Culture Documents
Record No. :
Sheet : Page 1 of 2
Substation No :
2.
2.1.
Duration: 1min.
Measured insulation value
Remarks
Criteria:
2.2.
To
2.3.
Measured
Resistance ()
V
A.C.
Ammeter
Test:
Witnessed by
Injected
secondary AC
Current (A)
Observed meter
reading (A)
Record No. :
Sheet : Page 2 of 2
Substation No :
Calculated meter
reading
Test Equipment
Freja 300
Serial Number
Tested by
Name:
Signature:
Date:
Calibration
Date
Calibration
Due Date
Witnessed by