You are on page 1of 3

Technical Queries for

Concord Healthcare and Research institute


Date: 18-Feb-16
We, The Concord Healthcare and Research institute are working for the proposed Stem cell project
in two different buildings at different areas as below:
A. Pearl Trade Center (Level 3 & 4) at Badda, Dhaka, Bangladesh
B. Newbury Place (Level 7) at Dhanmondi, Dhaka, Bangladesh
We need some technical information urgently regarding proposed Stem Cell Hospital as below:

1. Facility Layout/Conceptual Drawing:

We need facility layout which includes room position, work-flow etc.


to maintain quality of service ensuring safety issues. These layouts
have been mirrored in a simulation model to prove the efficiency of a
patient-centered system.

Pic 1: Pearl Trade Center, Badda, Dhaka, Bangladesh

Pic 2: Navana Newbury Place, Dhanmondi, Dhaka, Bangladesh


1

2. List of medical equipment:


We need medical equipment list with detail specification mentioning measurements (Length,
width, height)

3. Electricity Consumption:
We need electricity consumption for Stem Cell hospital separately for both buildings.

Building Name: Pearl Trade Center (Level 3 & 4), Badda, Dhaka, Bangladesh
Standby Generator requirements?
Which type of Air conditioning is required for Stem Cell?
Sl.
1
2
3
4
5

Particulars
Medical Equipment
HVAC System (Mention VRF of Chiller system)
Fire Fighting System
Electrical System
Plumbing System etc.

Yes
VRF system

No
Chiller system

Electricity Consumption (KW)

Total Electricity Consumption (KW)


Building Name: Newbury Place (Level 7) at Dhanmondi, Dhaka, Bangladesh
Standby Generator requirements?
Which type of Air conditioning is required for Stem Cell?
Sl.
1
2
3
4
5

Particulars
Medical Equipment
HVAC System (Mention VRF of Chiller system)
Fire Fighting System
Electrical System
Plumbing System etc.

Yes
VRF system

No
Chiller system

Electricity Consumption (KW)

Total Electricity Consumption (KW)

Comparison between VRF AC and Central AC


A. VRF AC
2

1) VRF AC is another Form of Split AC.


2) Medium Filter and HEPA Filter cannot be used in VRF AC.
3) In VRF AC, Refrigerant will run all over the premises. In case of any leakage, Refrigerant will
be flooded inside floor.
4) Total Power consumption is 1 kW per Ton. It is higher than Central Chiller.
5) Functionally VRF AC is equivalent to Split/Package AC.

B. Central AC with Centrifugal Chiller having Magnetic Bearing


1) Required Air Quality can be maintained.
2) Required grade of Air Filter can be used in AHU under Central AC. Thereby treated Fresh Air
can be maintained. It will ensure desired Air Quality.
3) Central AC used Chilled Water instead of Refrigerant. Water is quite safer than Refrigerant.
4) Total Power consumption is 0.75 kW per Ton.
5) Central AC has longer life and it is stable.