You are on page 1of 10

Maintenance Work Sheet

B744PF-TR
Item

1.

A/C Reg.

TRANSIT
Station

B744
Job No.

Rev No.
79

Description

Date
Jul 16

Page No.
1 of 10

NRC # Mech
raised

Auth

NOTE:
1. THIS CHECK CONTAINS MANDATORY
TASKS

XXX

XXX

XXX

XXX

XXX

XXX

2.

XXX

XXX

XXX

XXX

XXX
XXX

XXX
XXX

XXX

XXX

XXX

XXX

XXX

XXX

XXX

XXX

XXX

XXX

XXX

XXX

XXX

XXX

XXX

XXX

XXX

XXX

XXX

XXX

FOR FEEDBACK, COMMENTS, AND QUERIES REGARDING THIS


CHECK SHEET, PLEASE CALL DUTY MCP AT (852) 2747-8684 OR SEND
E-MAILTO ENG#MCP@CATHAYPACIFIC.COM.

B744 TRANSIT CHECK


AMS: CX in-house instruction
Perform Daily Check in addition to a Transit Check as follows:
1. In HKG, prior to B744F flights to China, Taiwan, Japan, Korea, Indonesia,
Singapore, Malaysia and Vietnam.
2. For flight terminating in Europe (excluding ZAZ), North America, Africa and
Middle East.
3. In HKG, prior to departure to Europe, North America, Africa, Australia, New
Zealand, Middle East, India, Bangladesh, Sri Lanka, and Pakistan.
4. In HKG, after arrival from Europe, North America, Africa, Australia, New Zealand,
Middle East, India, Bangladesh, Sri Lanka, and Pakistan.
5. Any station where the aircraft overnights (including HKG).
6. In ORD, prior to departure of flight to AMS.
7. In AMS, prior to departure of flight to ZAZ.
8. In ANC, prior to departure of flight to HKG.
NOTE:
A TERMINATING OR TURNAROUND STATION IS DEFINED AS THE STATION
WHERE A FLIGHT FROM HKG AND A FLIGHT BACK TO HKG STARTS. (E.G.
CX251, BECOMES CX250 IN LHR)

Signature_____________________ Auth No______________________ Date__________________


Certificate of Release to Service
HKAR145 organisation: Certifies that the work specified except as otherwise specified was carried out in accordance with HKAR-145 and in respect to that work the aircraft/aircraft component is considered ready for release to service. CX Auth DAI/17/1059,
HAECO Auth DAI/1/853; HAECO GTI-P-002; CI Auth AI/118/0102; HAECO XIAMEN Auth DAI/89/1295; HAECO XIAMEN EPM-Quality 1.2.1; CASL Auth. AI/101/798.
SAR-145 organisation accepted under the Technical Arrangement between CAD and CAAS: Certifies that the work specified except as otherwise specified was carried out in accordance with SAR-145 and the Air Navigation Order and in respect to that work
the aircraft/aircraft component is considered ready for release to service. HAECO SIN Approval No.: CAAS/AWI/227.
CCAR-145/JMM organisation: Certifies that the work specified except as otherwise specified was carried out in accordance with the current regulations of Civil Aviation Administration of China and in respect to that work the aircraft/aircraft component is
considered ready for release to service. STARCO Auth. CCAR-145 D.200078/JMM039/STARCO QD-SOP-014; AMECO Auth. CCAR-145 D.101131/JMM001.

ENG P/291R

Maintenance Work Sheet


B744PF-TR
Item

2.

A/C Reg.

TRANSIT
Station

B744
Job No.

Rev No.
79

Description

Date
Jul 16

Page No.
2 of 10

NRC # Mech
raised

Auth

Section A: AMS Mandatory Item

XXX

XXX

Task variation is not allowed

XXX

XXX

CDCCL TASKS OF AWL REQUIREMENT - FUEL SYSTEM


AMS: 28-AWL-04
Mandatory Ref: Section 9 (Part A) AWL Rules, 28-AWL-04
Is there any maintenance performed in the area(s) where related to the following CDCCL
tasks as listed in MMB 4-28-003-744 ?
If YES, please take appropriate action to satisfy the AWL requirement as per MMB
4-28-003-744 .
AWL Ref.
DESCRIPTIONS
28-AWL-04 Fuel Quantity Indicating System (FQIS) - out of tank wiring
lightning shield to ground termination.

DISTURBED?
YES / NO

If YES is declared on any AWL item(s), record the following information:


1.

2.

Record the originating Tech Log defect reference or Workcard reference.


AWL Ref.
Originating Doc. Ref.
.

................................

................................

................................

Record Tech Log reference and/or NRC reference of the performed CDCCL task(s).
AWL Ref.
Compliance Doc. Ref
.

................................

................................

................................

Signature_____________________ Auth No______________________ Date__________________


Certificate of Release to Service
HKAR145 organisation: Certifies that the work specified except as otherwise specified was carried out in accordance with HKAR-145 and in respect to that work the aircraft/aircraft component is considered ready for release to service. CX Auth DAI/17/1059,
HAECO Auth DAI/1/853; HAECO GTI-P-002; CI Auth AI/118/0102; HAECO XIAMEN Auth DAI/89/1295; HAECO XIAMEN EPM-Quality 1.2.1; CASL Auth. AI/101/798.
SAR-145 organisation accepted under the Technical Arrangement between CAD and CAAS: Certifies that the work specified except as otherwise specified was carried out in accordance with SAR-145 and the Air Navigation Order and in respect to that work
the aircraft/aircraft component is considered ready for release to service. HAECO SIN Approval No.: CAAS/AWI/227.
CCAR-145/JMM organisation: Certifies that the work specified except as otherwise specified was carried out in accordance with the current regulations of Civil Aviation Administration of China and in respect to that work the aircraft/aircraft component is
considered ready for release to service. STARCO Auth. CCAR-145 D.200078/JMM039/STARCO QD-SOP-014; AMECO Auth. CCAR-145 D.101131/JMM001.

ENG P/291R

Maintenance Work Sheet


B744PF-TR
Item

3.

A/C Reg.

TRANSIT
Station

B744
Job No.

Rev No.
79

Description

Date
Jul 16

Page No.
3 of 10

NRC # Mech
raised

Auth

Section B: AMS Item

XXX

XXX

Item must not be deferred without consultation with Duty MCP

XXX

XXX

ARRIVAL PROCEDURES
AMS: NA321000-01, NA321000-02 (Freighter only)
Ref: EOMP section 7B-2/7B-10
1.

Establish intercom contact with flight crew and advise Chocks in position and
confirm aircraft status.

2.

For all flights, connect ground power and air conditioning as per CX minimal APU
usage policy.

NOTE:
i) FOR HKG, REPORT APU RUNNING VIA AML TI ENTRY WITH REASON
FOR STARTING APU EARLY & BAY NO.
ii) FOR LINE STATIONS, REFER TO LOCAL STATION PROCEDURE MANUAL
(SPM) FOR LOCAL PROCEDURES.
3.

Prior to installing landing gear downlock safety pins, check safety clip is attached to
the downlock pin, and inspect downlock pin streamers for wear, dirt and
discoloration, replace as necessary.
NOTE: FOR LINE STATION, RAISE ADD IF NIL STOCK.

4.

Install landing gear downlock safety pins if schedules ground time is greater than 6
hours or if work requirements dictate the use of safety pins.
NOTE:
AN ENTRY SHALL BE MADE IN THE MAINTENANCE LOG STATING
SAFETY PINS HAVE BEEN FITTED.

5.

Fit tail support stanchion or nose tie down straps prior to loading / unloading.
(APPLICABLE TO FREIGHTER AIRCRAFT ONLY)
NOTE: AMM 07-11-08

6.

Pull all grey capped circuit breakers in the flight station as soon as possible after
landing.
Reference: AMM 24-50-01
(APPLICABLE IF GROUND TIME IS GREATER THAN 6 HRS)

Signature_____________________ Auth No______________________ Date__________________


Certificate of Release to Service
HKAR145 organisation: Certifies that the work specified except as otherwise specified was carried out in accordance with HKAR-145 and in respect to that work the aircraft/aircraft component is considered ready for release to service. CX Auth DAI/17/1059,
HAECO Auth DAI/1/853; HAECO GTI-P-002; CI Auth AI/118/0102; HAECO XIAMEN Auth DAI/89/1295; HAECO XIAMEN EPM-Quality 1.2.1; CASL Auth. AI/101/798.
SAR-145 organisation accepted under the Technical Arrangement between CAD and CAAS: Certifies that the work specified except as otherwise specified was carried out in accordance with SAR-145 and the Air Navigation Order and in respect to that work
the aircraft/aircraft component is considered ready for release to service. HAECO SIN Approval No.: CAAS/AWI/227.
CCAR-145/JMM organisation: Certifies that the work specified except as otherwise specified was carried out in accordance with the current regulations of Civil Aviation Administration of China and in respect to that work the aircraft/aircraft component is
considered ready for release to service. STARCO Auth. CCAR-145 D.200078/JMM039/STARCO QD-SOP-014; AMECO Auth. CCAR-145 D.101131/JMM001.

ENG P/291R

Maintenance Work Sheet


B744PF-TR

A/C Reg.

TRANSIT
Station

Item

Description

4.

WALK AROUND INSPECTION


AMS: 236100-CX-01, 06-001-01-CX
1.

B744
Job No.

Rev No.
79

Date
Jul 16

Page No.
4 of 10

NRC # Mech
raised

Auth

Perform general visual (walk around) inspection of fuselage, doors, static


dischargers, antennas, drain masts and control surfaces as visible from the ground
for damage, leaks, security of panel, pay particular attention to:

A. Left and right hand horizontal stabilizers and vertical fin including elevators and
rudders.
B. All cargo doors, ram air inlets, service doors and exits, wing to body fairing and
external fuselage.
C. Radome.
D. Left and Right hand wing leading edge & lower surfaces. Left and right hand
ailerons, flaps and spoilers.
E. Aft fuselage and drain masts for evidence of ground contact on T/O or landing,
including BS 2360 to 2792 (section 48) from ground level.
F. APU compartment doors for security and leakage.
G. Oxygen blowout disc intact (adjacent fwd cargo door).
H. Static ports, TAT, pitot/static probes and angle of attack sensor for obvious
damage.
I. Navigation / communications antennas for damage (from ground level).
J. Water / waste service assembly and nose jacking point blanking plug fitted for
condition (from ground level).
NOTE:
IF FUSELAGE BELLY AREA IS CONTAMINATED WITH TOILET FLUID, RAISE
A DEFERRED DEFECT IN THE MAINTENANCE LOG FOR CLEANING AT
EARLIEST CONVENIENT TIME.
5.

HYDRAULIC SYSTEM EXTERNAL LEAKAGE


AMS: 291100-CX-07
Perform a general inspection from the ground of the exterior of the aircraft for evidence
of any hydraulic fluid leakage.
NOTE:
PAY PARTICULAR ATTENTION TO:
A. NOSE AND MAIN LANDING GEARS
B. ENGINE NACELLES AND PYLON AREAS
C. ALL FLYING CONTROL SURFACES
D. UNDERSIDE OF THE FUSELAGE

6.

BRAKE WEAR (HKG ONLY)


AMS: 32-041-05
AMM: 32-41-15-206
Ref: MMB 4-32-018-744
Visually check of all wing and body gear brakes for wear pin extension as per MMB.

Signature_____________________ Auth No______________________ Date__________________


Certificate of Release to Service
HKAR145 organisation: Certifies that the work specified except as otherwise specified was carried out in accordance with HKAR-145 and in respect to that work the aircraft/aircraft component is considered ready for release to service. CX Auth DAI/17/1059,
HAECO Auth DAI/1/853; HAECO GTI-P-002; CI Auth AI/118/0102; HAECO XIAMEN Auth DAI/89/1295; HAECO XIAMEN EPM-Quality 1.2.1; CASL Auth. AI/101/798.
SAR-145 organisation accepted under the Technical Arrangement between CAD and CAAS: Certifies that the work specified except as otherwise specified was carried out in accordance with SAR-145 and the Air Navigation Order and in respect to that work
the aircraft/aircraft component is considered ready for release to service. HAECO SIN Approval No.: CAAS/AWI/227.
CCAR-145/JMM organisation: Certifies that the work specified except as otherwise specified was carried out in accordance with the current regulations of Civil Aviation Administration of China and in respect to that work the aircraft/aircraft component is
considered ready for release to service. STARCO Auth. CCAR-145 D.200078/JMM039/STARCO QD-SOP-014; AMECO Auth. CCAR-145 D.101131/JMM001.

ENG P/291R

Maintenance Work Sheet


B744PF-TR

A/C Reg.

Item

Description

7.

LANDING GEAR / TYRE


AMS: 32-045-02, 32-045-03

TRANSIT
Station

B744
Job No.

Rev No.
79

Date
Jul 16

Page No.
5 of 10

NRC # Mech
raised

Auth

Perform general visual inspection of the following:


1.

Tyres for wear and condition as per MMB 4-32-012-744, and presence of tie bolt
nuts.

2.

Landing gear and brakes for general condition and leaks.

3.

Oleo struts for correct extension. Ensure that the exposed portion of the oleo inner
cylinders is clean.

4.

Gear wells for general condition and leaks, as far as visible from the ground.

NOTE:
THE LANDING GEAR DOORS ARE CLOSED.

8.
(Revised)

ENGINE OIL QUANTITY CHECK


AMS: 12-168-00-CX
AMM: 12-13-03-603-001-001 (for RR engine)
12-13-03-603-012-003 (for PW engine)

1. Prior to any flight of more than 7 hours duration, service the engine oil tanks as per
AMM.
2. For ANY other flight, service any engine that is indicating 18 units or less.
3. Maintenance Log recording:A. Record the actual indicated oil quantity at departure in the ENG DEPART
QTY block.
B. Record amount of oil added in litres (if any) in the ENG UPLIFT block.
NOTE:
A. ALWAYS WAIT FOR 10 MINUTES AFTER ENGINE SHUTDOWN BEFORE
CHECKING OIL QUANTITY.
B. REFER MMB 4-20-1 FOR OIL SPECIFICATION.
C. REFER TO AMM FOR THE CORRECT OIL LEVEL.
D. FOR PW ENGINE, OIL QUANTITY CHECK MUST BE DONE WITHIN 2
HOURS AFTER ENGINE SHUT DOWN.
XXX
4.

After all works completed, Certifying staff conducts a visual inspection to ensure all
disturbed oil filler cap(s) is/are installed correctly and secure.

XXX

Raise a Tech Log defect entry if rectification/repair is required.


Please fill in LP ________ Item ________.

Signature_____________________ Auth No______________________ Date__________________


Certificate of Release to Service
HKAR145 organisation: Certifies that the work specified except as otherwise specified was carried out in accordance with HKAR-145 and in respect to that work the aircraft/aircraft component is considered ready for release to service. CX Auth DAI/17/1059,
HAECO Auth DAI/1/853; HAECO GTI-P-002; CI Auth AI/118/0102; HAECO XIAMEN Auth DAI/89/1295; HAECO XIAMEN EPM-Quality 1.2.1; CASL Auth. AI/101/798.
SAR-145 organisation accepted under the Technical Arrangement between CAD and CAAS: Certifies that the work specified except as otherwise specified was carried out in accordance with SAR-145 and the Air Navigation Order and in respect to that work
the aircraft/aircraft component is considered ready for release to service. HAECO SIN Approval No.: CAAS/AWI/227.
CCAR-145/JMM organisation: Certifies that the work specified except as otherwise specified was carried out in accordance with the current regulations of Civil Aviation Administration of China and in respect to that work the aircraft/aircraft component is
considered ready for release to service. STARCO Auth. CCAR-145 D.200078/JMM039/STARCO QD-SOP-014; AMECO Auth. CCAR-145 D.101131/JMM001.

ENG P/291R

Maintenance Work Sheet


B744PF-TR

A/C Reg.

TRANSIT
Station

B744
Job No.

Item

Description

9.

MAIN EQUIPMENT CENTRE WATER INTRUSION PREVENTION


(FOR FREIGHTER AIRCRAFT ONLY)
AMS: 122500-CX-01
Ref: MMB 4-12-003

10.

Rev No.
79

1.

Perform inspection for presence of water in the forward main deck floor and after
cargo is loaded and before L1 door is closed for departure.

2.

Inspect pallet top for signs of water accumulation after cargo is loaded to the MMB
Part 1 Guidelines.

3.

Action MMB Part 3 Checklist as required.

Date
Jul 16

Page No.
6 of 10

NRC # Mech
raised

Auth

AIRCRAFT STATUS REVIEW


AMS: 490000-CX-01, 291100-CX-01
AMM: 12-15-08-603-191
Review the following and action accordingly.
1. Present Leg Fault (PLF)
2.

Maintenance/ Cabin Log

3.

EICAS Status Review


A. Hydraulic Quantity
B. Oxygen Pressure
C. APU Oil Quantity
NOTE:
i. RECORD THE QUANTITY ADDED IN MAINTENANCE TECH LOG IF
SERVICING IS REQUIRED.
ii. MAKE SURE HYDRAULIC QUANTITY IS CHECKED AND SERVICE ANY
SYSTEM SHOWING RF (REFILL) I.E. BELOW 0.75.
iii. APU OIL QUANTITY INDICATION IS UNRELIABLE / ERRATIC BELOW
0.5 UNITS WHEN APU IS RUNNING, THEREFORE IF 0.5 UNITS OR LESS
IS INDICATED PERFORM A VISUAL CHECK AND SERVICE APU OIL
AT THE FIRST CONVENIENT OPPORTUNITY.
iv. REFER MMB 4-20-1 FOR HYDRAULIC FLUID AND APU OIL
SPECIFICATION.

4. In HKG, minimum Crew/Passenger oxygen pressure 1700 PSI


Oxygen pressure may be reduced at outports as per MEL 35-11-02 Cat C (Crew) and
35-21-02 Cat C (Passenger). Outports raise SADD if above minimum dispatch
pressure but below 1700 PSI.

Signature_____________________ Auth No______________________ Date__________________


Certificate of Release to Service
HKAR145 organisation: Certifies that the work specified except as otherwise specified was carried out in accordance with HKAR-145 and in respect to that work the aircraft/aircraft component is considered ready for release to service. CX Auth DAI/17/1059,
HAECO Auth DAI/1/853; HAECO GTI-P-002; CI Auth AI/118/0102; HAECO XIAMEN Auth DAI/89/1295; HAECO XIAMEN EPM-Quality 1.2.1; CASL Auth. AI/101/798.
SAR-145 organisation accepted under the Technical Arrangement between CAD and CAAS: Certifies that the work specified except as otherwise specified was carried out in accordance with SAR-145 and the Air Navigation Order and in respect to that work
the aircraft/aircraft component is considered ready for release to service. HAECO SIN Approval No.: CAAS/AWI/227.
CCAR-145/JMM organisation: Certifies that the work specified except as otherwise specified was carried out in accordance with the current regulations of Civil Aviation Administration of China and in respect to that work the aircraft/aircraft component is
considered ready for release to service. STARCO Auth. CCAR-145 D.200078/JMM039/STARCO QD-SOP-014; AMECO Auth. CCAR-145 D.101131/JMM001.

ENG P/291R

Maintenance Work Sheet


B744PF-TR

A/C Reg.

TRANSIT
Station

Item

Description

11.

POTABLE WATER SERVICING


AMS: 381100-CX-01

B744
Job No.

Rev No.
79

Date
Jul 16

Page No.
7 of 10

NRC # Mech
raised

Auth

Perform potable water tanks servicing as per AMM 12-14-01 (for passenger aircraft) and
12-14-61 (for freighter aircraft).
NOTE:
i. STATION UPLIFT POLICY IS LAID DOWN IN THE EOMP 7B-7-1, PLEASE
REFER TO THIS FOR UPLIFT AND SERVICING REQUIREMENTS.
ii. DRAIN POTABLE WATER WHEN GROUND TIME IS PLANNED TO EXCEED
6 HOURS EXCEPT WHERE WATER UPLIFT IS NOT PERMITTED (REF EOMP
7B-7-1).
12.

TOILET SHROUD AND PSU ASSEMBLY PANEL (TSA EA1546-01-07X)


(APPLICABLE TO PASSENGER AIRCRAFT ONLY AND ON FLIGHTS TO
USA AND EX-USA)
AMS: NA254001-CX-05
Ref: MMB 4-25-064-744
Check the lavatory and locate all compartments that can be reasonably opened with a
common tool, such as a screw driver. Ensure that all such compartments are sealed as
below:
1. Perform inspection of all toilets PSU header compartment security seal Part No.
F002356 (Transparent sticker) condition.
WARNING:
THE SECURITY TAPE MUST NOT BE PUT OVER THE OXYGEN MODULE
OF THE PSU/HEADER PANEL. IT MUST NOT PREVENT THE OXYGEN
MASKS FROM DROPPING IN AN EMERGENCY.
2.

Perform inspection of all toilet shroud/bowl panel for plastic blue seal Part No. 3340
condition.

3.

Perform inspection toilet bowl (bottom area) access panel of First Class toilet (VIP
toilet) for security seal Part No. F002356 (transparent sticker) condition.

4.

No further action if the seal/sticker have not been broken or show no sign of
tampering.

5.

If the security sticker or blue plastic seal has been tampered with or shows sign of
damaged, open the PSU header/compartment, toilet shroud and toilet bowl access
panel at VIP toilet to conduct a thorough physical search for prohibited or
contraband items.

6.

After inspection, seal the affected compartment as below:


A. Seal all toilet shroud with blue plastic seal Part No. 3340.
B. All toilet on the PSU header/compartment and toilet bowl transparent with
security sticker Part No. F002356.
C. First Class toilet (VIP toilet) toilet bowl (bottom area) access panel: Transparent
security sticker Part No. F002356.

7.

Notify ISM the area behind toilet bowl has been inspected and security seal is
installed.

Signature_____________________ Auth No______________________ Date__________________


Certificate of Release to Service
HKAR145 organisation: Certifies that the work specified except as otherwise specified was carried out in accordance with HKAR-145 and in respect to that work the aircraft/aircraft component is considered ready for release to service. CX Auth DAI/17/1059,
HAECO Auth DAI/1/853; HAECO GTI-P-002; CI Auth AI/118/0102; HAECO XIAMEN Auth DAI/89/1295; HAECO XIAMEN EPM-Quality 1.2.1; CASL Auth. AI/101/798.
SAR-145 organisation accepted under the Technical Arrangement between CAD and CAAS: Certifies that the work specified except as otherwise specified was carried out in accordance with SAR-145 and the Air Navigation Order and in respect to that work
the aircraft/aircraft component is considered ready for release to service. HAECO SIN Approval No.: CAAS/AWI/227.
CCAR-145/JMM organisation: Certifies that the work specified except as otherwise specified was carried out in accordance with the current regulations of Civil Aviation Administration of China and in respect to that work the aircraft/aircraft component is
considered ready for release to service. STARCO Auth. CCAR-145 D.200078/JMM039/STARCO QD-SOP-014; AMECO Auth. CCAR-145 D.101131/JMM001.

ENG P/291R

Maintenance Work Sheet


B744PF-TR
Item

13.

A/C Reg.

TRANSIT
Station

B744
Job No.

Rev No.
79

Description

Date
Jul 16

Page No.
8 of 10

NRC # Mech
raised

Auth

SECTION C: OPERATIONAL REQUIREMENTS

XXX

XXX

Item must not be deferred without consultation with Duty MCP

XXX

XXX

ENGINE / PYLON INSPECTION


AMS: CX in-house instruction
Perform general visual inspection of all engines and pylon areas for the following:
1. Intake and exhaust areas for damage / foreign objects.
2. Cowls for security and leakage.
3. Pylon and hydraulic bay access doors for security and leakage.
4. Thrust reversers stowed and locked.
NOTE:
(APPLICABLE TO RR ENGINES ONLY)
THRUST REVERSER INDICATOR PINS ARE AT 7:30 AND 4:30 POSITION
RETRACTED.

14.

TOILET SERVICING
AMS: CX in-house instruction
Perform toilet waste tank servicing as per the following reference,
A. AMM 12-17-01 for Passenger aircraft
B. AMM 12-17-61 for Freighter aircraft

15.

GREY CAPPED CIRCUIT BREAKER


AMS: CX in-house instruction
AMM: 24-50-01
Check and reset the pulled grey capped circuit breakers in the flight station.

16.

GALLEY AND SAFETY EQUIPMENT CENTRES CIRCUIT BREAKER


AMS: CX in-house instruction
Check galley and safety equipment centres (E8) circuit breakers are set after maintenance.

17.

DECK ESCAPE SLIDE CHECK ON FREIGHTER AIRCRAFT


AMS: CX in-house instruction
Check upper deck escape slide is locked in the forward active position and safety pin is
removed.

18.

PITOT-STATIC PROBES AND LANDING GEAR DOWNLOCK SAFETY PINS


AMS: CX in-house instruction
1.

Ensure all intakes and pitot-static probes are clear.

2.

Confirm all landing gear downlock safety pins removed.

Signature_____________________ Auth No______________________ Date__________________


Certificate of Release to Service
HKAR145 organisation: Certifies that the work specified except as otherwise specified was carried out in accordance with HKAR-145 and in respect to that work the aircraft/aircraft component is considered ready for release to service. CX Auth DAI/17/1059,
HAECO Auth DAI/1/853; HAECO GTI-P-002; CI Auth AI/118/0102; HAECO XIAMEN Auth DAI/89/1295; HAECO XIAMEN EPM-Quality 1.2.1; CASL Auth. AI/101/798.
SAR-145 organisation accepted under the Technical Arrangement between CAD and CAAS: Certifies that the work specified except as otherwise specified was carried out in accordance with SAR-145 and the Air Navigation Order and in respect to that work
the aircraft/aircraft component is considered ready for release to service. HAECO SIN Approval No.: CAAS/AWI/227.
CCAR-145/JMM organisation: Certifies that the work specified except as otherwise specified was carried out in accordance with the current regulations of Civil Aviation Administration of China and in respect to that work the aircraft/aircraft component is
considered ready for release to service. STARCO Auth. CCAR-145 D.200078/JMM039/STARCO QD-SOP-014; AMECO Auth. CCAR-145 D.101131/JMM001.

ENG P/291R

Maintenance Work Sheet


B744PF-TR

A/C Reg.

TRANSIT
Station

Item

Description

19.

Maintenance Manuals Revision

B744
Job No.

Rev No.
79

Date
Jul 16

Page No.
9 of 10

NRC # Mech
raised

Auth

Record the maintenance manuals revision used:


AMM :_________________________________
20.

CHECK CERTIFICATION
1.

Ensure that TR check or above is certified in the maintenance log CHECK


COMPLETED box.

2.

Confirm satisfactory review of all Inbound/Outstanding ADDs, Present Leg Fault


(PLF), aircraft status messages, and engine oil consumption for the intended flight
leg.

3.

Confirm that the removal/ installation of any cargo handling equipment to facilitate
loading has been performed in accordance with AMM and certified in the Tech Log.

Signature_____________________ Auth No______________________ Date__________________


Certificate of Release to Service
HKAR145 organisation: Certifies that the work specified except as otherwise specified was carried out in accordance with HKAR-145 and in respect to that work the aircraft/aircraft component is considered ready for release to service. CX Auth DAI/17/1059,
HAECO Auth DAI/1/853; HAECO GTI-P-002; CI Auth AI/118/0102; HAECO XIAMEN Auth DAI/89/1295; HAECO XIAMEN EPM-Quality 1.2.1; CASL Auth. AI/101/798.
SAR-145 organisation accepted under the Technical Arrangement between CAD and CAAS: Certifies that the work specified except as otherwise specified was carried out in accordance with SAR-145 and the Air Navigation Order and in respect to that work
the aircraft/aircraft component is considered ready for release to service. HAECO SIN Approval No.: CAAS/AWI/227.
CCAR-145/JMM organisation: Certifies that the work specified except as otherwise specified was carried out in accordance with the current regulations of Civil Aviation Administration of China and in respect to that work the aircraft/aircraft component is
considered ready for release to service. STARCO Auth. CCAR-145 D.200078/JMM039/STARCO QD-SOP-014; AMECO Auth. CCAR-145 D.101131/JMM001.

ENG P/291R

Maintenance Work Sheet


A/C Reg.

B744PF-TR

TRANSIT
Station

B744
Job No.

Rev No.
79

Item

Description

21.

* THIS ITEM IS A SERVICING FUNCTION AND MAY BE SIGNED FOR


AFTER THE RELEASE FOR FLIGHT HAS BEEN CERTIFIED.

Date
Jul 16

Page No.
10 of 10

NRC # Mech
raised

Auth

PRE-DEPARTURE CHECK
AMS: CX in-house instruction
1.

Perform pre-departure walk around check to ensure all doors/panels and cowlings are
closed and secured with no evidence of external damage.
- Verify fwd and aft lower cargo doors are correctly latched as per MMB 4-52-1
- Check aircraft is free of ice and snow.
- Ensure all equipment compartments exterior doors are closed.

2.

Perform quick check on all gears as per AMM 12-15-03/04/05


- All gears (nose and main) must have at least 1 inch of chrome exposed.
- Body gear pressures are within 150 psi of each other.
- Wing gear pressures are within 150 psi of each other.
- At least 1 inch of exposed chrome on each gear, and four main gears are within 2
inches of chrome of each other as per AMM (quick check).
NOTE:
THIS LANDING GEAR QUICK CHECK MUST BE COMPLETED AT OR NEAR
DESPATCH WEIGHT.

3.

PERFORM CHECK ON FREIGHTER AIRCRAFT:


A. Has MMB 4-12-003 Part 2/3 Checklist been activated in this transit? (Yes / No)
B. Remove tail support stanchion or nose tie down straps as applicable, re-stow
straps in aircraft as per AMM 7-11-08/09.
C. Main Deck Cargo Doors: Internal Inspection.
a. Side cargo door handle and indicating lights.
Check door closed, latch handle retainer in the closed position, door open and
latches closed lights extinguished.
b. Nose cargo door indicating lights.
Check nose cargo door latch annunciator lights (16 ea) and door closed
annunciator lights (2 ea) are illuminated green.

4.

REFUEL PROCESS (APPLICABLE TO HKG ONLY)


AMS: CX in-house instruction
Reference: EOMP 7B-5-6 / 7B-5-7 & CX Precision Timing Schedule (PTS)
A.
B.
C.
D.

E.

Obtain arrival fuel figure.


Receive standby fuel figure and refuel record form from flight crews, pass refuel
record form to the refueller.
Receive final fuel figure from flight crews and deliver the final fuel figure to the
refueller (as per PTS).
Once final uplift is completed, confirm with flight crews by using headset that the
Commander is satisfied with the final fuel distribution and advise the refueller (as
per PTS).
Pass the completed refuel record form and the fuel receipt to the Commander for
acceptance (as per PTS).

Signature_____________________ Auth No______________________ Date__________________


Certificate of Release to Service
HKAR145 organisation: Certifies that the work specified except as otherwise specified was carried out in accordance with HKAR-145 and in respect to that work the aircraft/aircraft component is considered ready for release to service. CX Auth DAI/17/1059,
HAECO Auth DAI/1/853; HAECO GTI-P-002; CI Auth AI/118/0102; HAECO XIAMEN Auth DAI/89/1295; HAECO XIAMEN EPM-Quality 1.2.1; CASL Auth. AI/101/798.
SAR-145 organisation accepted under the Technical Arrangement between CAD and CAAS: Certifies that the work specified except as otherwise specified was carried out in accordance with SAR-145 and the Air Navigation Order and in respect to that work
the aircraft/aircraft component is considered ready for release to service. HAECO SIN Approval No.: CAAS/AWI/227.
CCAR-145/JMM organisation: Certifies that the work specified except as otherwise specified was carried out in accordance with the current regulations of Civil Aviation Administration of China and in respect to that work the aircraft/aircraft component is
considered ready for release to service. STARCO Auth. CCAR-145 D.200078/JMM039/STARCO QD-SOP-014; AMECO Auth. CCAR-145 D.101131/JMM001.

ENG P/291R

You might also like