You are on page 1of 2

Technical Questionnaire

Doc. No.:

EPL/Q-25

Rev. No.:
ENVERGY
PROJECTS LTD.

Effective Date:

Upgradation
(ETP, STP, WTP)

Name of company &


address

Page No.: Page 1of 1

Tel. No. /Fax/Mobile &


Email

Contact
Person

INFORMATION

Ref. Visit/Any
other

FEEDBACK

Type of company
Current Capacity of Plant
Upgraded Capacity of Plant
Reason for Upgradation
Present kind of treatment (Attaches
separate sheet if required)
Inlet Effluent Parameters:

Stream 1

Stream 2

Stream 3

A) Flow Rate
B) PH
C) TDS (mg/lit)
D) TSS (mg/lit)
E) COD (mg/lit)
F) BOD (mg/lit)
G) Ammoniacal Nitrogen (mg/lit)
H) Other (if Available)
Outlet Effluent parameter (Existing):
A. Flow Rate
B. PH
Prepared By / Date:

Checked By / Date:

Approved By / Date:

Executive

Functional Head

Management Representative

Technical Questionnaire

Doc. No.:

EPL/Q-25

Rev. No.:
ENVERGY
PROJECTS LTD.

Upgradation
(ETP, STP, WTP)

Effective Date:
Page No.: Page 1of 1

C. TDS (mg/lit)
D. TSS (mg/lit)
E. COD (mg/lit)
F. BOD (mg/lit)
G. Ammoniacal Nitrogen (mg/lit)
H. Other (if Available)
Flow diagram of present treatment

(Attach Separate Sheet if Required)

Any space constraint?


Present Sludge Disposal method?
End use of Treated Water?
Waste water Disposal?
Outlet Quality Required after
upgradation
Any Other Information
Note: The above information shall be used only for preparation of our proposal & not
for any other purpose. Please forward this questionnaire duly completed to:

Envergy Projects Ltd.

Turnkey Solutions in Environment & Energy


For any further information/clarifications,
Tel. 0265 2371269 (Vadodara)
Tel- 022-28943090 (Mumbai)
Email: operations@envergy.co.in / projects@envergy.co.in

Prepared By / Date:

Checked By / Date:

Approved By / Date:

Executive

Functional Head

Management Representative

You might also like