.
TC1075

16

6) Remove the hydraulic line from the CLOSE port.


7) Apply 300 psi hydraulic pressure to the OPEN port, and observe
the CLOSE port for leaks.
8) Increase the pressure to 3000 psi and observe the CLOSE port for
leaks.
9) Inspect for leaks between intermediate flange, body, and bonnet. Bleed all pressure from the BOP opening line.
10) Replace the hydraulic line to the CLOSE port.
11) Replace the seals if leaks were observed and repeat the test with
new seals.
12) Repeat the procedure for each preventer.

B. Ram Test (After installation and as required by API RP53 or appropriate


regulatory agency.)
1. Hydraulically test ram packers with water using the following procedure:
a. Install the BOP stack on a prepared test stump or install a test plug
below the BOP if on the wellhead.
b. Inspect for ram packer leaks at low pressure by closing rams on an
appropriate size test mandrel (none if blinds or shears are used)
with 1500 psi operating pressure, and apply 200 psi pressure under
the rams. Hold pressure for 3 minutes. Maximum pressure drop is
10 psi in 3 minutes.
c. Increase pressure slowly to the rated working pressure of the
preventer. Hold pressure for 3 minutes. Maximum pressure drop is
100 psi in 3 minutes.
d. If rams leak at low pressure or at working pressure, inspect for
worn ram packers and replace if necessary.
e. Repeat the above procedure for each set of casing, pipe and shear
rams.

VII. STORAGE
A. Preventer
1. Open the bonnets and remove the ram subassemblies.

TC1075

17

2. Remove the top seals and packers, then wash the ram subassemblies.
3. Lubricate the ram bodies, covering them with a heavy grease.
Caution: DO NOT lubricate the top seals or packers.
4. Do not store the ram subassemblies inside the preventer.
Note: Rubber products that have been put into service and that are subsequently
stored, will have an unpredictable shelf-life. This is attributable to their varied physical condition when returned to storage, due to the inability to completely remove elastomeric solvents (hydrocarbon contaminates, etc.) and
storage in a container filled with air (chemically active gases).
5. Clean the inside and outside machined surfaces of the preventer.
6. Dry with an air blaster until no moisture is left inside or outside the
preventer.
7. Inspect the ram bores and the vertical bores for burrs.
8. Remove burrs by touching the surface lightly with a grinder using 36
to 60 grit paper.
9. Lubricate the ram bore with a heavy grease.
10. Lubricate the end and outlet connection faces with a heavy grease,
and cover them with flange protectors.
11. Flush the operating system using clean operating fluid.
12. Fill the operating system with preservation fluid P/N 718100.
13. Install the 1" NPT pipe plugs into the OPEN and CLOSE connections.
Caution: DO NOT use the bonnet lifting eyes to lift a preventer.
14. To lift the preventer, use appropriately rated slings around the ends
of the body.

B. Elastomers
1. Store rubber products inside a cool, dark, dry storage area.
a. The preferred storage temperature range for rubber goods is from
40F to 80F.

TC1075

18

b. Rubber goods should be wrapped or otherwise protected from direct exposure to sunlight or artificial light with a high ultraviolet
content (such as fluorescent lighting). Do not store in direct sunlight even if wrapped, as overheating will result.
c. Store rubber parts in a relaxed position. Do not stretch or hang
O-rings and seals. Labels should not be attached to seals with
string, wire, or tape, as these items may deform the sealing surface.
2. Use airtight containers when possible to protect against circulating
air.
3. Ozone is extremely harmful to rubber. Ensure that there is no equipment in the storage area which may generate ozone, such as mercury
vapor lamps, high-voltage electrical equipment, electric motors, or any
electric apparatus which produces arcing.
4. Keep the rubber products clean and free of solvents, oil, greases, or
any other semi-solid or liquid materials during storage. Rubber goods
should specifically be protected against direct contact with: manganese, copper, copper alloys (including brass), polyvinyl chloride (PVC),
creosote-impregnated timber, other rubber goods of different rubber
compounds, sulphur, and copper napthenate.
5. When cleaning is necessary, rubber goods may be cleaned with either
soap and water or methyl alcohol. After cleaning, the rubber goods
should be dried at room temperature.
6. Examine the part before installation.
Important: Rubber goods taken from storage must ALWAYS be inspected before
installation. Rubber goods should not be flexed at temperatures below
40F. Rubber goods in storage should be inspected every 12 months to
ensure that they are still serviceable.
a. Ensure that the part does not have a tacky surface or noticeable
softening or hardening of the surface.
b. Flex the part and inspect with a magnifying glass to ensure that
there are no cracks.
c. Replace items which show any of the aging signs mentioned above.

TC1075

19

19.000"
(482.6mm)

19.000"
(482.6mm)

Bonnets Open, Rams Open 172.500" (4381.5mm)


Bonnets Open, Rams Closed 156.250" (3968.75mm)
Bonnets Closed, Rams Open 130.375" (3311.525mm)
Bonnets Closed, Rams Closed 114.125" (2898.775mm)
150.500" (3822.7mm)w/o Screws (Bonnets Open)
107.875" (2740.025mm)w/o Screws (Bonnets Closed)

20.79"
(528.066mm)
CL of BOP

OPEN

CL of BOP

OPEN

66.55"
(1690.37mm)
45.76"
(1162.304mm)
40.01"
(1016.254mm)
20.79"
(528.066mm)

15.04"
(382.016mm)

13-5/8" 10,000 psi WP Double U BOP


P/N 2010363-01
TC1075

SD-10848-99

20

19.000"
(482.6mm)

19.000"
(482.6mm)

Bonnets Open, Rams Open 172.500" (4381.5mm)


Bonnets Open, Rams Closed 156.250" (3968.75mm)
Bonnets Closed, Rams Open 130.375" (3311.525mm)
Bonnets Closed, Rams Closed 114.125" (2898.775mm)
150.500" (3822.7mm)w/o Screws (Bonnets Open)
107.875" (2740.025mm)w/o Screws (Bonnets Closed)

41.58"
(1056mm)

OPEN

CL of BOP

20.79"
(528.066mm)

15.04"
(382.016mm)

13-5/8" 10,000 psi WP U BOP


SD-10852-99
TC1075

21

11
38
34

12

37

10

24

15

16

17

35

29

42

36

28

27

24
5

14

13

31

30

26

33

32

22

25

40

21

19

18

23

41

20

13-5/8" 10,000 psi WP Double U BOP


SD-10847-99
TC1075

22

Parts List: 13-5/8 10,000 psi WP Flange Double U BOP w/Flange Outlets
Item
1
2
3
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
TC1075

Qty.
1
4
4
4
4
4
4
4
4
8
16
32
32
4
4
4
4
4
4
8
4
8
8
4
4
4
4
8
8
8
8
8
16
48
4
4
2
20
4
4
4

Description
Body
Intermediate Flange
Bonnet
Operating Piston
Operating Cylinder
Locking Screw Housing
Locking Screw
Ram Change Piston, Open
Ram Change Piston, Close
Ram Change Cylinder
Bonnet Bolt
Stud, Double End
Nut, Heavy Hex
Check Valve
Screw, Socket Head Set
Pipe Plug
Plastic Packing Ring
Energizing Ring
Lip Seal (Connecting Rod)
Ring, Back-Up
Bonnet Seal
Ram Guide Pin
O-Ring
O-Ring
Seal Ring
Lip Seal (Tail Rod)
O-Ring
O-Ring
O-Ring
O-Ring
O-Ring
O-Ring
O-Ring
Screw
Tubing Gland
Blind Plug
Lifting Eye
Plastic Packing Stick
Lip Seal Retainer
Spirolox Retaining Ring
Operating Piston Wear Ring
23

Parts List: U BOP Standard Accessory Items


P/N 697149-03
Rev. C3 4-91
Item

Part No.
007959-13
008721-01
713878

Qty
1
1
1

Description
Box/Hammer Wrench
Hex Key
Ram Lube

Parts List: U BOP Locking Screw Accessory Items


P/N 697150-02
Rev. C3 1-96
Item

Part No.
005298
005526
005912-20-10
2709000-03-01
2709000-09-01
006018-03
034863-52-00-50

TC1075

Qty
1
1
1
4
2
1
2

Description
Locking Screw Handwheel
Extension Wrench
Stud
Nut, Heavy Hex
Nut, Heavy Hex
Universal Joint
Stud

24

Parts List: 13-5/8 10,000 psi WP Flange Single U BOP w/Flange Outlets
Item
1
2
3
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42

TC1075

Qty.
1
2
2
2
2
2
2
2
2
4
8
16
16
2
2
2
2
2
2
4
2
4
4
2
2
2
2
4
4
4
4
4
8
24
2
2
2
10
2
2
2

Description
Body
Intermediate Flange
Bonnet
Operating Piston
Operating Cylinder
Locking Screw Housing
Locking Screw
Ram Change Piston, Open
Ram Change Piston, Close
Ram Change Cylinder
Bonnet Bolt
Stud, Double End
Nut, Heavy Hex
Check Valve
Screw, Socket Head Set
Pipe Plug
Plastic Packing Ring
Energizing Ring
Lip Seal (Connecting Rod)
Ring, Back-Up
Bonnet Seal
Ram Guide Pin
O-Ring
O-Ring
Seal Ring
Lip Seal (Tail Rod)
O-Ring
O-Ring
O-Ring
O-Ring
O-Ring
O-Ring
O-Ring
Screw
Tubing Gland
Blind Plug
Lifting Eye
Plastic Packing Stick
Lip Seal Retainer
Spirolox Retaining Ring
Operating Piston Wear Ring
25

Parts List: Ram Subassembly, Blind Ram


Item
1
2
3

Qty
1
1
1

Description
Body
Packer, Blind
Top Seal

SD11074
1

TC1075

26

Parts List: Ram Subassembly, Casing, Pipe and Tubing


Item
1
2
3

Qty
1
1
1

Description
Body
Packer
Top Seal

SD11073
2

TC1075

27

Parts List: Ram Subassembly, Shearing Blind


Item
1
2
3
4
5
6

Qty
1
2
2
2
2
1

Description
Body, Upper
Blade Seal
Side Packer, Left
Side Packer, Right
Top Seal
Body, Lower

1
3
6

SD-11085-99

TC1075

28

P.O. Box 1212


Houston, TX 77251-1212
Ph: 713-939-2211
Fax: 713-939-2620
http://www.coopercameron.com

Cooper Cameron Corporation, Cameron Division, Printed in USA 1/02 TC1075