You are on page 1of 132

PRASARANA MALAYSIA BERHAD

(467220-U)

LIGHT RAIL TRANSIT LINE 3 PROJECT (LRT3):


BANDAR UTAMA JOHAN SETIA

TENDER DOCUMENT
FOR
CONSTRUCTION AND COMPLETION OF TRAINING CENTRE
AND CENTRALIZED LABOUR QUARTERS AT JOHAN SETIA,
KLANG, SELANGOR
TENDER NO. : PRASARANA/GPD/LRT3(E)/018/702/2016

VOLUME IV OF IV DRAWINGS
Vol 1 of 2
MAY 2016
PROJECT DELIVERY PARTNER (PDP)

CONSTRUCTION AND COMPLETION OF LIGHT RAIL TRANSIT LINE 3


(LRT3) FROM BANDAR UTAMA TO JOHAN SETIA

TRAINING CENTRE AND


CENTRALIZED LABOUR QUARTERS
Table of Contents

CONSTRUCTION AND COMPLETION OF TRAINING CENTRE AND


CENTRALIZED LABOUR QUARTERS AT JOHAN SETIA, KLANG,
SELANGOR
TABLE OF CONTENTS
Page

VOLUME I COMMERCIAL PROPOSAL


PART 1 OF 2
Section 1

Instructions to Tenderers

(1 47)

Section 2

Brief Description of Works

(1 4)

Section 3

Form of Articles of Agreement

(1 3)

Section 4

Conditions of Contract and Appendices


Conditions of Contract

(1 121)

Appendices (Appendix 1 to 14)

(APP1 APP14)

Section 5

Form of Tender

(1 4)

Section 6

Summary of Tender Sum

(ST/1 ST/2)

Section 7

Method of Measurement & Preambles

(Refer Separate Index)

Section 8

Bills of Quantities

PART 2 OF 2

8A

General Items

(8A/1 8A/20)

8B

Piling Works (ALL PROVISIONAL)

(8B/1/1 8B/SUM/1)

TRAINING CENTRE
8C

Building works

(8C/1/1 8C/SUM/1)

8D

Infrastructure works (ALL PROVISIONAL)

(8D/1/1 8D/SUM/1)

8E

Mechanical and Electrical Works

(8E/1/1 8E/SUM/1)

8F

Security Installation System

(8F/1 8F/3)

Page 1 of 4

CONSTRUCTION AND COMPLETION OF LIGHT RAIL TRANSIT LINE 3


(LRT3) FROM BANDAR UTAMA TO JOHAN SETIA

TRAINING CENTRE AND


CENTRALIZED LABOUR QUARTERS
Table of Contents

CONSTRUCTION AND COMPLETION OF TRAINING CENTRE AND


CENTRALIZED LABOUR QUARTERS AT JOHAN SETIA, KLANG,
SELANGOR
TABLE OF CONTENTS

Section 8

Page

Bills of Quantities (Contd)


CENTRALIZED LABOUR QUARTERS

Section 9

8G

Building works

(8G/1/1 8G/8/9)

8H

Infrastructure works (ALL PROVISIONAL)

(8H/1/1 8H/SUM/1)

8J

Mechanical and Electrical Works

(8J/1/1 8J/SUM/1)

8K

Security Installation System

(8K/1 8K/3)

8M

Loose Furniture

(8M/1/1 8M/SUM/1)

8N

Access Road

(8N/1 8N/SUM/1)

8P

Provisional Sums

(8P/1/1 8P/SUM/1)

Dayworks Schedule and Schedule of Rates


Daywork Schedule

(1 10)

Schedule of Rates (M&E Works)

(1 62)

Schedule of Rates (Relocation of Utilities)

(1 70)

Page 2 of 4

CONSTRUCTION AND COMPLETION OF LIGHT RAIL TRANSIT LINE 3


(LRT3) FROM BANDAR UTAMA TO JOHAN SETIA

TRAINING CENTRE AND


CENTRALIZED LABOUR QUARTERS
Table of Contents

CONSTRUCTION AND COMPLETION OF TRAINING CENTRE AND


CENTRALIZED LABOUR QUARTERS AT JOHAN SETIA, KLANG,
SELANGOR
TABLE OF CONTENTS

VOLUME II TECHNICAL PROPOSAL


Section 10

Page

Schedule of Particulars
Schedule A Financial Data

(SCH-A/1 A/4)

Schedule B Overall Implementation Plan

(SCH-B/1)

Schedule C Construction Method Statement

(SCH-C/1)

Schedule D List of All Completed Building Projects


for the Last Five (5) Years

(SCH-D(II)/1 D(II)/2)

Schedule E Proposed Project Organization Chart


for the Works

(SCH-E/1 E/3)

Schedule F Statement of Compliance to Instructions


to Tenderers

(SCH-F/1)

Schedule G Statement of Compliance to Specifications


and Appendices

(SCH-G/1)

Schedule H Quality Assurance and Quality Control


(QA/QC) System

(SCH-H/1)

Schedule I Occupational Safety & Health (OSH) and


Environmental Management

(SCH-I/1)

Schedule J Statement of Compliance

(SCH-J/1)

Schedule K Tenderers Declaration

(SCH-K/1)

Schedule L Non-Disclosure Agreement

(SCH-L/1)

Schedule M Declaration of Non-Collusion

(SCH-M/1 N/2)

Schedule N Schedule of Technical Data for Mechanical


and Electrical Services

(SCH-N/1 N/32)

Schedule O Product Technical Data Information/Catalogue/


Brochure/Manual

(SCH-O/1)

Schedule P Letter from Bank/Financial Institution


On Financial Capacity of the Tenderer

(SCH-P/1 P/2)

Schedule Q Litigation (Current and Last Five (5) Years)


Page 3 of 4

(SCH-Q/1)

CONSTRUCTION AND COMPLETION OF LIGHT RAIL TRANSIT LINE 3


(LRT3) FROM BANDAR UTAMA TO JOHAN SETIA

TRAINING CENTRE AND


CENTRALIZED LABOUR QUARTERS
Table of Contents

CONSTRUCTION AND COMPLETION OF TRAINING CENTRE AND


CENTRALIZED LABOUR QUARTERS AT JOHAN SETIA, KLANG,
SELANGOR
TABLE OF CONTENTS
Page
Section 10

Schedule of Particulars (Contd)


Schedule R Site Visit/Tender Briefing

(SCH-R/1)

Schedule S Reminder on Conduct

(SCH-S/1)

VOLUME III - SPECIFICATIONS


Section 11

Specifications

PART 1 OF 2
General Specification

(Section 1 Section 12)

Technical Specification

(Vol. 1 Vol. 3)

PART 2 OF 2

VOLUME IV - DRAWINGS
Section 12

Drawings

(Vol. 1 Vol. 2)

Page 4 of 4

You might also like