You are on page 1of 5

ALPHA BOILERS

No: 52/141,East Vanniyar Street,,


West K.K.Nagar,
Chennai-78.
E-Mail at: aboilers@yahoo.co.in web: www.alphaboiler.in
Ph: 044-45563168, 65879215/9884172331
Ref: AB/ /11-12

Date: 19/07/2011

To
VIJAYAM BIO CYTES PVT LTD
53-A,SIDCO Industrial estate,
kakkalore-602 003.

Kind Attention: Mr. SEKAR


Dear sir,
Sub: Offer for Non-IBR Steam Boiler
Thank you for your enquiry. This has reference to the mail you had with undersigned
regarding your above requirement.
As per discussion enclosed please find offer for:
Non-IBR Boiler model ASS-600 capable of generating 600kg/hr heat output at a
maximum safety valve set pressure of 10.54kg/cm2. When fired on LDO/HSD.
Our enclosed offer consists of following

Scope of supply and exclusions


Technical specifications giving technical details
Commercial price List giving price, delivery, of sale

Trust the above is in line with your requirement.


Thanking you and assuring you of our best attention at all times. We remain,
Yours faithfully,
For ALPHA BOILERS

N.JAYAPRAKASH

SCOPE OF SUPPLY
BOILER
One

Presser part assembly consisting of closely wound helical vertical membrane


Coil fabricated out of high temperature resistant ERW tubes and flats.

One

Double jacketed air casing with an aluminum radiator to enclose the pressure
Parts and serve as an integral combustion air Preheater

ACCESSORI ES
One

pressure atomized, forced draft, down firing burner assembly suitable for
LDO\HSD firing.

One

Blower coupled motor, mounted on bottom on chassis, dully connected to


The jacket.

One

Fuel pump coupled to motor

One

water pump with motor

One

Atmospheric economizer to pre-heat feed water control

One

Dust protected pre- wired control panel with necessary switch gear, and
Control circuitry.

PIPING
One

feed water line between economizer, feed pump and boiler.

One

fuel oil line between filter, fuel pump, Y-strainer and burner

STEAM
One

Main steam stop valve

One

Auxiliary steam stop valve

One

Single port spring loaded safety valve

WATER
One

Strainer Y type on feed water line

One

Relief valve on feed water pump

One

Blow down valve

INSTRUMENTS, CONTROLS AND SAFETIES


One

Burner programmer with matching flame sensor

One

Set audio alarms for abnormal conditions

STEAM
One

Steam pressure switch for burner ON-OFF control

One

Steam pressure indicator

One

Steam temperature indicator cum switch for high alarm

WATER
One

Low water level alarm switch on economizer

One

Blow down valve limit switch

FUEL
One

Fuel pressure indicator

EXCLUSIONS
1.Raw water, soft water service tanks.
2.steam,water,fuel oil and drain piping up to our terminal points.
3.All civil and structural work for installing the boiler.

4.Electrical works in boiler house up to our terminal point.


5.labour,tools and tackles, utilities (water,power,air,gas,etc) and consumables.
6.water treatment plant.
7.All insulation, wherever required.
8. Any other items not specifically mentioned in our offer will Be Charged Extra at
Actual. At the time of erection and commissioning ( Spare and other accessories)
TECHNICAL SPECIFICATION:

MODEL

ASS-600

Boiler capacity

600kgs/hr

Working pressure

10.5kgs/hr

Maximum temperature

185 degree C

Thermal efficiency based on NCV

88% +/- 2%

Fuel consumption HSD(NCV10,200kcal/kg)

36 kgs/hr

Blower motor

1.5/2HP

Water pump motor

0.75kw/1Hp

Fuel pump motor

0.375kw/0.5Hp

Total connected load

2.625kw/3.5Hp

Electric supply

415V, 3PH, AC50HZ

Overall Dimensions(Approximate)
Length

: 1700mm

Width

: 1500mm

Height

: 2000mm

Weight

: 2 Ton

PRICE SHEDULE
Steam boiler cost

RS : 4, 60,000.00

Erection & commissioning charges


OFFER FOR CHEIMNY:

Rs :

15,000.00

350 mm Dia, 5mm thick ,40 feet height chimney with stay ropes, heat resistance
aluminum paint, foundation bolt.
Total cost of the chimney
Erection charges

: Rs. 70,000.00
: Rs. 9,000.00

CHEIMNY DUCT:
250 mm Dia and 7 mtrs length chimney duct with erection charges: Rs. 30,000.00

TAX;
Vat 5%
DELIVERY:
60 Days against P.O
PAYMENT TERMS:
75% Advance 20% at the time of delivery, balance after completion of the job.
TRANSPORTATION:
As actual
Offer should be valid for 30 days.
In case any clarification please feel free to contact us.
For ALPHA BOILERS
N.JAYAPRAKASH

You might also like