You are on page 1of 43

READ IMPORTANT LICENSE INFORMATION

Dear Professor or Other Authorized User:


Jon Wiley & Sons, Inc. (Wiley) has produced the attached solutions manual or other copyrighted material (the
Supplement) solely for use by professors and other authorized users in the manner provided below. Wiley has
established these use limitations in response to concerns raised by professors and other authorized users regarding
the pedagogical problems stemming from unlimited distribution of Supplements.
If the attached Supplement was delivered to you by Wiley or its representatives or if you are a professor of a course
that has adopted the textbook to which the Supplement relates (the Course), then you are an authorized user of the
Supplement. As an authorized user, Wiley grants you a non-transferable license to use the Supplement subject to the
following conditions. The Supplement is for your personal use only, except that you may post the Supplement (or
portions thereof) on a password protected website or otherwise provide the Supplement (or portions thereof) to
students of the Course so long as such students are advised that they may not copy or distribute the Supplement to
any third party. The Supplement may only be used in connection with Courses for which the related textbook has
been adopted. You should take reasonable steps to protect the Supplement from unauthorized use, reproduction, or
distribution. Your use of the Supplement indicates your acceptance of the conditions set forth in this Agreement. If
you do not accept these conditions, you must return the Supplement unused within 30 days of receipt.
All rights (including without limitation, copyrights, patents and trade secrets) in the Supplement are and will remain
the sole and exclusive property of Wiley and/or its licensors. The Supplement is furnished by Wiley on an as is
basis without any warranties, express or implied. This Agreement will be governed by and construed pursuant to the
laws of the State of New York, without regard to such States conflict of law rules.
We hope that you find the Supplement useful.
Sincerely,
JOHN WILEY & SONS, INC.

Excerpts from this work may be reproduced by instructors for distribution on a not-for-profit basis for testing or
instructional purposes only to students enrolled in courses for which the textbook Fair, Greyer, and Okuns Water
and Wastewater Engineering: Water Supply and Wastewater Removal by Nazih K. Shammas and Lawrence K. Wang,
has been adopted. Any other reproduction or translation of this work beyond that permitted by Sections 107 or 108
of the 1976 United States Copyright Act without the permission of the copyright owner is unlawful. Page 1

Chapter 8
Pumping, Storage and Dual Water
Systems
Problem 8.1

Determine the water horsepower, break horsepower and motor horsepower for a pump operating under the following
conditions: water flow of 490 gpm is to be pumped against a total head of 110 ft; the pump efficiency is 75%; and
the motor driving the pump has an efficiency is 85%

Solution:
Water horsepower = Q H/3957
= (490) (110)/3957
= 13.6 hp
Break horsepower = Water horsepower/Epump
= 13.6/0.75
= 18.1 hp
Motor horsepower = break horsepower/Emotor)
= 18.1/0.85

Excerpts from this work may be reproduced by instructors for distribution on a not-for-profit basis for testing or
instructional purposes only to students enrolled in courses for which the textbook Fair, Greyer, and Okuns Water
and Wastewater Engineering: Water Supply and Wastewater Removal by Nazih K. Shammas and Lawrence K. Wang,
has been adopted. Any other reproduction or translation of this work beyond that permitted by Sections 107 or 108
of the 1976 United States Copyright Act without the permission of the copyright owner is unlawful. Page 2

= 21.3 hpProblem 8.2


A pump is to be located 6 ft above a wet well and must lift 600 gpm of water another 52 ft to a storage reservoir
through a piping system consisting of 1,250 ft of 6-in DIP pipe (C = 110), 2 globe valves (open), and 2 medium
sweep elbows. Determine the total dynamic head (TDH) for this water pumping system:

Solution:
Hs = Hsuction + Hd
TDH = Hs + Hf = Hsuction + Hd + Hf
Where
Hs = static head, ft
Hsuction = suction lift head, ft
Hd = discharge head, ft
TDH = total dynamic head, ft
Hf = friction loss head, ft
Hs = Hsuction + Hd
= 6 ft + 52 ft
= 58 ft
From Appendix 17 Equivalent length of pipe to headloss in fittings:
Equivalent 6-in pipe length for 2 globe valves (open) = 2 x 150 ft = 300 ft
Equivalent 6-in pipe length for 2 medium sweep elbows = 2 x 14 ft = 28 ft.
Total equivalent length of 6-in pipe = 1250 + 300 + 28 = 1,578 ft
From Nomogram (C= 110) in Appendix 14 at Q = 600 gpm
Hf = 40 ft of water per 1000 ft of 6-in DIP pipe
= (40/1000) (1,578)
= 63.12 ft
TDH = Hs + Hf
= 58 + 63.12 = 121.12 ft
Excerpts from this work may be reproduced by instructors for distribution on a not-for-profit basis for testing or
instructional purposes only to students enrolled in courses for which the textbook Fair, Greyer, and Okuns Water
and Wastewater Engineering: Water Supply and Wastewater Removal by Nazih K. Shammas and Lawrence K. Wang,
has been adopted. Any other reproduction or translation of this work beyond that permitted by Sections 107 or 108
of the 1976 United States Copyright Act without the permission of the copyright owner is unlawful. Page 3

Problem 8.3

Using the data given from Problem 8.2 assume the following additional data: efficiency of pump = 80 %, efficiency
of motor = 85 %. Determine (a) the motor horsepower in hp and kWh/day; and (b) the daily power cost if the unit
power cost is $0.1/kWh

Solution:
From Problem 8.2,

TDH = 121.12 ft
hp = (Q) (H)/3,957
= 600 x 121.12/3,957
= 18.4

(a) Motor horsepower = Water horsepower/(Epump) (Em)


= 18.4/0.80 x 0.85
= 27 hp
= (27 hp) (24 h/day) (0.746 kW/hp)
= 483 kWh/day

(b) Cost = ($0.1/kWh) (483 kWh/day) = $48.3/day

Excerpts from this work may be reproduced by instructors for distribution on a not-for-profit basis for testing or
instructional purposes only to students enrolled in courses for which the textbook Fair, Greyer, and Okuns Water
and Wastewater Engineering: Water Supply and Wastewater Removal by Nazih K. Shammas and Lawrence K. Wang,
has been adopted. Any other reproduction or translation of this work beyond that permitted by Sections 107 or 108
of the 1976 United States Copyright Act without the permission of the copyright owner is unlawful. Page 4

Problem 8.4

Determine the total power input if the electrical input to a motor-pump system is 220 volts and 36 amps.

Solution:
Input power = (V) ( A )/746
= (220) (36)/746
= 10.6 hp

Excerpts from this work may be reproduced by instructors for distribution on a not-for-profit basis for testing or
instructional purposes only to students enrolled in courses for which the textbook Fair, Greyer, and Okuns Water
and Wastewater Engineering: Water Supply and Wastewater Removal by Nazih K. Shammas and Lawrence K. Wang,
has been adopted. Any other reproduction or translation of this work beyond that permitted by Sections 107 or 108
of the 1976 United States Copyright Act without the permission of the copyright owner is unlawful. Page 5

Problem 8.5

Determine the wire-to-water efficiency (%) if Q = 510 gpm, TDH = 53.65 ft, V = 220 volts, A = 36 amps.

Solution:
Eww = Water horsepower/Input horsepower
Water horsepower = (Q) (H)/3,957
= 510 x 53.65/3,957
= 6.9 hp
Input power = VA/746
= 220x36/746
= 10.6 hp
Eww = (6.9/10.6) x 100
= 65 %

Excerpts from this work may be reproduced by instructors for distribution on a not-for-profit basis for testing or
instructional purposes only to students enrolled in courses for which the textbook Fair, Greyer, and Okuns Water
and Wastewater Engineering: Water Supply and Wastewater Removal by Nazih K. Shammas and Lawrence K. Wang,
has been adopted. Any other reproduction or translation of this work beyond that permitted by Sections 107 or 108
of the 1976 United States Copyright Act without the permission of the copyright owner is unlawful. Page 6

Problem 8.6

Changing the speed of a centrifugal pump will change its operating characteristics including the water flow.
Determine the new flow rate or capacity, Q2 if
Q1 = rated water flow = 620 gpm
N2 = pump speed now = 1320 rpm
N1= rated pump speed = 1650 rpm

Solution:
Q2 = (Q1) (N2/N1)
= (620) (1320/1650)
= 496 gpm

Excerpts from this work may be reproduced by instructors for distribution on a not-for-profit basis for testing or
instructional purposes only to students enrolled in courses for which the textbook Fair, Greyer, and Okuns Water
and Wastewater Engineering: Water Supply and Wastewater Removal by Nazih K. Shammas and Lawrence K. Wang,
has been adopted. Any other reproduction or translation of this work beyond that permitted by Sections 107 or 108
of the 1976 United States Copyright Act without the permission of the copyright owner is unlawful. Page 7

Problem 8.7

Changing the speed of a centrifugal pump will change its operating characteristics, including the head. Determine
the new head, if
H1 = rated head = 120 ft
N2 = pump speed now = 1320 rpm
N1 = rated pump speed = 1650 rpm

Solution:
H2 = (H1) (N2/N1)2
H2 = (120) (1320/1650)2
= 76.8 ft

Excerpts from this work may be reproduced by instructors for distribution on a not-for-profit basis for testing or
instructional purposes only to students enrolled in courses for which the textbook Fair, Greyer, and Okuns Water
and Wastewater Engineering: Water Supply and Wastewater Removal by Nazih K. Shammas and Lawrence K. Wang,
has been adopted. Any other reproduction or translation of this work beyond that permitted by Sections 107 or 108
of the 1976 United States Copyright Act without the permission of the copyright owner is unlawful. Page 8

Problem 8.8

Changing the speed of a centrifugal pump will change its operating characteristics, including the power requirement.
Determine the new power requirement, if
P1 = rated head = 16 hp
N2 = pump speed now = 1320 rpm
N1 = rated pump speed = 1650 rpm

Solution:
P2 = (P1) (N2/N1)3
= (16) (1320/1650)3
= 8.2 hp

Excerpts from this work may be reproduced by instructors for distribution on a not-for-profit basis for testing or
instructional purposes only to students enrolled in courses for which the textbook Fair, Greyer, and Okuns Water
and Wastewater Engineering: Water Supply and Wastewater Removal by Nazih K. Shammas and Lawrence K. Wang,
has been adopted. Any other reproduction or translation of this work beyond that permitted by Sections 107 or 108
of the 1976 United States Copyright Act without the permission of the copyright owner is unlawful. Page 9

Problem 8.9
A water pumping station is designed to raise water from a lake at an elevation of 50 ft to a reservoir located at an
elevation of 140 ft. Water is pumped through a 16 in cast iron pipe that develops a headloss of 19 ft of water at a
discharge of 1000 gpm. The pumping station has two pumps, each of which possesses the following characteristics:
Flow, gpm
Head, ft
500
195
1,000
180
1,500
150
2,000
110
2,500
50
Shot of head = 200 ft.

What will be the discharge of the two pumps when operating in parallel?

Solution:

Plot the characteristic curves for one pump and 2 pumps in parallel and the system dynamic head. From the
intersection points of the dynamic head and the characteristic curves for the two pumps in parallel we get the
discharge of the two pumps (see the plot below)

z =140 -50 = 90 ft the static head

hf = KQn
19 = K (1000)n
K = 19/(1000)n

H = hf + z = hf + 90

Flow
Q
gpm

n = 1.85
hf = KQ1.85
ft

H = hf + z
ft

n=2
hf = KQ2
ft

H = hf + z
ft

Excerpts from this work may be reproduced by instructors for distribution on a not-for-profit basis for testing or
instructional purposes only to students enrolled in courses for which the textbook Fair, Greyer, and Okuns Water
and Wastewater Engineering: Water Supply and Wastewater Removal by Nazih K. Shammas and Lawrence K. Wang,
has been adopted. Any other reproduction or translation of this work beyond that permitted by Sections 107 or 108
of the 1976 United States Copyright Act without the permission of the copyright owner is unlawful. Page 10

500
1000
1500
2000
2500
3000

5
19
40
68
104
145

95
109
130
158
194
235

5
19
43
76
119
171

95
109
133
166
209
261

Excerpts from this work may be reproduced by instructors for distribution on a not-for-profit basis for testing or
instructional purposes only to students enrolled in courses for which the textbook Fair, Greyer, and Okuns Water
and Wastewater Engineering: Water Supply and Wastewater Removal by Nazih K. Shammas and Lawrence K. Wang,
has been adopted. Any other reproduction or translation of this work beyond that permitted by Sections 107 or 108
of the 1976 United States Copyright Act without the permission of the copyright owner is unlawful. Page 11

Problem 8.10

The water supply system shown in Fig. 8.14 is designed to serve city ABCDEFA. Water is treated and collected in a
water tank in the treatment plant (WTP). A pump delivers the water through the 24-in main PR 1 to an elevated
reservoir (water level 2,700 ft) at the top of a hill. Pumping is done at a constant rate and only for a period of 16
hours per day from 4 AM to 8 PM. Water flows from the elevated reservoir into the distribution main network
ABCDEF through a 24-in main R2A.

Fig. 8.14 Water System for Problem 8.10


(Here 1 ft = 0.3048 m; 1 in = 2.54 cm)

The water consumption during the maximum day demand in the city is as follows:

Period
Midnight to 4 AM
4 AM to 8 AM
8 AM to Noon
Noon to 4 PM
4 PM to 8 PM
8 PM to Midnight

Flowrate, gpm
2,000
4,000
6,000
5,000
4,000
3,000

Excerpts from this work may be reproduced by instructors for distribution on a not-for-profit basis for testing or
instructional purposes only to students enrolled in courses for which the textbook Fair, Greyer, and Okuns Water
and Wastewater Engineering: Water Supply and Wastewater Removal by Nazih K. Shammas and Lawrence K. Wang,
has been adopted. Any other reproduction or translation of this work beyond that permitted by Sections 107 or 108
of the 1976 United States Copyright Act without the permission of the copyright owner is unlawful. Page 12

Assume that the water withdrawal from the network is equally distributed among the points A, B, C, D, E
and F, which are at the same elevation of 2,300 ft and that all pipes are ductile iron with C = 100. Also consider
that the pump possesses the following characteristics:

Head, ft
Flow, gpm

400

390

370

345

310

225

2,000

4,000

6,000

8,000

12,000

(a) Calculate the volume of the elevated reservoir needed to balance supply and demand.
(b) Compute the maximum flow in each pipe of the network.
(c) Determine the elevation of the water tank at the treatment plant
(d) At what rate of flow can you pump the water to the elevated reservoir if another identical pump is
installed in parallel with the existing pump?

Solution:
(a) Calculate the volume of the elevated reservoir needed to balance supply and demand.
Calculate the accumulative volume as follows (see following table):
Volume in MG = 4 h x rate gpm x 60 min/h/106
Volume MN to 4 AM = 4 x 2000 x 60/106 = 0.48 MG
Accumulative volume 4 AM to AM = 0.48 + 0.96 = 1.44 MG

Period

Flow rate
gpm

Volume
MG

Accumulative
volume
MG

Excerpts from this work may be reproduced by instructors for distribution on a not-for-profit basis for testing or
instructional purposes only to students enrolled in courses for which the textbook Fair, Greyer, and Okuns Water
and Wastewater Engineering: Water Supply and Wastewater Removal by Nazih K. Shammas and Lawrence K. Wang,
has been adopted. Any other reproduction or translation of this work beyond that permitted by Sections 107 or 108
of the 1976 United States Copyright Act without the permission of the copyright owner is unlawful. Page 13

Midnight to 4 AM
4 AM to 8 AM
8 AM to Noon
Noon to 4 PM
4 PM to 8 PM
8 PM to Midnight

2000
4000
6000
5000
4000
3000

0.48
0.96
1.44
1.20
0.96
0.72

0.48
1.44
2.88
4.08
5.04
5.76

Plot the accumulative volume vs. time of day for both consumption and pumping as shown in the following
figure:

Volume of elevated reservoir = S1 + S2 = 0.48 + 0.72 = 1.20 MG

(b) Compute the maximum flow in each pipe of the network.


Peak flow = 6000 gpm
Since flow is equally distributed at the 6 points A, B, C, D, E and F
So flow out of each point = 6000/6 =1000 gpm
Excerpts from this work may be reproduced by instructors for distribution on a not-for-profit basis for testing or
instructional purposes only to students enrolled in courses for which the textbook Fair, Greyer, and Okuns Water
and Wastewater Engineering: Water Supply and Wastewater Removal by Nazih K. Shammas and Lawrence K. Wang,
has been adopted. Any other reproduction or translation of this work beyond that permitted by Sections 107 or 108
of the 1976 United States Copyright Act without the permission of the copyright owner is unlawful. Page 14

Since the sides ABCD and AFED are identical


So flow distributes equally in both directions and then

Flow in each pipe in gpm is as shown in the following figure:

(c) Determine the elevation of the water tank at the treatment plant
sPR1 at Q = 6000 gpm, d = 24 and C =100 is 3.75
(hf)PR1 = sL = 3.75 x 35,000/1000 = 131.25 ft
z = 345 131.25 = 213.75 ft
Elevation of water tank = 2700 213.75 = 2486.25 ft

(d) At what rate of flow can you pump the water to the elevated reservoir if another identical pump is installed in
parallel with the existing pump?

Excerpts from this work may be reproduced by instructors for distribution on a not-for-profit basis for testing or
instructional purposes only to students enrolled in courses for which the textbook Fair, Greyer, and Okuns Water
and Wastewater Engineering: Water Supply and Wastewater Removal by Nazih K. Shammas and Lawrence K. Wang,
has been adopted. Any other reproduction or translation of this work beyond that permitted by Sections 107 or 108
of the 1976 United States Copyright Act without the permission of the copyright owner is unlawful. Page 15

To draw the system curve we need to calculate the total dynamic head for the system as shown in the following
table:

Q
gpm
2000
4000
6000
7000
8000

s
(d = 24 in, C = 100)

0.55
1.80
3.75
5.80
6.40

hf = sL = 35s
ft
19
63
131
182
224

Total dynamic head,


213.75 + hf
ft
233
277
345
396
438

Plot system dynamic head and pump characteristics (one pump and two pumps in parallel) as a function of
water flow rate, Q:

Excerpts from this work may be reproduced by instructors for distribution on a not-for-profit basis for testing or
instructional purposes only to students enrolled in courses for which the textbook Fair, Greyer, and Okuns Water
and Wastewater Engineering: Water Supply and Wastewater Removal by Nazih K. Shammas and Lawrence K. Wang,
has been adopted. Any other reproduction or translation of this work beyond that permitted by Sections 107 or 108
of the 1976 United States Copyright Act without the permission of the copyright owner is unlawful. Page 16

From the figure it can be seen that the flow using two pumps in parallel is 6,800 gpm. However since in
this case the water cant reach the reservoir, then Qmax = 6000 gpm.

Excerpts from this work may be reproduced by instructors for distribution on a not-for-profit basis for testing or
instructional purposes only to students enrolled in courses for which the textbook Fair, Greyer, and Okuns Water
and Wastewater Engineering: Water Supply and Wastewater Removal by Nazih K. Shammas and Lawrence K. Wang,
has been adopted. Any other reproduction or translation of this work beyond that permitted by Sections 107 or 108
of the 1976 United States Copyright Act without the permission of the copyright owner is unlawful. Page 17

Problem 8.11

The water supply system shown in Fig. 8.15 is planned to serve a small village. Treated water from the treatment
plant (WTP) flowing at a uniform rate throughout the day is collected in a ground tank. Water is then pumped to an
elevated reservoir at the top of a hill through the main AB. Water flows from the elevated reservoir into the
distribution network through the main CD.

Fig. 8.15 Water System for Problem 8.11

Water consumption during the maximum day in the village is as follows:


Midnight to 6 AM
6 AM to Noon

60 L/s
240 L/s

Noon to 6 PM
6 PM to Midnight

120 L/s
90 L/s

The pumping station has three pumps, two of which operate in parallel and the third pump is a standby.
Pumping is done at a constant rate and only for a period of 12 hours from 6 AM to 6 PM. Each pump possesses
the following characteristics:
Excerpts from this work may be reproduced by instructors for distribution on a not-for-profit basis for testing or
instructional purposes only to students enrolled in courses for which the textbook Fair, Greyer, and Okuns Water
and Wastewater Engineering: Water Supply and Wastewater Removal by Nazih K. Shammas and Lawrence K. Wang,
has been adopted. Any other reproduction or translation of this work beyond that permitted by Sections 107 or 108
of the 1976 United States Copyright Act without the permission of the copyright owner is unlawful. Page 18

Flow, L/s

60

90

120

150

180

Head, m

180

165

153

135

105

63

The Hazen-Williams Coefficient C for all mains is 100. The total equivalent length of main AB is 2,500 m and
main CD is 9,000 m.

(a) Determine the volumes of ground tank and elevated reservoir (each separately) needed to balance supply
and demand. (Storage for fire fighting and emergency are not required).
(b) Determine the minimum standard size of the water main AB needed so that the two operating pumps can
deliver the required flow from the ground tank to the elevated reservoir.

Solution:

(a) Determine the volumes of ground tank and elevated reservoir (each separately) needed to balance supply and
demand. (Storage for fire fighting and emergency are not required).
Plot accumulative supply and draft vs. time of day for ground tank:

Period
Midnight to 6AM
6 AM to 8 Noon
Noon to 6 PM
6 PM to Midnight

Flow rate
L/s

Volume
m3

60
240
120
90

1296
5184
2592
1944

Accumulative
volume
m3
1296
6480
9072
11,016

Excerpts from this work may be reproduced by instructors for distribution on a not-for-profit basis for testing or
instructional purposes only to students enrolled in courses for which the textbook Fair, Greyer, and Okuns Water
and Wastewater Engineering: Water Supply and Wastewater Removal by Nazih K. Shammas and Lawrence K. Wang,
has been adopted. Any other reproduction or translation of this work beyond that permitted by Sections 107 or 108
of the 1976 United States Copyright Act without the permission of the copyright owner is unlawful. Page 19

Volume = S1 + S2 = 2754 + 2754 = 5508 m3


Plot accumulative supply and draft vs. time of day for elevated reservoir:

Excerpts from this work may be reproduced by instructors for distribution on a not-for-profit basis for testing or
instructional purposes only to students enrolled in courses for which the textbook Fair, Greyer, and Okuns Water
and Wastewater Engineering: Water Supply and Wastewater Removal by Nazih K. Shammas and Lawrence K. Wang,
has been adopted. Any other reproduction or translation of this work beyond that permitted by Sections 107 or 108
of the 1976 United States Copyright Act without the permission of the copyright owner is unlawful. Page 20

Volume = S1 + S2 = 1,296 + 1944 = 3,240 m3

(b) Determine the minimum standard size of the water main AB needed so that the two operating pumps can deliver
the required flow from the ground tank to the elevated reservoir.
Plot the Characteristic curve for the two pumps in parallel.
Q = 11,016 m3/(12 h x 60 min x 60 s) = 0.255 m3/s = 255 L/s
hf = 127.5 120 = 7.5 m (see plot)
The required pipe diameter at Q = 255 L/s, s = 7.5/2.5 = 3 and C =100 is 540 mm.

Use 600 mm Nominal size

Excerpts from this work may be reproduced by instructors for distribution on a not-for-profit basis for testing or
instructional purposes only to students enrolled in courses for which the textbook Fair, Greyer, and Okuns Water
and Wastewater Engineering: Water Supply and Wastewater Removal by Nazih K. Shammas and Lawrence K. Wang,
has been adopted. Any other reproduction or translation of this work beyond that permitted by Sections 107 or 108
of the 1976 United States Copyright Act without the permission of the copyright owner is unlawful. Page 21

Excerpts from this work may be reproduced by instructors for distribution on a not-for-profit basis for testing or
instructional purposes only to students enrolled in courses for which the textbook Fair, Greyer, and Okuns Water
and Wastewater Engineering: Water Supply and Wastewater Removal by Nazih K. Shammas and Lawrence K. Wang,
has been adopted. Any other reproduction or translation of this work beyond that permitted by Sections 107 or 108
of the 1976 United States Copyright Act without the permission of the copyright owner is unlawful. Page 22

Problem 8.12

A water pumping station is designed to raise water from a treatment plant ground reservoir at an elevation of 600 m
to an elevated reservoir located on the opposite side of town at an elevation of 660 m. The trunk line and the water
distribution network connecting the two reservoirs is equivalent to a pipe line (C = 100) 400 mm in diameter and
25,000 m long.

The pumping station has three pumps, two of which operate in series and the third pump is a standby. Each pump
possesses the following characteristics:

Flow, L/s
Head, m

40

80

120

160

200

240

100

98

94

87

79

70

60

During night hours, when consumption is low, the pumped water is greater than demand and excess water is stored
in the elevated reservoir. Considering this mode of operation, determine the flow rate that can be delivered through
the system under the following pumping conditions:
(a) Two pumps are operational.
(b) One pump is operational i.e. one pump failed and the standby is under maintenance.

Solution:

Plot the characteristics curve for one pump using the given data (Head vs. Flow)

Plot the characteristics curve for the two pumps in series by doubling the one pump head for each flow rate.

Plot the total dynamic head for the system using the total head vs. flow rate as calculated in the following
table:

Excerpts from this work may be reproduced by instructors for distribution on a not-for-profit basis for testing or
instructional purposes only to students enrolled in courses for which the textbook Fair, Greyer, and Okuns Water
and Wastewater Engineering: Water Supply and Wastewater Removal by Nazih K. Shammas and Lawrence K. Wang,
has been adopted. Any other reproduction or translation of this work beyond that permitted by Sections 107 or 108
of the 1976 United States Copyright Act without the permission of the copyright owner is unlawful. Page 23

Q
L/S
0
40
80
100
120
140

s
(d = 400 mm, C = 100)

0
0.47
1.75
2.7
3.7
5.2

hf = sL = 25s
m
0
12
44
68
93
130

H = hf + z = hf + 60
m
60
72
104
128
153
190

(a) The intersection of the two pumps characteristic curve with the total dynamic head curve yields Q = 128
L/s
(b) The intersection of the one pump characteristic curve with the total dynamic head curve yields Q = 74 L/s

Excerpts from this work may be reproduced by instructors for distribution on a not-for-profit basis for testing or
instructional purposes only to students enrolled in courses for which the textbook Fair, Greyer, and Okuns Water
and Wastewater Engineering: Water Supply and Wastewater Removal by Nazih K. Shammas and Lawrence K. Wang,
has been adopted. Any other reproduction or translation of this work beyond that permitted by Sections 107 or 108
of the 1976 United States Copyright Act without the permission of the copyright owner is unlawful. Page 24

Problem 8.13
A water pumping station is designed to raise water from a treatment plant ground reservoir at an elevation of 190 ft
to a downtown elevated reservoir located at an elevation of 415 ft. Water is pumped through a 20-in pipe (C = 100),
which is 30,000 ft long. The pumping station has two pumps, each of which possesses the following characteristics:
Flow, L/s
Head, m

1,000

2,000

3,000

4,000

5,000

6,000

7,000

290

270

245

210

170

125

65

Shutoff head = 300 ft.


What will be the discharge of the two pumps when operating in series? Also what will be the total head against
which the pumps are actually operating?
Solution:

Plot the characteristics curve for one pump using the given data (Head vs. Flow)

Plot the characteristics curve for the two pumps in series by doubling the one pump head for each flow rate.

Plot the total dynamic head for the system using the total head vs. flow rate as calculated in the following
table:

hf = sL = 30s

H =hf + 225

gpm

(d=20 in, C= 100)

ft

ft

1000

0.35

10

235

2000

1.20

36

261

3000

2.40

72

297

4000

4.50

135

360

5000

6.40

192

417

6000

9.30

279

504

Excerpts from this work may be reproduced by instructors for distribution on a not-for-profit basis for testing or
instructional purposes only to students enrolled in courses for which the textbook Fair, Greyer, and Okuns Water
and Wastewater Engineering: Water Supply and Wastewater Removal by Nazih K. Shammas and Lawrence K. Wang,
has been adopted. Any other reproduction or translation of this work beyond that permitted by Sections 107 or 108
of the 1976 United States Copyright Act without the permission of the copyright owner is unlawful. Page 25

The intersection of the two pumps characteristic curve with the total dynamic head curve yields:
Q = 4500 GPM
H = 338 ft

Excerpts from this work may be reproduced by instructors for distribution on a not-for-profit basis for testing or
instructional purposes only to students enrolled in courses for which the textbook Fair, Greyer, and Okuns Water
and Wastewater Engineering: Water Supply and Wastewater Removal by Nazih K. Shammas and Lawrence K. Wang,
has been adopted. Any other reproduction or translation of this work beyond that permitted by Sections 107 or 108
of the 1976 United States Copyright Act without the permission of the copyright owner is unlawful. Page 26

Problem 8.14

An Industrial Complex utilizes water at a uniform rate of 5,400 gpm during its working hours from 8 AM to 12
Noon and from 4 PM to 8 pm. This water demand is withdrawn from an elevated water tank located at an elevation
of 40 ft above ground level.

Water is pumped, at a uniform rate continuously throughout the day to the tank using two pumps connected in series
from a well whose water level is 460 ft below ground level. The water pipe from the well to the tank is 3000 ft long
(C = 100).

Each pump has the following characteristics:


Flow, gpm
Head, ft

1,000

2,000

3,000

4,000

350

325

275

175

50

(a) Calculate the water tank volume required to equalize supply and demand.
(b) Determine the size of the pipe delivering water from the well to the water tank.
Solution:
(a) Calculate the water tank volume required to equalize supply and demand.
Total flow = 5400 gpm 60 min x 8 h/106
= 2.592 MGD
Pumping rate = 2.592/24 =0.108 MG/h
=1800 gpm
Plot the supply and demand curves as shown in the figure
Total storage Volume = 0.432 + 0.864
S = 1.3 MG (see the plot)
Excerpts from this work may be reproduced by instructors for distribution on a not-for-profit basis for testing or
instructional purposes only to students enrolled in courses for which the textbook Fair, Greyer, and Okuns Water
and Wastewater Engineering: Water Supply and Wastewater Removal by Nazih K. Shammas and Lawrence K. Wang,
has been adopted. Any other reproduction or translation of this work beyond that permitted by Sections 107 or 108
of the 1976 United States Copyright Act without the permission of the copyright owner is unlawful. Page 27

(b) Determine the size of the pipe delivering water from the well to the water tank.
Static head = 460 + 40 = 500 ft
Plot the characteristic curves for 1
Plot the characteristic curves for 2 pumps in series by doubling the head for each given Q
Since the pumping rate Q =1800 gpm, then the 2 pumps in series should be able to deliver this flow.
From the plot of the two pumps characteristics as shown in the following figure, at 1800 gpm the total head
is 575 ft.
Hence the maximum hf shall not be more than 575 500 = 75 ft.
Then the required size of pipe should not be less than the following:
Excerpts from this work may be reproduced by instructors for distribution on a not-for-profit basis for testing or
instructional purposes only to students enrolled in courses for which the textbook Fair, Greyer, and Okuns Water
and Wastewater Engineering: Water Supply and Wastewater Removal by Nazih K. Shammas and Lawrence K. Wang,
has been adopted. Any other reproduction or translation of this work beyond that permitted by Sections 107 or 108
of the 1976 United States Copyright Act without the permission of the copyright owner is unlawful. Page 28

for Q = 1800 gpm, s = 75/3 =25 and C = 100 yields d = 10 in

Excerpts from this work may be reproduced by instructors for distribution on a not-for-profit basis for testing or
instructional purposes only to students enrolled in courses for which the textbook Fair, Greyer, and Okuns Water
and Wastewater Engineering: Water Supply and Wastewater Removal by Nazih K. Shammas and Lawrence K. Wang,
has been adopted. Any other reproduction or translation of this work beyond that permitted by Sections 107 or 108
of the 1976 United States Copyright Act without the permission of the copyright owner is unlawful. Page 29

Problem 8.15
A summer resort complex consumes water at the following uniform rates during the indicated periods:
Period
Midnight to 8 a.m.
8 a.m. to 4 p.m.
4 p.m. to midnight

Consumption rate, m3/h


20
50
30

How large a storage tank would be required to equalize supply and demand for each of the following
conditions?
(a) Water is obtained from a nearby city at a uniform rate from 8 a.m. to 4 p.m.
(b) Water is obtained from the same city at a uniform rate over the 24-hr. period.
Solution:
Plot the accumulative consumption and supply curves over 24 h (see figure)

(a) Storage volume 1 = S1a + S1b = 160 + 240 = 400 m3

Excerpts from this work may be reproduced by instructors for distribution on a not-for-profit basis for testing or
instructional purposes only to students enrolled in courses for which the textbook Fair, Greyer, and Okuns Water
and Wastewater Engineering: Water Supply and Wastewater Removal by Nazih K. Shammas and Lawrence K. Wang,
has been adopted. Any other reproduction or translation of this work beyond that permitted by Sections 107 or 108
of the 1976 United States Copyright Act without the permission of the copyright owner is unlawful. Page 30

(b) Storage volume 2 = S2a + S2b = 107 + 27 = 134 m3

Excerpts from this work may be reproduced by instructors for distribution on a not-for-profit basis for testing or
instructional purposes only to students enrolled in courses for which the textbook Fair, Greyer, and Okuns Water
and Wastewater Engineering: Water Supply and Wastewater Removal by Nazih K. Shammas and Lawrence K. Wang,
has been adopted. Any other reproduction or translation of this work beyond that permitted by Sections 107 or 108
of the 1976 United States Copyright Act without the permission of the copyright owner is unlawful. Page 31

Problem 8.16

For the water supply of a small town with daily water requirement of 2,250 m 3, it is proposed to construct a water
reservoir. The pattern of draw off is as below:

Period

% of dail y demand

7 a.m. to 8 a.m.

30

8 a.m. to 5 p.m.
5 p.m. to 6.30 p.m.
8 . 3 0 p.m. to 7 a . m .

35
30
5

Water is to be supplied to the reservoir at a constant rate for a period of 8 hours; 8 AM - 4 PM


Determine the storage capacity of the reservoir needed to balance supply and demand. No storage for fire is
required. If pumping is to be done at a constant rate over the 24 hours, what will then be the required reservoir
size?
Solution:

Calculate the accumulative volume (see table)


Plot the accumulative consumption and supply curves over 24 h period (see figure)
% of
Daily demand

m3/period

7 AM 8 AM

30

675

Accumulative
volume
m3
675

8 A M 5 PM

35

787.5

1462.5

5 P M 6.30 PM

30

675

2137.5

8 . 3 0 PM 7AM

112.5

2250

Period

For 8-h pumping, storage capacity of reservoir = 675 + 875 = 1550 m3


For 24-h pumping, storage capacity of reservoir = 1060 m3

Excerpts from this work may be reproduced by instructors for distribution on a not-for-profit basis for testing or
instructional purposes only to students enrolled in courses for which the textbook Fair, Greyer, and Okuns Water
and Wastewater Engineering: Water Supply and Wastewater Removal by Nazih K. Shammas and Lawrence K. Wang,
has been adopted. Any other reproduction or translation of this work beyond that permitted by Sections 107 or 108
of the 1976 United States Copyright Act without the permission of the copyright owner is unlawful. Page 32

Excerpts from this work may be reproduced by instructors for distribution on a not-for-profit basis for testing or
instructional purposes only to students enrolled in courses for which the textbook Fair, Greyer, and Okuns Water
and Wastewater Engineering: Water Supply and Wastewater Removal by Nazih K. Shammas and Lawrence K. Wang,
has been adopted. Any other reproduction or translation of this work beyond that permitted by Sections 107 or 108
of the 1976 United States Copyright Act without the permission of the copyright owner is unlawful. Page 33

Problem 8.17

An industrial plant requires 5000 gpm of water during its onshift hours from 6 a.m. to 10 p.m. How large (in
gallons) a storage tank would be required to equalize the pumping rate for each of the following conditions:
(a) Water is obtained from a well at a uniform rate over the 214-h period.
(b) Water is obtained from a well during the period 10 p.m. to 6 a.m., which is the off peak period in electricity
consumption.
Solution:

Plot the accumulative demand and the two supply alternative curves over 24 h period (see figure)

(a) For 24-h pumping, storage capacity of tank should be = 1.6 MG


(b) For 10 p.m. to 6 a.m. pumping, storage capacity of tank should be = 4.8 MG

Excerpts from this work may be reproduced by instructors for distribution on a not-for-profit basis for testing or
instructional purposes only to students enrolled in courses for which the textbook Fair, Greyer, and Okuns Water
and Wastewater Engineering: Water Supply and Wastewater Removal by Nazih K. Shammas and Lawrence K. Wang,
has been adopted. Any other reproduction or translation of this work beyond that permitted by Sections 107 or 108
of the 1976 United States Copyright Act without the permission of the copyright owner is unlawful. Page 34

Problem 8.18

A factory requires 50 L/s of water during its working hours from 8 AM to 4 PM How large a storage reservoir would
be required, to equalize supply and demand for each of the following water supply conditions?
(a) Water is supplied from a well at a uniform rate over the 24-h period.
(b) Water is supplied at a uniform rate from the city network during the off peak period from 4 p.m. to 8 a.m
Solution:
Plot the accumulative demand and the two supply alternative curves over 24 h period (see figure)

(a) For 24-h pumping, storage capacity of tank should be = V1a + V1b = 480 + 480 = 960 m3
(b) For 4 p.m. to 8 a.m. pumping, storage capacity of tank should be = V2 = 1440 m3

Excerpts from this work may be reproduced by instructors for distribution on a not-for-profit basis for testing or
instructional purposes only to students enrolled in courses for which the textbook Fair, Greyer, and Okuns Water
and Wastewater Engineering: Water Supply and Wastewater Removal by Nazih K. Shammas and Lawrence K. Wang,
has been adopted. Any other reproduction or translation of this work beyond that permitted by Sections 107 or 108
of the 1976 United States Copyright Act without the permission of the copyright owner is unlawful. Page 35

Problem 8.19
A residential neighborhood, population 20,000, is supplied with water from an elevated reservoir. The daily water
consumption is as follows:
Period of day
% of daily demand
Midnight to 3 a.m.
5
3 a.m. to 6 a.m.
7
6 a.m. to 9 a.m.
13
9 a.m. to noon
20
Noon to 3 p.m.
20
3 p.m.to 6 p.m.
15
6 p.m.to 9 p.m.
10
9 p.m.to midnight
10
The average daily water consumption is 400 L/capita and the maximum daily consumption is 125% of the daily
average. Determine the storage volume (in m 3) necessary to balance supply and demand in each of the
following cases:
(a) If water is supplied into the reservoir at a constant rate over the 24-h period.
(b) If water is supplied into the reservoir at a constant rate, but only for a period of 12 h from 6 a.m. to 6 p.m.
Solution:

Total max daily demand = 20,000 persons x 400 L/capita x 1.25 for max day/ (1000 L/m 3 ) = 10,000 m3
Calculate the accumulative volume (see table)
Plot the accumulative consumption and supply curves over 24 h period (see figure)

Period

% of
Daily demand

m3/period

MN 3

500

Accumulative
volume
m3
500

3-6

700

1200

6-9

13

1300

2500

9-N

20

2000

4500

N-3

20

2000

6500

36

15

1500

8000

79

10

1000

9000

9 - MN

10

1000

10,000

Excerpts from this work may be reproduced by instructors for distribution on a not-for-profit basis for testing or
instructional purposes only to students enrolled in courses for which the textbook Fair, Greyer, and Okuns Water
and Wastewater Engineering: Water Supply and Wastewater Removal by Nazih K. Shammas and Lawrence K. Wang,
has been adopted. Any other reproduction or translation of this work beyond that permitted by Sections 107 or 108
of the 1976 United States Copyright Act without the permission of the copyright owner is unlawful. Page 36

(a) For 24 h pumping, storage capacity of tank should be = S1a + S1b = 1300 + 500 = 1800 m3
(b) For 4 PM to 8 AM pumping, storage capacity of tank should be = S2a + S2b = 1200 + 2000 = 3200 m3

Excerpts from this work may be reproduced by instructors for distribution on a not-for-profit basis for testing or
instructional purposes only to students enrolled in courses for which the textbook Fair, Greyer, and Okuns Water
and Wastewater Engineering: Water Supply and Wastewater Removal by Nazih K. Shammas and Lawrence K. Wang,
has been adopted. Any other reproduction or translation of this work beyond that permitted by Sections 107 or 108
of the 1976 United States Copyright Act without the permission of the copyright owner is unlawful. Page 37

Problem 8.20

A residential complex consists of 60 duplex villas (two housing units in each). Each housing unit can accommodate
a maximum of 10 persons. The expected maximum daily water consumption is 400 L/capita. Water is supplied from
the municipal network at a uniform rate throughout the day and is collected in a ground storage reservoir. Water is
then pumped to an elevated reservoir at a constant rate but only for a period of 9 hours from 6 a.m. to 3 p.m. Water
then flows from the elevated reservoir to the various villas by gravity to satisfy the following daily demands:
Period of day
Midnight to 3 a.m.
3 a.m. to 6 a.m.
6 a.m. to 9 a.m.
9 a.m. to noon
Noon to 3 p.m.
3 p.m. to 6 p.m.
6 p.m. to 9 p.m.
9 p.m. to midnight

% of daily demand
5
5
25
15
15
10
15
10

In order to balance supply and demand, determine:


(a) Required volume of ground reservoir.
(b) Required volume of elevated reservoir.
Solution:

Total max daily demand = 60x2x10 persons x 400 L/capita x (1000 L/m3 ) = 480 m3
Calculate the accumulative volume (see table)
Plot the accumulative consumption and the two supply curves over 24 h period (see figure)

Period

% of
Daily demand

m3/period

MN 3
3-6
6-9
9-N
N-3
36
79
9 - MN

5
5
25
15
15
10
15
10

24
24
120
72
72
48
72
48

Accumulative
volume
m3
24
48
168
240
312
360
432
480

Excerpts from this work may be reproduced by instructors for distribution on a not-for-profit basis for testing or
instructional purposes only to students enrolled in courses for which the textbook Fair, Greyer, and Okuns Water
and Wastewater Engineering: Water Supply and Wastewater Removal by Nazih K. Shammas and Lawrence K. Wang,
has been adopted. Any other reproduction or translation of this work beyond that permitted by Sections 107 or 108
of the 1976 United States Copyright Act without the permission of the copyright owner is unlawful. Page 38

(a) Volume of ground reservoir should be = S1a + S2a = 120 + 180 = 300 m3
(b) Volume of elevated reservoir should be = S1b + S2b = 48 + 168 = 216 m3

Excerpts from this work may be reproduced by instructors for distribution on a not-for-profit basis for testing or
instructional purposes only to students enrolled in courses for which the textbook Fair, Greyer, and Okuns Water
and Wastewater Engineering: Water Supply and Wastewater Removal by Nazih K. Shammas and Lawrence K. Wang,
has been adopted. Any other reproduction or translation of this work beyond that permitted by Sections 107 or 108
of the 1976 United States Copyright Act without the permission of the copyright owner is unlawful. Page 39

Problem 8.21

A small water system in the rural area has a population of 800 persons, and its daily per capita usage is estimated to
be 100 gpcd. The required fire flow determined by the village engineer is 500 gpm for a duration of 2 hours. There is
no particular hazard to the water supply works. Determine the required water storage to be provided for the village
using the Recommended Standards for Water Works, 2007 Edition. Visit the website or contact the local health
department for the latest edition of these Ten- State Standards for water works.

Solution:
Storage volume for domestic consumption = Average daily consumption (Ten States Standards)
= 800 x 100 = 80,000 gpd average daily demand
= 0.08 MGD
The fire reserve is 500 gpm for 2 hours
= (500 gal/min x 2 h x 60 min/h)/106
= 0.06 MG
Total storage = Domestic storage + Fire storage = 0.08 + 0.06 = 0.14 MG

Excerpts from this work may be reproduced by instructors for distribution on a not-for-profit basis for testing or
instructional purposes only to students enrolled in courses for which the textbook Fair, Greyer, and Okuns Water
and Wastewater Engineering: Water Supply and Wastewater Removal by Nazih K. Shammas and Lawrence K. Wang,
has been adopted. Any other reproduction or translation of this work beyond that permitted by Sections 107 or 108
of the 1976 United States Copyright Act without the permission of the copyright owner is unlawful. Page 40

Problem 8.22

A city is planning to improve its water supply system (Fig. 8.16). At present the city has a surface water supply
reservoir at elevation 100 ft (Point A), a pumping station at elevation 80 ft (Point B), water storage tank at elevation
200 ft (Point C), a 500 ft o suction transmission line between the reservoir and the pumping station, and a 10,000 ft
of 10-in pressure transmission line between the pumping station and the water storage tank. The water at the water
storage tank site is treated by UV for disinfection and then discharged to the water distribution system.

Fig. 8.16 Water Supply System for Problem 8.22


(Here 1 ft = 0.3048 m; 1 in = 2.54 cm)
A proposal has been made to replace the current pumps with two centrifugal pumps, construct 10,000 ft of 16-in
transmission main to parallel the present 10-in water main and to provide additional water storage at elevation 200 ft
at the present water storage site. The following conditions are assumed: (a) C factor for all pipes = 120, (b) fire flow
requirements in the city = 2000 gpm for 10 hours; (c) average daily demand = 3 MGD; (d) maximum daily demand
= 5 MGD, (e) peak hourly demand = 10 MGD; (f) pumping station head losses = 500 ft of 16-in pipe (equivalent);
(g) the field measured total dynamic head delivered by the pump from raw water supply reservoir to the pump
station, then to the water storage tank = 150 ft.
(a) What should the pump rating (gpm) be for each of the two new pumps?
(b) What will be the brake horsepower (BHP) for pump selection, and what will be the motor horsepower
(MHP) for motor selection?
(c) Will the two selected pumps be connected in parallel or in series?
Excerpts from this work may be reproduced by instructors for distribution on a not-for-profit basis for testing or
instructional purposes only to students enrolled in courses for which the textbook Fair, Greyer, and Okuns Water
and Wastewater Engineering: Water Supply and Wastewater Removal by Nazih K. Shammas and Lawrence K. Wang,
has been adopted. Any other reproduction or translation of this work beyond that permitted by Sections 107 or 108
of the 1976 United States Copyright Act without the permission of the copyright owner is unlawful. Page 41

Solution:
It should be noted that the head loss is the same for the existing 10-in pipe and the new 16-in pipe in parallel. Two
new pumps are necessary, each of the same capacity, in order to meet the maximum daily demand of 5 MGD (i.e.
3470 gpm), with one pump operating and the other idle for repairs or in reserve as a standby for emergency.

(a) Maximum horsepower output of each pump:


= (Q gpm) (8.33 lb/gal) (H ft)/(33,000 ft-lb/min)
= (Q gpm) (H ft) /(3957)
= (3740) (150)/3957
= 142 hp

(b) Assuming the combined efficiency (Epump)(Emotor) = 0.75, the input power to the motor can then be
determined.
= (142 hp) / 0.75
= 189 hp

(c) When pumps operate in series the total flow is limited to the capacity of the smallest pump. Therefore, the
two new pumps should operate in parallel.

Excerpts from this work may be reproduced by instructors for distribution on a not-for-profit basis for testing or
instructional purposes only to students enrolled in courses for which the textbook Fair, Greyer, and Okuns Water
and Wastewater Engineering: Water Supply and Wastewater Removal by Nazih K. Shammas and Lawrence K. Wang,
has been adopted. Any other reproduction or translation of this work beyond that permitted by Sections 107 or 108
of the 1976 United States Copyright Act without the permission of the copyright owner is unlawful. Page 42

Problem 8.23

Using the same given data in Problem 8.22, explain why the pipe line is designed based on the maximum daily
water demand, and determine the total storage capacity of a new water storage tank.

Solution:
Water supply conduits leading to water storage tanks are generally so proportioned that they can deliver water at a
rate sufficient to meet the maximum daily demand. Hour peak water demands in excess of this rate are supplied
from the water storage tanks. The three major components of water storage are: (a) equalizing or operating storage;
(b) fire reserve; and (c) emergency reserve.

1.

Equalizing water storage = 15 to 50 % of average daily demand. Use 30 %, 0.3 x 3 MG = 0.9 MG

2.

Fire reserve = 2000 gpm x (10 x 60 min)/1,000,000 = 1.2 MG

3.

Emergency reserve = 25 % of the total storage

4.

Total storage = (0.9 + 1.2) MG/0.75 = 2.8 MG

The capacity of a new water storage tank can also be determined in accordance with the 10 State Standards (2007
edition):
1.

Required basic water storage = average water demand = 3 MG

2.

Fire reserve = 2000 gpm x (10 x 60 min)/1000000 = 1.2 MG

3.

Total storage = 3 + 1.2 = 4.2 MG

Excerpts from this work may be reproduced by instructors for distribution on a not-for-profit basis for testing or
instructional purposes only to students enrolled in courses for which the textbook Fair, Greyer, and Okuns Water
and Wastewater Engineering: Water Supply and Wastewater Removal by Nazih K. Shammas and Lawrence K. Wang,
has been adopted. Any other reproduction or translation of this work beyond that permitted by Sections 107 or 108
of the 1976 United States Copyright Act without the permission of the copyright owner is unlawful. Page 43

You might also like