You are on page 1of 1

Standard Meraas Aconex Configuration: Project Categorization Metadata Template - rev 11

DOCUMENT SETUP

Organisations
Organisation List

Roles

TBC

TBC

Code
Mail

Aconex Limited
MERAAS

Single Select Fields

Aconex Title
Doc

Description

Document Types

Mandatory?

YES

ACX

ACX

ACX

As-Built Drawing

CL

MER

MER

Addendum
Building Information Model

Project Owner

Aconex Limited

Contact Person
Contact Org.

Code

Discipline

PROJECT MAIL

Multi Select Fields


Code

Design Stage

Code

TBC

Code

Package Field

Project Field 1

Project Field 2

Document Status
Handover Asset Tag

CSI Code

ABD

Acoustics

ADD

Architectural

BIM

Asset Management
Civil & Infrastructure Works

YES
ACU

Concept Design

ARC

Design Development

ASM

Issued for Construction

-00.00-Procurement and Contracting Requirements

Draft

Issued for Action

Informal Correspondence

DD

-00.10-Solicitation

Closed (used to Close RFIs)

Issued for Approval

Internal Memorandum

IFC

-00.20-Instructions for Procurement

Issued for Action

Issued for Construction

Letter

Bond / Insurance

BIN

CIW

Issued for Tender

IFT

-00.30-Available Information

Issued for Approval

Issued for Coordination

Project Invitation

BOQ

Commercial

COM

Schematic Design

SD

-00.40-Procurement Forms and Supplements

Issued for Construction

Issued for Information

Site instruction

Calculation

CAL

Communications

CMM

XXX-Non Specific

XXX

-00.50-Contracting Forms and Supplements

Issued for Co-ordination

Issued for Review

Sub-Contract Letter

Certificate

CER

District Cooling

DSC

-00.60-Project Forms

Issued for Information

Contract

CON

Electrical

ELE

-00.70-Conditions of the Contract

Issued for Review

Confirmation of Verbal Instruction

CVI

Electronic Safety & Security

ESS

-01.00-General Requirements

No Objection

Data Sheet

DAT

Fire

FIR

-01.10-Summary

Open (used to monitor Open RFIs)

Daily Report

DRP

Geotechnical

GEO

-01.20-Price and Payment Procedures

Under Workflow Review

Mr. Timothy Shelton

Document Review Sheet

DRS

Health Safety & Environment

HSE

-01.30-Administrative Requirements

Approved

Meraas

Drawing

DWG

HVAC

HVC

-01.40-Quality Requirements

Approved with Comments

ERI

Integrated Automation

IAU

-01.50-Temporary Facilities and Controls

Revise and Resubmit

EST

Interiors

INT

-01.60-Product Requirements

Responded

Historical Correspondence

HCR

Landscaping

LSC

-01.70-Execution and Closeout Requirements

Rejected

Document No.

Invoice

INV

Legal

LEG

-01.80-Performance Requirements

Revision

Inspection Request

IRE

Logistics

LOG

-01.90-Life Cycle Activities

Title

Inspection Report

IRP

Marine Works

MAR

-02.00-Existing Conditions

Type

Inspection Test Plan

ITP

Mechanical

MEC

-02.20-Assessment

Status

Manual

MAN

Plumbing

Discipline

Material Submittal

Revision Date

PLB

-02.30-Subsurface Investigation

MAS

Procurement

PRO

-02.40-Demolition and Structure Moving

Method Statement

MES

Project Controls

PRC

-02.50-Site Remediation

Package Field

Minutes of Meeting

MOM

Project Management

PRM

-02.60-Contaminated Site Material Removal

Project Field 1 - WBS

Monthly report

MRP

Public Transportation Systems

PTS

-02.70-Water Remediation

Project Field 2 - (Zone / Level)

Material Inspection Request

MRQ

Quality Management

QMS

-02.80-Facility Remediation

Non Conformance Report

NCR

Risk Management

RSK

-03.00-Concrete

No Objection Certificate

NOC

Special Construction

SPC

-03.10-Concrete Forming and Accessories

Optional

YES

Bill of Quantities

Employer's Representative Instruction


Mandatory

Mail Types

YES

CD

Estimate

Document Fields

Reason for Issue


Transmittal Settings

YES

O&M Manual

OMM

Structural

STR

-03.20-Concrete Reinforcing

Confidential

Permit

PER

Survey

SUR

-03.30-Cast-in-Place Concrete

File

Photographs, Images & Videos

PIV

Signage & Way Finding

SWF

-03.40-Precast Concrete

Print Size

Plan

PLN

Sustainability

SUS

-03.50-Cast Decks and Underlayment

Created by

Payment Recommendation

PMR

Utilities

UTI

-03.60-Grouting

Planned Submission Date

Policy

POL

-03.70-Mass Concrete

Comments

Proposal

PPL

-03.80-Concrete Cutting and Boring

CSI Codes

Presentation

PPT

-04.00-Masonry

Handover Asset Tag

Procedure

PRO

-04.20-Unit Masonry

Pre-qualification

PRQ

-04.40-Stone Assemblies

Progress Report

PRR

-04.50-Refractory Masonry

Register

REG

-04.60-Corrosion-Resistant Masonry

Request for Change

RFC

-04.70-Manufactured Masonry

Request for Information

RFI

-05.00-Metals

Report

RPT

-05.10-Structural Metal Framing

Program / Schedule
Schedule
Shop Drawing
Sketch
Specification
Sample Submittal
Sample Submittal
Tender Document
Technical Note
Test Report
Variation / Claim
Variation Order Approval Form
Variation Order
Warranty
Work Notification
Weekly Report

SCH
SCL
SHD
SKT
SPE
SSB
SSB
TND
TNT
TRP
VCL
VOA
VOS
WAR
WNT
WRP

-05.20-Metal Joists
-05.30-Metal Decking
-05.40-Cold-Formed Metal Framing
-05.50-Metal Fabrications
-05.70-Decorative Metal
-06.00-Wood, Plastics, and Composites
-06.10-Rough Carpentry
-06.20-Finish Carpentry
-06.40-Architectural Woodwork
-06.50-Structural Plastics
-06.60-Plastic Fabrications
-06.70-Structural Composites
-06.80-Composite Fabrications
-07.00-Thermal and Moisture Protection
-07.20-Thermal Protection
-07.30-Steep Slope Roofing
-07.40-Roofing and Siding Panels
-07.50-Membrane Roofing
-07.60-Flashing and Sheet Metal
-07.70-Roof and Wall Specialties and Accessories
-07.80-Fire and Smoke Protection
-07.90-Joint Protection
-08.00-Openings
-08.10-Doors and Frames
-08.30-Specialty Doors and Frames
-08.40-Entrances, Storefronts, and Curtain Walls
-08.50-Windows
-08.60-Roof Windows and Skylights
-08.70-Hardware
-08.80-Glazing
-08.90-Louvers and Vents
-09.00-Finishes
-09.20-Plaster and Gypsum Board
-09.30-Tiling
-09.50-Ceilings
-09.60-Flooring
-09.70-Wall Finishes
-09.80-Acoustic Treatment
-09.90-Painting and Coating
-10.00-Specialties
-10.10-Information Specialties
-10.20-Interior Specialties
-10.30-Fireplaces and Stoves
-10.40-Safety Specialties
-10.50-Storage Specialties
-10.70-Exterior Specialties
-10.80-Other Specialties
-11.00-Equipment
-11.10-Vehicle and Pedestrian Equipment
-11.20-Commercial Equipment
-11.30-Residential Equipment
-11.40-Foodservice Equipment
-11.50-Educational and Scientific Equipment
-11.60-Entertainment Equipment
-11.70-Healthcare Equipment
-11.80-Collection and Disposal Equipment
-11.90-Other Equipment
-12.00-Furnishings
-12.10-Art
-12.20-Window Treatments
-12.30-Casework
-12.40-Furnishings and Accessories
-12.50-Furniture
-12.60-Multiple Seating
-12.90-Other Furnishings
-13.00-Special Construction
-13.10-Special Facility Components
-13.20-Special Purpose Rooms
-13.30-Special Structures
-13.40-Integrated Construction
-13.50-Special Instrumentation
-14.00-Conveying Equipment
-14.10-Dumbwaiters
-14.20-Elevators
-14.30-Escalators and Moving Walks
-14.40-Lifts
-14.70-Turntables
-14.80-Scaffolding
-14.90-Other Conveying Equipment
-21.00-Fire Suppression
-21.10-Water-Based Fire-Suppression Systems
-21.20-Fire-Extinguishing Systems
-21.30-Fire Pumps
-21.40-Fire-Suppression Water Storage
-22.00-Plumbing
-22.10-Plumbing Piping
-22.30-Plumbing Equipment
-22.40-Plumbing Fixtures
-22.50-Pool and Fountain Plumbing Systems
-22.60-Gas and Vacuum Sys for Lab, Healthcare Faci
-23.00-Heating, Ventilating, Air Con (HVAC)
-23.10-Facility Fuel Systems
-23.20-HVAC Piping and Pumps
-23.30-HVAC Air Distribution
-23.40-HVAC Air Cleaning Devices
-23.50-Central Heating Equipment
-23.60-Central Cooling Equipment
-23.70-Central HVAC Equipment
-23.80-Decentralized HVAC Equipment
-25.00-Integrated Automation
-25.10-Integrated Automation Network Equipment
-25.30-Integrated Autom Instrum, Terminal Devices
-25.50-Integrated Automation Facility Controls
-25.90-Integrated Automation Control Sequences
-26.00-Electrical
-26.10-Medium-Voltage Electrical Distribution
-26.20-Low-Voltage Electrical Transmission
-26.30-Facility Electr Power Gener, Storing Equip
-26.40-Electrical and Cathodic Protection
-26.50-Lighting
-27.00-Communications
-27.10-Structured Cabling
-27.20-Data Communications
-27.30-Voice Communications
-27.40-Audio-Video Communications
-27.50-Distributed Communications and Monit Syst
-28.00-Electronic Safety and Security
-28.10-Electronic Access Control and Intrus Detect
-28.20-Electronic Surveillance
-28.30-Electronic Detection and Alarm
-28.40-Electronic Monitoring and Control
-31.00-Earthwork
-31.10-Site Clearing
-31.20-Earth Moving
-31.30-Earthwork Methods
-31.40-Shoring and Underpinning
-31.50-Excavation Support and Protection
-31.60-Special Foundation and Load-Bearing Element
-31.70-Tunneling and Mining
-32.00-Exterior Improvements
-32.10-Bases, Ballasts, and Paving
-32.30-Site Improvements
-32.70-Wetlands
-32.80-Irrigation
-32.90-Planting
-33.00-Utilities
-33.10-Water Utilities
-33.20-Wells
-33.30-Sanitary Sewerage Utilities
-33.40-Storm Drainage Utilities
-33.50-Fuel Distribution Utilities
-33.60-Hydronic and Steam Energy Utilities
-33.70-Electrical Utilities
-33.80-Communications Utilities
-34.00-Transportation
-34.10-Guideways/Railways
-34.20-Traction Power
-34.40-Transportation Signaling Control Equipment
-34.50-Transportation Fare Collection Equipment
-34.70-Transportation Construction and Equipment
-34.80-Bridges
-35.00-Waterway and Marine Construction
-35.20-Waterway and Marine Construction and Equip
-35.30-Coastal Construction
-35.40-Waterway Construction and Equipment
-35.50-Marine Construction and Equipment
-35.70-Dam Construction and Equipment
-40.00-Process Integration
-40.10-Gas and Vapor Process Piping
-40.20-Liquids Process Piping
-40.30-Solid and Mixed Materials Piping and Chutes
-40.40-Process Piping and Equipment Protection
-40.80-Commissioning of Process Systems
-40.90-Instrumentation and Control for Process Sys
-41.00-Material Processing and Handl Equipment
-41.10-Bulk Material Processing Equipment
-41.20-Piece Material Handling Equipment
-41.30-Manufacturing Equipment
-41.40-Container Processing and Packaging
-41.50-Material Storage
-41.60-Mobile Plant Equipment
-42.00-Process Heating, Cooling, Drying Equipment
-42.10-Process Heating Equipment
-42.20-Process Cooling Equipment
-42.30-Process Drying Equipment
-43.00-Process Gas, Liq Handl, Purif, Stor Equip
-43.10-Gas Handling Equipment
-43.20-Liquid Handling Equipment
-43.30-Gas and Liquid Purification Equipment
-43.40-Gas and Liquid Storage
-44.00-Pollution and Waste Control Equipment
-44.10-Air Pollution Control
-44.20-Noise Pollution Control
-44.30-Odor Control
-44.40-Water Pollution Control Equipment
-44.50-Solid Waste Control and Reuse
-44.60-Waste Thermal Processing Equipment
-45.00-Industry-Specific Manufacturing Equipment
-46.00-Water and Wastewater Equipment
-46.20-Water and Wastewater Prelim Treat Equip
-46.30-Water and Wastewater Chemical Feed Equip
-46.40-Water and Wastewater Clarif Mixing Equip
-46.50-Water and Wastewater Secondary Treat. Equip
-46.60-Water and Wastewater Advanced Treat. Equip
-46.70-Water and Wastewater Resid Handl and Treat
-48.00-Electrical Power Generation
-48.10-Electrical Power Generation Equipment
-48.70-Electrical Power Generation Testing

Transmittal

Attribute 1

Attribute 2

Attribute 3

Attribute 4

(Description)

(Description)

(Description)

(Description)

You might also like