MEASUREMENT
Quantity
measurement
- taking off quantities
Bills of quantity
- is a document which
contains itemized list of
building item and its
quantity.
Find the
uses of bill
of quantity?
Substructure
-
Ground beam
Ground slab
Bill of Quantity
-
Uses
To provide sufficient information on the quantities of
Works to be performed to enable bids to be
prepared efficiently and accurately
- To provide a priced Bill of Quantities for use in the
periodic valuation of works executed.
i.
To call for tender
ii.
To prepare progress payments
iii. To evaluate non compliance work
iv. To order and purchase materials
-
Description of item
3.0
SITE CLEARANCE
3.1
Site
clearance
Unit
Quantity
RM
Total
Sen
RM
Sen
approximately
fencing
line
including
own
dumping
4, 500
50
6750
00
Measurement
Units
Length
Area
Volume
Weight
Kilogramme / ton
Number
No
Item
BILL
ELEMENT
SLIP NO
NO.
HEADING
DESCRIPTION
UNIT
COLUMN
DESCRIPTION
SQUARING COLUMN
COLUMN
DIMENSIONING
TIMESING COLUMN
QUANTITY
solution
DRWG NO.
BILL NO.
ELEMENT :
SLIP NO : 1
UNIT
m2
QUANTITY
A]
5.00
12.00
B]
B 8.73
C 7.69
D 8.67
E 8.67
F 5.32
G 7.98
H 7.50
I 5.78
J 7.98
K 8.56
L 7.75
M 6.89
N 7.78
O 9.23
P 6.95
Q 7.29
R 4.90
S 7.70
30m
T 5.75
solution
Location
Ground
Level
Depth (A)
Weighting (B)
No of square
Weighting depth
AxB
(Cut)
4.37
4.37
4.00
4.58
9.16
Reduce
level
Formation
Level
0.15
0.15
8.37
4.00
8.58
Top soil
Cutting
(+)
Filling
(-)
8.52
8.73
7.69
0.15
7.54
4.00
3.54
7.08
8.67
0.15
8.52
4.00
4.52
9.04
8.67
0.15
8.52
4.00
4.52
4.52
7.98
0.15
7.83
4.00
3.83
7.66
G
I
7.98
7.50
5.78
0.15
0.15
0.15
7.83
7.35
5.63
4.00
4.00
4.00
3.83
3.35
1.63
4
4
4
15.32
13.4
6.52
7.98
0.15
7.83
4.00
3.83
7.66
8.56
0.15
8.41
4.00
3.85
7.7
7.75
0.15
7.6
4.00
3.75
15
6.89
0.15
6.74
4.00
2.74
10.95
7.78
0.15
7.63
4.00
3.63
14.52
9.23
0.15
9.08
4.00
5.08
10.16
6.95
0.15
6.8
4.00
2.8
2.8
7.29
0.15
7.14
4.00
3.14
6.28
4.90
0.15
4.75
4.00
0.75
1.5
7.70
0.15
7.55
4.00
3.55
7.1
5.75
0.15
5.6
4.00
1.6
1.6
48
162.34
TOTAL
AVERAGE
VOLUME OF SOIL
Weighting depth
AxB
(Fill)
Calculation:
Average height = total weighting depth
total weighting
= 162.34/ 48
=3.38
Volume of soil = area x average of height
= (60x 30) x 3.38
=6087m3
B 8.73
C 7.69
D 8.67
E 8.67
F 5.32
G 7.98
H 7.50
I 5.78
J 7.98
K 8.56
L 7.75
M 6.89
N 7.78
O 9.23
P 6.95
Q 7.29
R 4.90
S 7.70
30m
T 5.75
solution
Location
Ground
Level
Depth (A)
Weighting (B)
No of square
Weighting depth
AxB
(Cut)
4.37
8.74
4.00
4.58
13.74
Reduce
level
Formation
Level
0.15
0.15
8.37
4.00
8.58
Top soil
Cutting
(+)
Filling
(-)
8.52
8.73
7.69
0.15
7.54
4.00
3.54
10.62
8.67
0.15
8.52
4.00
4.52
13.56
8.67
0.15
8.52
4.00
4.52
4.52
7.98
0.15
7.83
4.00
3.83
11.49
0.15
0.15
0.15
7.83
7.35
5.63
4.00
4.00
4.00
3.83
3.35
1.63
6
6
6
22.98
7.98
7.50
5.78
7.98
0.15
7.83
4.00
3.83
11.49
8.56
0.15
8.41
4.00
3.85
11.55
7.75
0.15
7.6
4.00
3.75
22.5
6.89
0.15
6.74
4.00
2.74
16.44
7.78
0.15
7.63
4.00
3.63
21.78
9.23
0.15
9.08
4.00
5.08
15.24
6.95
0.15
6.8
4.00
2.8
2.8
7.29
0.15
7.14
4.00
3.14
9.42
4.90
0.15
4.75
4.00
0.75
2.25
7.70
0.15
7.55
4.00
3.55
10.65
5.75
0.15
5.6
4.00
1.6
3.2
72
222.8
TOTAL
AVERAGE
VOLUME OF SOIL
20.1
9.78
Weighting depth
AxB
(Fill)
Calculation:
Average height = total weighting depth
total weighting
= 222.8/ 72
=3.09
Volume of soil = area x average of height
= (60x 30) x 3.09
=5562m3
Piling Work
- Piling is a type of ground treatment
which is driving a pile into the ground
below ground level
- Its used to strengthen the soil so
that the ground able to support
the load of the building
Types of piles
Pre-Cast
Ground level
Column
Pile cap
pile
pile
Point-number
1 hole
2 holes
4 holes
Calculation
NOTES:
All pile is precast reinforced concrete pile
All pile should be in 300mm diameter
Supply length of pile shall be:
Starter pile: 6.00 m long
Extension pile: 6.00 m long
Estimated penetration depth is 35 meter
Working load: 30 tones per pile
Allow 2 no. of testing for each group and single pile
The test load to twice working load shall be maintained
for 48 hours.
Legend:
P1 pile cape with 1 point
P2 pile with 2 point
P3 pile cap with 3 point
Taking of list
DRAWING NO
BILL NO
ELEMENT
SLIP NO
HEADING
DESCRIPTION
UNIT
QUANTITY
1.
2.
3.
4.
5.
6.
7.
8.
P1
1
1
2
BILL NO
ELEMENT
PILING
SLIP NO
1
1 mark
DESCRIPTION
Bringing in and removing from site all plant required for this section
of work
&
1 mark
Maintaining on site all plant ditto.
UNIT
Item
1 mark
QUANTITY
Item
1 mark
Item
Item
1 mark
(total 5 marks)
Initial pile
DRAWING NO
PSAS/CC301/JULY
2011/PILING
HEADING
Initial pile
BILL NO
ELEMENT
PILING
1 mark
DESCRIPTION
Supply, deliver and unload on site 6.00 meter long with 300mm
diameter initial precast reinforced concrete pile.
1 mark
1/
SLIP NO
2
UNIT
No
1 mark
QUANTITY
27
1 mark
P1
2
2
P2
2
5
10
3
5
Point of pile
(Refer legend)
P3
15
(total 7 marks)
27
3 marks
Total pile
initial
Driven pile
DRAWING NO
PSAS/CC301/JULY 2011/PILING
HEADING
Driven depth
BILL NO
ELEMENT
PILING
SLIP NO
3
1 mark
DESCRIPTION
Driven only vertical 300mm diameter precast reinforced concrete pile
Penetration
depth
QUANTITY
945 1 mark
1 mark
1/ 2
UNIT
m
1 mark
P1
35.00
70.00
2
5
P2
35.00
350.00
3
P3
5
35.00
(total 7
marks)
525.00
945.00
3 marks
Total driven
Pile extension
DRAWING NO
PSAS/CC301/JULY
2011/PILING
HEADING
Pile extention
BILL NO
ELEMENT
PILING
SLIP NO
4
1 mark
DESCRIPTION
Supply, deliver and unload on site 6.00m long with 300mm diameter
extension precast reinforced concrete pile.
1 mark
1/2
P1
6m
5
10
P2
2
5
5
50
P3
UNIT
No
1 mark
QUANTITY
135
1 mark
6m
6m
6m
(total 7 marks)
5
75
6m
135
3 marks
Initial pile
6m
Note:
penetration = 35 m
Length =6 m
36 m- 35m =1 m(cut)
BILL NO
HEADING
Extention of pile exceed 3.00 m long
ELEMENT
PILING
SLIP NO
5
1 mark
DESCRIPTION
Total length of pile extension for pile length exceeds 3.00 meters long.
1 mark
1/
UNIT
m
1 mark
QUANTITY
810 1 mark
2
5
P1
6.00
60.00
point
Bil ext
2/5/5
P2
Bil pile
5
6.00
300.00
P3
(total 7
marks)
3
5
5
6.00
450.00
810.00
Length of
pile
3 marks
Jointing of pile
DRAWING NO
PSAS/CC301/JULY
2011/PILING
HEADING
Jointing of pile
BILL NO
ELEMENT
PILING
SLIP NO
6
1 mark
DESCRIPTION
Total no of jointing of pile
UNIT
No
1 mark
1 mark
QUANTITY
135
1 mark
P1
5
10
P2
2
5
5
P3
50
(total 7 marks)
3
5
nting=bil extention
5
75
135
3marks
ELEMENT
PILING
1 mark
DESCRIPTION
Total no cutting of top pile and prepare pile head for pile capping
1 mark
12
SLIP NO
7
UNIT
No
1 mark
QUANTITY
27
1 mark
P1
21
2
P2
2
5
51
10
33
5
P3
51
(total 7 marks)
15
27
3 marks
Testing of pile
DRAWING NO
PSAS/CC301/JULY
2011/PILING
HEADING
Testing of pile
BILL NO
ELEMENT
PILING
SLIP NO
8
1 mark
DESCRIPTION
Allow 2 no. testing on a single and group pile to a total load of 140
60
tonnes
UNIT
Item
1 mark
QUANTITY
Item
1 mark
1 mark
Ite
m
P1 , P2 and P3
1 mark
(total 5 marks)
2 x 30(working load)= 6
Total marks:
= 52/52 x 22
= 22 marks