HOW CHIN ENGINEERING

Job Safety Analysis


JOB DESCRIPTION
TYPES OF WORK
LOCATION OF WORK
RISK RATING

: Painting works on ceiling


: Office Balcony
: low

GWP :

REQUIRED PERSONAL PROTECTIVE EQUIPMENT


x
x
x

Safety Helmet
Safety Shoes / Boots
Safety Glasses
Face / Welding Shield
Goggles
Life Jackets (Type 1-offshore)

x
x
x

Cotton Gloves
Welding Gloves
Leather Gloves
Leather Apron
Rubber / Nitrile Gloves
Dust Mask

OTHER SAFETY EQUIPMENT / REQUIREMENTS

Fire Extinguisher
Gas Detector
Safety Signs
Barricades
Lifeline

JSA DEVELOPED BY :
Name
Position
Jayammohan
Safety
Balachandaram
Supervisor
N
Activity
Potential
Hazard
Kit Yew Sin
Safety
o ( Job Steps )
Manager
Aris Hooi
General
Manager

Work Vest
Safety Vest
Safety Harness (when painting at height)
Face Mask
Ear Protection
Others (Specify):____________
HAZARD IDENTIFICATION

Tag Out / Lock Out


Work Permit
Competency Certificate
Respirator
First Aid Equipment

Control/ Recovery Measures

Responsib
le/ Action

HOW CHIN ENGINEERING

1.

Work permit
from Client
to be
obtained.

Pre-task
briefing
toolbox
talks.

Access
height
Ladders
(e.g., Aframe,
straight, or
extension)

Unauthorized
commencement of
works may result in
exposing workers
and or potential to
harm or danger

The work force does


not understand the
pre task briefing
therefore does not
understand the
potential dangers
and control
measures to be
implemented. Some
of the workers could
be lacking PPE or
using defective PPE.
Falls

Authorized lead-operator / in-charge shall ensure obtaining and


maintaining valid work permit.
The worksite supervisor responsible for this activity has to check
the PPE of his staff to ensure that all required items are available
and properly used.
Inform all workers regarding permit condition before work starts.
Worksite supervisor shall conduct toolbox talks about nature of
works and associated potential hazards and their essential
precautionary measure.
Safety standby is required
Ensure that the pre task briefing is given out in a language
understood by the work force, have it translated.
Issue required appropriate PPE and replace PPE that has signs of
defect.
Discuss about emergency rescue plan
Explain to address abnormal conditions such as windy weather,
gasoline odor, rainy weather and humidity
Ask question regarding the briefing to get feedback from the staff,
this ensures full comprehension.

Before use, check the load rating of the ladder, to make sure
the ladder can support the combined weight of the user, the
weight of tools, and the weight of any material that will be
placed on the ladder.
This includes the weight of anything that may be supported
by the user.
Ladders must be inspected prior to each use.
Workers using ladders shall not work above the rated working
height. All extension ladders will be tied off at the top.
Another worker will secure the ladder while its being tied off.

By
Leadoperator
Supervisor

Supervisor
Leadoperator
Workers

Supervisor
Workers
Authorised
Personnel

HOW CHIN ENGINEERING

Remove the
ceiling

Taking
Photograph
Painting
works on
ceiling

Fall

Ignition

Poisoning from
substance through
contact.
Environmental
damage from
spilling paint

General

Items Before
Leaving Job
Site / House
-keeping

Unattended/
abandoned
materials or tool
that can able the

Employees Exposed
To Falling In
Messy or Unsafe
Work Site-Looks Bad
For Company &
Unsafe For others

Prepared By :
29/11/2016
Contractor / Contractor Representative

Once the worker on the ladder, ensure he hooked to the


pipeline / pipeline beam
Ensure to lift only one ceiling board at time
Work in a group to reduce risk
Reduce additional personnel to reduce risk of ground people
Turn off the flash
Do painting works at ground
Use of gloves while painting, correct PPE as per manufacture data
/ MSDS sheet to be worn.
Workers to be aware of information contained on these
instructions and be available at all times for reference.
Workers to carry paint in small amounts so not to strain or
overbalance while working at heights.
Paint will be in small container to reduce the risk of spills of large
amounts.
Spills to be clean up as per MSDS with water and soap to break
up and disperse.
Place ceiling boards on canvas and paint
Once the ceiling dried completely, install it carefully.
Pack-up all the tools and Barricades Before Leaving The Job
Clear debris From Equipment And job site, Secure All Material
Before Exiting The Job
Remove the masking tape or wrapping
Restore Property To Its Original Condition To The Best Of Your
Ability

Reviewed By :
Lead-operator / In-charge

Date :

Supervisor
Supervisor
Workers

Supervisor
Workers

You might also like