You are on page 1of 10

FOR APPROVAL

PROJECT

THAI BINH THERMAL POWER PLANT AND


TRANSMISSION LINES
CONSTRUCTIONS PROJECT
(CONTRACT NO. 261213/TB-EVN-MC)
OWNER

VIETNAM ELECTRICITY
CONSULTANT

FICHTNER GmbH & Co. KG


in association with TEPSCO and PECC1
CONTRACTOR

MARUBENI CORPORATION
PROJECT
CONTROL NO.

TB-18GUA-C-MC2-2001

REV. NO.
1

Title:

Study for Rain Water Discharge


from TB site to Tra Ly River
1

Revised as per CaRs 4133-R1

Hojo

Tomizaki

27/01/2016

First Issue

Hojo

Tomizaki

20/11/2015

By

App.

Date

Rev.

Description

Drawing No.: MC-SDS-8-0-2001


Scale: non
Date: 27 January 2016

Rev.: 1

MARUBENI CORPORATION

Thai Binh Thermal Power Plant and Transmission Lines Construction Project

Study for Rain Water Discharge from TB site to Tra Ly River


The maximum river water level EL+3.5m is stipulated for circulating water pump design as stated in ITB
2.1.3.2.
The river high water level only appears in a limited time (within 1 hour) since it interlocks with the sea level
variation. It is very rare situation that when this river high water level (EL +3.5m) has occurred, the rainfall
of the design target scale (rainfall intensity I = 94mm/hr) occurs at the same time. But even if in such an
extraordinary situation, it is shown below that the flooding of the Buildings and Plant Facilities do not occurs.
Rainfall intensity I : 94mm/hr Average runoff coefficient C0.43 (Refer to Attachment-1)
13 2
Design storm water flow : Q = CIA
Hydraulic design : Q = AV, V
R i
n

Road in the site


EL+4.50m (Ground Level)

EL+4.35m
(Ground Level)

EL+4.30m (Top of Drain Ditch)

Dike
EL+4.20m

EL+3.58

EL+1.65m

H = Hr + Hsc = 0.078m
Qin

Culvert

River
EL+3.50m(H.W.L.)

Qout
Vout
EL+0.60m

Length 14m

EL-1.90m

Culvert
Seashell
10cm

2.5m

Fig. 1 Image of the water level in the site

Qin = 0.094m/hr 0.43393,400m2 = 15,901m3/hr = 4.417m3/sec


A=(2.5-0.2)(1.5-0.2)=2.99m2, P=(2.3+1.3)27.2m2, R=A/P=2.99/7.2=0.415m
Vout = Qin/A = 4.417 / 2.99 = 1.48m/sec
Friction head of the waterway at the floodgateHr
Calculated from the Manning formula.
Hr = {(Qinn) / (A R^(2/3)) }^2L
= {(4.417 0.015) / (2.99 0.415^(2/3)}^2 14 = 0.022m

1.5m

Thai Binh Thermal Power Plant and Transmission Lines Construction Project

Entrance head loss to the waterway at the floodgate (Loss load due to abrupt contraction) Hsc
Hsc = fsc V^2/(2g)
= 0.5(1.48^2)/(29.8) = 0.056 m
fscloss coefficient of abrupt contraction =0.5
Head loss at the floodgate H = Hr + Hsc = 0.022 + 0.056 = 0.078 m
Thus, when the liver water level rises to EL+ 3.5m, the water level at the downstream of the site side is EL
3.50.078 = EL3.578m. In this situation, it is shown that the water level of the site is lower than
EL+4.3m in the Table1and 2.

Thai Binh Thermal Power Plant and Transmission Lines Construction Project

Table1 Flow Rate Calculations and Water Level (West route)

Upper

Drainage area

Lower

Runoff

Each line Cumulation


Co(ha)
(ha)
efficient

Rain
intensity
(mm/h)

Channel length

Each line Cumulation Each line Cumulation


3
3
(m)
(m)
Q(m /s)
Q(m /s)

1-1

1-2

1.07

1.07

0.10

94.0

158.8

1-2

2-a

0.50

1.57

0.22

94.0

133.1

291.9

2-a

94.0

5.4

297.3

4-a

94.0

113.0

410.3

4-a

94.0

9.5

419.8

8-a

94.0

32.6

452.4

8-a

10

94.0

7.5

459.9

10

10-a

94.0

19.1

479.0

10-a

11-1

94.0

11.5

490.5

11-1

11-2

0.23

5.91

0.35

94.0

29.3

519.8

11-2

11-3

0.22

6.13

0.38

94.0

32.5

11-3

11-4

0.23

6.36

0.34

94.0

11-4

12-1

0.10

6.46

0.56

12-1

12-2

0.08

6.54

12-2

13

0.14

13

17-a

0.06

17-a

22

22

22-a

22-a

23

23

25-a

25-a

27

27

27-a

27-a

28

28

29-a

29-a

31-1

31-1

31-a

31-a

400

400

401

401

500

500

4.30

3.900

0.028

0.057

U 300

487.135

0.61

0.390

0.057

4.069

3.987

4.30

4.30

3.500

0.086

0.086

U 500

495.533

0.30

0.347

0.086

3.987

3.986

4.30

4.30

3.490

0.282

0.304

U 800

674.611

0.45

0.563

0.304

3.986

3.935

4.30

4.30

3.260

0.308

0.308

U 800

680.307

0.45

0.566

0.308

3.935

3.930

4.30

4.30

3.250

0.311

0.316

U 800

737.589

0.39

0.536

0.316

3.930

3.918

4.30

4.30

3.180

0.400

0.400

U 800

742.984

0.61

0.673

0.400

3.918

3.913

4.30

4.30

3.170

0.415

0.417

U 800

771.361

0.61

0.676

0.417

3.913

3.901

4.30

4.30

3.130

0.417

0.417

U 800

774.432

0.60

0.673

0.417

3.901

3.894

4.30

4.30

3.120

0.021

0.417

0.438

U 800

817.361

0.58

0.670

0.438

3.894

3.877

4.30

4.30

3.060

552.3

0.022

0.438

0.460

U 800

858.844

0.57

0.670

0.460

3.877

3.859

4.30

4.30

3.000

32.5

584.8

0.020

0.460

0.480

U 800

900.881

0.55

0.666

0.480

3.859

3.841

4.30

4.30

2.940

94.0

27.7

612.5

0.015

0.480

0.495

U 800

946.418

0.52

0.654

0.495

3.841

3.826

4.30

4.30

2.880

0.61

94.0

48.7

661.2

0.013

0.495

0.508

U 800

1024.239

0.46

0.620

0.508

3.826

3.804

4.30

4.30

2.780

6.68

0.77

94.0

36.4

697.6

0.028

0.508

0.536

U 800

1077.885

0.45

0.622

0.536

3.804

3.788

4.30

4.30

2.710

6.74

0.24

94.0

30.2

727.8

0.004

0.536

0.540

U 800

1094.604

0.44

0.617

0.540

3.788

3.775

4.30

4.30

2.680

94.0

7.9

735.7

0.601

0.601

U 800

1110.443

0.53

0.677

0.601

3.775

3.770

4.30

4.30

2.660

94.0

46.7

782.4

0.643

0.648

U 800

1143.773

0.57

0.708

0.648

3.770

3.744

4.30

4.30

2.600

94.0

5.5

787.9

0.648

0.648 DN 1200

0.28

0.573

0.648

3.744

3.742

4.30

4.30

2.590

94.0

198.8

986.7

0.648

0.670

0.36

0.586

0.670

3.742

3.670

4.30

4.30

2.240

94.0

9.9

996.6

0.693

0.693 DN 1200

0.32

0.613

0.693

3.670

3.667

4.30

4.30

2.230

94.0

29.1

1025.7

0.726

0.733

0.41

0.626

0.734

3.667

3.655

4.30

4.30

2.190

94.0

5.0

1030.7

0.733

0.733 DN 1200

0.35

0.648

0.733

3.655

3.653

4.30

4.30

2.180

94.0

71.2

1101.9

0.733

0.756

0.34

0.580

0.756

3.653

3.628

4.30

4.30

2.000

94.0

5.9

1107.8

0.764

0.764 DN 1000

1.02

0.973

0.764

3.628

3.623

4.30

4.30

1.990

94.0

28.1

1135.9

0.775

0.781

0.35

0.587

0.781

3.623

3.613

4.30

4.30

1.950

10.02

94.0

4.0

1139.9

0.802

0.802 DN 1200

0.42

0.709

0.802

3.613

3.611

4.30

4.30

1.940

15.22

94.0

41.5

1181.4

1.244

1.244

1200

1743.69

0.18

0.595

1.245

3.611

3.604

4.30

4.30

1.860

94.0

57.3

1238.7

1.248

1.253

U 1200

1790.96

0.22

0.583

1.253

3.604

3.591

4.30

4.30

1.800

94.0

30.0

1268.7

4.399

4.399

2000

1838.00

0.43

1.197

4.400

3.591

3 .5 7 8

4.30

4.30

1.740

0.27

5.12

0.62

5.68

0.15

8.25

0.20

8.70

0.19

9.38

0.42

9.62

0.36

9.70

0.06

Bottom
elevation of
pipe/channel

4.50

9.38

0.06

Ground elevation
Start(m)
End (m)

4.069

9.12

0.24

Water level
Start(m)
End (m)
4.218

8.25

0.06

Flow rate
3
(m /s)
0.028

7.47

0.45

Flow velocity
(m/s)
0.415

5.68

0.10

Gradient
()
0.94

5.45
0.06

Section
(mm)
168.898

5.05
0.03

Design rainwater arterial line

U 400

5.00

9.88

15.34

36.16

0.38

0.30

0.028

Total
Rain
water
3
Q(m /s)
0.028

2.42
0.31

Rain water amount

0.029

0.022

0.005

0.002

0.005

0.022

0.007

0.023

0.006

0.005

U 800

U 800

U 800

U 800

1429.916

1464.795

1628.496

1662.646

Thai Binh Thermal Power Plant and Transmission Lines Construction Project

Table2 Flow Rate Calculations and Water Level (East route)

Upper

Drainage area

Lower

Runoff

Each line Cumulation


Co(ha)
(ha)
efficient

Rain
intensity
(mm/h)

Channel length

Rain water amount

Each line Cumulation Each line Cumulation


3
3
(m)
(m)
Q(m /s)
Q(m /s)

101

102

1.71

1.71

0.15

94.0

219.1

102

103

0.20

1.91

0.23

94.0

107.0

326.1

0.012

103

114

0.03

1.94

0.29

94.0

12.9

339.0

114

132

0.07

3.36

0.32

94.0

55.4

132

144

0.07

4.68

0.32

94.0

144

152

0.11

5.97

0.31

152

182

0.06

7.46

182

187-1

0.11

187-1

187-2

0.20

187-2

190

190

500

500

1.83

Design rainwater arterial line


Section
(mm)

Gradient
()

Flow velocity
(m/s)

Flow rate
3
(m /s)

Water level
Start(m)
End (m)

Ground elevation
Start(m)
End (m)

Bottom
elevation of
pipe/channel

0.067

U 600

489.224

0.11

0.228

0.067

4.193

4.169

4.30

4.30

3.680

0.067

0.079

U 600

588.846

0.10

0.224

0.079

4.169

4.159

4.30

4.30

3.570

0.002

0.079

0.081

U 600

597.577

0.10

0.226

0.081

4.159

4.158

4.30

4.30

3.560

394.4

0.006

0.306

0.312

U 800

925.451

0.22

0.421

0.312

4.158

4.145

4.30

4.30

3.220

58.4

452.8

0.006

0.667

0.673

U 1000

1063.274

0.38

0.633

0.673

4.145

4.123

4.30

4.30

3.060

94.0

87.0

539.8

0.009

0.944

0.953

U 1200

1161.784

0.36

0.684

0.954

4.123

4.092

4.30

4.30

2.930

0.31

94.0

46.3

586.1

0.005

1.273

1.278

U 1200

1204.179

0.60

0.884

1.277

4.092

4.064

4.30

4.30

2.860

10.66

0.31

94.0

99.8

685.9

0.009

1.746

1.755

U 1200

1252.16

1.02

1.168

1.755

4.064

3.962

4.30

4.30

2.710

14.47

0.31

94.0

175.2

861.1

0.016

2.566

2.582

U 1500

1423.41

0.85

1.209

2.581

3.962

3.813

4.30

4.30

2.390

94.0

10.5

871.6

2.594

2.594

1600

1437.93

0.52

1.128

2.595

3.813

3.808

4.30

4.30

2.370

94.0

356.2

1227.8

2.616

2.678

U 1500

1680.96

0.61

1.062

2.678

3.808

3.591

4.30

4.30

1.910

94.0

30.0

1268.7

4.399

4.399

2000

1838.00

0.43

1.197

4.400

3.591

3 .5 7 8

4.30

4.30

1.740

14.62
16.91
36.16

0.13

0.067

Total
Rain
water
3
Q(m /s)

0.062

Thai Binh Thermal Power Plant and Transmission Lines Construction Project

Legend:
(upstream point NO.)
Water level:EL+

102

103

114

132

144

152

182

187-1

187-2

4.17

4.16

4.16

4.15

4.12

4.09

4.06

3.96

3.81

190

3.81
(1-1)

4.22

(1-2)

2-a

4.07

3.99

101

4.19

4-a

3.94
(8-a)

500

3.92

3.59

(11-3)

25-a

3.86

3.67

29-a

3.63

3.58
400

3.61

(12-1)

3.83

22-a

27-a

3.74

3.66

(17-a)

3.78

(12-2)

3.80
Figure Water level
6

401

3.60

Thai Binh Thermal Power Plant and Transmission Lines Construction Project

Attachment-1 : Average runoff coefficient C


Runoff coefficient 1/4
Route
No

Area2
roof(0.95)

Concrete(0.85)

Asphalt(0.75) Gravel(0.30) Turf,grass garden(0.10)

Total
Area2

Runoff
coefficient

1-1

25

10,675

10,700

0.10

1-2

949

4,051

5,000

0.22

2-1

361

8,139

8,500

0.13

6,936

22,700

0.33

3,100

0.27

2-2

480

983

2,894

11,407

787

2,313

4-1

141

359

500

0.28

4-2

141

259

400

0.33

238

62

300

0.62

600

0.83

477

123

7-1

85

39

176

300

0.42

7-2

194

109

97

400

0.69

7-3

123

79

498

700

0.32

38

211

9-1

128

96

1,051
434

1,300

0.23

242

900

0.39

9-2

217

583

800

0.28

10

47

553

600

0.15

11-1

413

354

1,533

2,300

0.35

11-2

593

188

1,419

2,200

0.38

11-3

474

243

1,583

2,300

0.34

11-4

395

193

412

1,000

0.56

12-1

391

116

293

800

0.61

12-2

942

204

254

1,400

0.77

13

133

467

600

0.24

14

124

676

800

0.20

15-1

427

3,773

4,200

0.17

15-2

80

74

246

400

0.39

16

86

71

943

1,100

0.21

155

645

800

0.23

17
18-1

297

115

788

1,200

0.13

18-2

210

514

1,576

2,300

0.23

19

153

1,347

1,500

0.35

20

151

849

1,000

0.20

21

173

627

800

0.24

22

152

848

1,000

0.20

23

640

3,860

4,500

0.19

24

566

3,034

3,600

0.20

25

150

450

600

0.26

26-1

163

101

148

388

800

0.58

26-2

407

78

323

392

1,200

0.68

27

34

115

451

600

0.42

28

80

220

2,100

2,400

0.36

29

43

85

672

800

0.38

30

54

88

1,058

1,200

0.36

104

496

600

0.38

128

207

500

0.63

900

0.57

1,800

0.47

31-1
31-2

165

32

166

92

186

456

33

206

387

1,199

Thai Binh Thermal Power Plant and Transmission Lines Construction Project

Runoff coefficient 2/4


Route
No
50

Area2
roof(0.95)

Concrete(0.85)

404

Asphalt(0.75) Gravel(0.30) Turf,grass garden(0.10)

1,175

51-1

2,238

462

51-2

2,260

641

6,621

Total
Area2

Runoff
coefficient

8,200

0.24

2,700

0.83

2,099

5,000

0.52

51-3

180

591

529

1,300

0.51

52-1

214

264

722

1,200

0.39

52-2

145

1,555

1,700

0.16

52-3

506

52-4
52-5

44

1,494

2,000

0.26

13,900

13,900

0.10

7,256

7,300

0.10

53

228

572

800

0.29

54

236

564

800

0.29

55

607

1,793

2,400

0.26

56

50

24

224

702

1,000

0.31

24

328

2,648

3,000

0.18

85

64

427

700

0.40

59

151

450

600

0.26

101

894

14,895

17,100

0.15

102

391

1,609

2,000

0.23

57
58

124

1,311

103

89

211

300

0.29

104

467

2,833

3,300

0.19

231

902

1,200

0.27

229

471

700

0.31

424

3,108

3,600

0.19

312

1,088

1,400

0.24

67

333

105

67

106
107

68

108
109

400

0.21

110

139

61

200

0.82

111

453

147

600

0.83

1,526

75

2,100

0.87

700

0.32

112

499

114
116

241
499

459

1,611

90

2,200

0.87

117

275

25

300

0.84

118

342

58

400

0.84

119

345

55

400

0.84

120

518

82

600

0.84

121

426

74

500

0.84

122

240

160

400

0.81

123-1

1,034

166

1,200

0.84

123-2

1,414

186

1,600

0.84

124

327

73

400

0.83

125

328

72

400

0.83

126-1

1,296

204

1,500

0.84

126-2

785

115

900

0.84

127-1

273

27

300

0.84

127-2

245

55

300

0.83

128

244

56

300

0.83

129

144

56

200

0.82

130

375

225

600

0.81

700

0.32

132

234

466

Thai Binh Thermal Power Plant and Transmission Lines Construction Project

Runoff coefficient 3/4


Route
No

Area2

Total
Area2

Runoff
coefficient

roof(0.95)

Concrete(0.85)

133

246

694

260

1,200

0.85

134

331

527

142

1,000

0.87

135

72

774

154

1,000

0.84

136

246

953

201

1,400

0.85

137

478

222

700

0.82

138

681

219

900

0.83

139-1

242

158

400

0.81

139-2

231

69

300

0.83

139-3

331

69

400

0.83

Asphalt(0.75) Gravel(0.30) Turf,grass garden(0.10)

140-1

224

184

92

500

0.88

140-2

224

261

115

600

0.87

140-3

72

432

96

600

0.85

141-1

72

432

96

600

0.85

141-2

246

239

115

600

0.87

141-3

246

168

86

500

0.88

142-1

226

74

300

0.83

142-2

141

59

200

0.82

142-3

473

127

600

0.83

144

1,100

0.31

145

353

348
147

752

500

0.82

146

2,676

524

3,200

0.83

147

2,444

356

2,800

0.84

148

154

2,927

219

3,300

0.85

149

154

3,027

219

3,400

0.85

874

226

1,100

0.83

600

0.31

150
152

190

153

52

154

410

63

1,385

1,500

0.34

179

1,121

1,300

0.36

155

60

85

155

300

0.56

156-1

557

206

937

1,700

0.57

156-2

277

162

561

1,000

0.55

157

128

56

116

300

0.66

42

58

100

0.49

158
159

147

291

562

1,000

0.53

160

508

229

763

1,500

0.59

161

67

124

209

400

0.55

162-1

180

245

1,200

0.24

162-2

219

481

700

0.44

163

214

786

1,000

0.40

775

164

734

166

900

0.83

165

945

155

1,100

0.84

166-2

80

110

310

500

167-1

139

0.50

18

232

311

700

0.59

167-2

101

81

218

400

0.53

168-1

15

65

120

200

0.49

168-2

13

97

190

300

0.47

169

253

747

1,000

0.41

170

181

319

500

0.46

171

384

2,416

2,800

0.36

200

1,548

1,800

0.37

172

52

Thai Binh Thermal Power Plant and Transmission Lines Construction Project

Runoff coefficient 4/4


Route
No

Area2
roof(0.95)

Concrete(0.85)

Asphalt(0.75) Gravel(0.30) Turf,grass garden(0.10)

Total
Area2

Runoff
coefficient

173

206

1,194

1,400

0.20

174

194

806

1,000

0.23

175

865

334

1,701

2,900

0.32

80

434

486

1,000

0.54

35

116

111

400

0.70

177-2

53

65

182

300

0.49

178

31

72

197

300

0.46

179

17

125

158

300

0.52

180

326

774

1,100

0.43

182

349

1,100

0.31

176
177-1

183

138

195

184
A

125

751

31

1,075

2,299

3,600

0.47

104

540

2,756

3,400

0.39

65

72

38

300

0.76

57

35

100

0.60

41

62

497

600

0.38

30

66

100

0.46

300

300

0.30

3,200

0.41

228

300

0.43

911

1,300

0.47

73

100

0.43

800

0.30

1,700

0.38

300

0.43

F
G

312

H
I

252

2,636

72

126

223

40

795

1,489

71

229

115

206

N
185-1

23

285

400

0.46

185-2

4,800

600

5,400

0.88

185-3

4,800

600

5,400

0.88

185-4

6,400

400

6,800

0.91

1,866

2,000

0.34

185-5

121

187-1
188
189

100

190

201

104

202
203

8,064

13
656

1,344

2,000

0.31

479

1,021

1,500

0.31

467

4,033

4,600

0.18

722

17,578

18,300

0.13

642

5,254

6,000

0.36

632

11,768

12,400

0.32

9,434

17,500

0.60

204

83

1,317

1,400

0.33

401

184

600

0.30

416

361,600
roof only

26,300

387,900

total area

63,957

42,113

41,454

83,984

156,394

0.95

0.85

0.75

0.30

0.10

60,759

35,796

31,090

25,195

15,639

(Total Area)

387,902
168,480

0.434

Average runoff
coefficient
10

You might also like